Search NASA⌕ Search

SEARCH · Search NASA

Results for “DRILL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Geothermal Play-Fairway Analysis of Washington State Prospects: Final Report

The Washington State Geothermal Play-Fairway Analysis overcomes the exploration challenges posed by dense vegetation, glacial deposits, and extreme precipitation. The geothermal play-fairways we target are locations where heat, permeability, and saturated porosity are present in sufficient volume to provide adequate heat exchange at depths accessible by modern drilling technology. The three study areas lie along the Cascade Range magmatic arc and are near Mount Baker, Mount St. Helens, and the Wind River Valley. The seven-year project is divided into three phases. In Phase 1 we build on a previous statewide assessment of geothermal resources and develop an initial modeling approach. The results are a series of favorability, uncertainty, and risk maps for three targeted study areas. Based on these initial results, we collect new geologic and geophysical data to further refine our modeling and reduce exploration uncertainty in Phase 2. We improve the modeling method to handle the new data and update the favorability, uncertainty, and risk maps. We also update the conceptual geothermal resource models. In Phase 3 we validate our modeling approach by drilling two temperature-gradient holes and collecting and analyzing core, image logs, and new geochemistry. Our modeling approach improves on an earlier statewide method through a more-rigorous and detailed assessment of heat and permeability. Permeability potential is assessed through geomechanical modeling of the deformation that can generate and maintain reservoir porosity and permeability. Metrics to inform heat potential include temperature-gradient wells, which are sparse in Washington; proximity of Quaternary volcanic vents and young intrusive rock; spring temperature; and reservoir temperature inferred from geothermometry. We weight the individual components using an expert-guided approach known as the Analytical Hierarchy Process. During Phase 2 we also develop a fluid-filled fracture model, and an infrastructure model that helps to delineate areas which are more favorable for geothermal development based on proximity to transmission lines, elevation, land ownership and use restrictions, and availability of process water. New geologic and geophysical data is collected during Phase 2 in each of our three main study areas. At Mount Baker and north of Mount St. Helens we conduct 1:24,000-scale geologic mapping and lidar analysis to better constrain the location and character of surface faults; detailed mapping in the Wind River Valley was completed just prior to the start of this project. Ages of intrusive rocks are determined with 40 Ar/ 39 Ar geochronology, though all of our samples are Miocene or older. We collect ground based gravity observations (a total of 1,580 new stations) in all of our study areas and ground-based magnetic lines (a total of 93 km) at Mount Baker. These data are combined with existing gravity and aeromagnetic data and used to constrain fault locations and geometry. Two to three cross sections are constructed at each study area using the mapped surface geology and forward-modeling of the gravity and magnetic data; these cross sections form the basis for our updated conceptual models. We collect magnetotelluric surveys at Mount Baker and Mount St. Helens and these data are inverted to form a resistivity model from the surface to about 10 km depth; each model shows conductive zones that can be interpreted as upwelling geothermal fluids. At Mount St. Helens we deploy a passive seismic array and use the newly detected events to refine the location of the Saint Helens seismic zone. We also employ ambient-noise tomography to develop a detailed seismic-velocity model for the study area and use this model to help constrain our cross sections and conceptual model. Based on the new data collected during Phase 2—and our updated models—we develop a campaign of temperature-gradient holes and core analysis to validate our modeling in Phase 3. Drill hole MB76-31 is located near Little Park Creek, 11 km west-southwest of the summit of Mount Baker, and is 1,471 ft deep. About 410 ft of core from the lower portion of the hole—and image logs from ~175 ft below ground surface to the bottom—are collected and analyzed. Water samples are collected and processed for geothermometry. Drill hole MSH17-24 is located along upper Schultz Creek, 16 km north-northeast of Mount St. Helens and has core from 470 ft to the bottom at 1,053 ft. We did not collect image logs due to borehole stability concerns, but water samples are collected and analyzed for geothermometry. Repeat temperature-gradient measurements are made at both sites and thermal conductivity is measured from core samples. At MB76-31, the equilibrated temperature gradient of 64°C/km and calculated heat flow of 141–159 mW/m 2 is more than twice the regional average. Detailed mapping and analysis of the core, coupled with correlation to the image logs, indicates a history of permeability generation consistent with our predictions of high permeability. Because the site has high favorability in the Phase 2 model, we consider the results a positive validation of the modeling. At site MSH17-24, the equilibrated temperature gradient of ~15°C/km and calculated heat flow of 41–43 mW/m 2 are similar to regional. Geochemical analysis of the water samples indicates a meteoric source without any geothermal component. Detailed outcrop-based mapping of fault exposures near the drill site and analysis of image logs from nearby boreholes indicates a history of permeability generation consistent with our predictions. Because the site has low favorability in the Phase 2 model, we consider the results a positive validation of the modeling. Together, the two sites provide a reasonably positive validation of the Phase 2 modeling and should encourage future use of this modeling approach.

