Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Troika partnership model for licensing NASA-LaRC technologies

The Technology Applications (TAG) Group at NASA Langley Research Center has currently more than 100 technologies that are ripe for commercialization. These technologies are categorized by various sectors including: Energy and the Environment; Materials and Structures; Manufacturing; Information and Communications; Transportation, and Medical/Sensor/ Instrumentation. A requirement that TAG has placed on all technologies ready for licensing is that there will be some university involvement in the technology transfer or knowledge transfer process. This model involves the troika of government (LaRC), industry and university. A number of variations on the Troika Partnership Model (TPM) were developed as a part of this ASEE Fellowship. Furthermore, five technologies were identified - three of which industrial interests have been matched: LaRC-SI, a thermoplastic that can be used as a coating; Variable Geometry Truss Manipulator Arm that can be used for nuclear waste clean -up and as scaffolding; and ADAPT (Approach to Data Management, Archive Protection, and Transmission) is a technology that could be used for a variety of multi-tasking operations over the Internet. The aim of this work was to initiate a Space Act Agreement (SAA) for at least one of these technologies using one of the options of the TPM. A preliminary partnership agreement using the SAA is currently being negotiated with NASA-LaRC, VPI and Virginia Power for the LaRC-SI thermoplastic that will be used as a coating.

Maclin, Arlene P.↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Graphite waste classification and disposal cost estimation for high temperature gas and salt reactors

As high-temperature reactor designs progress to demonstration, managing the radioactive wastes from these systems presents unique challenges. This work explores the irradiated graphite source term produced by three reactor designs: The Modular High Temperature Gas reactor (MHTGR), a pebble-bed High Temperature Gas Reactor (pb-HTGR), and a Fluoride-cooled High-temperature Reactor (FHR). We predicted a C-14 concentration of 4.3 Ci/m 3 for the MHTGR, 1.2 Ci/m 3 for the pebble bed HTGR, and 2.5 Ci/m 3 for the gFHR after 20 years of operation. The final C-14 concentration highly depended on the graphite nitrogen impurity, a major precursor for C-14. The C-14 concentration in all reactor types exceeded the 0.8 Ci/m3 threshold, resulting in a Class C waste classification. The costs associated with accepting the graphite after 20 years in a low-level waste disposal facility were projected to be 255 dollars per kWe for the MHTGR, 248 dollars per kWe for the pb-HTGR, and 56.8 dollars per kWe for the FHR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Complex Sources and Impacts on Remediation and Monitoring Approaches - 19058

Remedy selection, implementation, and coordination with tank farm activities for adjacent waste sites need to be facilitated by a technically defensible description of sources and their relative strength and temporal contributions to groundwater contamination. Detailed data describing contaminant source releases are typically not available, so source locations are highly uncertain. Furthermore, data on sources and model parameters are not readily available through direct measurements. Instead, source data are often derived by extrapolation from a few direct and/or indirect measurements, while model parameters are commonly estimated using inverse modeling or calibration methods. Because the conceptual model of sources will influence the mass and timing of the flux of contaminants to groundwater, uncertainty in the source terms should be considered. Even though a best-fit model can often be identified, it may not be the best representation of the sources given the sparse, uncertain nature of the data used for estimating source terms. To support future feasibility studies, a systematic approach is needed for identifying remediation and monitoring activities appropriate under conditions of uncertainty. In this study, an integrated assessment of alternative conceptual model elements has been examined using the B-Complex site in the Hanford Central Plateau to demonstrate how multiple sources in a waste management complex can be described to identify their relative contributions to groundwater. The heterogeneous structure of the system is modeled based on available field information on the lithological data for both the vadose zone and aquifer. The approach includes a simulation assessment and linkages to site data, with an uncertainty analysis applied to evaluate the effects of source term uncertainty on contaminant mass flux to groundwater. An integrated assessment of alternative conceptual model elements was evaluated to identify how parameter uncertainty impacts both temporal and spatial uncertainties associated with vadose zone source terms. Modeling scenarios identify important characteristics of remediation target zones to provide context for how surface barriers, in situ remedies, and water-table treatment zones can be designed to account for source dynamics. Ramifications for remediation and monitoring are discussed within the context of the source term uncertainty. The described approach facilitates systematically addressing alternative conceptual model questions in relation to remediation and monitoring and supports the remedial investigation/ feasibility study process and the remediation strategy development for the Hanford Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategic Implications of Active In-Container Vitrification Trials on Thermal Treatment of UK LLW and ILW - 19240

