Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control Centers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

A System Concept for Facilitating User Preferences in En Route Airspace

The Federal Aviation Administration is trying to make its air traffic management system more responsive to the needs of the aviation community by exploring the concept of 'free flight' for aircraft flying under instrument flight rules. A logical first step toward free flight could be made without significantly altering current air traffic control (ATC) procedures or requiring new airborne equipment by designing a ground-based system to be highly responsive to 'user preference' in en route airspace while providing for an orderly transition to the terminal area. To facilitate user preference in all en route environments, a system based on an extension of the Center/TRACON Automation System (CTAS) is proposed in this document. The new system would consist of two integrated components. An airspace tool (AT) focuses on unconstrained en route aircraft (e.g., not transitioning to the terminal airspace), taking advantage of the relatively unconstrained nature of their flights and using long-range trajectory prediction to provide cost-effective conflict resolution advisories to sector controllers. A sector tool (ST) generates efficient advisories for all aircraft, with a focus on supporting controllers in analyzing and resolving complex, highly constrained traffic situations. When combined, the integrated AT/ST system supports user preference in any air route traffic control center sector. The system should also be useful in evaluating advanced free-flight concepts by serving as a test bed for future research. This document provides an overview of the design concept, explains its anticipated benefits, and recommends a development strategy that leads to a deployable system.

Vivona, R. A.↗

Earth-Mars Telecommunications and Information Management System (TIMS): Antenna Visibility Determination, Network Simulation, and Management Models

This report presents the results of our research on Earth-Mars Telecommunications and Information Management System (TIMS) network modeling and unattended network operations. The primary focus of our research is to investigate the feasibility of the TIMS architecture, which links the Earth-based Mars Operations Control Center, Science Data Processing Facility, Mars Network Management Center, and the Deep Space Network of antennae to the relay satellites and other communication network elements based in the Mars region. The investigation was enhanced by developing Build 3 of the TIMS network modeling and simulation model. The results of several 'what-if' scenarios are reported along with reports on upgraded antenna visibility determination software and unattended network management prototype.

Odubiyi, Jide↗

Field Guide for Designing Human Interaction with Intelligent Systems

The characteristics of this Field Guide approach address the problems of designing innovative software to support user tasks. The requirements for novel software are difficult to specify a priori, because there is not sufficient understanding of how the users' tasks should be supported, and there are not obvious pre-existing design solutions. When the design team is in unfamiliar territory, care must be taken to avoid rushing into detailed design, requirements specification, or implementation of the wrong product. The challenge is to get the right design and requirements in an efficient, cost-effective manner. This document's purpose is to describe the methods we are using to design human interactions with intelligent systems which support Space Shuttle flight controllers in the Mission Control Center at NASA/Johnson Space Center. Although these software systems usually have some intelligent features, the design challenges arise primarily from the innovation needed in the software design. While these methods are tailored to our specific context, they should be extensible, and helpful to designers of human interaction with other types of automated systems. We review the unique features of this context so that you can determine how to apply these methods to your project Throughout this Field Guide, goals of the design methods are discussed. This should help designers understand how a specific method might need to be adapted to the project at hand.

Malin, Jane T.↗

STS-96 FD Highlights and Crew Activities Report: Flight Day 06

On this sixth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen performing logistics transfer activities within the Discovery/International Space Station orbiting complex. Ochoa, Jernigan, Husband and Barry devote a significant part of their day to the transfer of bags of different sizes and shapes from the SPACEHAB module in Discovery's cargo bay to resting places inside the International Space Station. Payette and Tokarev complete the maintenance on the storage batteries. Barry and Tokarev complete installation of the remaining sound mufflers over the fans in Zarya. Barry then measures the sound levels at different positions inside the module. Rominger and Tokarev conduct a news conference with Russian reporters from the Mission Control Center in Moscow.

Source record↗

Overview of the NASA Wallops Flight Facility Mobile Range Control System

The NASA GSFC's Wallops Flight Facility (WFF) Mobile Range Control System (MRCS) is based on the functionality of the WFF Range Control Center at Wallops Island, Virginia. The MRCS provides real time instantaneous impact predictions, real time flight performance data, and other critical information needed by mission and range safety personnel in support of range operations at remote launch sites. The MRCS integrates a PC telemetry processing system (TELPro), a PC radar processing system (PCDQS), multiple Silicon Graphics display workstations (IRIS), and communication links within a mobile van for worldwide support of orbital, suborbital, and aircraft missions. This paper describes the MRCS configuration; the TELPro's capability to provide single/dual telemetry tracking and vehicle state data processing; the PCDQS' capability to provide real time positional data and instantaneous impact prediction for up to 8 data sources; and the IRIS' user interface for setup/display options. With portability, PC-based data processing, high resolution graphics, and flexible multiple source support, the MRCS system is proving to be responsive to the ever-changing needs of a variety of increasingly complex missions.

