Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration

Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Constellation Training Facility Support

The National Aeronautics and Space Administration is developing the next set of vehicles that will take men back to the moon under the Constellation Program. The Constellation Training Facility (CxTF) is a project in development that will be used to train astronauts, instructors, and flight controllers on the operation of Constellation Program vehicles. It will also be used for procedure verification and validation of flight software and console tools. The CxTF will have simulations for the Crew Exploration Vehicle (CEV), Crew Module (CM), CEV Service Module (SM), Launch Abort System (LAS), Spacecraft Adapter (SA), Crew Launch Vehicle (CLV), Pressurized Cargo Variant CM, Pressurized Cargo Variant SM, Cargo Launch Vehicle, Earth Departure Stage (EDS), and the Lunar Surface Access Module (LSAM). The Facility will consist of part-task and full-task trainers, each with a specific set of mission training capabilities. Part task trainers will be used for focused training on a single vehicle system or set of related systems. Full task trainers will be used for training on complete vehicles and all of its subsystems. Support was provided in both software development and project planning areas of the CxTF project. Simulation software was developed for the hydraulic system of the Thrust Vector Control (TVC) of the ARES I launch vehicle. The TVC system is in charge of the actuation of the nozzle gimbals for navigation control of the upper stage of the ARES I rocket. Also, software was developed using C standards to send and receive data to and from hand controllers to be used in CxTF cockpit simulations. The hand controllers provided movement in all six rotational and translational axes. Under Project Planning & Control, support was provided to the development and maintenance of integrated schedules for both the Constellation Training Facility and Missions Operations Facilities Division. These schedules maintain communication between projects in different levels. The CxTF support provided is one that requires continuous maintenance since the project is still on initial development phases.

Flores, Jose M.↗

SDN-NGenIA, a Software Defined Next Generation Integrated Architecture for HEP and Data Intensive Science

This project aims to enable the LHC and other leading programs in high energy physics and other global science domains funded by the DOE to operate with a new level of efficiency and control, through the development of a Next Generation Integrated Architecture (NGenIA) based on intelligent software defined network (SDN)-driven network systems coupled to high throughput applications. While the initial focus is on the challenging LHC use case, the systems and products being developed are general, and apply to many fields of data intensive science ranging from astrophysical sky surveys to bioinformatics and earth observation, as well as other organizations facing the challenges of extracting knowledge from distributed multi-petabyte data stores. A central concept in this development program is a new paradigm ‘consistent network operations’ among widely distributed computing and storage facilities, where stable high throughput flows, at set rates, cross load-balanced network paths, up to flexible high water marks that are adjusted in real time to accommodate other network traffic. The large smooth flows are launched and managed by SDN services that act in concert with the experiments’ site-resident data distribution and management systems, to meet the expanding needs of the science programs. The technical goals include the construction of autonomous, intelligent site-resident services that interact dynamically with network-resident services, and with the science programs’ principal data distribution and management tools, to request or command network resources in support of high throughput petascale to exascale workflow Specific work items include: 1. Developing compact Data Transfer Nodes (DTNs) with auto-tuning functions that support data transfer rates in the 100 Gbps to the 1 Tbps range when used with high throughput data transfer applications 2. Deep site orchestration among virtualized clusters, storage subsystems and subnets to successfully coschedule CPU, storage and network resources 3. Science-program designed site architectures, operational modes, and policy and resource usage priorities, adjudicated across multiple network domains and virtual organizations, using the orchestration functions and methods 4. Seamlessly extending end-to-end operation across both extra-site and intra-site boundaries through the use of Open vSwitch (OVS), FireQoS + next generation Science DMZs 5. Novel methods of system integration that enable granular control of extreme scale long distance transfers through flow matching of scattered source-destination address pairs to multi-domain dynamic circuits 6. Funneling massive sets of streams to DTNs at the site edge hosting petascale buffer pools configured for flows of 100 Gbps and up, exploiting state of the art data transfers 7. Adaptive scheduling based on pervasive end-to-end monitoring, including DTN or compute-node resident agents providing comprehensive end-system profiling 8. Developing unsupervised and supervised machine learning and modeling methods to optimize the workflow involving terabyte to multi-petabyte datasets.

