Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Assessing Tactical Scheduler Options for Time-Based Surface Metering

NASA is committed to demonstrating a concept of integrated arrival, departure, and surface operations by 2020 under the Airspace Technology Demonstration 2 (ATD2) sub-project. This will be accomplished starting with a demonstration of flight specific time-based departure metering at Charlotte Douglass International Airport (CLT). ATD2 tactical metering capability is based on NASAs Spot And Runway Departure Advisor (SARDA) which has been tested successfully in human-in-the-loop simulations of CLT. SARDA makes use of surface surveillance data and surface modeling to estimate the earliest takeoff time for each flight active on the airport surface or ready for pushback from the gate. The system then schedules each flight to its assigned runway in order of earliest takeoff time and assigns a target pushback time, displayed to ramp controllers as an advisory gate hold time. The objective of this method of departure metering is to move as much delay as possible to the gate to minimize surface congestion and engine on-time, while keeping sufficient pressure on the runway to maintain throughput. This flight specific approached enables greater flight efficiency and predictability, facilitating trajectory-based operations and surface-airspace integration, which ATD2 aims to achieve.Throughout ATD2 project formulation and system development, researchers have continuously engaged with stakeholders and future users, uncovering key system requirements for tactical metering that SARDA did not address. The SARDA scheduler is updated every 10 seconds using real-time surface surveillance data to ensure the most up-to-date information is used to predict runway usage. However, rapid updates also open the potential for fluctuating advisories, which Ramp controllers at a busy airport like CLT find unacceptable. Therefore, ATD2 tactical metering requires that all advisories freeze once flights are ready so that Ramp controllers may communicate a single hold time when responding to pilot ready calls.

Zelinski, Shannon↗

Development and Demonstration of a Fuel-Efficient, Class 8 Tractor & Trailer Engine System (SuperTruck II)

Navistar presents the SuperTruck II (ST II) Final Report to the Unites States Department of Energy (US DOE), which covers the five Budget Periods (BPs) from 10-1-2016 through 6-30-2022. For ST II, Navistar built on the achievements of the SuperTruck I (ST I) Program as a catalyst to continue critical research, design and development, testing, and operations to reach the ambitious goals of the ST II project. This approach allowed Navistar to continue contributing to the essential needs of our nation for safe, efficient, and cost-effective delivery of goods and services, as we reduced negative environmental effects and improved operational productivity. This document contains information specified in DOE F 4600.2, Final Scientific/Technical Report DOE F 241.3, B. SCIENTIFIC/TECHNICAL REPORTS, explaining how we met and exceeded program requirements. Throughout this Final Report, Navistar extracted information from documents prepared during the project that represent our management, design and development, building, and testing efforts to meet and exceed SuperTruck II project goals. Navistar followed Plan requirements to achieve / exceed Project Objectives: a) >100% improvement in vehicle freight efficiency (FE) (on ton-MPG basis) relative to 2009 baseline with stretch goal of 140% improvement [actual: 170%); b) >55% engine brake thermal efficiency (BTE) demonstrated in operational engine at a 65-mph cruise point on a dynamometer – ≥31% increase from 2009 baseline [actual: 55.20% of combined BTE) ; and c) development and implementation of commercially cost effective technologies (in terms of a simple payback). Technology selection / development path focused on developing technologies applicable for production within 3-year approach, while ensuring technology readiness and cost of ownership for end users. The Program was organized into five budget periods: Requirements / Technology Assessment and Initial Hardware Testing; Technology Development and Concept Readiness Demonstration; Technology Finalization and Validation Tractor / Trailer Fabrication, Integration and Commissioning Demonstration; and Fuel Economy (FE) and Brake Thermal Efficiency (BTE) and Program Completion. Leadership was provided by DOE, with tasks performed by laboratories (Argonne National Laboratory, Lawrence Livermore National Laboratory); partners at Bosch, TPI, Dana, and J.B. Hunt; , and support from University of Michigan and Clemson University. Navistar lead this team with Principal Investigator / Contracting Officer; Project Manager (PM); Vehicle, Engine, and Aftertreatment Engineers; Finance Manager, Technical Program Leads, and Legal/IP; and other key personnel. Work also included personnel in risk management; funding / budget / finance. Work involved analysis, development, testing, and down selection of individual/system engine, aftertreatment, and vehicle technologies, with integration of selected technologies into a prototype vehicle for demonstration of fuel-efficiency gain. Work also included component/integrated system level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. As ST II progressed, Navistar performed computer-based modeling / simulations of technologies focused on the primary operational areas: Engine, Aftertreatment, and Vehicle. During the ST II Program, the COVID Virus outbreak unexpectedly challenged by the effects of, which affected staffing, scheduling, design, supplies, availability of materials, production procedures, and testing. The DOE responded by extending the program by three quarters to ensure that project tasks were completed for this vital project. Focus continued on analyzing, developing, testing, and down selecting individual-/system-level engine and vehicle technologies for integration of the final selected technologies into a prototype vehicle that would demonstrate fuel-efficiency gains made possible through these technologies. This included component/integrated system-level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, solar power, distributed and intelligent vehicle power, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. Throughout the program, function, reliability, and performance at all levels were ensured through testing. Proof of this approach was demonstrated in multiple, on-road demonstrations: Scenario A (Flatland) Fuel Economy, Scenario B (Hilly) Fuel Economy, and City Cycle Tests. Other benefits derived from ST II included new/improved products, publications, patents, and next-step capabilities related to electric/hydrogen vehicles and autonomous driving.

