Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Inventory of Radioactive Waste in Canada - 19336

Since 1999, the Government of Canada has been conducting a regular exercise of gathering and compiling Canada's radioactive waste inventory and projection data from waste owners and making it available to the public in the form of a triennial Inventory Summary Report. The goal of this data collection exercise has been to support federal policy development, support the Canadian Nuclear Safety Commission's regulatory activities, provide consolidated radioactive waste information for the nuclear industry, promote transparency, and meet Canada's international commitments and growing demands internationally for radioactive waste data. The detailed national inventory report provides an overview of the production, accumulation and future projections of radioactive waste in Canada. Since the coming into force of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management in June 2001, the data collection and reporting cycle has been aligned to provide the waste inventory data required for Canada's triennial National Report for the Joint Convention. This paper presents Canada's radioactive waste inventory and projection data as of the end of December 2016, and summarizes key findings from the analysis of the data. For this reporting cycle, the waste data collected was expanded to include more detailed information on the decommissioning schedules and associated waste volume projections for nuclear power plants, and research and prototype reactors, as well as plans for transitioning waste inventories from storage to long-term management and disposal facilities, based on current schedules for establishing these facilities in Canada. With this additional information, the Government of Canada and Canadian stakeholders are better able to understand the waste disposal capacity and schedules required to accommodate all nuclear fuel waste and radioactive waste that will be produced by Canada's existing fleet of nuclear power plants and research reactors. The collection and analysis of projected waste volumes to be emplaced in long-term management facilities is in line with and will support the proposed methodology of presenting waste inventories in terms of management strategy and disposal routes by the Organization for Economic Cooperation and Development Nuclear Energy Agency Expert Group on Waste Inventorying and Reporting Methodology. The paper describes some of the uses that are made of the waste inventory information, as well as Canada's approach to national inventory data collection and its experience and lessons learned. Canada continues to modernize the format of the Inventory Summary Report with the goal of disseminating the technical information into an attractive and public-friendly report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Netload Range Cost Curves for Coordinated Transmission-Distribution Planning Under DER Growth Uncertainty

The increasing penetration of distributed energy resources (DERs) requires better coordination between transmission and distribution (T&D) planning to ensure system security and cost efficiency. However, misaligned planning horizons, computational burdens, and privacy concerns hinder effective coordination, leading to either underutilized resources caused by overinvestments or reliability risks due to underinvestment. To address this challenge, we introduce netload range cost curves (NRCCs), a novel approach for managing long-term DER growth uncertainty through T&D coordination, while preserving existing data-sharing and regulatory structures. NRCCs provide pairs of (i) peak substation netload guarantees and (ii) corresponding distribution upgrade options and costs, enabling their seamless integration into transmission planning workflows. To compute NRCCs efficiently, we develop a transmission-aware distribution network planning (TADNP), which is subsequently integrated to an iterative computation procedure. These NRCCs are then embedded into an NRCC-informed transmission planning model to enable resource-efficient coordination. We illustrate our proposed approach with a case study based on realistic distribution and transmission systems in the San Francisco Bay Area, California. Our results indicate the possibility of dramatic savings in transmission investments by incorporating the proposed NRCC-integrated T&D coordination framework.

Li, Yujia↗

MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication between all parties involved in the TP process increasing patient safety.