Thermal treatment is being considered in the UK for the treatment of a wide range of low and intermediate level wastes (LLW and ILW). To support this objective, a range of in-container vitrification trials were conducted to test a wide range of simulated waste streams. One of the major aims of these trials was to assess the disposability of the thermally treated products and the potential for using this process, either for management of wastes that currently have no clear disposal route, or for reducing the cost of disposal (through volume and hazard reduction). To this end, this paper considers the disposability of the disposal products produced during these treatment trials. Particular focus is given to the waste loading and volume reduction achieved by the process, based on the explicitly calculated values for each of the melts. A brief discussion of other disposability assessment criteria is also provided covering: Homogeneity (are radionuclides evenly distributed through the package): Porosity and permeability of the product; Water content; Potential for gas generation; Organic content; and chemical properties. It was observed that the highest waste loading and greatest volume reduction was achieved when treating wastes that could themselves act as glass formers, such as silicate minerals or soils, removing the need for addition of glass frit. Glass-forming wastes also produced homogenous products with low visible porosity and favourable chemical characteristics. Conversely treatment of wastes containing significant volumes of metal gave relatively poor volume reduction and a heterogenous product with visible porosity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficient Mesofluidic Separation of Large Particles in nuclear slurries - 20408

Efficient and effective particle separation is essential to cleanup of many nuclear wastes. For example, particle separation may be used to accelerate settle-decant bottlenecks that limit the throughput necessary to achieve the U.S. Department of Energy waste cleanup mission in a timely manner. Particle separation may be used to protect downstream processing equipment from pulses of solids that may be encountered near (within a few feet of) liquid-solid interfaces during waste transfer operations, thereby preventing work stoppages. Effective particle separation may permit efficient sludge washing. These are only a few of the ways in which particle separation is important. Yet, efficient and effective particle separation in nuclear processing environments remains challenging. For example, settle-decant operations permit larger and heavier particles to settle, leaving smaller, lighter particles suspended. However, settle-decant operations are slow, convection currents may resuspend solids, hindered settling of multicomponent slurries remains incompletely understood, and predictive models for settling in graduated cylinders fail to match limited observations of settling in large waste tanks. Additionally, pumping operations can cause turbulent resuspension of particles when the pump intake is close to the settled solids layer. Filtration techniques that use membranes or partially permeable barriers retain larger particles, permitting smaller particles to permeate. However, filters, including dead-end filtration, are prone to clogging and caking, operate at elevated pressures due to minimal void volume, and increase in pressure during operations, which require more control systems. Therefore, the need for high throughput particle separation techniques that operate with modest pressure drops persists. A novel mesofluidic separator presents the opportunity to effectively and efficiently accelerate the waste cleanup mission. The separator separates large particles from process streams across a broad range of particle sizes and has no moving parts or media to replace, regenerate, or clean. This separator design has an unusually large void volume, permitting operation at much higher flow rates (and lower pressures) than traditional filtration (e.g., dead-end filtration). Industrial-scale flow rates have been demonstrated. In performance testing, mesofluidic separators operate at might flow rates (>90 gpm (0.0006 m{sup 3}/s) in piping 3 inches (0.08 m) in diameter; Re>10{sup 5}), with modest pressure drop (∼25 psi (170 KPa) in testing). In complex, aggregating waste simulants, the separator loses <25% of flow projected over months without back pulsing or chemical cleaning. Mesofluidic separation presents infrastructure advantages, reduces risk, and provides mission impact. Infrastructure advantages include implementation within existing transfer systems, plug and play without facility modifications to safety systems, and operation at low pressures. The separator is flexible in location, may be positioned within or outside of waste tanks, and may replace or augment dead-end and cross-flow filters. Mesofluidic separation reduces risk by minimizing waste (no media to replace or regenerate and no cleaning chemicals to handle and dispose) and by minimizing filter change-out consistent with as low as reasonably achievable (ALARA) exposure to workers. The potential mission impact of these separators is substantial. The separator has potential to support, simplify, and accelerate in-farm transfers and waste feed delivery. Furthermore, the separator can free up settling and holding tanks in the Direct Feed Low-Activity Waste (DFLAW) mission by reducing or eliminating post-transfer settling and wait times with the potential to free up 1 Mgal (4000 m{sup 3}) of double-shell tank space. This paper quantitatively compares mesofluidic separation to dead-end filtration, discusses scale-up results, and considers the separator's potential to efficiently and effectively reduce the long-term environmental ability of particulate-rich nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Isolation-Development of the Safety Case for Disposal of Radioactive Wastes in Horizontal Boreholes - 20028

