Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR PROTECTION SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

MACCS (MELCOR Accident Consequence Code System) User Guide

The MELCOR Accident Consequence Code System (MACCS) is used by Nuclear Regulatory Commission (NRC) and various national and international organizations for probabilistic consequence analysis of nuclear power accidents. This User Guide is intended to assist analysts in understanding the MACCS/WinMACCS model and to provide information regarding the code. This user guide version describes MACCS Version 3.10.0. Features that have been added to MACCS in subsequent versions are described in separate documentation. This User Guide provides a brief description of the model history, explains how to set up and execute a problem, and informs the user of the definition of various input parameters and any constraints placed on those parameters. This report is part of a series of reports documenting MACCS. Other reports include the MACCS Theory Manual, MACCS Verification Report, Technical Bases for Consequence Analyses Using MACCS, as well as documentation for preprocessor codes including SecPop, MelMACCS, and COMIDA2. PAPERWORK REDUCTION ACT STATEMENT The NUREG does not contain information collection requirements and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 USC 3501, et seq.). PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. ACKNOWLEDGEMENTS Contributions to this User Guide were received from NRC and Sandia National Laboratories (SNL) project managers, technical experts, and code authors dedicated to the production of a valuable resource for the MACCS user community. Instructions and guidance included herein were developed over many years and include advancements in the code that provide users the ability to develop complex consequence modeling scenarios. WinMACCS and many of the early MACCS developments were due to vision of an earlier Project Manager, Jocelyn Mitchell. Jonathan Barr and AJ Nosek also contributed to the development of this report. The current NRC Project Manager, Salman Haq, provided the leadership to ensure this document was completed. Several other NRC and Sandia staff provided insights supporting development of the MACCS code and of this document.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The conduct of the united states department of energy nuclear criticality safety program hands-on training and education courses - 14621

The United States Department of Energy (DOE) Nuclear Criticality Safety Program (NCSP), funded and managed by the National Nuclear Security Administration (NNSA), offers courses to educate nuclear criticality safety (NCS) engineers, process supervisors, and others, and to provide experimental, hands-on training addressing important characteristics of neutron multiplying systems. This training satisfies the American National Standard Institute/American Nuclear Society (ANSI/ANS)-8.26-2007 requirement for participating in hands-on experiments with fissionable materials and provides awareness and understanding of DOE Orders, Guides and Rules, ANS standards, and hazard identification techniques, as well as control design, implementation, and maintenance in criticality safety evaluations. Since the pilot course was developed in 2011, a variety of courses have been developed for NCS practitioners and process supervisors. Attendees have come from several US and international sites. Through NCSP international collaborations and relationships, students from the Atomic Weapons Establishment (AWE) in the United Kingdom, Atomic Energy of Canada, and the Institute for Radiation Protection and Nuclear Safety in France have participated in these courses in the US. Manager courses are available for process supervisors and operations managers with NCS responsibilities in their daily jobs. Manager courses are taught at Sandia National Laboratory (SNL) and the National Criticality Experiments Research Center (NCERC); they offer a combination of hands-on experiments and classroom discussions. A two-week course is also offered for NCS practitioners, with a week of classroom instruction at Los Alamos National Laboratory (LANL) focused on generation of NCS evaluations, and a week of hands-on training utilizing the critical assemblies at either SNL or NCERC. Cleared students can attend the hands-on training at either SNL or NCERC, and uncleared students can attend at SNL. Courses continue to evolve and continuously improve as important elements of NCS evaluations (e.g., human factors, non-destructive assay (NDA) techniques, process criticality accident lessons-learned, and hand calculation methods) are integrated with criticality safety evaluation exercises. Courses include tours of process operations at SNL, NCERC, and LANL, and interaction with instructors experienced in conducting critical experiments and working in NCS. The NNSA NCSP provides management, funding, and technical direction for these courses and makes them available with no tuition cost to NCS practitioners. This paper provides a status report to the NCS community on the conduct of these courses and how they will likely evolve in the future. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modification of the Decontamination Facility at the Kruemmel NPP - 13451