47 OTHER INSTRUMENTATION↗

Repair and Resource Scheduling in Unbalanced Distribution Systems Using Neighborhood Search

—This paper proposes an optimization strategy to assist utility operators to recover power distribution systems after large outages. Specifically, a mixed-integer linear programming (MILP) model is developed for co-optimizing crews, resources, and network operations. The MILP model coordinates damage isolation, network reconfiguration, distributed generator re-dispatch, and crew/resource logistics. In addition, a framework for integrating different types of photovoltaic (PV) systems in the restoration process is developed. We consider two different types of crews, namely, line crews for damage repair and tree crews for obstacle removal. We also model the repair resource logistic constraints. Furthermore, a new algorithm is developed for solving the distribution system repair and restoration problem (DSRRP). The algorithm starts by solving DSRRP using an assignmentbased method, then a neighborhood search method is designed to iteratively improve the solution. The proposed method is validated on modified IEEE 123- and 8500-bus distribution test systems.

Outage management↗

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record↗

VIPER – Volatiles Investigating Polar Exploration Rover: Mission Overview

VIPER is a low cost, lunar volatiles detection and measurement mission that will be delivered to the lunar south pole by one of NASA’s Commercial Lunar Payload Services partners and will characterize the nature of the volatiles in the area and extrapolate this data to create global lunar water resource maps. It will be the first mining expedition on another world while simultaneously addressing fundamental planetary science questions. Prospecting for lunar water at the poles is the next step in understanding the resource potential and addressing key theories about water emplacement and retention. It now appears that potentially economically significant amounts of water ice exists at the poles of the Moon, however, the distribution of this water is still not understood at a level sufficient to fully evaluate economic models. The water ice (and other potential volatiles), the “ore body”, needs to be understood at the scales of 10s to 100s of meters to evaluate localization, extraction and processing techniques. To accomplish this, VIPER will survey permanently-shadowed regions, semi-permanent shadowed regions, and even semi and full sunlit areas in order to have a comprehensive survey of polar region volatiles, to best inform future mission architectures. In order to characterize the volatiles, a payload suite consisting of a neutron spectrometer, mass spectrometer, near infrared spectrometer and a 1-meter drill will be hosted on the VIPER mobile lunar rover platform. Since VIPER is a relatively low cost, schedule-constrained, risk-tolerant mission, there are architectural limitations that require unique mission planning constraints to enable exploration of the lunar south pole region. These regions offer unique challenges such as uncertain terrain conditions, rock and crater hazards, lunar dust, multipath communications effects, extreme thermal environments and multiple overlapping planning constraints. Mission design/traverse planning, system design capabilities and mission operations are all highly linked through initial development phases. We will describe the current mission overview and the unique approaches taken by the VIPER project based on our programmatic framework and unique mission environment.

VIPER↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

Space Shuttle Rudder Speed Brake Actuator-A Case Study Probabilistic Fatigue Life and Reliability Analysis

The U.S. Space Shuttle fleet was originally intended to have a life of 100 flights for each vehicle, lasting over a 10-year period, with minimal scheduled maintenance or inspection. The first space shuttle flight was that of the Space Shuttle Columbia (OV-102), launched April 12, 1981. The disaster that destroyed Columbia occurred on its 28th flight, February 1, 2003, nearly 22 years after its first launch. In order to minimize risk of losing another Space Shuttle, a probabilistic life and reliability analysis was conducted for the Space Shuttle rudder/speed brake actuators to determine the number of flights the actuators could sustain. A life and reliability assessment of the actuator gears was performed in two stages: a contact stress fatigue model and a gear tooth bending fatigue model. For the contact stress analysis, the Lundberg-Palmgren bearing life theory was expanded to include gear-surface pitting for the actuator as a system. The mission spectrum of the Space Shuttle rudder/speed brake actuator was combined into equivalent effective hinge moment loads including an actuator input preload for the contact stress fatigue and tooth bending fatigue models. Gear system reliabilities are reported for both models and their combination. Reliability of the actuator bearings was analyzed separately, based on data provided by the actuator manufacturer. As a result of the analysis, the reliability of one half of a single actuator was calculated to be 98.6 percent for 12 flights. Accordingly, each actuator was subsequently limited to 12 flights before removal from service in the Space Shuttle.

