Search NASA⌕ Search

SEARCH · Search NASA

Results for “Rev”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Godiva IV and Juliet Diagnostics CED-1, Rev. 1 (IER-176)

The Juliet experiment is currently in preliminary design (IER-128). This experiment will utilize a suite of diagnostics to measure the physical state of the device (temperature, surface motion, stress, etc.) and the total and time rate of change of neutron and gamma fluxes. A variety of potential diagnostics has been proposed in this CED-1 report. Based on schedule and funding, a subset of diagnostics will be selected for testing using the Godiva IV pulsed reactor as a source of neutrons and gammas. The diagnostics development and testing will occur over a two year period (FY12-13) culminating in a final set of diagnostics to be fielded for he Juliet experiment currently proposed for execution in FY15.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decision Paper for the Disposition of FS-65 Shipping Containers, Support Equipment, and Mixed Oxide (MOX) Material Contents (Rev. 1.1)

A description of the containers, contents, and disposition alternatives follow. Table 1 provides a rough order of magnitude cost and schedule duration estimate for the 2 disposition alternatives. Cost and schedule data are rounded to two significant figures and the durations are based on 1735 working hours per year. The sub-task durations and personnel are not totaled for the tasks because many of the sub-tasks will be conducted in parallel. Once an Alternative is selected a detailed resource loaded schedule will be developed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decision Paper for the Disposition of FS-65 Shipping Containers, Support Equipment, and Mixed Oxide (MOX) Material Contents (Rev. 1.2)

A description of the containers, contents, and disposition alternatives follow. Table 1 provides a rough order of magnitude cost and schedule duration estimate for the 2 disposition alternatives. Cost and schedule data are rounded to two significant figures and the durations are based on 1735 working hours per year. The sub-task durations and personnel are not totaled for the tasks because many of the sub-tasks will be conducted in parallel. Once an Alternative is selected a detailed resource loaded schedule will be developed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Case for an Improved Effective-Atomic Number for the Electronic Baggage Scanning Program (Rev. 1)

Z eff , a parameter representing an “effective atomic number” for a material, plays an important role in the Electronic Baggage Scanning Program (EBSP) to detect threats in dual-energy computed tomography (CT) baggage-scanning systems. We believe that Zeff, as defined and used on this program, does not provide the most accurate representation of a material's x-ray properties.. We present the case for a new method that defines an effective atomic number for compounds and mixtures, which we refer to as Z e . Unlike Z eff , Z e is tied by definition to the x-ray absorption properties of each specific material. Use of this alternative will provide a more accurate scale for calibrating LLNL-designed Micro-CT systems and vendor-built Explosives Detection Systems (EDS) against standard reference materials, and it will provide a more accurate physical characterization of the x-ray properties of materials evaluated on those systems. This document, (1) Describes the current usage of the Z eff parameter; (2) Details problems entailed in the use of the Z eff parameter; (3) Proposes a well-defined alternative—Z e ; (4) Proposes and demonstrates an algorithm for optimally associating Z e with any specified compound or mixture; (5) Discusses issues that can impact the usefulness of an effective-Z model; and (6) Recommends that, in order that the chosen effective-Z parameter not materially impact the accuracy of data produced by the EBSP program, the use of Z eff be replaced by Z e .

42 ENGINEERING↗

AGR-1 Irradiation Test Final As-Run Report, Rev 2

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39 ?1025 n/m2 (E >0.18 MeV). We’ll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10-7 with only one capsule significantly exceeding this value. A maximum R/B of around 2?10-7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Idaho National Laboratory Site Environmental Monitoring Plan (Rev. 2)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Environmental Monitoring Plan (Rev. 1)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Site Environmental Monitoring Plan (Rev. 3)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

2012 Emergency Response Capability Baseline Needs Assessment Requirements Document (Rev. 7.0)

This document was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by LLNL Emergency Management Department Head James Colson. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response.