Zukouski, Russ↗

Spatial Atomic Layer Deposition to Scale Manufacturing of Robust Catalysts for Biomass Conversion Applications: Cooperative Research and Development Final Report, CRADA Number CRD-17-715

This CRADA will facilitate technology maturation for NREL-developed ALD-coated catalyst materials that are tailored for durability during harsh biomass conversion chemistries. This project will address optimizing process parameters for scale-up of Al2O3 ALD-coated catalysts, demonstrating ALD-coated catalyst performance for muconic acid hydrogenation, and validating economic models that project significant cost benefits for ALD-enhanced catalytic processes. This work will strengthen private-public partnerships in the area of advanced catalyst manufacturing for energy-related technology. Critical information will be collected to elevate the Technology Readiness Level and increase our competitiveness for cooperative R&D agreements and licensing. Success of this work will be crosscutting as it can facilitate advanced catalyst development for both renewable and conventional processes.

09 BIOMASS FUELS↗

CRADA Number NFE-18-07313 with Nth Cycle, Inc. (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-18-07313 between Oak Ridge National Laboratory (ORNL) and Nth Cycle Inc. focused on developing a technology for sustainable recycling of rare earth and specialty metals (e.g., Y, Co, Li; RESE), as well as bulk and precious metals from industrial manufacturing and waste streams through the use of electrochemical carbon nanotube-enabled filters. The project outcome was expected to be a stronger mechanistic understanding of the electrochemical recovery of metals from real manufacturing process streams and e-waste streams, and the development of an optimized high-throughput pilot-scale device ready for commercialization. Testing, design, and development of a v1 prototype to prove the technology was unsuccessful (we were not able to reach the go/no-go outlined in Objective 1) and we were unable to continue our redesign due to COVID-19 lockdown and no access to lab from March 2020 – until our graduation from the program.

36 MATERIALS SCIENCE↗

Enhanced Catalyst Durability for the Oxidative Production of Biobased Chemicals (Cooperative Research and Development Final Report)

This CRADA will facilitate technology maturation for NREL-developed atomic layer deposition (ALD) coated catalyst materials that are tailored for durability during the oxidative production of biobased chemicals. This project will address optimizing process parameters for scaling aluminum oxide (Al 2 O 3 ) ALD coated catalysts, demonstrating ALD coated catalyst performance for biomass oxidation, and validating economic models that project significant cost benefits for ALD-enhanced catalytic processes. This work will strengthen private-public partnerships in the area of advanced catalyst manufacturing for energy-related technology. Critical information will be collected to elevate the Technology Readiness Level and increase our competitiveness for cooperative R&D agreements and licensing. Success of this work will be crosscutting as it can facilitate advanced catalyst development for both renewable and conventional processes.