In February 2009, Siempelkamp Nukleartechnik GmbH was awarded the contract for the design, manufacture, delivery and construction of a new Decontamination Facility in the controlled area for Kruemmel NPP. The new decontamination equipment has been installed according to the state of art of Kruemmel NPP. The existing space required the following modification, retrofitting and reconstruction works: - Demounting of the existing installation: to create space for the new facility it was necessary to dismantle the old facility. The concrete walls and ceilings were cut into sizes of no more than 400 kg for ease of handling. This enabled decontamination so largest possible amount could be released for recycling. All steel parts were cut into sizes fitting for iron-barred boxes, respecting the requirement to render the parts decontaminable and releasable. - Reconstructing a decontamination facility: Reconstruction of a decontamination box with separate air lock as access area for the decontamination of components and assemblies was conducted using pressurized air with abrasives (glass beads or steel shots). The walls were equipped with sound protection, the inner walls were welded gap-free to prevent the emergence of interstices and were equipped with changeable wear and tear curtains. Abrasive processing unit positioned underneath the dry blasting box adjacent to the two discharge hoppers. A switch has been installed for the separation of the glass beads and the steel shot. The glass beads are directed into a 200 l drum for the disposal. The steel shot was cleaned using a separator. The cleaned steel shot was routed via transportation devices to the storage container, making it available for further blasting operations. A decontamination box with separate air lock as access area for the decontamination of components and assemblies using high pressure water technology was provided by new construction. Water pressures between 160 bar and 800 bar can be selected. The inner walls are welded gap-free and all rough edges are rounded off. All wetted parts are steel grade 1.4301 or higher. In an extension to the high pressure water decontamination box, 2 ultrasonic ponds and one washing station for small components as provide by new construction. A long pond with 3.25 m length for the decontamination of large components (e.g. turbine blades, pump rotors, driving rods) was installed. For the handling heavy components, a 2 t crane was installed. New construction of a mechanical effluent treatment facility including oil separator was connected to the existing effluent storage tank provided by the customer. One exhaust air filtration system is provided for each decontamination box, with the following requirements. The exhaust air is sent back to the room (recirculated air system). Dry blasting box including raw separator with dust collection in 200 l drum, filter for suspended particles; High pressure water decontamination box and wet area with water separator, pre-separator, filter for suspended particles. Installation of a steel platform at building height +12.85 above the decontamination boxes + 8.50 m for the erection of the high pressure water facilities, the recirculating air filter system, the air compressor and the respiratory air supply unit. The aforementioned components are placed on the steel platform and have been encased in a sound-lowering and accessible manner. New construction of the entire E and C technology for the TU system including modification of the supply lines from the switch gear. All devices are to be operated automatically. Dry blasting box, high pressure water decontamination box and wet area are designed to guarantee a unitary 'exterior view' of the decontamination facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Independence: Construction of an Integrated Biorefinery for Production of Renewable Biofuels at an Existing Pulp and Paper Mill