60 APPLIED LIFE SCIENCES↗

Extreme Compression for Large Scale Data Store

For the last 5 years Accelogic pioneered and perfected a radically new theory of numerical computing codenamed “Compressive Computing”, which has an extremely profound impact on real-world computer science [1]. At the core of this new theory is the discovery of one of its fundamental theorems which states that, under very general conditions, the vast majority (typically between 70% and 80%) of the bits used in modern large-scale numerical computations are absolutely irrelevant for the accuracy of the end result. This theory of Compressive Computing provides mechanisms able to identify (with high intelligence and surgical accuracy) the number of bits (i.e., the precision) that can be used to represent numbers without affecting the substance of the end results, as they are computed and vary in real time. The bottom line outcome would be to provide a state-of-the-art compression algorithm that surpasses those currently available in the ROOT framework, with the purpose of enabling substantial economic and operational gains (including speedup) for High Energy and Nuclear Physics data storage/analysis. In our initial studies, a factor of nearly x4 (3.9) compression was achieved with RHIC/STAR data where ROOT compression managed only x1.4.In this contribution, we will present our concepts of “functionally lossless compression”, have a glance at examples and achievements in other communities, present the results and outcome of our current, ongoing R&D, as well as present a high-level view of our plan to move forward with a ROOT implementation that would deliver a basic solution readily integrated into HENP applications. As a collaboration of experimental scientists, private industry, and the ROOT Team, our aim is to capitalize on the substantial success delivered by the initial effort and produce a robust technology properly packaged as an open-source tool that could be used by virtually every experiment around the world as means for improving data management and accessibility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Initial Findings from US Department of Energy’s Better Plants Virtual in-Plant Training on 50001 Ready

Manufacturing facilities use about 35% of the domestic energy in the United States every year. Implementing an effective energy management system (EnMS) is one of the most important approaches to improve energy efficiency. However, the implementation of EnMS is low for many countries (including the US) and even for energy-intensive sectors. The reasons for the low implementation rate of energy management systems had been investigated by multiple researchers, but very few studies have focused on the barriers and challenges of implementing ISO 50001-based energy management systems. To contribute to this understudied area, this paper discusses the implementation and outcomes of the first Better Plants 50001 Ready Virtual In-plant Training. This paper first provides an overview of 50001 Ready and the 50001 Ready Navigator Tool. Then, it provides details on this training event and its outcomes. Finally, it discusses findings from the responses to 40 live polling questions about the status of the 25 tasks of the 50001 Ready Navigator for participating companies, key components of the participating manufacturing companies’ energy management systems, and challenges and barriers that these companies are facing. The findings suggest that although many companies understood the importance of an effective energy management system, about half of them do not understand the required resources for building energy management systems, and most of them have only just begun establishing these systems and need more assistance and resources in multiple areas. More specifically, more assistance is necessary for the following: (1) improving corporate management’s understanding of the time and resources needed to build an EnMS as well as the benefits; (2) creating linear regression models for more accurate energy performance tracking; (3) understanding energy use, collecting and analyzing energy performance data; (4) optimizing equipment operational controls, and creating action plans.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pilot Interactions in an Over-Constrained Conflict Scenario as Studied in a Piloted Simulation of Autonomous Aircraft Operations

Feasibility and safety of autonomous aircraft operations were studied in a multi-piloted simulation of overconstrained traffic conflicts to determine the need for, and utility of, priority flight rules to maintain safety in this extraordinary and potentially hazardous situation. An overconstrained traffic conflict is one in which the separation assurance objective is incompatible with other objectives. In addition, a proposed scheme for implementing priority flight rules by staggering the alerting time between the two aircraft in conflict was tested for effectiveness. The feasibility study was conducted through a simulation in the Air Traffic Operations Laboratory at the NASA Langley Research Center. This research activity is a continuation of the Distributed Air-Ground Traffic Management feasibility analysis reported in the 4th USA/Europe Air Traffic Management R&D Seminar in December 2001 (paper #48). The over-constrained conflict scenario studied here consisted of two piloted aircraft that were assigned an identical en-route waypoint arrival time and altitude crossing restriction. The simulation results indicated that the pilots safely resolved the conflict without the need for a priority flight rule system. Occurrences of unnecessary maneuvering near the common waypoint were traced to false conflict alerts, generated as the result of including waypoint constraint information in the broadcast data link message issued from each aircraft. This result suggests that, in the conservative interests of safety, broadcast intent information should be based on the commanded trajectory and not on the Flight Management System flight plan, to which the aircraft may not actually adhere. The use of priority flight rules had no effect on the percentage of the aircraft population meeting completely predictable which aircraft in a given pair would meet the constraints and which aircraft would make the first maneuver to yield right-of-way. Therefore, the proposed scheme for implementing priority flight rules through staggering the alerting time between the two aircraft was completely effective. The data and observations from this experiment, together with results from the previously reported study, support the feasibility of autonomous aircraft operations.