Davis, Rodney A.↗

The Influence of Loss of Visual Cues on Pilot Performance During the Final Approach and Landing Phase of a Remotely Piloted Vehicle Mission

Remotely piloted research vehicles (RPRVS) are currently being flown from fixed-base control centers, and visual information is supplied to the remote pilot by a TV camera mounted in the vehicle. In these circumstances, the possibility of a TV failure or an interruption in the downlink to the pilot must be considered. To determine the influence of loss of TV information on pilot performance during the final approach and landing phase of a mission, an experiment was conducted in which pilots were asked to fly a fixed-base simulation of a Piper PA-30 aircraft with loss of TV information occurring at altitudes of 15.24, 30.48, and 45.72 m (50, 100, and 150 ft). For this experiment, a specially designed display configuration was presented to four pilots in accordance with a Latin square design. Initial results indicate that pilots could not ensure successful landings from altitudes exceeding 15.24 m (.50 ft) without the visual cues supplied by the TV picture.

Howard, James C.↗

STS-51G Mission Highlights Resource Tape

The STS-51G flight crew, Commander Daniel C. Brandenstein, Pilot John O. Creighton, Mission Specialists Shannon W. Lucid, John M. Fabian, and Steven R Nagel, and Payload Specialists Patrick, Baudry, and Sultan Salman Al-Saud are seen performing pre-launch activities such as eating of the traditional breakfast, ride out to the launch pad, and crew suit-up for an early morning launch. Also, included are various panoramic views of Discovery on the pad. The main objective of this mission is to deploy three communication satellites. The satellites being deployed are MORE LOS-A, for Mexico; ARABSAT-A, for the Arab Satellite Communications Organization; and TELSTAR-3D, for AT&T. The crew also retrieve the SPARTAN-1 satellite. Scenes include the crew in the mess deck via video link with Mission Control Center in celebration of the 100th American in space. Al-Saud also spoke with his father in Saudi Arabia via video link. Views of certain experiments are also seen. Al-Saud is seen conducting the postural experiment, and Baudry is seen conducting the equilibrium experiments. Panoramic views of the Hawaiian Island Archipelago, and Wadi Habawnah, Saudi Arabia are also visible from the shuttle. Live footage ends with the re-entry of the vehicle into the Earth's Atmosphere, an early morning touchdown at Edwards Air Force Base and crew departure from the craft.

Source record↗

President Clinton's Arrival at CCAS and Visit to KSC for Launch of STS-95

Live footage shows President Bill Clinton and First Lady Hillary Rodham Clinton arriving in Airforce 1 on the Skid Strip, viewing the launch, and tracking the plume of Space Shuttle Discovery, on mission STS-95. The viewing takes place on the roof of the Launch Control Center (LCC). Also present on the roof to watch this event are Astronaut Robert Cabana and Eileen Collins (both in flight suit), and the NASA Administrator Daniel Goldin. The President is shown giving a speech to the Launch Team and shaking hands with employees in the LCC.

Source record↗

STS-99 Flight Day Highlights and Crew Activities Report

Live footage shows the Blue Team (second of the dual shift crew), Dominic L. Pudwill Gorie, Janice E. Voss and Mamoru Mohri, beginning the first mapping swath covering a 140-mile-wide path. While Mohri conducts mapping operations, Voss and Gorie are seen participating in a news conference with correspondents from NBC and CNN. The Red Team (first of the dual shift crew), Kevin R. Kregel, Janet L. Kavandi and Gerhard P.J. Thiele, relieves the Blue Team and are seen continuing the mapping operations for this around the clock Shuttle Radar Topography Mission (SRTM). Commander Kregel is shown performing boom (mass) durability tests, calibrating the EarthCam Payload, and speaking with the Launch Control Center (LCC) about trouble shooting a bracket for better camera angle.

Source record↗

STS-99 Flight Day Highlights 03 and Crew Activities Report

Live footage shows the STS-99's Blue Team Pilot Dominic L. Pudwill Gorie, and Mission Specialist Mamoru Mohri speaking with Dr. Bob Ballard and fielding questions from Fox News Network. During the interviews Janet E. Voss oversees the mapping activities. The Blue Team is also seen speaking with the Launch Control Center (LCC) troubleshooting a problem with a small nitrogen thruster mounted at the tip of the radar's outboard antenna.

Source record↗

STS-99 Crew Activities Report / Flight Day 07 Highlights

Live footage shows the Blue Team of STS-99, Pilot Dominic L. Pudwill Gorie, and Mission Specialists Mamoru Mohri and Janet E. Voss, participating in a discussion with the Launch Control Center (LCC). Gorie and Mohri are also seen speaking with the Prime Minister of Japan. The Blue Team also answers questions from students. Footage also includes various shots of the mass hanging from the shuttle, the star tracker, the X- and C-band panels on the shuttle, and the dumping of water from the shuttle. Still shots of the (Shuttle Radar Topography Mission) SRTM Coverage Map are also presented. Places shown include the San Andreas Fault, San Gabriel Mountains, Simi Valley, Las Angeles, New Zealand, New Mexico, and Hokkaido Japan.