15 GEOTHERMAL ENERGY↗

2024 Geothermal Rising Conference Poster

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY↗

Volatile Organic Compound Investigation Results, 300 Area, Hanford Site, Washington

Unexpectedly high concentrations of volatile organic compounds (VOC) were discovered while drilling in the unconfined aquifer beneath the Hanford Site’s 300 Area during 2006. The discovery involved an interval of relatively finer-grained sediment within the unconfined aquifer, an interval that is not sampled by routine groundwater monitoring. Although VOC contamination in the unconfined aquifer has been identified and monitored, the concentrations of newly discovered contamination are much higher than encountered previously, with some new results significantly higher than the drinking water standards. The primary contaminant is trichloroethene, with lesser amounts of tetrachloroethene. Both chemicals were used extensively as degreasing agents during the fuels fabrication process. A biological degradation product of these chemicals, 1,2-dichloroethene, was also detected. To further define the nature and extent of this contamination, additional characterization drilling was undertaken during 2007. Four locations were drilled to supplement the information obtained at four locations drilled during the earlier investigation in 2006. The results of the combined drilling indicate that the newly discovered contamination is limited to a relatively finer-grained interval of Ringold Formation sediment within the unconfined aquifer. The extent of this contamination appears to be the area immediately east and south of the former South Process Pond. Samples collected from the finer-grained sediment at locations along the shoreline confirm the presence of the contamination near the groundwater/river interface. Contamination was not detected in river water that flows over the area where the river channel potentially incises the finer-grained interval of aquifer sediment. The source for this contamination is not readily apparent. A search of historical documents and the Hanford Waste Information Data System did not provide definitive clues as to waste disposal operations and/or spills that might have resulted in groundwater contamination in this sediment, although several relatively small accidental releases of VOCs have occurred in the past in the northern portion of the 300 Area. It is likely that large quantities of degreasing solutions were disposed to the North and South Process Ponds during the 1950s and 1960s, and that evidence for them in the upper portion of the unconfined aquifer has been removed because of groundwater movement through the much more transmissive sediment. Also, investigations to date have revealed no evidence to suggest that a dense, non-aqueous phase liquid remains undetected in the subsurface. Potential pathways for contamination to migrate from this finer-grained sediment include groundwater movement through the interval to offshore locations in the Columbia River channel, dispersion out of the finer-grained interval into the overlying transmissive sediment (again, with transport to the riverbed), and potential future withdrawal via water supply wells.

300 Area↗

Concept Study: Exploration and Production in Environmentally Sensitive Arctic Areas