Project Independence proposed to construct a demonstration biomass-to-liquids (BTL) biorefinery in Wisconsin Rapids, isconsin. The biorefinery was to be co-located at the existing pulp and paper mill, NewPage Wisconsin System Incorporated’s Wisconsin Rapids Mill, and when in full operation would both generate renewable energy for Wisconsin Rapids Mill and produce liquid fuels from abundant and renewable lignocellulosic biomass. The biorefinery would serve to validate the thermochemical pathway and economic models for BTL production using forest residuals and wood waste, providing a basis for proliferating BTL conversion technologies throughout the United States. It was a project goal to create a compelling new business model for the pulp and paper industry, and support the nation’s goal for increasing renewable fuels production and reducing its dependence on foreign oil. NewPage Corporation planned to replicate this facility at other NewPage Corporation mills after this first demonstration scale plant was operational and had proven technical and economic feasibility. An overview of the process begins with biomass being harvested, sized, conditioned and fed into a ThermoChem Recovery International (TRI) steam reformer where it is converted to high quality synthetic gas (syngas). The syngas is then cleaned, compressed, scrubbed, polished and fed into the Fischer-Tropsch (F-T) catalytic reactors where the gas is converted into two, sulfur-free, clean crude products which will be marketed as revenue generating streams. Additionally, the Fischer-Tropsch products could be upgraded for use in automotive, aviation and chemical industries as valuable products, if desired. As the Project Independence project set out to prove forest products could be used to commercially produce biofuels, they planned to address and mitigate issues as they arose. In the early days of the Project Independence project, the plant was sized to process 500 dry tons of biomass per day but would generate a blend of synthesis gas for the lime kiln and a minimum of Fischer-Tropsch liquids for sale. This was to be done using a single stage of Fischer-Tropsch reaction at roughly a 70% yield. The capability of the Wisconsin Rapids Mill lime kiln to run on the relatively low heating value of the product synthesis gas was problematic. The design was then changed to maximize Fischer-Tropsch liquids production using a two stage Fischer-Tropsch process. Project Independence progressed with the design of the mill as ThermoChem Recovery International worked on the technical details of the project as well as develop information from their pilot plant. The pilot plant work uncovered several problems with the synthesis gas clean-up that solutions. ThermoChem Recovery International found these solutions and developed a very good path forward on the technical side. The technical solutions were demonstrated in the pilot plant to everyone’s satisfaction. In July 2010, NewPage Corporation had been severely affected by the downturn in the economy and actively went to find a strategic partner. By April 2011 the Abell Foundation entered the picture as this strategic partner. The Abell Foundation would join forces as Project Independence Inc. to build the 500 dry ton per day Project Independence plant. The design of this facility progress even after NewPage Corporation declared Chapter 11 Bankruptcy protection in September, 2011. This continued until April 2012 when NewPage Corporation determined that continued work on Project Independence Inc. presented too much risk with little reward for NewPage Corporation. The project was terminated at this point.

09 BIOMASS FUELS↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Integrating HPC simulations and physical experiments to characterize the effects of gamma radiation on seismic protective devices

Seismic protective systems, composed of seismic isolators and dampers, can substantially reduce the effects of earthquake shaking on nuclear power plants and components therein. To enable the use of these devices to protect equipment inside a plant and close to a source of radiation, the U.S. Department of Energy (DOE) funded a project at the Idaho National Laboratory (INL) and the University at Buffalo to characterize the effects of absorbed gamma dose on their mechanical properties. An early task in the project was to determine the exposure time required in the INL Foss Therapy Services (FTS) 60 Co gamma irradiator to achieve a target absorbed dose in the materials used to construct isolators and dampers, including fluids, polymers, composites, and metals. This task required the novel integration of high-performance computing (HPC), Monte Carlo N-Particle (MCNP) simulations, and irradiation experiments using Fricke dosimetry. An MCNP model of the FTS irradiator at INL was developed and validated using Fricke dosimetry. Simulations of three experiments in the irradiator, two with Fricke vials only and one with Fricke vials and a large-size isolator, predicted the Fricke-measured absorbed dose rate to within 15% in all three cases, providing high confidence in the calculation of the gamma dose absorbed in the materials comprising the seismic protective devices. The simulations demonstrated that the effects of photon scattering on absorbed dose rate in the FTS irradiator are negligible for test articles installed close to the cobalt sources and near the rear of the irradiator. The validated MCNP model of the FTS irradiator is being used to support ongoing DOE-funded experiments on seismic protective devices and could be applied to future, non-seismic-related experiments. In conclusion, the novel validation process successfully deployed for the FTS irradiator at INL could be applied to other irradiators, requiring new MCNP models and simulations, and irradiation experiments using dosimeters.

42 - ENGINEERING↗

Commissioning and Startup of a New Category 2 Nuclear Facility for RH TRU Sludge Packaging - 18614