09 BIOMASS FUELS↗

Electric Drive Technologies Consortium (EDTC)/ Cost competitive, high-Performance, highly Reliable (CPR) Power Devices on 4H-SiC (Final Report)

4H-Silicon carbide (4H-SiC) is a wide bandgap semiconductor that offers superior material properties over silicon, including higher critical electric field, thermal conductivity, and electron saturation velocity. These advantages make 4H-SiC highly attractive for high-voltage, high-efficiency power electronics. However, realizing the full potential of SiC requires device technologies that are not only high-performing but also manufacturable and reliable under real-world operating conditions. This report summarizes the outcomes of a five-year R&D effort funded by the U.S. Department of Energy (DOE) under the Electric Drive Technologies Consortium (EDTC), focused on developing cost-competitive, high-performance, and highly reliable (CPR) power devices on 4H-SiC substrates. The program targeted scalable and manufacturable 1.2 kV-class SiC MOSFETs optimized for next-generation electric vehicles, renewable energy systems, and industrial power conversion. The project delivered transformative advancements in SiC power device performance and ruggedness. Particularly, Specific on-resistance (R on,sp ) was reduced by up to 37%, from ~4.0 m$\Omega \cdot$cm 2 in earlier designs to an industry-leading 2.40 m$\Omega \cdot$cm 2 , driven by optimized doping, refined JFET widths, and layout engineering. Breakdown voltages (BV) exceeded 1600 V, marking improvement over legacy baselines, and demonstrating the robustness of newly implemented junction profiles and edge terminations. Short-circuit withstand time (SCWT) saw a remarkable 4$\times$ increase, from ~2 $\mu$s to over 8 $\mu$s, achieved through the successful deployment of deep P-well structures (~1.8–2.0 $\mu$m) via channeling implantation. This innovative process breakthrough enabled precise junction formation without MeV-class implantation tools, reduced leakage under high field stress, and allowed even the shortest-channel devices (down to 0.3 $\mu$m) to achieve both high BV and excellent ruggedness—breaking the traditional trade-off between conduction efficiency and blocking capability. Several novel architectures pushed the performance envelope further. JBSFETs—featuring embedded Schottky portions—eliminated bipolar degradation and drastically reduced third-quadrant leakage, while Ladder MOSFETs introduced a clever orthogonal conduction path that achieved a 15.4% reduction in R on,sp over standard linear designs. Switching performance reached new benchmarks: short-channel devices showed a 31% reduction in total switching energy compared to 0.5 $\mu$m counterparts, while maintaining manageable gate drive requirements. Layout-optimized structures not only improved transconductance but also accelerated switching transitions, pointing to real-world benefits in converter-level efficiency. The devices also passed rigorous reliability validation. Stress-tested across TDDB, HTGB, HTRB, HVP, and burn-in, the devices screened under 30 V/10 hr and 43 V/1 s protocols consistently exhibited tighter lifetime distributions and long-term oxide robustness. These screening techniques proved effective in identifying latent defects and ensuring deployment-grade reliability. Meanwhile, advanced 3D TCAD simulations revealed and resolved electric field hotspots—particularly in HEXFET corners—where fields exceeding 4.8 MV/cm were mitigated through geometry-aware layout corrections. Overall, the results of this project demonstrate a manufacturable and scalable SiC power device platform that addresses key DOE performance targets for efficient, robust, and reliable 1.2kV 4H-SiC Power Devices. The developed technologies represent a meaningful step forward in the commercial readiness of high-voltage SiC solutions and provide a strong foundation for continued advancement in wide bandgap power electronics.

42 ENGINEERING↗

SITCOMTN-086: Rubin Observatory Baseline Calibration Plan

Baseline calibration plan describing the as-built system to be delivered at the time of the Operations Readiness Review (ORR), and for use during Year 1 of the Rubin Observatory Legacy Survey of Space and Time (LSST).

79 ASTRONOMY AND ASTROPHYSICS↗

Ion drive technology readiness for the 1985 Halley Comet rendezvous mission

This paper summarizes the results of an assessment performed by the Jet Propulsion Laboratory (JPL) in FY 77 of the technology readiness of ion propulsion technology to support a 1985 Halley Comet Rendezvous (HCR) mission. The assessment identifies the status of ion propulsion technology and risk of its utilization to perform the HCR mission as of July 1977 and provides projections of status and risk at the required date for an HCR project start, October 1978. These projections are based on the assumed completion of the development activities ongoing at the time of this assessment and the recommended new activities identified in this paper. The conclusions of the study indicate that a National Aeronautics and Space Administration (NASA) commitment to the performance-demanding HCR mission would involve significant risk, greater than that experienced in any post-1964 planetary mission, despite years of supporting research and advanced development funding for ion propulsion and even assuming the success of an ambitious, aggressive FY 78 pre-project advanced systems technology (AST) program proposed by JPL. Contributing principally to the identified risk are a marginal mass margin of 6.7%, driven by uncertainties in ion drive vehicle masses and an unconfirmed solar array power degradation model of 12%, and technology currently undemonstrated to meet HCR mission requirements in two of the six subsystems of the ion propulsion module: the thrust and solar array subsystems.