Source record↗

STS-99 Crew Activities Report / Flight Day 08 Highlights

Live footage shows the Red Team of STS-99, Commander Kevin R. Kregel and Mission Specialists Janet L. Kavandi and Gerhard P.J. Thiele, participating in interviews with the Launch Control Center (LCC). Kregel discusses the mapping system, and Thiele speaks about the antenna. The Red Team completes the flight cast maneuver for the day. Footage also shows the Red Team, Pilot Dominic L. Pudwill Gorie and Mission Specialists Janet E. Voss and Mamoru Mohri, participating in discussion with the LCC. Voss explains how the equipment works, while Mohri and Gorie discusses the mass. Also seen is the entire crew gathered on the flight deck participating in an interview with the LCC.

Source record↗

A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions

Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.

Heere, Karen R.↗

Apollo 11: The Twentieth Year

Live footage shows the Apollo 11 crew, Commander Neil A. Armstrong, Lunar Module Pilot Edwin E. Aldrin, Jr., and Command Module Pilot Michael Collins, preparing for their mission. The crewmembers are seen getting their medical examinations, suiting up, and walking out to the Astro-van. Scenes include a brief view of the Launch Control Center (LCC), ignition, liftoff, and shell and engine skirt separation. The most important images are those of the moon landing and astronauts walk on the moon. Also shown are the parachute landing of the shuttle and the celebration of the world.

Source record↗

STS-35/Astro-1: Launch T-20 Through Orbit with Replays (Tape 2 of 2)

Live footage shows the Launch Control Center (LCC) communicating with the STS-35 Space Shuttle. Scenes include various playback launch views of STS-35. Also shown are panoramic views of the Shuttle on the launch pad, main engine start, ignition, liftoff and booster separation and various Long Range Tracker views.

Source record↗

STS-35: Mission Highlights Resource Tape

Live footage shows the crewmembers of STS-35, Commander Vance D. Brand, Pilot Guy S. Gardner, Mission Specialists Jeffrey A. Hoffman, John M. Lounge, and Robert A. Parker, and Payload Specialists Samuel T. Durrance, and Ronald A. Parise, participating in the traditional breakfast prior to launch. The crew is seen suiting up, and walking out to the Astro-Van for their 1 a.m. launch. Also shown are some beautiful panoramic shots of the shuttle on the launch pad, main engine start, ignition, liftoff, and various shots of the Launch Control Center (LCC). The crew is also shown during flight performing some routine functions such as operating the trash compactor, eating, and getting into and out of their sleeping quarters. The crew is seen taking part in a conversation with the Secretary of State, and the Foreign Minister of the Soviet Union. Footage also includes the landing of Columbia, its rollout on the runway, and its crew as they depart from the vehicle.

Source record↗

STS-37: Downlinks M. E. T.

Live footage shows the crewmembers of STS-37, Commander Steven R. Nagel, Pilot Kenneth D. Cameron, and Mission Specialists Jerry L. Ross, Jay Apt, and Linda M. Godwin, participating in a question and answer segment with students at the Launch Control Center (LCC). The crew is also seen working in the zero-gravity environment and taking photographs of the space environment. Also seen are some beautiful shots of the Atlantis orbiter with the Earth as its background.

Source record↗

Operational Considerations when Designing New Ground Systems

The Hubble Space Telescope (HST) launched in April of 1991 with a nominal 15-year old mission. Since then, the HST mission life has been extended to 2010. As is true for all NASA missions, HST is being asked to decrease its operational costs for the remainder of its mission life. Various techniques are being incorporated for cost reductions, with one of the core means being the design of a new and more efficient ground system for HST operations. This new ground system, "Vision 2000", will reduce operational and maintenance costs and also provide the HST Project with added flexibility to react to future changes. Vision 2000 began supporting HST Operations in January of 1999 and will support the mission for the remainder of the mission life. Upgrading a satellite's ground system is a popular approach for reducing costs, but it is also inherently risky. Validating a new ground system can be a severe distraction to a flight team while operating a satellite. Mission data collection and health and safety requirements are rarely, if ever, relaxed during this validation period, forcing flight teams to undertake an additional task while operating the satellite. Additionally, flight teams must usually undergo extensive training to effectively utilize the new system. Once again, this training usually occurs as an additional task, in addition to the nominal satellite operations. While operating the spacecraft, the Flight Team typically assists in the design, validation, and verification of a new ground system. This is a distraction and strain on the Flight Team, but the benefit of using the Flight Team in all phases of ground system development far outweigh the negative aspects. Finally, above the cost of the new system, the integration into the facility with the current control center system are resources and costs not normally taken into account in the design phase of the new system. In addition to the standard issues faced by a Project when upgrading its ground system, the HST Project also must continue to support Space Shuttle servicing missions, which occur approximately every two to three years. This paper will address many of the issues common to all missions when re-hosting ground systems, and those faced by the HST Project in particular.

Walyus, Keith↗