Deep Isolation has developed a safe, secure, and permanent geological disposal method for high-level waste, including spent nuclear fuel as well as sealed sources and other highly radioactive materials. The method leverages well established directional drilling technology to create horizontal repositories deep underground. The combination of great depth (1-3 km) and the ability to precisely position repositories in a horizontal orientation provides access to geologic strata that are inaccessible for typical mined and deep vertical borehole repositories. A number of potential direct and indirect safety benefits accrue including:1) greater depth below regional freshwater aquifers; 2) increased flexibility and more geologic options for siting; 3) access to deep formations with persistent and sustained reducing conditions. In addition there are a number of safety elements related specifically to the horizontal repository geometry including: 1) passive direction of thermally driven fluid and radionuclide movement away from the vertical access hole and toward the 'dead end' portion of the repository; 2) mitigation of seismic hazards by orienting repositories parallel to local and regional fault structures. In this paper we explore and discuss some of the key technologic, geologic and hydrologic elements that support the deep horizontal borehole safety case. The stalemate seen across the globe on the disposal of spent nuclear fuel and high-level waste can be broken. Deep Isolation offers a novel option for safe, secure, and permanent deep geological disposal of nuclear waste that can be developed as centralized repositories or adapted to smaller regional or site-specific repositories located near waste sources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benchmarking NPP Decommissioning Costs - Outcomes of the OECD Nuclear Energy Agency Activity - 19117

This paper describes work at the OECD Nuclear Energy Agency (NEA) on benchmarking in the context of nuclear power plant decommissioning costs. The NEA's Decommissioning Cost Estimation Group (DCEG) benchmarking activity was conducted during 2017-2018, and the report is scheduled for publication by NEA during the first half of 2019. The DCEG's activity focuses on identifying possible benchmarking approaches and discussing their specific application to decommissioning costing, including the 'added value' in developing decommissioning cost benchmarking approaches. It includes consideration of prevailing barriers to the sharing of information and data required for decommissioning cost benchmarking, and explores a range of possible initiatives intended to facilitate implementation of benchmarking approaches in nuclear decommissioning costing (i.e. a possible 'road map' for implementation). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Site Environmental Report (2019)

Los Alamos National Laboratory’s (the Laboratory’s) annual site environmental reports are prepared by the Laboratory’s environmental organizations, as required by U.S. Department of Energy Order 231.1B, Administrative Change 1, Environment, Safety, and Health Reporting, and Order 458.1, Administrative Change 3, Radiation Protection of the Public and the Environment. The following chapters in this report discuss our success in complying with environmental laws, regulations, and orders (Chapter 2, Compliance Summary); how we manage the Laboratory’s environmental performance (Chapter 3, Environmental Programs); how we monitor for air emissions of radioactive materials and climate conditions (Chapter 4, Air Quality); how we monitor for effects of Laboratory operations on groundwater quality (Chapter 5, Groundwater Protection); how we monitor the movement of chemicals and radionuclides by storm water runoff and the levels of chemicals and radionuclides in deposited sediment (Chapter 6, Watershed Quality); how we monitor for the presence, levels, and effects of chemicals and radionuclides in plants, animals, and soil (Chapter 7, Ecosystem Health); and finally, what radionuclide dose or risk from chemical exposure members of the public may experience as a result of Laboratory operations (Chapter 8, Public Dose and Risk Assessment).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of the PHDS Germanium Gamma-ray Imager (GeGI) in Facility Decontamination Assessment - 19471