99 GENERAL AND MISCELLANEOUS↗

HTR –Proteus Pebble Bed Experimental Program Cores 1, 1A, 2, and 3: Hexagonal Close Packing with a 1:2 Moderator-to-Fuel Pebble Ratio (Rev. 1)

In its deployment as a pebble bed reactor (PBR) critical facility from 1992 to 1996, the PROTEUS facility was designated as HTR-PROTEUS. This experimental program was performed as part of an International Atomic Energy Agency (IAEA) Coordinated Research Project (CRP) on the Validation of Safety Related Physics Calculations for Low Enriched HTGRs. Within this project, critical experiments were conducted for graphite moderated LEU systems to determine core reactivity, flux and power profiles, reaction-rate ratios, the worth of control rods, both in-core and reflector based, the worth of burnable poisons, kinetic parameters, and the effects of moisture ingress on these parameters. Four benchmark experiments were evaluated in this report: Cores 1, 1A, 2, and 3. These core configurations represent the hexagonal close packing (HCP) configurations of the HTR-PROTEUS experiment with a moderator-to-fuel pebble ratio of 1:2. Core 1 represents the only configuration utilizing ZEBRA control rods. Cores 1A, 2, and 3 use withdrawable, hollow, stainless steel control rods. Cores 1 and 1A are similar except for the use of different control rods; Core 1A also has one less layer of pebbles (21 layers instead of 22). Core 2 retains the first 16 layers of pebbles from Cores 1 and 1A and has 16 layers of moderator pebbles stacked above the fueled layers. Core 3 retains the first 17 layers of pebbles but has polyethylene rods inserted between pebbles to simulate water ingress. The additional partial pebble layer (layer 18) for Core 3 was not included as it was used for core operations and not the reported critical configuration. Cores 1, 1A, 2, and 3 were determined to be acceptable benchmark experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fresh-Core Reload of the Neutron Radiography (NRAD) Reactor with Uranium(20)-Erbium-Zirconium-Hydride Fuel (Rev. 1)

The neutron radiography (NRAD) reactor is a 250 kW TRIGA ® (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The initial critical configuration developed during the fuel loading process, which contains only 56 fuel elements, has been evaluated as an acceptable benchmark experiment. The 60-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (~±1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Validation and Verification of the Correct Operation of the Savannah River National Laboratories, Model SRNL-Rev. 2, Serial # SRNL-003 Coulometer.

In August of 2011, C-AAC successfully installed a new coulometer. This system was only the third ever built of a newly redesigned system that SRNL had completed. The other two new systems reside at the IAEA in Vienna and at SRNL in South Carolina. The new system will replace an old PAR173 system that had been the workhorse of the Plutonium Assay team since the early 1970s. This 40+ year old system was not computer compatible and no longer had available spare parts. Upon the request of the IAEA and C-AAC personnel, the SRNL team undertook a project to modernize their systems and completely revamped the electronics and data acquisition system of their coulometry models (designed and built in the early 1990’s) by combining all electronics on a single, multilayer printed circuit board with individual isolated ground and power planes.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Description Of the Tritium-Producing Burnable Absorber Rod for the Commercial Light Water Reactor Ttqp-1-015 Rev 19

Tritium-producing burnable absorber rods (TPBARs) used in the U.S. Department of Energy’s Tritium Readiness Program are designed to produce tritium when placed in a Westinghouse or Framatome 17x17 fuel assembly and irradiated in a pressurized water reactor (PWR). This document provides an unclassified description of the current design baseline for the TPBARs. This design baseline is currently valid only for Watts Bar reactor production cores. A description of the Lead Use TPBARs will not be covered in the text of the document, but the applicable drawings, specifications and test plan will be included in the appropriate appendices.

Burns, Kimberly A.↗

Unclassified TPBAR Releases, Including Tritium Ttqp-1-091 Rev 14

This document provides a listing of unclassified tritium release values that should be assumed for unclassified analysis. Much of the information is brought forth from the related documents listed in Section 5.0 to provide a single-source listing of unclassified release values. This information has been updated based on current design analysis and available experimental data.

Gruel, Robert L.↗