Search NASA⌕ Search

SEARCH · Search NASA

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Production of High-Hydrogen Content Coal-Derived Liquids [Part 2 of 3]

The primary goal of this project has been to evaluate and compare the effect of the intrinsic differences between cobalt (Co) and iron (Fe) catalysts for Fischer-Tropsch (FT) synthesis using coal-derived syngas. Crude oil, especially heavy, high-sulfur crude, is no longer the appropriate source for the additional, or marginal, amounts of middle-distillate fuels needed to meet growing US and world demand for diesel and jet fuels. Only about 1/3 of the marginal crude oil barrel can be made into diesel and jet fuels. The remaining 2/3 contributes further to global surpluses of by-products. FT can produce these needed marginal, low-sulfur middle-distillate fuels more efficiently, with less environmental impact, and from abundant US domestic resources. Cobalt FT catalyst is more efficient, and less expensive overall, than iron FT catalyst. Mechanisms of cobalt FT catalyst functioning, and poisoning, have been elucidated. Each of these primary findings is amplified by several secondary findings, and these are presented, and verified in detail. The most effective step the United States can take to begin building toward improved long-term national energy security, and to reduce dependence, over time, on imported crude oil from unfriendly and increasingly unstable areas of the world, is to begin producing additional, or marginal amounts of, middle-distillate-type fuels, such as ultralow sulfur diesel (ULSD) and jet fuel (not gasoline) from US domestic resources other than petroleum. FT synthesis of these middle distillate fuels offers the advantage of being able to use abundant and affordable US coal and biomass as the primary feedstocks. Use of the cobalt FT catalyst system has been shown conclusively to be more effective and less expensive than the use of iron FT catalyst with syngas derived from coal, or from coal and biomass combined. This finding is demonstrated in detail for the initial case of a relatively small FT plant of about 2000 barrels per day based upon coal and biomass. The primary feature of such a plant, in the current situation in which no commercial FT plants are operating in the US, is that it requires a relatively modest capital investment, meaning that such a plant could actually be built, operated, and replicated in the near term. This is in contrast to the several-billion dollar investment, and accompanying risk, that would be required for a plant of more than an order of magnitude greater capacity, which has been referred to in the technical literature on fuel production as the capacity required to be considered "commercial-scale." The effects of more than ten different potential poisons for cobalt FT catalyst have been studied extensively and in detail using laboratory continuous-stirred tank reactors (CSTRs) and bottled laboratory syngas "spiked" with precisely controlled amounts of the poisons, typically at the levels of 10s or 100s of parts per billion. This data set has been generated and interpreted by world-renowned experts on FT catalysis at the University of Kentucky Center for Applied Energy Research (UK-CAER), and has enabled unprecedented insight regarding the many molecular-scale mechanisms that can play a role in the "poisoning" of cobalt FT catalyst.

01 COAL, LIGNITE, AND PEAT↗

Production of High-Hydrogen Content Coal-Derived Liquids [Part 3 of 3]

The primary goal of this project has been to evaluate and compare the effect of the intrinsic differences between cobalt (Co) and iron (Fe) catalysts for Fischer-Tropsch (FT) synthesis using coal-derived syngas. Crude oil, especially heavy, high-sulfur crude, is no longer the appropriate source for the additional, or marginal, amounts of middle-distillate fuels needed to meet growing US and world demand for diesel and jet fuels. Only about 1/3 of the marginal crude oil barrel can be made into diesel and jet fuels. The remaining 2/3 contributes further to global surpluses of by-products. FT can produce these needed marginal, low-sulfur middle-distillate fuels more efficiently, with less environmental impact, and from abundant US domestic resources. Cobalt FT catalyst is more efficient, and less expensive overall, than iron FT catalyst. Mechanisms of cobalt FT catalyst functioning, and poisoning, have been elucidated. Each of these primary findings is amplified by several secondary findings, and these are presented, and verified in detail. The most effective step the United States can take to begin building toward improved long-term national energy security, and to reduce dependence, over time, on imported crude oil from unfriendly and increasingly unstable areas of the world, is to begin producing additional, or marginal amounts of, middle-distillate-type fuels, such as ultralow sulfur diesel (ULSD) and jet fuel (not gasoline) from US domestic resources other than petroleum. FT synthesis of these middle distillate fuels offers the advantage of being able to use abundant and affordable US coal and biomass as the primary feedstocks. Use of the cobalt FT catalyst system has been shown conclusively to be more effective and less expensive than the use of iron FT catalyst with syngas derived from coal, or from coal and biomass combined. This finding is demonstrated in detail for the initial case of a relatively small FT plant of about 2000 barrels per day based upon coal and biomass. The primary feature of such a plant, in the current situation in which no commercial FT plants are operating in the US, is that it requires a relatively modest capital investment, meaning that such a plant could actually be built, operated, and replicated in the near term. This is in contrast to the several-billion dollar investment, and accompanying risk, that would be required for a plant of more than an order of magnitude greater capacity, which has been referred to in the technical literature on fuel production as the capacity required to be considered "commercial-scale." The effects of more than ten different potential poisons for cobalt FT catalyst have been studied extensively and in detail using laboratory continuous-stirred tank reactors (CSTRs) and bottled laboratory syngas "spiked" with precisely controlled amounts of the poisons, typically at the levels of 10s or 100s of parts per billion. This data set has been generated and interpreted by world-renowned experts on FT catalysis at the University of Kentucky Center for Applied Energy Research (UK-CAER), and has enabled unprecedented insight regarding the many molecular-scale mechanisms that can play a role in the "poisoning" of cobalt FT catalyst.