As part of a site wide investigation, U.S. EPA Region 5 had to assess the nature and extent of contamination in a former radioactive source manufacturing facility. This work involved verification of the radioisotope expected, ensuring no other radioisotopes were present, and quantification of the activity and areal extent of contamination throughout the facility. The device used to support this assessment work was the Germanium Gamma-ray Imager (GeGI) manufactured by PHDS Co. of Knoxville, Tennessee. GeGI is a germanium-semiconductor imaging detector system that provides identification, location, and quantification of radioactive materials within its field of view. GeGI provides the highest fidelity radiological assay information including the best gamma-ray energy resolution and spatial localization of any existing technology, including gamma-ray energy resolution of ∼0.3% full-width half-max (FWHM) at 662 keV and angular location resolution ∼ +/-1 degree. The GeGI is a mechanically cooled, portable system well-suited to field operations. PHDS Co. also provided on-site support during assessment operations and performed subsequent data analysis. Gamma-ray spectral data and associated images were collected with GeGI in six primary areas of the facility having significant residual contamination. A total of 61 gamma-ray spectrum/image sets were collected over the course of three working days (22 Compton images and 39 Pinhole/Compton images). During data collection, Compton imaging was used as the means by which to identify and prioritize hotspots. After contaminated regions were identified via Compton imaging, short-distance Pinhole spectrum/image sets were collected for additional analysis. All of the spectrum/image sets were analyzed to determine the radioisotope distribution within the GeGI field of view, as well as to provide an estimate of the activity associated with each hotspot. It was determined that the nature of residual contamination present was distributed across specific areas of elevated activity, where in some areas there was significant accumulation of contaminated material. It was also determined that no discrete sources of high-activity were present, as would be expected in the case of radioactive material product intended for sealed source manufacture. Results included the activity of residual contamination for each of the areas assessed, and an estimate of the physical area over which that contamination was distributed. It was anticipated by EPA that if decontamination were to be performed that it would involve some type of concrete scabbling or other means of physical removal of contaminated material. The GeGI data could be used to estimate the areal extent (square footage) of concrete removal that would be required for decontamination. Using the activity estimate data from the GeGI along with an estimated depth of concrete removal, planning could be performed for decontamination work (equipment and personnel), waste collection, packaging, transportation, and disposal, along with an associated cost estimate. With regard to health and safety, use of the GeGI reduced the radiation dose to the EPA R5 staff performing the assessment work. The GeGI is a non-destructive device that supports assessment of radioactively contaminated areas and sources from a distance, reducing the need for close contact to radiation, and the time necessary for personnel to operate near such hazards. Use of the GeGI in this facility assessment was our first attempt to apply this technology in what proved to be a quick and efficient decontamination assessment method. The GeGI can assess the nature and extent of residual contamination in a facility, first by quickly identifying the areas of elevated activity, followed by refined measurement and assessment of those elevated areas. The GeGI data can then be used to develop planning and a cost estimate of required decontamination and waste management activities. Since it's a non-destructive gamma identification and imaging device, it can reduce the distance of workers from radioactive sources and the dose incurred from assessment work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of an Unrefined Humate Solution as a Possible Attenuation-based Remedy for Uranium Contamination in Acidic Groundwater - 20351