The Alaska North Slope offers one of the best prospects for increasing U.S. domestic oil and gas production. However, this region faces some of the greatest environmental and logistical challenges to oil and gas production in the world. A number of studies have shown that weather patterns in this region are warming, and the number of days the tundra surface is adequately frozen for tundra travel each year has declined. Operators are not allowed to explore in undeveloped areas until the tundra is sufficiently frozen and adequate snow cover is present. Spring breakup then forces rapid evacuation of the area prior to snowmelt. Using the best available methods, exploration in remote arctic areas can take up to three years to identify a commercial discovery, and then years to build the infrastructure to develop and produce. This makes new exploration costly. It also increases the costs of maintaining field infrastructure, pipeline inspections, and environmental restoration efforts. New technologies are needed, or oil and gas resources may never be developed outside limited exploration stepouts from existing infrastructure. Industry has identified certain low-impact technologies suitable for operations, and has made improvements to reduce the footprint and impact on the environment. Additional improvements are needed for exploration and economic field development and end-of-field restoration. One operator-Anadarko Petroleum Corporation-built a prototype platform for drilling wells in the Arctic that is elevated, modular, and mobile. The system was tested while drilling one of the first hydrate exploration wells in Alaska during 2003-2004. This technology was identified as a potentially enabling technology by the ongoing Joint Industry Program (JIP) Environmentally Friendly Drilling (EFD) program. The EFD is headed by Texas A&M University and the Houston Advanced Research Center (HARC), and is co-funded by the National Energy Technology Laboratory (NETL). The EFD participants believe that the platform concept could have far-reaching applications in the Arctic as a drilling and production platform, as originally intended, and as a possible staging area. The overall objective of this project was to document various potential applications, locations, and conceptual designs for the inland platform serving oil and gas operations on the Alaska North Slope. The University of Alaska Fairbanks assisted the HARC/TerraPlatforms team with the characterization of potential resource areas, geotechnical conditions associated with continuous permafrost terrain, and the potential end-user evaluation process. The team discussed the various potential applications with industry, governmental agencies, and environmental organizations. The benefits and concerns associated with industry's use of the technology were identified. In this discussion process, meetings were held with five operating companies (22 people), including asset team leaders, drilling managers, HSE managers, and production and completion managers. Three other operating companies and two service companies were contacted by phone to discuss the project. A questionnaire was distributed and responses were provided, which will be included in the report. Meetings were also held with State of Alaska Department of Natural Resources officials and U.S. Bureau of Land Management regulators. The companies met with included ConcoPhillips, Chevron, Pioneer Natural Resources, Fairweather E&P, BP America, and the Alaska Oil and Gas Association.

02 PETROLEUM↗

Delaware Basin Monitoring Annual Report - September 2008

The PA is required by 40 CFR §194.33 to consider disturbed case scenarios that include intrusions into the repository by inadvertent and intermittent drilling for resources. The data provided in this report covers the period from September 1, 2007 to August 31, 2008. The probability of these intrusions is based on a future drilling rate of 46.8 boreholes per square kilometer per 10,000 years which was established for the CCA, Appendix DEL, and 52.5 boreholes per square kilometer for the CRA-2004, Appendix DATA. These rates are based on consideration of the record of drilling events in the Delaware Basin for the most recent 100-year period. The DOE models multiple types of human intrusion scenarios in the PA. These include both single intrusion events and combinations of multiple boreholes. Two different types of boreholes are considered: (1) those that penetrate a pressurized brine reservoir in the underlying Castile Formation and (2) those that do not. While the presence of pressurized brine under the repository is speculative, it cannot be completely ruled out based on available information. The primary consequence of contacting pressurized brine is the introduction of an additional source of brine beyond that which is assumed to be released into the repository from the Salado Formation. The human intrusion scenario models are based on extensive field data sets collected by the DOE. The DBDSP collects the drilling-related data to be used for future PA calculations. The data have been continuously collected from the time of the 1996 submittal of the CCA and include specific wells drilled during the last year in the New Mexico portion of the Delaware Basin, specifically that of the nine-township area immediately surrounding the WIPP Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Delaware Basin Monitoring Annual Report - September 2010