For many years the Department of Energy (DOE) has been executing a plan to eliminate all threats of Radiological release to the Columbia River from the Hanford site, in Richland, Washington. While the River Corridor Closure Project is nearing completion, one of the last remaining facilities along the Columbia River is the 100K reactor complex. Since the 1950's the 105KW fuel storage basin has contained varying levels of spent reactor fuel and products of the degradation of aging stored fuel. Having previously removed all of the distinguishable spent fuel components, CH2M HILL Plateau Remediation Company (CH2M) is now in the final stages of readiness review to commence removal of the residual sludge material that has accumulated in the basin throughout the years of operation. There is approximately 27 m3 of sludge in the 105KW basin currently. This sludge material exhibits a very high radiation dose rate with levels reaching 100 R/hr. It is also very difficult to mobilize and transfer due to its physical characteristics. CH2M engineers have developed a novel mechanical system for mobilization and transfer of the sludge to specially designed storage containers. Once transferred to these containers, the sludge will be moved away from the river and taken to T Plant, a decontamination and repair facility on site, for interim storage, while a project to treat and package the material for final disposition is established. The Sludge Removal Project (SRP) is a $309 M capital line item project that was established to achieve the goals of this mission. Part of the project is to develop and install the equipment needed to do the transfer, and part of the project is to construct a new Category 2 sludge packaging facility. Construction of the facility is now complete, all equipment is installed and the project is well into the commissioning phase. Over the final three months of 2017, the project progressed into the final stages of readiness to transition to operations. This will represent the first commissioning of a new Category 2 process and facility at Hanford in over 10 years. The SRP team has crossed over many hurdles in establishing a workable plan for the safety basis for installing, commissioning and transitioning to operations within the boundaries of an existing Facility Safety Analysis Report. The project team has also applied extensive use of a mockup facility in the development and execution of the path to readiness and commencement of operations. At the time of the conference, the project will have completed a DOE Operational Readiness Review and will be very near of just entering full operation. This paper will share the experiences of the project team through these final steps and lessons learned on making the project successful. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Considerations on the Nuclear Material Accounting of PB-HTR Commercial Plants

The pebble bed high temperature reactor (PB-HTR) is a promising reactor type with inherent safety features in the next generation nuclear systems Based on the experience of studying and operating test PB-HTR (the HTR-10) for decades, China is constructing the first commercial nuclear power plant of modular PB-HTR in the world, i.e. the HTR-PM, which is expected to commission by the end of 2017. Since the PB-HTRs are quite different from the conventional PWRs in many aspects, including the large amount of fuel pebbles, the continuous refueling, the low heavy metal density in fuels, the safeguards of PB-HTR is important to investigate. Unfortunately, the research on this topic is insufficient by far, especially for the upcoming commercial PB-HTR plants. The PB-HTR has excellent features on proliferation resistance The graphite fuel pebbles with diameter of 6 cm are used as fuel elements, embedded with more than ten thousand TRISO coated fuel particles. This kind of fuel design provides more than one order of magnitude lower heavy metal concentration in fuel than other fuels. For the typical uranium loading of 7 grams in the HTR-PM, more than 10,000 fresh fuel pebbles (about 1.2 tons) are required to provide a significant quantity of indirect-use uranium with enrichment less than 20%. Moreover, the reprocessing of TRISO particle fuels is difficult because of the rigid SiC layer in the coating. Also, the possibility of utilizing materials from PB-HTR's spent fuels to product dirty bombs is quite low just due to the same reason as reprocessing. On the other hand, the large amount of fuel pebbles and the continuous on-line fueling introduce new challenges in nuclear safeguards and material accounting of PB-HTRs. This summary discusses the major considerations on the nuclear material accounting of PB-HTRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Identifying Challenges in Safeguards for Metallic Fuel Fabrication Facilities