John L West↗

The NASA Evolutionary Xenon Thruster (NEXT): NASA's Next Step for U.S. Deep Space Propulsion

NASA s Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to enhance the performance and lower the costs of future NASA space science missions. This is being accomplished by producing Engineering Model (EM) and Prototype Model (PM) components, validating these via qualification-level and integrated system testing, and preparing the transition of NEXT technologies to flight system development. The project is currently completing one of the final milestones of the effort, that is operation of an integrated NEXT Ion Propulsion System (IPS) in a simulated space environment. This test will advance the NEXT system to a NASA Technology Readiness Level (TRL) of 6 (i.e., operation of a prototypical system in a representative environment), and will confirm its readiness for flight. Besides its promise for upcoming NASA science missions, NEXT may have excellent potential for future commercial and international spacecraft applications.

Schmidt, George R.↗

Development of Acoustic Backscatter for In Situ Monitoring of Nuclear Sludge Wastes During Transfer - 20117

This paper presents an overview into the use of acoustic backscatter systems (ABS) for the in situ characterization of nuclear waste sludge concentration, size and aggregation, highlighting key achievements from the University of Leeds. Previous projects funded through the Engineering and Physical Sciences Research Council (EPSRC) UK and Innovate UK are firstly reviewed and linked to current research within the new TRANSCEND consortium. Detailed are a number of developments at various stages of technology readiness level, from the use of ABS to monitor small-scale sludge settling in columns, to large-scale jet-mixing and waste transfer operations. Current work with Sellafield Ltd will see new technology and world leading analysis methods deployed to measure the consolidation of complex wastes currently undergoing containment, the first time full industrial utilization of these systems has been achieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Science Validation for Dark Energy Research with Optical Imaging Surveys

The Universe has been expanding at an accelerating rate over the past several billion years, as though an unknown form of dark energy permeates all of space. The ultimate scientific goal of the proposed research is to distinguish between different physical mechanisms that could account for this observed accelerated expansion, for example, the zero-point energy of the vacuum, a dynamical form of energy that varies in time and/or space, or a modification to our theory of gravity. Wide- field optical imaging surveys of the night sky can test these competing models by measuring both the cosmic expansion history and the growth of large-scale structure. To this end, the Dark Energy Survey (DES) has cataloged several hundred million galaxies and thousands of supernovae. The Vera C. Rubin Observatory Legacy Survey of Space and Time (LSST), will enlarge the census to billions of galaxies and hundreds of thousands of supernovae. A critical question for these dark energy experiments is whether systematic uncertainties can continue to be controlled at a level to keep pace with the statistical precision offered by such enormous datasets. The immediate research objectives of this project were (1) to prepare and validate input datasets that are the foundation of cosmological analyses with DES, and (2) to prepare for value-added characterization of Rubin Observatory commissioning data to inform early operations and accelerate the realization of dark energy science from LSST data products. For DES, we assembled and curated cosmology-ready data releases that include value-added components such as enhanced photometric and astrometric calibrations, alternative source extraction algorithms, maps of the survey coverage and survey conditions, object classifications, object quality selections, galaxy shapes, and photometric redshifts. We used the galaxy clustering technique to validate the photometric redshift distributions of various galaxy samples to be used as lenses in combined studies of galaxy clustering and weak gravitational lensing. The galaxy clustering redshift analysis was enhanced by use of a larger sample of reference galaxies from the eBOSS spectroscopic survey that extends to higher redshifts. For LSST, we prepared for science validation studies of commissioning data aimed at dark energy science capability that extend beyond the normative system-level tests to be done by the Rubin Observatory Construction Project. We identified a set of proposed survey strategies and candidate target fields that could be observed during the commissioning period to enhance science validation activities related to studies of dark energy.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Hybrid Thermally Efficient Core (HyTEC) HyTEC Phase 1 – Advanced Aerodynamics Final Report