The PA is required by 40 CFR §194.33 to consider disturbed case scenarios that include intrusions into the repository by inadvertent and intermittent drilling for resources. The data provided in this report covers the period from September 1, 2009 to August 31, 2010. The probability of these intrusions is based on a future drilling rate of 46.8 boreholes per square kilometer per 10,000 years which was established for the CCA, Appendix DEL, 52.5 boreholes per square kilometer for the CRA-2004, Appendix DATA, and 58.5 boreholes per square kilometer for CRA-2009, Appendix DATA. These rates are based on consideration of the record of drilling events in the Delaware Basin for the most recent 100-year period. The DOE models multiple types of human intrusion scenarios in the PA. These include both single intrusion events and combinations of multiple boreholes. Two different types of boreholes are considered: (1) those that penetrate a pressurized brine reservoir in the underlying Castile Formation and (2) those that do not. While the presence of pressurized brine under the repository is speculative, it cannot be completely ruled out based on available information. The primary consequence of contacting pressurized brine is the introduction of an additional source of brine beyond that which is assumed to be released into the repository from the Salado Formation. The human intrusion scenario models are based on extensive field data sets collected by the DOE. The DBDSP collects the drilling-related data to be used for future PA calculations. The data have been continuously collected from the time of the 1996 submittal of the CCA and include specific wells drilled during the last year in the New Mexico portion of the Delaware Basin, specifically that of the nine-township area immediately surrounding the WIPP Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Delaware Basin Monitoring Annual Report - September 2009

The PA is required by 40 CFR §194.33 to consider disturbed case scenarios that include intrusions into the repository by inadvertent and intermittent drilling for resources. The data provided in this report covers the period from September 1, 2008 to August 31, 2009. The probability of these intrusions is based on a future drilling rate of 46.8 boreholes per square kilometer per 10,000 years which was established for the CCA, Appendix DEL, 52.5 boreholes per square kilometer for the CRA-2004, Appendix DATA, and 58.5 boreholes per square kilometer for CRA-2009, Appendix DATA. These rates are based on consideration of the record of drilling events in the Delaware Basin for the most recent 100-year period. The DOE models multiple types of human intrusion scenarios in the PA. These include both single intrusion events and combinations of multiple boreholes. Two different types of boreholes are considered: (1) those that penetrate a pressurized brine reservoir in the underlying Castile Formation and (2) those that do not. While the presence of pressurized brine under the repository is speculative, it cannot be completely ruled out based on available information. The primary consequence of contacting pressurized brine is the introduction of an additional source of brine beyond that which is assumed to be released into the repository from the Salado Formation. The human intrusion scenario models are based on extensive field data sets collected by the DOE. The DBDSP collects the drilling-related data to be used for future PA calculations. The data have been continuously collected from the time of the 1996 submittal of the CCA and include specific wells drilled during the last year in the New Mexico portion of the Delaware Basin, specifically that of the nine-township area immediately surrounding the WIPP Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Mojave Subsurface Bio-Geochemistry Explorer (MOSBE)

The MOSBE Team has developed a terrestrial field campaign to explore two subsurface biological habitats under the Mojave Desert. This field campaign will not only help us understand terrestrial desert biology, but also will develop methodologies and strategies for potential future Mars missions that would seek to explore the Martian subsurface. We have proposed to the ASTEP program to integrate a suite of field demonstrated instruments with a 20 m subsurface drill as a coherent unit, the Mojave Subsurface Bio-geochemistry Explorer. The ATK Space Modular Planetary Drill System (MPDS) requires no drilling fluid, which allows aseptic sampling, can penetrate lithic ground up to 20 meters of depth, and utilizes less than 100 Watts throughout the entire depth. The drill has been developed and demonstrated in field testing to a depth of 10 meters in Arizona, December 2002. In addition to caching a continuous core throughout the drilling depth, it also generates and caches cuttings and fines that are strata-graphically correlated with the core. As a core segment is brought to the surface, it will be analyzed for texture and structure by a color microscopic imager and for relevant chemistry and mineralogy with a UV fluorescence/Raman spectrometer. Organic and soluble ionic species will be identified through two instruments -- a microcapillary electrophoresis, and an ion trap mass spectrometer that have been developed under PIDDP, ASTID and MIDP funding.

