Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Task sequence planning in a robot workcell using AND/OR nets

An approach to task sequence planning for a generalized robotic manufacturing or material handling workcell is described. Given the descriptions of the objects in this system and all feasible geometric relationships among these objects, an AND/OR net which describes the relationships of all feasible geometric states and associated feasibility criteria for net transitions is generated. This AND/OR net is mapped into a Petri net which incorporates all feasible sequences of operations. The resulting Petri net is shown to be bounded and have guaranteed properties of liveness, safeness, and reversibility. Sequences are found from the reachability tree of the Petri net. Feasibility criteria for net transitions may be used to generate an extended Petri net representation of lower level command sequences. The resulting Petri net representation may be used for on-line scheduling and control of the system of feasible sequences. A simulation example of the sequences is described.

Cao, Tiehua↗

Short-range precipitation forecasts using assimilation of simulated satellite water vapor profiles and column cloud liquid water amounts

These observing system simulation experiments investigate the assimilation of satellite-observed water vapor and cloud liquid water data in the initialization of a limited-area primitive equations model with the goal of improving short-range precipitation forecasts. The assimilation procedure presented includes two aspects: specification of an initial cloud liquid water vertical distribution and diabatic initialization. The satellite data is simulated for the next generation of polar-orbiting satellite instruments, the Advanced Microwave Sounding Unit (AMSU) and the High-Resolution Infrared Sounder (HIRS), which are scheduled to be launched on the NOAA-K satellite in the mid-1990s. Based on cloud-top height and total column cloud liquid water amounts simulated for satellite data a diagnostic method is used to specify an initial cloud water vertical distribution and to modify the initial moisture distribution in cloudy areas. Using a diabatic initialization procedure, the associated latent heating profiles are directly assimilated into the numerical model. The initial heating is estimated by time averaging the latent heat release from convective and large-scale condensation during the early forecast stage after insertion of satellite-observed temperature, water vapor, and cloud water formation. The assimilation of satellite-observed moisture and cloud water, together withy three-mode diabatic initialization, significantly alleviates the model precipitation spinup problem, especially in the first 3 h of the forecast. Experimental forecasts indicate that the impact of satellite-observed temperature and water vapor profiles and cloud water alone in the initialization procedure shortens the spinup time for precipitation rates by 1-2 h and for regeneration of the areal coverage by 3 h. The diabatic initialization further reduces the precipitation spinup time (compared to adiabatic initialization) by 1 h.

Wu, Xiaohua↗

MRO High Resolution Imaging Science Experiment (HiRISE): Instrument Development

The primary functional requirement of the HiRISE imager is to allow identification of both predicted and unknown features on the surface of Mars to a much finer resolution and contrast than previously possible. This results in a camera with a very wide swath width, 6km at 300km altitude, and a high signal to noise ratio, >100:1. Generation of terrain maps, 30 cm vertical resolution, from stereo images requires very accurate geometric calibration. The project limitations of mass, cost and schedule make the development challenging. In addition, the spacecraft stability must not be a major limitation to image quality. The nominal orbit for the science phase of the mission is a 3pm orbit of 255 by 320 km with periapsis locked to the south pole. The track velocity is approximately 3,400 m/s.

Alan Delamere↗

Open-Loop Pitch Table Optimization for the Maximum Dynamic Pressure Orion Abort Flight Test

NASA has scheduled the retirement of the space shuttle orbiter fleet at the end of 2010. The Constellation program was created to develop the next generation of human spaceflight vehicles and launch vehicles, known as Orion and Ares respectively. The Orion vehicle is a return to the capsule configuration that was used in the Mercury, Gemini, and Apollo programs. This configuration allows for the inclusion of an abort system that safely removes the capsule from the booster in the event of a failure on launch. The Flight Test Office at NASA's Dryden Flight Research Center has been tasked with the flight testing of the abort system to ensure proper functionality and safety. The abort system will be tested in various scenarios to approximate the conditions encountered during an actual Orion launch. Every abort will have a closed-loop controller with an open-loop backup that will direct the vehicle during the abort. In order to provide the best fit for the desired total angle of attack profile with the open-loop pitch table, the table is tuned using simulated abort trajectories. A pitch table optimization program was created to tune the trajectories in an automated fashion. The program development was divided into three phases. Phase 1 used only the simulated nominal run to tune the open-loop pitch table. Phase 2 used the simulated nominal and three simulated off nominal runs to tune the open-loop pitch table. Phase 3 used the simulated nominal and sixteen simulated off nominal runs to tune the open-loop pitch table. The optimization program allowed for a quicker and more accurate fit to the desired profile as well as allowing for expanded resolution of the pitch table.