The objective of the Hybrid Thermally Efficient Core (HyTEC) – Advanced High Pressure Turbine (HPT) Aerodynamics project is to develop technology for a compact core that contributes to significant fuel burn reductions of 5-10% over current generation technologies. To accomplish this, the HPT is incorporating a range of aerodynamic features and technologies to improve component efficiency and provide favorable systems level trades. In particular, this project explored low solidity airfoils, advanced tip treatments, platform contouring, and advanced ceramic matrix composite (CMC) Stage 2 Nozzle (S2N) airfoils to eliminate the need for post throat cooling in a compact core environment. The maturation of these technology areas is expected to provide a significant improvement in component efficiencies, and consequently reductions in fuel burn, over the current state of the art (SoA). To mature these technologies to Technology Readiness Level (TRL) 4, a test campaign was performed that consisted of four tests at three facilities. TRL 3 testing was performed in the CW22 linear cascade at NASA Glenn for blade and nozzle technologies, TRL 4 nozzle testing was performed at GE Aerospace (GEA) Test Cell A8, and TRL 4 blade testing was performed at the Notre Dame Turbomachinery Laboratory (NDTL) using the Transonic Research Turbine (TRT) rig. Low solidity was successfully demonstrated to a TRL 4 level. Low solidity nozzles showed benefits in line with pre-project expectations, while low solidity blades were shown to have an aerodynamic penalty. Crucially, this program only considered the aerodynamic losses, and systems trades such as reductions in cooling flows are expected to continue to make low solidity blades a net positive. By successfully quantifying the aerodynamic performance in this project, these trades can be conducted to determine where in the engine architecture low solidity blades will contribute positively to system operation. Platform contouring was demonstrated to a TRL 4 level, with performance in line with the lower end of the pre-project expected range. Advanced tip treatments performance levels were indeterminate, showing the expected improvements to flow physics but with a performance level confounded by several rig issues including whirl mode induced variation in tip clearance. The elimination of post-throat cooling on the S2N was successfully demonstrated to provide a performance benefit, however that benefit was approximately half the level that was expected in pre-project predictions. Overall, the technology maturation plan for HyTEC Phase 1 was successful, bringing the suite of technologies to TRL 4.

High pressure turbine↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Integrated Display and Environmental Awareness System - System Architecture Definition

The Integrated Display and Environmental Awareness System (IDEAS) is an interdisciplinary team project focusing on the development of a wearable computer and Head Mounted Display (HMD) based on Commercial-Off-The-Shelf (COTS) components for the specific application and needs of NASA technicians, engineers and astronauts. Wearable computers are on the verge of utilization trials in daily life as well as industrial environments. The first civil and COTS wearable head mounted display systems were introduced just a few years ago and they probed not only technology readiness in terms of performance, endurance, miniaturization, operability and usefulness but also maturity of practice in perspective of a socio-technical context. Although the main technical hurdles such as mass and power were addressed as improvements on the technical side, the usefulness, practicality and social acceptance were often noted on the side of a broad variety of humans' operations. In other words, although the technology made a giant leap, its use and efficiency still looks for the sweet spot. The first IDEAS project started in January 2015 and was concluded in January 2017. The project identified current COTS systems' capability at minimum cost and maximum applicability and brought about important strategic concepts that will serve further IDEAS-like system development.

Wearables↗

Power Management and Distribution Trades Studies for a Deep-Space Mission Scientific Spacecraft

As part of NASA's Project Prometheus, the Nuclear Systems Program, NASA GRC performed trade studies on the various Power Management and Distribution (PMAD) options for a deep-space scientific spacecraft which would have a nominal electrical power requirement of 100 kWe. These options included AC (1000Hz and 1500Hz and DC primary distribution at various voltages. The distribution system efficiency, reliability, mass, thermal, corona, space radiation levels and technology readiness of devices and components were considered. The final proposed system consisted of two independent power distribution channels, sourced by two 3-phase, 110 kVA alternators nominally operating at half-rated power. Each alternator nominally supplies 50kWe to one half of the ion thrusters and science modules but is capable of supplying the total power re3quirements in the event of loss of one alternator. This paper is an introduction to the methodology for the trades done to arrive at the proposed PMAD architecture. Any opinions expressed are those of the author(s) and do not necessarily reflect the views of Project Prometheus.