01 COAL, LIGNITE, AND PEAT↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Polarized fusion and potential in situ tests of fuel polarization survival in a tokamak plasma

Abstract The use of spin-polarized fusion fuels would provide a significant boost towards the ignition of a burning plasma. The cross section for D + T → α + n, would be increased by 1.5 if the fuels were injected with parallel polarization. Furthermore, our simulations demonstrate additional non-linear power gains in large-scale machines such as ITER, due to increased alpha heating. Such benefits require the survival of spin polarizations for periods comparable to the particle confinement time. During the 1980s, calculations predicted that polarizations could survive a plasma environment, although concerns persisted regarding the cumulative impacts of wall recycling. In that era, technical challenges prevented direct tests and left the large scale fueling of a power reactor beyond reach. Over the last decades, this situation has changed dramatically. Detailed simulations of ITER have predicted negligible wall recycling in a high-power reactor, and recent advances in laser-driven sources project the capability of producing large quantities of ∼100% polarized D and T. The remaining crucial step is an in-situ demonstration of polarization survival in a plasma. For this, we outline a measurement strategy using the isospin-mirror reaction, D + 3 He → α + p. Polarized 3 He avoids the complexities of handling tritium, while encompassing the same spin-physics. We evaluate two methods of delivering deuterium, using dynamically polarized Lithium-Deuteride (with vector polarization P V D of 70%) or frozen-spin Hydrogen-Deuteride (with P V D of 40%), together with a method of injecting optically-pumped 3 He (with 65% polarization). Pellets of these materials all have long polarization decay times (∼6 min for LiD at 2 K, ∼2 months for HD at 2 K, and ∼3 d for 3 He at 77 K), all far greater than a plasma shot in a research tokamak such as DIII-D (∼20 s). Both species can be propelled from a single cryogenic injection gun. We review plasma requirements and strategies for detecting polarization survival. Polarization alters both fusion yields and the angular distribution of fusion products, and each of these provides a potential signal. In this paper we simulate a selection of shots with similar characteristics in a future high-T ion H plasma, and find ratios of yields from shots with fuel spins parallel and antiparallel reaching 1.3 (HD + 3 He) to 1.6 (LiD + 3 He) over a wide range of poloidal angles. (A companion paper finds sensitivity to fusion product angular distributions as reflected in the pitch angles of protons and alphas reaching the plasma facing wall.)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pooling the resources of the CMS Tier-1 sites