As new advanced reactors gain popularity, there is an increasing interest in metallic fuel fabrication for fast reactors. While metallic fuels themselves are not a new idea, as many of the first reactors employed metallic fuels, new designs, compositions, and fabrication methods are appearing throughout the nuclear community. As the interest grows and facilities are constructed, both domestic and international safeguards will need to be heavily involved to support safeguards-by-design (SBD) measures from the start. This work compiles a review of historical and modern fuel types and fabrication methods, fabrication processes, safeguards gaps, and potential safeguards solutions. Metallic nuclear fuel types have been around for many decades and were included in some of the first reactors including the Experimental Breeder Reactor (EBR)-I and -II, the Fermi 1 reactor, the Integral Fast Reactor (IFR), and the Dounreay Fast Reactor (DFR). These reactors used various compositions including pure uranium (U) metal, U-zirconium (Zr) alloys, plutonium (Pu)-aluminum (Al) alloys, U-fissium (Fs) alloys, U-Pu-Zr alloys, and U-molybdenum (Mo) alloys [1, 2, 3, 4, 5]. These small alloying additions are included to improve the material properties of the pure U metal. The alpha-phase U (stable below 661C) suffers elongation in one direction causing grain boundary cracking and increasing creep rate due to irradiation growth, thermal cycling, and preferential crystal orientation. It is ideal to utilize the gamma-phase U (typically stable above 769C) by adding small amounts of alloying elements such as Zr or Mo to stabilize this phase down to room temperature [3]. Additionally, some research has been focused on U with transuranic (TRU) elements present, typically coming from the used fuel recycling process. Including these elements in fast reactor fuel can aid in the reduction of nuclear waste by burning minor long-lived actinides. However, the additions of TRU elements can cause concerns to arise when trying to fabrication or safeguard metallic fuels. A typical metallic fuel element is shown in Figure 1. Sodium is added into the cladding to create a thermal bond between the fuel slug and cladding wall. The fuel slug is then inserted and the end plug is welded on to the top of the fuel element. A gas plenum is left to create a headspace for gaseous fission products to escape rather than continue to build in the fuel itself [1, 5]. Other fuel element geometries exist as well, such as the Lightbridge twisted cruciform geometry shown in Figure 2 [6]. This design allows for better cooling performance and provides room for fuel rod swelling without impacting the fuel rod diameter. There are many different fabrication methods for metallic fuels, which is one of the many benefits of these fuel types. Many of these fabrication methods are relatively easy and cost-efficient. The most popular fabrication method is injection casting, sometimes called vacuum induction melting (VIM), shown in Figure 3 [4, 8, 9, 7, 10]. This method was largely used for EBR-II fuel fabrication. The injection casting system is contained inside of a vessel consisting of a Y2O3-coated graphite crucible surrounded by an induction coil with ZrO2-coated quartz molds suspended above the crucible. The fuel feedstock is placed inside of the graphite crucible and melted using the induction furnace. The induction furnace utilizes a dual frequency with the high frequency melting the feedstock and the low frequency causing stirring of the melted feedstock to form a homogeneous mixture. The mixture is heated to approximately 1600C in an argon environment. The vessel is evacuated and then the quartz molds are lowered into the graphite crucible containing the molten metal and the vessel is repressurized to inject the metal fuel upwards into the molds. The molds are removed and then shattered to release the fuel slugs. This fabrication method was used to fabricate 39,000 metallic fuel pins for EBR-II. While injection casting has been the most common metallic fuel fabrication method throughout the decades, many other methods have been explored including low-pressure gravity casting, microwave casting, continuous casting, centrifugal casting, coextrusion, and many others [11, 12, 8, 13, 14, 15]. Some of these methods aim to mitigate challenges that arise with americium (Am) volatilization during the casting process for TRU-containing fuel feedstocks, an issue with injection casting. Coextrusion is one of the methods explored at the Idaho National Laboratory (INL) and has been utilized for the initial fabrication tests of Lightbridge's unique fuels, as well as other metallic fuels with cladding coextruded. In this process, large billets are formed and machined and then inserted into a molten salt bath for approximately 30 minutes. The billets are then loaded into the extrusion press and extruded. This process can be seen in Figure 4 [15].

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Site-Specific Studies for Removing SNF from Six Shutdown Sites - 18042