robotic subsurface drilling↗

The Auto-Gopher: A Wireline Rotary-Percussive Deep Sampler

Accessing regions on planetary bodies that potentially preserved biosignatures or are presently habitable is vital to meeting NASA solar system "Search for Life" exploration objectives. To address these objectives, a wireline deep rotary-percussive corer called Auto-Gopher was developed. The percussive action provides effective material fracturing and the rotation provides effective cuttings removal. To increase the drill's penetration rate, the percussive and rotary motions are operated simultaneously. Initially, the corer was designed as a percussive mechanism for sampling ice and was demonstrated in 2005 in Antarctica reaching about 2 m deep. The lessons learned suggested the need to use a combination of rotation and hammering to maximize the penetration rate. This lesson was implemented into the Auto-Gopher-I deep drill which was demonstrated to reach 3-meter deep in gypsum. The average drilling power that was used has been in the range of 100-150 Watt, while the penetration rate was approximately 2.4 m/hr. Recently, a task has started with the goal to develop Auto-Gopher-II that is equipped to execute all the necessary functions in a single drilling unit. These functions also include core breaking, retention and ejection in addition drilling. In this manuscript, the Auto-Gopher-II, its predecessors and their capability are described and discussed.

drilling↗

The ARADS Project as an Astrobiological Survey Mission Prototype

An astrobiological survey prior to human arrival will be important for preservation of signs of any existing or past evidence of Martian life, to reduce the risk of unintentional forward contamination of Martian environments in which terrestrial microbes might be able to gain a foothold (e.g., [1]), and to potentially protect the health of any human crews and enable their safe return to Earth. Evaluating for the presence of life and biosignatures may become a critical-path Mars exploration precursor in the not-so-far future, circa 2030-35. The near-subsurface, with its potential combination of volatiles, vapor exchange with the surface, and shelter from surface radiation, will be a primary initial target for in-situ astrobiological investigation. Sample acquisition, drilling and sample handling are key elements of robotic missions that target the subsurface [2], as well as near-surface ground ice deposits. In the mid 2000s, the Mars Astrobiology Field Laboratory (AFL) was proposed as a follow-on mission concept to the Mars Science Laboratory (MSL)/Curiosity rover mission [3]. The AFL would have included precision drilling to 2m, automated sample handling and remote processing of cores. However, the AFL concept needed further development and maturation. The Atacama Rover Astrobiology Drilling Studies (ARADS) project concept [4] was in part AFL-inspired. The 2014 ARADS concept included a medium sized rover, with habitability instruments, including the Phoenix Wet Chemistry Laboratory (WCL) [5], and an enhanced version of the ExoMars Mars Organic Molecule Analyzer (MOMA) Laser Desorption-Linear Ion Trap Mass Spectrometer (LITMS) [6]. ARADS likewise included two biosignature detection instruments -- the Signs of Life Detector (SOLID) immunoassay instrument [7,8] and the Chemical Laptop-derived [9] Planetary In-Situ Capillary Electrophoresis System (PISCES), while mitigating Planetary Protection-relevant contamination issues [10]. ARADS project objectives were to demonstrate the potential science return for such a mission in the context of the search for evidence of life, and technically to demonstrate the feasibility of roving with drilling missions to Mars. ARADS technology goals targeted analog-site demonstrations of automated drilling and sampling, integrated with its mobile habitability and biosignature detection instruments. And ARADS science operations goals developed remote science, contamination mitigation, and communications methods to enable simulating AFL-like science operations with time delays, directed by a remote science team[11]. Five subsequent Mars analog site field demonstrations (in Chile’s hyperarid Atacama Desert, 2016-19) provided a step-by-step development pathway for the ARADS platform’s science capabilities and systems integration, culminating in an integrated remote roving mission simulation in the final ARADS year (2019).

biosignatures↗

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Isolation - Innovation for the Storage and Disposal of High-level Waste and Spent Nuclear Fuel - 19367