The CMS experiment at the LHC relies on 7 Tier-1 centres of the WLCG to perform the majority of its bulk processing activity, and to archive its data. During the first run of the LHC, these two functions were tightly coupled as each Tier-1 was constrained to process only the data archived on its hierarchical storage. This lack of flexibility in the assignment of processing workflows occasionally resulted in uneven resource utilisation and in an increased latency in the delivery of the results to the physics community.The long shutdown of the LHC in 2013-2014 was an opportunity to revisit this mode of operations, disentangling the processing and archive functionalities of the Tier-1 centres. The storage services at the Tier-1s were redeployed breaking the traditional hierarchical model: each site now provides a large disk storage to host input and output data for processing, and an independent tape storage used exclusively for archiving. Movement of data between the tape and disk endpoints is not automated, but triggered externally through the WLCG transfer management systems.With this new setup, CMS operations actively controls at any time which data is available on disk for processing and which data should be sent to archive. Thanks to the high-bandwidth connectivity guaranteed by the LHCOPN, input data can be freely transferred between disk endpoints as needed to take advantage of free CPU, turning the Tier-1s into a large pool of shared resources. The output data can be validated before archiving them permanently, and temporary data formats can be produced without wasting valuable tape resources. Lastly, the data hosted on disk at Tier-1s can now be made available also for user analysis since there is no risk any longer of triggering chaotic staging from tape.In this contribution, we describe the technical solutions adopted for the new disk and tape endpoints at the sites, and we report on the commissioning and scale testing of the service. We detail the procedures implemented by CMS computing operations to actively manage data on disk at Tier-1 sites, and we give examples of the benefits brought to CMS workflows by the additional flexibility of the new system.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Status on the Component Models Developed in the Modelica Framework: High-Temperature Steam Electrolysis Plant & Gas Turbine Power Plant

This report has been prepared as part of an effort to design and build a modeling and simulation (M&S) framework to assess the economic viability of a nuclear-renewable hybrid energy system (N-R HES). In order to facilitate dynamic M&S of such an integrated system, research groups in multiple national laboratories have been developing various subsystems as dynamic physics-based components using the Modelica programming language. In fiscal year (FY) 2015, Idaho National Laboratory (INL) performed a dynamic analysis of two region-specific N-R HES configurations, including the gas-to-liquid (natural gas to Fischer-Tropsch synthetic fuel) and brackish water reverse osmosis desalination plants as industrial processes. In FY 2016, INL has developed two additional subsystems in the Modelica framework: a high-temperature steam electrolysis (HTSE) plant and a gas turbine power plant (GTPP). HTSE has been proposed as a high priority industrial process to be integrated with a light water reactor (LWR) in an N-R HES. This integrated energy system would be capable of dynamically apportioning thermal and electrical energy (1) to provide responsive generation to the power grid and (2) to produce alternative industrial products (i.e., hydrogen and oxygen) without generating any greenhouse gases. A dynamic performance analysis of the LWR/HTSE integration case was carried out to evaluate the technical feasibility (load-following capability) and safety of such a system operating under highly variable conditions requiring flexible output. To support the dynamic analysis, the detailed dynamic model and control design of the HTSE process, which employs solid oxide electrolysis cells, have been developed to predict the process behavior over a large range of operating conditions. As first-generation N-R HES technology will be based on LWRs, which provide thermal energy at a relatively low temperature, complementary temperature-boosting technology was suggested for integration with the HTSE process that requires higher temperature input. Simulation results involving several case studies show that the suggested control scheme could maintain the controlled variables (including the steam utilization factor, cathode stream inlet composition, and temperatures of the process streams at various locations) within desired limits under various plant operating conditions. The results also indicate that the proposed HTSE plant could provide operational flexibility to participate in energy management at the utility scale by dynamically optimizing the use of excess plant capacity within an N-R HES. A natural-gas fired GTPP has been proposed as a secondary energy supply to be included in an N-R HES. This auxiliary generator could be used to cover rapid dynamics in grid demand that cannot be met by the remainder of the N-R HES. To evaluate the operability and controllability of the proposed process during transients between load (demand) levels, the dynamic model and control design were developed. Special attention was given to the design of feedback controllers to regulate the power frequency, and exhaust gas and turbine firing temperatures. Several case studies were performed to investigate the system responses to the major disturbance (power load demand) in such a control system. The simulation results show that the performance of the proposed control strategies was satisfactory under each test when the GTPP experienced high rapid variations in the load.

08 HYDROGEN↗

Radiological Exposure Devices (RED) Technical Basis for Threat Profile

Facilities that manufacture, store or transport significant quantities of radiological material must protect against the risk posed by sabotage events. Much of the analysis of this type of event has been focused on the threat from a radiological dispersion device (RDD) or "dirty bomb" scenario, in which a malicious assailant would, by explosives or other means, loft a significant quantity of radioactive material into a plume that would expose and contaminate people and property. Although the consequences in cost and psychological terror would be severe, no intentional RDD terrorism events are on record. Conversely, incidents in which a victim or victims were maliciously exposed to a Radiological Exposure Device (RED), without dispersal of radioactive material, are well documented. This paper represents a technical basis for the threat profile related to the risk of nefarious use of an RED, including assailant and material characterization. Radioactive materials of concern are detailed in Appendix A.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Evaluating the Grid Impact of Oregon Offshore Wind [Slides]