Rudder↗

Optimization of Advanced Steels for Cyclic Operation through an Integration of Material Testing, Modeling and Novel Component Test Validation

The efforts in this project were focused in three primary objectives, provided below: • To develop the needed microstructural processing and performance relationships and associated material models for specific constituents in fabricated weldments (such as the parent material, heat affected zone regions and weld metal), • Apply these metallurgical relationships through modeling of a welded pressure bearing power plant component subjected to cyclic operational conditions under both mechanical and thermal loading, and • Validate the model through novel structural feature and component tests. An attempt was made to optimize the heat treatment schedule to reduce or eliminate the presence of boron nitride (BN) in the matrix of the Grade 92 material. BN has been shown to be a primary nucleation source for creep damage. Proper evaluation of material behavior, and as assessed in this research, included the influence of geometric notches (such as those from poor fabrication or design) and metallurgical notches (such as weldments or poorly processed parent material). Better practice methodologies were implemented in the theoretical design of a high-temperature, critical component for cyclic operation. It was demonstrated that vessel testing can be reliably performed and provides a critical link between standard testing, structural assessment and validation. While the goal of an improved Grade 92 steel was not achieved in this project, there is considerable value in applying the documented testing and assessment methodologies to assess material and/or component behavior. This is especially true for materials and/or designs which are expected to be subjected to flexible operating modes. Design of a cycling state of the art thick wall steam header for long term operation with a state of the art ferritic steel was a task in this project. Implementation of that task showed how many factors including plant operating mode, creep strength, creep ductility, fatigue strength, and resistance to crack growth should be considered and evaluated to properly design high temperature components for long term service (200,000 operating hours or more) in a modern Fossil energy power plant. The current ASME non-nuclear boiler design code does not mandate this level of complex analysis nor does it provide all the metallurgical and mechanical properties data needed to perform this kind of design analysis.

20 FOSSIL-FUELED POWER PLANTS↗

Web Design for Space Operations: An Overview of the Challenges and New Technologies Used in Developing and Operating Web-Based Applications in Real-Time Operational Support Onboard the International Space Station, in Astronaut Mission Planning and Mission Control Operations

The International Space Station (ISS) Operations Planning Team, Mission Control Centre and Mission Automation Support Network (MAS) have all evolved over the years to use commercial web-based technologies to create a configurable electronic infrastructure to manage the complex network of real-time planning, crew scheduling, resource and activity management as well as onboard document and procedure management required to co-ordinate ISS assembly, daily operations and mission support. While these Web technologies are classified as non-critical in nature, their use is part of an essential backbone of daily operations on the ISS and allows the crew to operate the ISS as a functioning science laboratory. The rapid evolution of the internet from 1998 (when ISS assembly began) to today, along with the nature of continuous manned operations in space, have presented a unique challenge in terms of software engineering and system development. In addition, the use of a wide array of competing internet technologies (including commercial technologies such as .NET and JAVA ) and the special requirements of having to support this network, both nationally among various control centres for International Partners (IPs), as well as onboard the station itself, have created special challenges for the MCC Web Tools Development Team, software engineers and flight controllers, who implement and maintain this system. This paper presents an overview of some of these operational challenges, and the evolving nature of the solutions and the future use of COTS based rich internet technologies in manned space flight operations. In particular this paper will focus on the use of Microsoft.s .NET API to develop Web-Based Operational tools, the use of XML based service oriented architectures (SOA) that needed to be customized to support Mission operations, the maintenance of a Microsoft IIS web server onboard the ISS, The OpsLan, functional-oriented Web Design with AJAX

Khan, Ahmed↗

SOAREX-8 Suborbital Experiments 2015 - A New Paradigm for Small Spacecraft Communication