Wing, David J.↗

UAVSAR Instrument: Current Operations and Planned Upgrades

The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) instrument is a pod-based Lband polarimetric synthetic aperture radar (SAR), specifically designed to acquire airborne repeat track SAR data for differential interferometric measurements. This instrument is currently installed on the NASA Gulfstream- III (G-III) aircraft with precision real-time Global Positioning System (GPS) and a sensor-controlled flight management system for precision repeat-pass data acquisitions. UAVSAR has conducted engineering and preliminary science data flights since October 2007 on the G-III. We are porting the radar to the Global Hawk Unmanned Airborne Vehicle (UAV) to enable long duration/long range data campaigns. We plan to install two radar pods (each with its own active array antenna) under the wings of the Global Hawk to enable the generation of precision topographic maps and single pass polarimetric-interferometry (SPI) providing vertical structure of ice and vegetation. Global Hawk's range of ~ 8000 nm will enable regional surveys with far fewer sorties as well as measurements of remote locations without the need for long and complicated deployments. We are also developing P-band polarimetry and Ka-band single-pass interferometry capabilities on UAVSAR by replacing the radar antenna and front-end electronics to operate at these

Uninhabited Airborne Vehicle Synthetic Aperture Ra↗

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2011

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2011 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2011 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2011 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2011 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2011) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

Multi-Mission Automated Task Invocation Subsystem

Multi-Mission Automated Task Invocation Subsystem (MATIS) is software that establishes a distributed data-processing framework for automated generation of instrument data products from a spacecraft mission. Each mission may set up a set of MATIS servers for processing its data products. MATIS embodies lessons learned in experience with prior instrument- data-product-generation software. MATIS is an event-driven workflow manager that interprets project-specific, user-defined rules for managing processes. It executes programs in response to specific events under specific conditions according to the rules. Because requirements of different missions are too diverse to be satisfied by one program, MATIS accommodates plug-in programs. MATIS is flexible in that users can control such processing parameters as how many pipelines to run and on which computing machines to run them. MATIS has a fail-safe capability. At each step, MATIS captures and retains pertinent information needed to complete the step and start the next step. In the event of a restart, this information is retrieved so that processing can be resumed appropriately. At this writing, it is planned to develop a graphical user interface (GUI) for monitoring and controlling a product generation engine in MATIS. The GUI would enable users to schedule multiple processes and manage the data products produced in the processes. Although MATIS was initially designed for instrument data product generation,

Cheng, Cecilia S.↗

2016 Postclosure Groundwater Monitoring and Inspection Report, Central Nevada Test Area, Nevada, Subsurface Corrective Action Unit 443

This report presents the groundwater monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) from the Central Nevada Test Area (CNTA), Nevada, Site, Subsurface Corrective Action Unit (CAU) 443 in Nye County, Nevada (Figure 1). The site was the location of an underground nuclear test in 1968, which resulted in residual contamination at and near the detonation depth of approximately 3200 feet (ft) below ground surface (bgs) that requires long-term monitoring. Responsibility for the environmental restoration and long-term monitoring was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office to LM on October 1, 2006. The environmental restoration and site closure process were completed in 2015 in accordance with the Federal Facility Agreement and Consent Order (State of Nevada et al. 1996) (as amended) (FFACO) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The Closure Report, Central Nevada Test Area, Subsurface Corrective Action, Unit 443 (LMS/CNT/S12760) (DOE 2016a) (Closure Report) describes LM’s plan for the long-term postclosure monitoring of radioisotope concentrations and water elevations, inspecting the site and maintaining the institutional controls (ICs), evaluating and reporting data, and documenting the site’s records and data management processes (DOE 2016a).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada (Rev.1)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using C to build a satellite scheduling expert system: Examples from the Explorer Platform planning system

A C-based artificial intelligence (AI) development effort which is based on a software tools approach is discussed with emphasis on reusability and maintainability of code. The discussion starts with simple examples of how list processing can easily be implemented in C and then proceeds to the implementations of frames and objects which use dynamic memory allocation. The implementation of procedures which use depth first search, constraint propagation, context switching, and blackboard-like simulation environment are described. Techniques for managing the complexity of C-based AI software are noted, especially the object-oriented techniques of data encapsulation and incremental development. Finally, all these concepts are put together by describing the components of planning software called the Planning And Resource Reasoning (PARR) Shell. This shell was successfully utilized for scheduling services of the Tracking and Data Relay Satellite System for the Earth Radiation Budget Satellite since May of 1987 and will be used for operations scheduling of the Explorer Platform in Nov. of 1991.