Kimnach, Greg L.↗

De-Inventory Plan for Transuranic Waste Stored at Area G

This report describes the strategy and detailed work plan developed by Los Alamos National Laboratory (LANL) to disposition transuranic (TRU) waste stored at its Area G radioactive waste storage site. The focus at this time is on disposition of 3,706 m 3 of TRU waste stored above grade by June 30, 2014, which is one of the commitments within the Framework Agreement: Realignment of Environmental Priorities between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) and the State of New Mexico Environment Department (NMED), Reference 1. A detailed project management schedule has been developed to manage this work and better ensure that all required activities are aligned and integrated. The schedule was developed in conjunction with personnel from the NNSA Los Alamos Site Office (LASO), the DOE Carlsbad Field Office (CBFO), the Central Characterization Project (CCP), and Los Alamos National Security, LLC (LANS). A detailed project management schedule for the remainder of the above grade inventory and the below grade inventory will be developed and incorporated into the De-Inventory Plan by December 31, 2012. This schedule will also include all newly-generated TRU waste received at Area G in FYs 2012 and 2013, which must be removed by no later than December 31, 2014, under the Framework Agreement. The TRU waste stored above grade at Area G is considered to be one of the highest nuclear safety risks at LANL, and the Defense Nuclear Facility Safety Board has expressed concern for the radioactive material at risk (MAR) contained within the above grade TRU waste inventory and has formally requested that DOE reduce the MAR. A large wildfire called the Las Conchas Fire burned extensive areas west of LANL in late June and July 2011. Although there was minimal to no impact by the fire to LANL, the fire heightened public concern and news media attention on TRU waste storage at Area G. After the fire, New Mexico Governor Susana Martinez also requested that LANL accelerate disposition of TRU waste stored above grade at Area G. The 3,706 m 3 volume of TRU waste stored above grade consists of 4,495 containers that include all above grade non-cemented waste as well as above grade cemented waste that was ready for characterization on October 1, 2011. This volume includes all newly-generated TRU waste currently stored at Area G as of October 1, 2011. This volume does not include the Bolas Grandes spheres, mixed low level waste (MLLW) containers, empty containers, cemented waste that requires remediation, projected newly generated TRU waste from FY 2012 and later, or TRU waste stored below grade. The 3,706 m 3 volume represents about 86 per cent of the total volume of TRU waste stored above grade on October 1, 2011. The De-Inventory Plan supports the DOE Office of Environmental Management (EM) goal to disposition 90% of the Legacy TRU waste within the DOE complex by the end of 2015 as stated in its Roadmap for EM’s Journey to Excellence (Reference 2). The plan also addresses precursor actions for disposition of TRU waste that are necessary for compliance with the Compliance Order on Consent issued by the NMED in 2005 (Reference 3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Christmas Valley Renewable Energy Assessment

In partnership with the Oregon Military Department, the Department of Energy used the award to assess and evaluate renewable resources in a 2,622-acre location in Lake County, central Oregon, leading to future development of up to 200 MW of solar electricity. In partnership with the Oregon Military Department, the Department of Energy used the award to assess and evaluate renewable resources in a 2,622-acre location in Lake County, central Oregon, leading to future development of up to 200 MW of solar electricity. The Oregon Military Department (Military) acquired a large parcel of land located in south central Oregon. The land was previously owned by the US Air Force and developed for an Over-the-Horizon Backscatter Radar Transmitter Facility, located about 10 miles east of the town of Christmas Valley. The Military is investigating a number of uses for the site, including Research and Development (R&D) laboratory, emergency response, military operations, developing renewable energy and related educational programs. One of the key potential uses would be for a large scale solar photovoltaic power plant. This is an attractive use because the site has excellent solar exposure; an existing strong electrical interconnection to the power grid; and a secure location at a moderate cost per acre. The project objectives include: 1. Site evaluation 2. Research and Development (R&D) facility analysis 3. Utility interconnection studies and agreements 4. Additional on-site renewable energy resources analysis 5. Community education, outreach and mitigation 6. Renewable energy and emergency readiness training program for veterans

14 SOLAR ENERGY↗

Experimentation for the Maturation of Deep Space Cryogenic Refueling Technologies

This report describes the results of the "Experimentation for the Maturation of Deep Space Cryogenic Refueling Technology" study. This study identifies cryogenic fluid management technologies that require low-gravity flight experiments bring technology readiness levels to 5 to 6; examines many possible flight experiment options; and develops near-term low-cost flight experiment concepts to mature the core technologies. A total of 25 white papers were prepared by members of the project team in the course of this study. The full text of each white paper is included and 89 relevant references are cited. The team reviewed the white papers that provided information on new or active concepts of experiments to pursue and assessed them on the basis of technical need, cost, return on investment, and flight platform. Based on on this assessment the "Centaur Test Bed for Cryogenic Fluid Management" was rated the highest. "Computational Opportunities for Cryogenics for Cryogenic and Low-g Fluid Systems" was ranked second, based on its high scores in state of the art and return on investment, even though scores in cost and time were second to last. "Flight Development Test Objective Approach for In-space Propulsion Elements" was ranked third.

Chato, David J.↗