In 2015 NASA plans to launch a payload to 280 Km altitude on a sounding rocket from the Wallops Flight Facility. This payload will contain several novel technologies that work together to demonstrate methodologies for space sample return missions and for nanosatellite communications in general. The payload will deploy and test an Exo-Brake, which slows the payload aerodynamically, providing eventual de-orbit and recovery of future ISS samples through a Small Payload Quick Return project. In addition, this flight addresses future Mars mission entry technology, space-to-space communications using the Iridium Short Messaging Service (SMS), GPS tracking, and wireless sensors using the ZigBee protocol. SOAREX-8 is being assembled and tested at Ames Research Center (ARC) and the NASA Engineering and Safety Center (NESC) is funding sensor and communications work. Open source Arduino technology and software are used for system control. The ZigBee modules used are XBee units that connect analog sensors for temperature, air pressure and acceleration measurement wirelessly to the payload telemetry system. Our team is developing methods for power distribution and module mounting, along with software for sensor integration, data assembly and downlink. We have demonstrated relaying telemetry to the ground using the Iridium satellite constellation on a previous flight, but the upcoming flight will be the first time we integrate useful flight test data from a ZigBee wireless sensor network. Wireless sensor data will measure the aerodynamic efficacy of the Exo-Brake permitting further on orbit flight tests of improved designs. The Exo-Brake is 5 sq m in area and will be stored in a container and deployed during ascent once the payload is jettisoned from the launch vehicle. We intend to further refine the hardware and continue testing on balloon launches, future sounding rocket flights and on nanosatellite missions. The use of standards-based and open source hardware/software has allowed for this project to be completed with a very modest budget and a challenging schedule. There is a wealth of hardware and software available for both the Arduino platform and the XBee, all low-cost or open-source. Along with the Exo-Brake hardware and deployment discussion, this paper will describe in detail the system architecture emphasizing the successful use of open source hardware and software to minimize effort and cost. Testing procedures, radio frequency interference (RFI) mitigation, success criteria and expected results will also be discussed. The use of Iridium short messaging capability for space-to-space links, standards-based wireless sensor networks, and other innovative communications technology are also presented.

aerobrake↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Demonstration of Frequency Regulation by Commercial Buildings – Part II: Results and Performance Evaluation

This paper is the second part of a two-part series presenting the results from an experimental demonstration of frequency regulation in a commercial building test facility. We developed relevant building models and designed a hierarchical controller for reserve scheduling, building climate control and frequency regulation in Part I. In Part II, we introduce the communication architecture and experiment settings, and present extensive experimental results under frequency regulation. More specifically, we compute the day-ahead reserve capacity of the test facility under different assumptions and conditions. Furthermore, we demonstrate the ability of model predictive control to satisfy comfort constraints under frequency regulation, and show that fan speed control can track the fast-moving RegD signal of the Pennsylvania, Jersey, and Maryland Power Market (PJM) very accurately. In addition, we discuss potential effects of frequency regulation on building operation (e.g., increase in energy consumption, oscillations in supply air temperature, and effect on chiller cycling), and provide suggestions for real-world implementation projects. Lastly, our results show that hierarchical control is appropriate for frequency regulation from commercial buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ELaNa - Educational Launch of Nanosatellite Enhance Education Through Space Flight