Deep Isolation, Inc. is a private, Berkeley based company that has brought innovation to nuclear waste disposal. Deep Isolation has developed a disposal technique that adapts mature drilling technology and customizes it for the purpose of providing a safe and secure solution. Though the stalled nuclear waste program in the US has created unwanted burdens and costs, it has also provided object lessons which Deep Isolation has learned from and designed a novel approach. The solution proposed by Deep Isolation combines the best of the geosciences and social sciences to present the US and other countries with an optimized and tailored approach to disposing of a variety of nuclear waste. This system can complement existing potential storage and disposal sites, or in the case of countries with smaller amounts of waste--the national solution. Deep Isolation innovates where others have stalled and offers a means of deep geological disposal that costs less, takes less time to implement, and cuts down and in some cases eliminates the need for transportation of the waste. The technical solution optimized by Deep Isolation uses established directional drilling technology from the oil and gas industry to drill a vertical drill hole thousands of meters deep and then transition to a horizontal drill hole that is thousands of meters in length. The target media is in or below shale formations, which are present at various depths throughout much of the United States and throughout the world. The availability of suitable geology allows for permanent disposal at multiple locations - including existing nuclear sites, without a need to transport the waste to a central repository. This innovative solution not only offers options for commercial used nuclear fuel and defense spent nuclear fuel and high-level waste, but also other nuclear wastes such as those considered by DoE's past deep bore-hole program, i.e. cesium and strontium capsules. Greater-Than-Class-C (GTCC) waste is also an opportunity for Deep Isolation. DoE's preferred alternative for GTCC includes 'land disposal at generic commercial facilities.' Deep Isolation could provide safe, secure, and permanent disposal at a commercial facility. Deep Isolation complements the technical innovation with best practices from the social sciences. In acknowledgement that the past challenges to implement nuclear waste disposal facilities have been primarily due to socio-political failings, we have designed a means to deeply engage with public and stakeholders. Our approach is committed to partnering with communities, local jurisdictions, states, and Tribes to determine a path forward that benefits all involved, that is fully transparent, collaborative and accountable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold laser machining of nickel-yttrium stabilised zirconia cermets: Composition dependence

Cold laser micromachining efficiency in nickel-yttrium stabilised zirconia cermets was studied as a function of cermet composition. Nickel oxide-yttrium stabilised zirconia ceramic plates obtained via tape casting technique were machined using 8-25 ns pulses of a Nd: YAG laser at the fixed wavelength of 1.064 {mu}m and a frequency of 1 kHz. The morphology of the holes, etched volume, drill diameter, shape and depth were evaluated as a function of the processing parameters such as pulse irradiance and of the initial composition. The laser drilling mechanism was evaluated in terms of laser-material interaction parameters such as beam absorptivity, material spallation and the impact on the overall process discussed. By varying the nickel oxide content of the composite the optical absorption (-value is greatly modified and significantly affected the drilling efficiency of the green state ceramic substrates and the morphology of the holes. Higher depth values and improved drilled volume upto 0.2 mm{sup 3} per pulse were obtained for substrates with higher optical transparency (lower optical absorption value). In addition, a laser beam self-focussing effect is observed for the compositions with less nickel oxide content. Holes with average diameter from 60 {mu}m to 110 {mu}m and upto 1 mm in depth were drilled with a high rate of 40 ms per hole while the final microstructure of the cermet obtained by reduction of the nickel oxide-yttrium stabilised zirconia composites remained unchanged.

36 MATERIALS SCIENCE↗

Design and performance validation of a high-temperature downhole permanent magnet generator used for an electro-pulse boring system in geothermal energy applications

Novel, direct-energy drilling technologies such as electro-pulse boring, have the potential to significantly increase the speed and depth of geothermal drilling but have not achieved widespread adoption due to several economic and technical barriers. One major challenge is that these drilling systems require electric power downhole. The current practice is to supply power to the drill string components by running electric cables down the geothermal well, but at the targeted well depths, this practice is cost-inhibitive, inefficient in terms of power consumption, and adds an additional failure point with the long cabling going through a highly corrosive, high-temperature environment. A solution to this problem is to develop high-temperature electric generator technology that can generate the required power downhole. Such a generator must also operate with high efficiency at the target downhole ambient temperature of 250 °C. In this paper, we investigate the various design considerations for this concept and subsequently design the downhole electric generator using a multi-objective design optimization approach. Through electromagnetic-, thermal- and short-circuit fault condition analysis, it is demonstrated that the optimized downhole electric generator concept presented in this paper can meet the performance requirements within this extreme drilling environment. Most remarkably, it is shown that a generator efficiency of 90% is achieved. In conclusion, to validate the results presented in this paper, a prototype generator is built and its performance is measured at 250 °C using a test bench uniquely developed for this application.