This analysis used high-resolution offshore wind data and a detailed production cost model (PCM) of the Western Interconnection to explore the value and operational impact of integrating offshore wind along Oregon's coastline. Leveraging local technical stakeholder expertise and input, we determined a set of scenarios to explore. These scenarios vary both offshore wind capacities and the Western Interconnection generation and transmission infrastructure. From the scenario modeling and analysis, we identified the following key findings. In addition, we simulated a subset of the scenarios for a range of historical weather years (2007-2013), to understand the robustness of our findings to different weather conditions. Trans-coastal transmission constraints and congestion are the key drivers to the curtailment of Oregon offshore wind. Once power can be delivered into the Willamette Valley, there are few system constraints that lead to a significant curtailment of offshore wind off the coast of Oregon. Approximately 2.6 GW of installed offshore wind capacity can be integrated into Oregon's power system without major upgrades to trans-coastal transmission while avoiding significant curtailment. The system value provided by offshore wind ranges between $\$65$ /MWh and $\$85$ /MWh across the various scenarios considered. Offshore wind heavily influences the flow of the cross Cascade transmission. Across all scenarios, we found a robust relationship of approximately 500-550 MW decrease in the hourly flow of the cross Cascade transmission for every 1,000 MW of hourly offshore wind generation. However, we also found there was not a strong relationship between the highest cross-Cascade transmission flow hours and high offshore wind generation, limiting the extent to which offshore wind can be considered a non-wires alternative to cross cascade transmission. Depending on the meteorological year, 880-1,580 MW and 1,650-3,100 MW can be counted on to serve coastal loads with 2.6 GW and 5 GW of offshore wind capacity, respectively. Offshore wind allows for more optimal daily and hourly scheduling of hydropower, while still complying with various technical and regulatory constraints on the water resource. Oregon offshore wind has the potential to contribute to the evening net load peak in California (i.e., mitigate duck curve challenges), however transmission congestion between California and Oregon limits this contribution. Co-located storage at the point of interconnection for offshore wind reduces curtailment when trans-coastal transmission is not upgraded, providing a non-wires alternative to increase offshore wind capacity beyond 2.6 GW.

17 WIND ENERGY↗

Fundamental Algorithmic Research for Quantum Computing (FAR‐QC) (Final report)

This document is the final technical report for the "Fundamental Algorithmic Research for Quantum Computing" (FAR-QC) project at Dartmouth College (PI: J. Whitfield, co-PI: L. Viola). It details the project's primary scientific accomplishments from 2019 to 2025, focusing on advances in quantum simulation algorithms, resource-efficient fermionic encodings, bosonic topology, and optimization methods for near-term quantum devices. The report also summarizes project impacts, including software development (Quiqbox.jl), workforce training, and a complete list of resulting publications.

97 MATHEMATICS AND COMPUTING↗

Dimethyl Carbonate: Review of Synthesis Routes and Catalysts Used

This review summarizes the performance of potential catalysts for the synthesis of dimethyl carbonate (DMC) using CO2 as a feedstock by two major processes—the direct route of carbonylation of alcohols and the indirect route of alcoholysis of urea. The reaction mechanisms and corresponding catalysts that were previously investigated are discussed. The major challenges associated with the conversion of CO2 to DMC are the low yields, low DMC selectivity, and thermodynamic limitations (alcohol carbonylation) of reversible reactions with low equilibrium constants. This occurs mainly due to the highly stable carbon dioxide molecules. The development of novel catalysts with high yields and high selectivity needs to be studied to overcome these technical challenges. In addition, to enhance the DMC yield, the use of dehydrating agents for water removal from the reaction mixture is recommended and discussed in detail in this article. This review critically examines the different catalysts used by investigators, along with their respective operating conditions and suitability in applications for the commercial synthesis of CO2-based DMC.