Mclean, David R.↗

Interactive Web Application for Traffic Simulation Data Management and Visualization

As traffic simulation software becomes more effective for realistically simulating and analyzing traffic dynamics and vehicle interactions on the mesoscopic and microscopic level, the management, dissemination, and collaborative visualization of traffic simulation results produced by individual transportation planners presents a significant challenge. Existing online content management systems have a very limited capability in allowing users to query specific traffic simulation scenarios and geospatially visualize simulation results through shareable and interactive web interfaces. This paper presents a web-based application for promoting the archiving, sharing, and visualization of large-scale traffic simulation outputs. The application is developed to enhance cyber-physical controls, communications, and public education for collaborative transportation planning. Unique features of the web application include: (a) allowing users to upload their new traffic simulation scenarios (parameters and outputs), as well as search existing scenarios using easily accessible interfaces; (b) optimizing simulation output files with heterogeneous data formats and projected coordinate systems for web-based storage and management using a scalable and searchable data/metadata standard; (c) standardizing user-uploaded simulation outputs using web interfaces and data processing libraries with parallel computing capacity; and (d) providing shareable web visual interfaces for visualizing the traffic flow and signal information stored in simulation outputs (e.g., regional traffic patterns and individual vehicle interactions) and visually comparing multiple simulation outputs both spatially and temporally. Furthermore, the paper presents the conceptual design and implementation of this application, and demonstrates the application’s performance for sharing, comparing, and visualizing simulation outputs from VISSIM and SUMO, two commonly used traffic simulation software programs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Processes for Quality Improvements in Radiation Oncology Clinical Trials

Quality assurance in radiotherapy (RT) has been an integral aspect of cooperative group clinical trials since 1970. In early clinical trials, data acquisition was nonuniform and inconsistent and computational models for radiation dose calculation varied significantly. Process improvements developed for data acquisition, credentialing, and data management have provided the necessary infrastructure for uniform data. With continued improvement in the technology and delivery of RT, evaluation processes for target definition, RT planning, and execution undergo constant review. As we move to multimodality image-based definitions of target volumes for protocols, future clinical trials will require near real-time image analysis and feedback to field investigators. The ability of quality assurance centers to meet these real-time challenges with robust electronic interaction platforms for imaging acquisition, review, archiving, and quantitative review of volumetric RT plans will be the primary challenge for future successful clinical trials.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A simulation framework for evaluating electronic order workflows in integrated health records

Electronic health record (EHR) systems are critical to modern healthcare delivery, yet the dynamic workflows that govern electronic order processing remain underexplored. Inefficiencies in these digital pathways can cause delays in care, repetitive workloads, and even patient harm. This study presents a discrete-event simulation framework used to reconstruct and evaluate EHR-based order workflows in a large integrated healthcare system. Using real-world data extracted from the Veterans Health Administration’s Corporate Data Warehouse, the authors mapped order events to standardized state transitions and modeled their progression across different facilities of varying complexity levels. After being calibrated with empirical distributions of transition times and validated against observed time-in-system metrics, the simulation demonstrates close alignment with historical performance. Scenario analyses reveal that resource capacity constraints significantly amplify the impact of electronic order surges, which are reflected in the disproportionate growth in backlogs and processing delays. Adjustments in transition probabilities further increased recirculation and extended workflow paths. Network-based analysis identified Reserved, InProgress, and Completed as structurally critical states that function as hubs within the process network but the transitions in-between also act as major bottlenecks. These results showcased the effectiveness of simulation-based approaches in monitoring EHR order processing performance and evaluating consequences of workflow changes on healthcare network resources planning. The proposed simulation framework provides a scalable data-driven tool to support operational decision-making and improve the efficiency of electronic order management in complex healthcare environments.

Engineering↗