One of NASA's missions is to attract and retain students in the science, technology, engineering and mathematics (STEM) disciplines. Creating missions or programs to achieve this important goal helps strengthen NASA and the nation's future work force as well as engage and inspire Americans and the rest of the world. During the last three years, in an attempt to revitalize educational space flight, NASA generated a new and exciting initiative. This initiative, NASA's Educational Launch of Nanosatellite (ELaNa), is now fully operational and producing exciting results. Nanosatellites are small secondary satellite payloads called CubeSats. One of the challenges that the CubeSat community faced over the past few years was the lack of rides into space. Students were building CubeSats but they just sat on the shelf until an opportunity arose. In some cases, these opportunities never developed and so the CubeSat never made it to orbit. The ELaNa initiative is changing this by providing sustainable launch opportunities for educational CubeSats. Across America, these CubeSats are currently being built by students in high school all the way through graduate school. Now students know that if they build their CubeSat, submit their proposal and are selected for an ELaNa mission, they will have the opportunity to fly their satellite. ELaNa missions are the first educational cargo to be carried on expendable launch vehicles (ELY) for NASA's Launch Services Program (LSP). The first ELaNa CubeSats were slated to begin their journey to orbit in February 2011 with NASA's Glory mission. Due to an anomaly with the launch vehicle, ELaNa II and Glory failed to reach orbit. This first ELaNa mission was comprised of three IU CubeSats built by students at Montana State University (Explorer Prime Flight 1), the University of Colorado (HERMES), and Kentucky Space, a consortium of state universities (KySat). The interface between the launch vehicle and the CubeSat, the Poly-Picosatellite Orbital Deployer (P-POD), was developed and built by students at California Polytechnic State University (Cal Poly). Integrating a P-POD on a NASA ELV was not an easy task. The creation of new processes and requirements as well as numerous reviews and approvals were necessary within NASA before the first ELaNa mission could be attached to a NASA launch vehicle (LV). One of the key objectives placed on an ELaNa mission is that the CubeSat and PPOD does not increase the baseline risk to the primary mission and launch vehicle. The ELaNa missions achieve this objective by placing a rigorous management and engineering process on both the LV and CubeSat teams. So, what is the future of ELaNa? Currently there are 16 P-POD missions manifested across four launch vehicles to support educational CubeSats selected under the NASA CubeSat Initiative. From this initiative, a rigorous selection process produced 22-student CubeSat missions that are scheduled to fly before the end of 2012. For the initiative to continue, organizations need to submit proposals to the annual CubeSat initiative call so they have the opportunity to be manifested and launched.

Skrobot, Garrett Lee↗

Interferometers Sharpen Measurements for Better Telescopes

Over the last decade, there have been a number of innovations that have made possible the largest and most powerful telescope of its time: the James Webb Space Telescope (JWST). Scheduled to launch in 2018, JWST will provide insight into what the oldest, most distant galaxies look like. When engineers build a first-of-its-kind instrument like the JWST, they often must make new tools to construct the new technology. Throughout the decades of planning, development, and construction of the JWST, NASA has worked with numerous partners to spur innovations that have enabled the telescope s creation. Though the JWST s launch date is still several years away, a number of these innovations are spinning off to provide benefits here on Earth. One of these spinoffs has emerged from the extensive testing the JWST must undergo to ensure it will function in the extreme environment of space. In order to test the JWST instruments in conditions that closely resemble those in space, NASA uses a cryogenic vacuum chamber. By dropping the temperatures down to -400 F and employing powerful pumps to remove air from the chamber, engineers can test whether the JWST instruments will function once the spacecraft leaves Earth. Traditionally, a phase-shifting interferometer is used to measure optics like the JWST s mirrors to verify their precise shape, down to tens of nanometers, during manufacturing. However, the large size of the mirrors, coupled with vibration induced by the cryo-pumps, prohibits the use of traditional phase-shifting interferometers to measure the mirrors within the chamber environment. Because the JWST will be located in deep space, far from any possible manned service mission, it was essential to find a robust solution to guarantee the performance of the mirrors.

Source record↗

Application of Site Controllers for Electrification of Commercial Fleet Vehicles

Electrification of transportation fleets presents a significant challenge for commercial customers. These challenges can be specific to region, weather, operating schedule, charging infrastructure, and other factors. This paper presents the value of integrating a site controller to monitor the health of assets and co-optimize the operation of commercial sites with multiple distributed energy resource technologies and electric vehicle fleets. The tests demonstrate smart-charging and vehicle-to-building uses compared to business-as-usual cases. The secondary objectives of power management for the customer vehicle are optimized by a planning tool (REopt) and integrated using the site controller. Any deviations from the planned dispatch are addressed by the real-time controllers offering tertiary controls, such as energy management, and limiting the reverse power flow (back into the grid). The results indicate that site controllers offer an efficient solution to manage the health of the connected assets and a scalable means to optimize the operations of a commercial customer with electrified transportation fleets.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