10 SYNTHETIC FUELS↗

The Office of Groundwater & Soil Remediation Fiscal Year 2011 Research & Development Program

The U.S. Department of Energy s (DOE) Office of Groundwater and Soil Remediation supports technology development and technical assistance for the remediation of environments contaminated by legacy nuclear waste. The core of the program is centered on delivering proactive, responsive expertise and technologies with highly-leveraged, carefully selected investments that maximize impact on life-cycle cleanup costs and risks across the DOE complex. The program currently focuses on four main priorities: improved sampling and characterization strategies, advanced predictive capabilities, enhanced remediation methods, and improved long-term performance evaluation and monitoring. In FY 2010, the program developed a detailed research and development (R&D) plan in support of a larger initiative to integrate R&D efforts across EM. This paper provides an overview of the high priority action areas and the program s near-term technical direction.

Pierce, Eric M↗

The Office of Groundwater & Soil Remediation Fiscal Year 2011 Research & Development Program

The U.S. Department of Energy's (DOE) Office of Groundwater and Soil Remediation supports technology development and technical assistance for the remediation of environments contaminated by legacy nuclear waste. The core of the program is centered on delivering proactive, responsive expertise and technologies with highly-leveraged, carefully selected investments that maximum impact on life-cycle cleanup costs and risks across the DOE complex. The program currently focuses on four main priorities: improved sampling and characterization strategies, advanced predictive capabilities, enhanced remediation methods, and improved long-term performance evaluation and monitoring. In FY 2010, the program developed a detailed research and development (R and D) plan in support of a larger initiative to integrate R and D efforts across EM. This paper provides an overview of the priority action areas and the program's near-term technical direction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geothermal Play-Fairway Analysis of Washington State Prospects: Phase 2 Technical Report

An investment of $0.7M from the Geothermal Technology Office for Phase 2 of Play Fairway Analysis in Washington State improved existing favorability models and increased model confidence. New 1:24,000-scale geological mapping, 15 detailed geophysical surveys, 2 passive seismic surveys, and geochronology collected during this phase were coupled with updated and detailed structural modeling and have significantly improved the conceptual models of three potential blind geothermal systems/ plays in Washington State, the St. Helens Shear Zone, Mount Baker, and Wind River Valley. Results of this analysis reveal the presence of commercially viable undiscovered geothermal resources in all three study areas. The analysis additionally provides a clear definition of the geothermal prospects in terms of the essential elements of a functioning geothermal system, the confidence in these assessments, and associated potential and risk of development. This report also includes a proposal to validate the modeling results in highly favorable areas for two main reasons: (1) to develop confidence in the modeling approach that will encourage future development of geothermal resources in Washington State inside and outside of the Phase 2 study areas, and (2) to provide actionable results to the DOE, existing industry partners, newly identified developers, and other renewable-energy stakeholders. The proposed validation activities aim to collect new data that will further the understanding of geothermal resource potential in Washington, as well as substantiate the favorability, confidence, and risk models developed in Phases 1 and 2.

Forson, Corina↗

Role and Effectiveness of Percutaneous Arterial Embolization in Hemodynamically Unstable Patients with Ruptured Splanchnic Artery Pseudoaneurysms

PurposeTo assess the role and effectiveness of percutaneous arterial embolization (TAE) in patients with hemodynamic instability due to hypovolemic shock secondary to ruptured splanchnic artery pseudoaneurysms (SAPA).Materials and MethodsSeventeen patients (11 men, 6 women; mean age, 53 years) with hemodynamic instability (systolic blood pressure <90 mmHg) due to hypovolemic shock secondary to ruptured SAPA were treated by TAE. Clinical files, multidetector row computed tomography angiography, and angiographic examinations along with procedure details were reviewed.ResultsSeventeen SAPAs were present, predominantly located on gastroduodenal or pancreatic arteries (9/17; 53 %). Angiography showed extravasation of contrast medium from SAPA in 15/17 patients (88 %). Technical success rate of TAE was 100 %. TAE was performed using metallic coils in all patients (100 %), in association with gelatin sponge in 5/17 patients (29 %). TAE allowed controlling the bleeding and returning to normal hemodynamic status in 16/17 patients (94 %). In 1/17 patient (6 %), surgery was needed to definitively control the bleeding. The mortality and morbidity rate of TAE at 30 days were 0 and 12 %, respectively. Morbidity consisted in coil migration in 1/17 patient (6 %) and transient serum liver enzyme elevation in 1/17 patient (6 %).ConclusionTAE is an effective and safe treatment option for ruptured SAPA in hemodynamically unstable patients, with a success rate of 94 %. Our results suggest that TAE should be the favored option in patients with hemodynamic instability due to ruptured SAPA.

62 RADIOLOGY AND NUCLEAR MEDICINE↗