Stillwater, Ryan A.↗

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian↗

LANL JOWOG 31 2012 Forecast

Joint Working Group (JOWOG) 31, Nuclear Weapons Engineering, has a particularly broad scope of activities within its charter which emphasizes systems engineering. JOWOG 31 brings together experts from AWE and the national laboratories to address engineering issues associated with warhead design and certification. Some of the key areas of interaction, as addressed by the HOCWOGs are: (1) Engineering Analysis, (2) Hydrodynamic Testing, (3) Environmental Testing, and (4) Model Based Integrated Toolkit (MBIT). Gas Transfer Systems and Condition Monitoring interaction has been moved back to JOWOG 31. The regularly scheduled JOWOG 31 activities are the General Sessions, Executive Sessions, Focused Exchanges and HOCWOGs. General Sessions are scheduled every 12-18 months and are supported by the four design laboratories (AWE, LANL, LLNL, and SNL). Beneficial in educating the next generation of weapons engineers and establishing contacts between AWE and the US laboratory personnel. General Sessions are based on a blend of presentations and workshops centered on various themed subjects directly related to Stockpile Stewardship. HOCWOG meetings are more narrowly focused than the General Sessions. They feature presentations by experts in the field with a greater emphasis on round table discussions. Typically about 20 people attend. Focused exchanges are generally the result of interactions within JOWOG general sessions or HOCWOG meetings. They generally span a very specific topic of current interest within the US and UK.

42 ENGINEERING↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Department of Energy Consequence Management Under the National Response Framework

Under the Nuclear/Radiological Incident Annex of the National Response Framework, the U.S. Department of Energy (DOE) has specific responsibilities as a coordinating agency and for leading interagency response elements in the Federal Radiological Monitoring and Assessment Center (FRMAC). Emergency response planning focuses on rapidly providing response elements in stages after being notified of a nuclear/radiological incident. The use of Home Teams during the field team deployment period and recent advances in collecting and transmitting data from the field directly to assessment assets has greatly improved incident assessment times for public protection decisions. The DOE’s Remote Sensing Laboratory (RSL) based in Las Vegas, Nevada, has successfully deployed technical and logistical support for this mission at national exercises such as Top Officials Exercise IV (TOPOFF IV). In a unique response situation, DOE will provide advance contingency support to NASA during the scheduled launch in the fall of 2009 of the Mars Science Laboratory (MSL). The MSL rover will carry a radioisotope power system that generates electricity from the heat of plutonium’s radioactive decay. DOE assets and contingency planning will provide a pre-incident response posture for rapid early plume phase assessment in the highly unlikely launch anomaly.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Main Engine Prototype Development for 2nd Generation RLV RS-83

This presentation reports on the NASA project to develop a prototype for RS-83 engine designed for use on reusable launch vehicles (RLV). Topics covered include: program objectives, overview schedule, organizational chart, integrated systems engineering processes, requirement analysis, catastrophic engine loss, maintainability analysis tools, and prototype design analysis.

John Vilja↗

A Generation-Storage Coordination Dispatch Strategy for Power System Based on Causal Reinforcement Learning

In the backdrop of global energy transformation, power systems integrating high proportions of renewable energy sources are facing unprecedented challenges in operational stability and dispatch efficiency. To address these challenges, this study introduces a generation-storage coordination real-time dispatch strategy based on Causal Power System Dynamic Reinforcement Learning (CPSDRL). Diverging from traditional reinforcement learning approaches, CPSDRL innovatively incorporates causal inference within the state prediction model - the crux of model-based reinforcement learning - thereby establishing the Power Causal Dynamic Model (PCDM). Assisted by the prior knowledge of power systems, the model significantly enhances prediction accuracy and reliability through a two-stage training process. Utilizing PCDM, this study further applies a direct policy search algorithm to optimize the real-time dispatch strategy. Experimental results indicate that the proposed method improves the stability of generation-storage coordination real-time dispatch and exhibits competitive advantages in sample efficiency and computational speed, compared to traditional model-based and model-free reinforcement learning algorithms. This method is expected to enhance the practicality and adaptability of causal reinforcement learning techniques in power system scheduling and control.

causal reinforcement learning↗

Next Generation NASA Initiative for Space Geodesy

Space geodesy measurement requirements have become more and more stringent as our understanding of the physical processes and our modeling techniques have improved. In addition, current and future spacecraft will have ever-increasing measurement capability and will lead to increasingly sophisticated models of changes in the Earth system. Ground-based space geodesy networks with enhanced measurement capability will be essential to meeting these oncoming requirements and properly interpreting the sate1!ite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation ofthe observed geophysical signals. These requirements have been articulated by the Global Geodetic Observing System (GGOS). The NASA Space Geodesy Project (SGP) is developing a prototype core site as the basis for a next generation Space Geodetic Network (SGN) that would be NASA's contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Each of the sites in the SGN would include co-located, state of-the-art systems from all four space geodetic observing techniques (GNSS, SLR, VLBI, and DORIS). The prototype core site is being developed at NASA's Geophysical and Astronomical Observatory at Goddard Space Flight Center. The project commenced in 2011 and is scheduled for completion in late 2013. In January 2012, two multiconstellation GNSS receivers, GODS and GODN, were established at the prototype site as part of the local geodetic network. Development and testing are also underway on the next generation SLR and VLBI systems along with a modern DORIS station. An automated survey system is being developed to measure inter-technique vector ties, and network design studies are being performed to define the appropriate number and distribution of these next generation space geodetic core sites that are required to achieve the driving ITRF requirements. We present the status of this prototype next generation space geodetic core site, results from the analysis of data from the established geodetic stations, and results from the ongoing network design studies.