The Savannah River Site (SRS), joined the environmental cleanup program in 1981 after the Cold War, and was designated as a hazardous waste management facility. About 1.8 billion gallons of acid wastes were disposed into the F/H Area Seepage Basin that included many radionuclides and dissolved metals, resulting in highly contaminated groundwater plumes with pH of 3 - 5.5. The acidity of the plumes contributes to the mobility of several constituents of concern (COC) such as H-3, U-238, I-129, and Sr-90 for the F-Area plume and H-3, Sr-90 and mercury for the H-Area plume. An active treatment (pump-and-treat and re-injection) system was constructed and put in place in 1997 to address the removal of metals and radionuclides from the contaminated groundwater. As remediation projects advanced, active treatments were transitioned to more passive or enhanced-passive approaches such as the subsurface barrier with base injection system, which has been controlling the mobility of contaminants. However, new and more efficient attenuation-based remedies are always sought. Several studies have proposed that humic substances can be used to remediate sites contaminated with heavy metals by creating a permeable reactive barrier. Humic substances (HS) are major components of soil organic matter. HS are polyfunctional organic macromolecules formed by the chemo-microbiological decomposition of biomass or dead organic matter. These substances are usually divided into three main fractions: humin (insoluble at all pH values), humic acid (soluble at pH greater than 3.5), and fulvic acid (soluble at all pH values). Humic substances are major components of the soil at SRS and, in addition, are also helpful in the removal process of uranium. This research focuses on uranium (VI), which is a key contaminant of concern in the F-Area groundwater plume. The interaction of uranium with sediment in the presence or absence of humic substances involves complex mechanisms that are not yet well understood. The interaction of U(VI) with humic substances can affect the adsorption of U on sediment, altering its mobility in the subsurface. The objective of this study is to study the mobility of uranium in the presence of humic acid and to determine if sediments amended by humic acid can enhance the sorption of heavy metals onto sediments. In this research, experiments were conducted using background (clean) F-Area aquifer sediments to understand and predict uranium mobility. A blended material, humate, containing both humic and fulvic acids and a chemically modified humate (KW15 modified humic or mod-HA) was studied as a possible amendment for uranium remediation in SRS groundwater. Batch experiments were conducted in triplicates using 20 ml of aqueous suspension in DI water containing SRS sediment and mod-HA and studied the effect of pH, kinetics of humate sorption onto SRS sediment and also studied the sorption of uranium onto mod-HA amended SRS sediment. Results indicate that mod-HA amended sediment increases uranium removal significantly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Shielded Casks Transfer by Funicular from the Surface to Disposal Level in Cigeo - 20007

Andra is completing the detailed engineering phase of Cigeo - the French HLW and ILW-LL DGR. A funicular system is dedicated to the transfer of the waste disposal containers from the surface to the underground infrastructures down the nuclear access ramp. This paper explains the rationale having led to the choice of a funicular and presents the advantages of this system. Main technical components and mechanical performance of the funicular system are then detailed. Lastly, the ongoing two stages qualification testing program managed by Andra (in order to reach a level 6 on the international Technology Readiness Level scale) is discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The dissolution of simulant vitrified intermediate level nuclear waste in young cement water

Abstract It is pertinent to the safety case for geological disposal in the UK that the behaviour of vitrified wastes in proximity to cementitious materials is understood. In this study, vitrified simulant intermediate level nuclear waste (ILW) was subject to dissolution in a synthetic cement water solution to simulate disposal conditions. Results show that the presence of alkali / alkaline earth elements in the cementitious solution can be favourable, at least in the short-term, leading to lower dissolution rates associated with incorporation of these elements into the altered layer of the glass.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US/EURATOM I-NERI 2019 Annual Review Assessing

This project addresses the important issue of validating the integrity of spent nuclear fuel storage for extended periods of time, followed by transportation. While it is believed that this fuel is safe in its current condition for long periods of time, confirmatory data and analyses need to be obtained to validate our understanding of used fuel degradation mechanisms that may impinge on the integrity of the fuel to withstand long term storage and transportation conditions. This is especially true for high burnup fuel (> 45 GWD/MTU) that is currently being discharged. The international community recognizes the importance of these issues. Moreover, several European countries now envisage to subject mixed oxide (MOX) fuel to extended storage and direct disposal. The institutes collaborating on this proposal all have active programs focused on resolving these very issues. Collaborating together provides a leverage of programs and funding that will benefit each program individually as well as the commercial nuclear industry, as a whole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