15 GEOTHERMAL ENERGY↗

Hydrogeology, chemical and microbial activity measurement through deep permafrost

Little is known about hydrogeochemical conditions beneath thick permafrost, particularly in fractured crystalline rock, due to difficulty in accessing this environment. The purpose of this investigation was to develop methods to obtain physical, chemical, and microbial information about the subpermafrost environment from a surface-drilled borehole. Using a U-tube, gas and water samples were collected, along with temperature, pressure, and hydraulic conductivity measurements, 420 m below ground surface, within a 535 m long, angled borehole at High Lake, Nunavut, Canada, in an area with 460-m-thick permafrost. Piezometric head was well above the base of the permafrost, near land surface. Initial water samples were contaminated with drill fluid, with later samples <40% drill fluid. The salinity of the non-drill fluid component was <20,000 mg/L, had a Ca/Na ratio above 1, with {delta}{sup 18}O values {approx}5{per_thousand} lower than the local surface water. The fluid isotopic composition was affected by the permafrost-formation process. Nonbacteriogenic CH{sub 4} was present and the sample location was within methane hydrate stability field. Sampling lines froze before uncontaminated samples from the subpermafrost environment could be obtained, yet the available time to obtain water samples was extended compared to previous studies. Temperature measurements collected from a distributed temperature sensor indicated that this issue can be overcome easily in the future. The lack of methanogenic CH{sub 4} is consistent with the high sulfate concentrations observed in cores. The combined surface-drilled borehole/U-tube approach can provide a large amount of physical, chemical, and microbial data from the subpermafrost environment with few, controllable, sources of contamination.

54 ENVIRONMENTAL SCIENCES↗

Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide

The project Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. Sandia Technologies, LLC, and co-investigator Conrad Geoscience Corporation, examined the potential for large-scale, permanent CO2 storage in sedimentary strata within the Newark Rift Basin. The Newark Rift Basin underlies an industrialized, developed region comprising parts of New York, New Jersey, and Pennsylvania. The project characterized and investigated the suitability of Triassic age sedimentary formations for potential geologic CO2 storage. The project team drilled and cored two test wells to define the sedimentary geologic formations underlying the basin and to document or reach basement rock. With this geologic characterization phase, an integration of seismic, geologic, borehole, and formation core results provided a higher resolution assessment of CO2 storage potential. The Stockton Formation is known to be a potentially favorable geologic storage formation in the basin. In 2011, the 1-NYSTA Tandem Lot stratigraphic test well was drilled to a depth of 6,855 feet in the northern portion of the Newark Basin in southern New York State. Approximately 9 miles south-southeast on the Lamont Doherty Campus, TW-4 was drilled and cored in 2013 to a depth of 1,802 feet and contacted apparent igneous basement at a depth of 1,712 feet. Both wells penetrated the Palisades Sill ranging from 800 feet thick in the eastern well to approximately 1,800 feet in thickness at the 1-NYSTA Tandem Lot deep drill site. A diabase sill can provide an excellent seal and dense confining layer for potential CO2 storage reservoirs and flow layers that are situated beneath it within the Stockton Sandstone. The Stockton Sandstone was encountered beneath the sill in the TW-4 well on the Lamont campus, and data integration suggests that it was likely observed near total depth in the deep 1-NYSTA Tandem Lot well. The test wells confirm and define reservoirs are present beneath the sill and offer CO2 storage potential. The integration of geologic and reservoir characterization of well logs, formation cores, and formation fluids indicated Triassic age lacustrine playa lake and mudbank shales of the Upper Passaic Group can provide an effective seal for the porous and permeable underlying sandstone reservoir layers. This project acquired seismic data, drilled borehole well logs, acquired core samples, and integrated these findings to provide a better understanding of the subsurface geologic formations in the Newark Rift Basin. These findings have contributed to a higher degree of accuracy in predicting potential geologic storage opportunities, while refining geologic storage capacity estimates for the indicated reservoirs and flow units.