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational. To provide an understanding of the tasks and interfaces required for the complete de-inventory of particular sites where SNF is stored, DOE solicited bids from integrating contractors to develop initial site-specific de-inventory reports. The reports were developed for several nuclear power plant sites selected to represent a range of geographic locations, existing on-site SNF storage systems, and expected transportation modal options. Each report is presented in a self-contained narrative describing a potential campaign for removing all SNF and greater-than-class-C low-level radioactive waste (GTCC waste) from each specified site. Each study narrative includes site information; an analysis of the near-site transportation infrastructure; a concept of operations for the de-inventory; an estimated budget and schedule for the duration of operations; and a safety and security plan with site-specific considerations, emergency response considerations, and recommendations for the next steps DOE could take to de-inventory the site. The reports provide cost estimates for analytical purposes only; they do not attempt to specify the party or parties responsible for the costs. These reports present a first look at how an integrating contractor might recommend removing SNF from particular sites. They are written from the perspective of the contractor and do not represent DOE's plans. At this writing, six sites have been studied: - Connecticut Yankee, - Big Rock Point, - Humboldt Bay, - Maine Yankee, - Trojan, - Kewaunee. DOE may develop de-inventory reports for all reactor sites, with an initial focus on shutdown reactor sites. The order in which sites have been selected for study should not be considered an indicator of the order used by DOE to remove SNF from the sites. Since the SNF's destination is not important for the purpose of this work, DOE tasked the contractor with planning transportation of the SNF from the site to a generic railroad location in the approximate geographical center of the United States. These reports represent an initial study of the specific sites. Per the terms of the contract, the contractor was not permitted to engage in dialogue with power plant site personnel; near-site railroad personnel; or any local, state, or regional stakeholders about the studies. DOE provided site-specific data. The contractor was tasked to rely on past corporate experience, data available from DOE, and publicly available data when making site-specific recommendations for removing all SNF from each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Critical Dose of Internal Organs Internal Exposure - 13471

The health threat posed by radionuclides has stimulated increased efforts to developed characterization on the biological behavior of radionuclides in humans in all ages. In an effort motivated largely by the Chernobyl nuclear accident, the International Commission on Radiological Protection (ICRP) is assembling a set of age specific biokinetic models for environmentally important radioelements. Radioactive substances in the air, mainly through the respiratory system and digestive tract, is inside the body. Radioactive substances are unevenly distributed in various organs and tissues. Therefore, the degree of damage will depend not only on the dose of radiation have but also on the critical organ, which is the most accumulation of radioactive substances, which leads to the defeat of the entire human body. The main objective of radiation protection, to avoid exceeding the maximum permissible doses of external and internal exposure of a person to prevent the physical and genetic damage people. The maximum tolerated dose (MTD) of radiation is called a dose of radiation a person in uniform getting her for 50 years does not cause changes in the health of the exposed individual and his progeny. The following classification of critical organs, depending on the category of exposure on their degree of sensitivity to radiation: First group: the whole body, gonads and red bone marrow; Second group: muscle, fat, liver, kidney, spleen, gastrointestinal tract, lungs and lens of the eye; The third group: bone, thyroid and skin; Fourth group: the hands, forearms, feet. MTD exposure whole body, gonads and bone marrow represent the maximum exposures (5 rem per year) experienced by people in their normal activities. The purpose of this article is intended dose received from various internal organs of the radionuclides that may enter the body by inhalation, and gastrointestinal tract. The biokinetic model describes the time dependent distribution and excretion of different radionuclides that have intake into the organism or absorbed into blood. Transport of different radionuclides between compartments is assumed to follow first order kinetics provided the concentration in red blood cells (RBCs) stays below a nonlinear threshold concentration. When the concentration in RBCs exceeds that threshold, the transfer rate from diffusible plasma to RBCs is assumed to decrease as the concentration in RBCs increases. For the calculations used capabilities AMBER by using the traces of radionuclides in the body. Model for the transfer of radionuclides in the body has been built on the basis of existing models at AMBER for lead. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Heat Transfer Salts for Nuclear Reactor Systems - Chemistry Control, Corrosion Mitigation, and Modeling