Merkowitz, S. M.↗

Expert system for scheduling simulation lab sessions

Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

Lund, Chet↗

Application of the Software as a Service Model to the Control of Complex Building Systems

In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building. The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analyzed.

25 ENERGY STORAGE↗

Waste Attributes of SMRs Scheduled for Near Term Deployment

This is a short presentation as part of a "roundtable" panel on Back-end Fuel Cycle Implications of Advanced Reactor Fuel Cycles. It covers an evaluation of waste generation rates projected for small modular reactors expected to be constructed this decade which are compared to a reference gigawatt-scale light water reactor like those in the current commercial fleet. For ease of comparison, results are normalized per unit of electricity generated.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data-Driven Modeling of Spatially Explicit Air Pollutant Inventories for Agricultural and Forestry Feedstock Production

As biomass feedstock production expands, air pollutants generated from feedstock supply chain activities may impact air quality and human health. The National Renewable Energy Laboratory's Feedstock Production Emissions to Air Model (FPEAM) generates county-scale inventories of direct air pollutant emissions produced by feedstock supply chain activities. FPEAM can also be used to generate local, temporally resolved inventories for input into air quality models. This presentation provides an overview of FPEAM functionality and discusses several recent use cases prior to FPEAM's scheduled public release in September 2019. FPEAM is a modular, data-driven model. Each module contains calculations for an activity type, except for the feedstock transportation and on-farm equipment operation modules which connect to the U.S. Environmental Protection Agency's Motor Vehicle Emissions Simulator (MOVES) and Nonroad models, respectively. The data-driven aspect of FPEAM means that it is the input data provided for a scenario rather than the model itself that determines the pollutants and supply chain activities included in the scenario scope. Modules within FPEAM can also be turned on or off manually to adjust the scenario scope. Default input data packaged with the FPEAM code base can be used to calculate inventories of volatile organic compounds, particulate matter, ammonia, nitrogen oxides, sulfur oxides, and carbon monoxide generated by agricultural and forestry equipment operation, application of nitrogenous fertilizers, herbicide and insecticide, and feedstock transportation. Custom, user-developed data can be used in place of the default data to analyze scenarios with additional or alternate feedstocks, pollutants, and supply chain activities.

09 BIOMASS FUELS↗

The development and validation of command schedules for SeaWiFS

An automated method for developing and assessing spacecraft and instrument command schedules is presented for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) project. SeaWiFS is to be carried on the polar-orbiting SeaStar satellite in 1995. The primary goal of the SeaWiFS mission is to provide global ocean chlorophyll concentrations every four days by employing onboard recorders and a twice-a-day data downlink schedule. Global Area Coverage (GAC) data with about 4.5 km resolution will be used to produce the global coverage. Higher resolution (1.1 km resolution) Local Area Coverage (LAC) data will also be recorded to calibrate the sensor. In addition, LAC will be continuously transmitted from the satellite and received by High Resolution Picture Transmission (HRPT) stations. The methods used to generate commands for SeaWiFS employ numerous hierarchical checks as a means of maximizing coverage of the Earth's surface and fulfilling the LAC data requirements. The software code is modularized and written in Fortran with constructs to mirror the pre-defined mission rules. The overall method is specifically developed for low orbit Earth-observing satellites with finite onboard recording capabilities and regularly scheduled data downlinks. Two software packages using the Interactive Data Language (IDL) for graphically displaying and verifying the resultant command decisions are presented. Displays can be generated which show portions of the Earth viewed by the sensor and spacecraft sub-orbital locations during onboard calibration activities. An IDL-based interactive method of selecting and testing LAC targets and calibration activities for command generation is also discussed.

Woodward, Robert H.↗

Automated Scenario Generation for Meeting Human-in-the-Loop Simulation Requirements

A two-step automated Multi-Aircraft Control System traffic scenario generation process for Human-in-the-Loop evaluations of air traffic management concepts is described. The first step of the two-step process employs the scenario generation capability currently available in NASA's Air Traffic Management Testbed. The second step refines the scenario by filtering flights from the traffic scenario based on route length, cruise speed, cruise altitude, entry time and the desired ratio of internal to external flights. A solution for achieving the desired ratio of internal to external flights, where internal flights are shorter flights and external flights are longer flights based on a distance threshold, is described. Finally, schedulers are described for shaping the hourly arrival traffic count as a function of time in response to airport capacity constraint or for increasing the traffic demand with respect to the available arrival capacity. Results generated for arrival traffic to the four major airports in the New York Metroplex on a busy day using the two-step procedure are discussed. These results show that traffic scenarios for Multi-Aircraft Control System that meet the Human-in-the-Loop and fast-time simulation requirements can be created automatically following the procedures described in the paper. The automated process will improve the accuracy and efficiency by eliminating the tedious manual process for scenario generation.

Automated Scenario Generation↗