.las↗

Constraints on iron sulfate and iron oxide mineralogy from ChemCam visible/near-infrared reflectance spectroscopy of Mt. Sharp basal units, Gale Crater, Mars

Relative reflectace point spectra (400–840 nm) were acquired by the Chemistry and Camera (ChemCam) instrument on the Mars Science Laboratory (MSL) rover Curiosity in passive mode (no laser) of drill tailings and broken rock fragments near the rover as it entered the lower reaches of Mt. Sharp and of landforms at distances of 2–8 km. Freshly disturbed surfaces are less subject to the spectral masking effects of dust, and revealed spectral features consistent with the presence of iron oxides and ferric sulfates. Here, we present the first detection on Mars of a ~433 nm absorption band consistent with small abundances of ferric sulfates, corroborated by jarosite detections by the Chemistry and Mineralogy (CheMin) X-ray diffraction instrument in the Mojave, Telegraph Peak, and Confidence Hills drilled samples. The disturbed materials near the Bonanza King region also exhibited strong 433 nm bands and negative near-infrared spectral slopes consistent with jarosite. ChemCam passive spectra of the Confidence Hills and Mojave drill tailings showed features suggestive of the crystalline hematite identified by CheMin analyses. The Windjana drill sample tailings exhibited flat, low relative reflectance spectra, explained by the occurrence of magnetite detected by CheMin. Passive spectra of Bonanza King were similar, suggesting the presence of spectrally dark and neutral minerals such as magnetite. Long-distance spectra of the “Hematite Ridge” feature (3–5 km from the rover) exhibited features consistent with crystalline hematite. The Bagnold dune field north of the Hematite Ridge area exhibited low relative reflectance and near-infrared features indicative of basaltic materials (olivine, pyroxene). Light-toned layers south of Hematite Ridge lacked distinct spectral features in the 400–840 nm region, and may represent portions of nearby clay minerals and sulfates mapped with orbital near-infrared observations. The presence of ferric sulfates such as jarosite in the drill tailings suggests a relatively acidic environment, likely associated with flow of iron-bearing fluids, associated oxidation, and/or hydrothermal leaching of sedimentary rocks. Combined with other remote sensing data sets, mineralogical constraints from ChemCam passive spectra will continue to play an important role in interpreting the mineralogy and composition of materials encountered as Curiosity traverses further south within the basal layers of the Mt. Sharp complex.

58 GEOSCIENCES↗

Geothermal Exploration in Hot Springs, Montana

The project involves drilling deeper in the Camp Aqua well drilled in June 1982 as part of an effort to develop an ethanol plant. The purpose of the current drilling effort is to determine if water at or above 165°F exists for the use in low temperature resource power generation. Previous geothermal resource study efforts in and around Hot Springs, MT and the Camp Aqua area (NE of Hot Springs) have been conducted through the years. A confined gravel aquifer exists in deep alluvium overlain by approximately 250 of silt and clay deposits from Glacial Lake Missoula. This gravel aquifer overlies a deeper bedrock aquifer. In the Camp Aqua area several wells exist in the gravel aquifer which receives hot water from bedrock fractures beneath the area. Prior to this exploration, one known well in the Camp Aqua area penetrated into the bedrock without success in intersecting fractures transporting hot geothermal water. The exploration associated with this project adds to the physical knowledge database of the Camp Aqua area. The drilling effort provides additional subsurface information that can be used to gain a better understanding of the bedrock formation that is leaking hot geothermal water into an otherwise cold water aquifer. The existing well used for the exploration is located within the center of the hottest water within the gravel aquifer. This lent itself as a logical and economical location to continue the exploration within the existing well. Faced with budget constraints due to unanticipated costs, changing drilling techniques stretched the limited project resources to maximize the overall well depth which fell short of original project goals. The project goal of finding 165°F or hotter water was not achieved; however the project provides additional information and understanding of the Camp Aqua area that could prove valuable in future exploration efforts.

15 GEOTHERMAL ENERGY↗