The concept of a molten salt reactor has existed for nearly sixty years. Previously all work was done during a large collaborative effort at Oak Ridge National Laboratory, culminating in a research reactor which operated for 15,000 hours without major error. This technical success has garnished interest in modern, high temperature, reactor schemes. Research using molten fluoride salts for nuclear applications requires a steady supply of high grade molten salts. There is no bulk supplier of research grade fluoride salts in the world, so a facility which could provide all the salt needed for testing at the University of Wisconsin had to be produced. Two salt purification devices were made for this purpose, a large scale purifier, and a small scale purifier, each designed to clean the salts from impurities and reduce their corrosion potential. As of now, the small scale has performed with flibe salt, hydrogen, and hydrogen fluoride, yielding clean salt. This salt is currently being used in corrosion testing facilities at the Massachusetts Institute of Technology and the University of Wisconsin. Working with the beryllium based salts requires extensive safety measures and health monitoring to prevent the development of acute or chronic beryllium disease, two pulmonary diseases created by an allergic reaction to beryllium in the lungs. Extensive health monitoring, engineering controls, and environment monitoring had to be set up with the University of Wisconsin department of Environment, Health and Safety. The hydrogen fluoride required for purification was also an extreme health hazard requiring thoughtful planning and execution. These dangers have made research a slow and tedious process. Simple processes, such as chemical handling and clean-up, can take large amounts of ingenuity and time. Other work has complemented the experimental research at Wisconsin to advance high temperature reactor goals. Modeling work has been performed in house to re-evaluate thermophysical properties of flibe and flinak. Pacific Northwest National Laboratories has focused on evaluating the fluorinating gas nitrogen trifluoride as a potential salt purification agent. Work there was performed on removing hydroxides and oxides from flinak salt under controlled conditions. Lastly, the University of California Berkeley has spent considerable time designing and simulating reactor components with fluoride salts at high temperatures. Despite the hurdles presented by the innate chemical hazards, considerable progress has been made. The stage has been set to perform new research on salt chemical control which could advance the fluoride salt cooled reactor concept towards commercialization. What were previously thought of as chemical undesirable, but nuclear certified, alloys have been shown to be theoretically compatible with fluoride salts at high temperatures. This preliminary report has been prepared to communicate the construction of the basic infrastructure required for flibe, as well as suggest original research to performed at the University of Wisconsin. Simultaneously, the contents of this report can serve as a detailed, but introductory guide to allow anyone to learn the fundamentals of chemistry, engineering, and safety required to work with flibe salt.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Intelligent Process Visualization through Nuclear Operation Process Modeling, Reasoning, and Object Detection from Field Videos (Final Report)

This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Safety [Vol. 33, No. 4, October-December 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 499 Technical Note: Nuclear Regulatory Commission’s Examination Question Bank System, C. L Jensen and N. L. Skinner; 506 Report on the Specialists’ Meeting on Passive and Active Safety Features of Liquid-Metal Fast Breeder Reactors Organized by the International Atomic Energy Agency at Oarai Engineering Centre of Power Reactor and Nuclear Development Corporation, Japan, November 5-7,1991, S. R. Paranjpe; ACCIDENT ANALYSIS: 514 A Review of Hydrogen Production During Melt/Water Interaction in LWRs, D. F. Fletcher, B. D. Turland, and S. P. A. Lawrence; 535 A Review of the U 3 0 8 -Al Reaction as a Potential Heat Source in Research and Test Reactor Accidents, J. L. Snelgrove; CONTROL AND INSTRUMENTATION: 543 Multilevel Interfaces for Power Plant Control Rooms II: A Preliminary Design Space, K. J. Vicente; DESIGN FEATURES: 549 Twenty-Second DOE/NRC Nuclear Air Cleaning and Treatment Conference, R. R. Bellamy, D. W. Moeller, and M. W. First; 562 Book Review: Safety Assessment of Unit 5 (WWER-440/W-213) of the Greifswald Nuclear Power Station, M. H. Fontana; WASTE AND SPENT FUEL MANAGEMENT: 576 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 586 Analysis of Corrective Actions Applied to Nuclear Power Plant Operations, A. E. Cross; 593 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 596 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; 609 Non-Commercial Power Operating Experience; 614 World Nuclear Performance, Compiled by M. D. Muhlheim; RECENT DEVELOPMENTS: 623 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 635 Reports, Standards, and Safety Guides, D. S. Queener; 639 Proposed Rule Changes as of June 30, 1992; ANNOUNCEMENTS: 513 Fourth International Conference on Nuclear Fuel Reprocessing and Waste Management RECOD '94; 585 International Topical Meeting on Advanced Reactors Safety; 622 International Workshop on Implementation of ALARA at Nuclear Power Plants; 648 Short Course on Nuclear Criticality Safety; 648 8th Topical Meeting on Problems in Reactor Physics MEPhi-VOLGA-93; 643 The Authors; 646 Reviewers of Nuclear Safety, Vol. 33

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