Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

DOE Solid-State Lighting CALiPER Program Summary of Results: Round 9 of Product Testing

Round 9 of testing for the Department of Energy (DOE) Commercially Available LED Product Evaluation and Reporting (CALiPER) Program was conducted from June 2009 to September 2009. In this round, 30 products, representing a range of product types and technologies, were tested with both spectroradiometry and goniophotometry using absolute photometry. All solid-state lighting (SSL) products were tested following the IESNA LM-79-08 testing method. Testing also included measurements of surface temperatures (taken at the hottest accessible spots on the luminaire).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Toxecon Retrofit for Mercury and Mulit-Pollutant Control on Three 90-MW Coal-Fired Boilers

This U.S. Department of Energy (DOE) Clean Coal Power Initiative (CCPI) project was based on a cooperative agreement between We Energies and the DOE Office of Fossil Energy's National Energy Technology Laboratory (NETL) to design, install, evaluate, and demonstrate the EPRI-patented TOXECON{trademark} air pollution control process. Project partners included Cummins & Barnard, ADA-ES, and the Electric Power Research Institute (EPRI). The primary goal of this project was to reduce mercury emissions from three 90-MW units that burn Powder River Basin coal at the We Energies Presque Isle Power Plant in Marquette, Michigan. Additional goals were to reduce nitrogen oxide (NO{sub x}), sulfur dioxide (SO{sub 2}), and particulate matter emissions; allow reuse and sale of fly ash; advance commercialization of the technology; demonstrate a reliable mercury continuous emission monitor (CEM) suitable for use at power plants; and demonstrate recovery of mercury from the sorbent. Mercury was controlled by injection of activated carbon upstream of the TOXECON{trademark} baghouse, which achieved more than 90% removal on average over a 44-month period. During a two-week test involving trona injection, SO{sub 2} emissions were reduced by 70%, although no coincident removal of NOx was achieved. The TOXECON{trademark} baghouse also provided enhanced particulate control, particularly during startup of the boilers. On this project, mercury CEMs were developed and tested in collaboration with Thermo Fisher Scientific, resulting in a reliable CEM that could be used in the power plant environment and that could measure mercury as low as 0.1 {micro}g/m{sup 3}. Sorbents were injected downstream of the primary particulate collection device, allowing for continued sale and beneficial use of captured fly ash. Two methods for recovering mercury using thermal desorption on the TOXECON{trademark} PAC/ash mixture were successfully tested during this program. Two methods for using the TOXECON{trademark} PAC/ash mixture in structural concrete were also successfully developed and tested. This project demonstrated a significant reduction in the rate of emissions from Presque Isle Units 7, 8, and 9, and substantial progress toward establishing the design criteria for one of the most promising mercury control retrofit technologies currently available. The Levelized Cost for 90% mercury removal at this site was calculated at $77,031 per pound of mercury removed with a capital cost of $63,189 per pound of mercury removed. Mercury removal at the Presque Isle Power Plant averages approximately 97 pounds per year.

01 COAL, LIGNITE, AND PEAT↗

SU-F-T-169: A Periodic Quality Assurance Program for a Spot-Scanning Proton Treatment Facility

Purpose: To develop daily and monthly quality assurance (QA) programs in support of a new spot-scanning proton treatment facility using a combination of commercial and custom equipment and software. Emphasis was placed on efficiency and evaluation of key quality parameters. Methods: The daily QA program was developed to test output, spot size and position, proton beam energy, and image guidance using the Sun Nuclear Corporation rf-DQA™3 device and Atlas QA software. The program utilizes standard Atlas linear accelerator tests repurposed for proton measurements and a custom jig for indexing the device to the treatment couch. The monthly QA program was designed to test mechanical performance, image quality, radiation quality, isocenter coincidence, and safety features. Many of these tests are similar to linear accelerator QA counterparts, but many require customized test design and equipment. Coincidence of imaging, laser marker, mechanical, and radiation isocenters, for instance, is verified using a custom film-based device devised and manufactured at our facility. Proton spot size and position as a function of energy are verified using a custom spot pattern incident on film and analysis software developed in-house. More details concerning the equipment and software developed for monthly QA are included in the supporting document. Thresholds for daily and monthly tests were established via perturbation analysis, early experience, and/or proton system specifications and associated acceptance test results. Results: The periodic QA program described here has been in effect for approximately 9 months and has proven efficient and sensitive to sub-clinical variations in treatment delivery characteristics. Conclusion: Tools and professional guidelines for periodic proton system QA are not as well developed as their photon and electron counterparts. The program described here efficiently evaluates key quality parameters and, while specific to the needs of our facility, could be readily adapted to other proton centers.

60 APPLIED LIFE SCIENCES↗

Nevada Test Site 2009 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2009 results. During 2009, groundwater at each of the three pilot wells was sampled on March 10, 2009, and August 18, 2009, and water levels at each of the three pilot wells were measured on February 17, May 6, August 17, and November 10, 2009. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2009 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

54 ENVIRONMENTAL SCIENCES↗

Chemistry and Reactivity of Oxide Films on Aluminum Clad Test Reactor Fuels - 19294

This paper describes recent work performed to assess the degradation of aluminum spent nuclear fuel (ASNF) as part of an ongoing Department of Energy project. As part of a multi-task effort, this paper specifically describes efforts initiated in 2018 to better understand chemical phenomena and degradation in ASNF). In this paper experimental and modeling activities are described. The modeling effort presents initial results in two areas potentially influencing stability. Using an established electrolyte model based on experimental data, the solubility of aluminum as a function of temperature and pH was examined. This work describes interesting results for the minimum pH providing relevant data that was not available from the literature. It was found that solubility increases with temperature and that the minimum pH shifts to low pH with increase in temperature. The second area involves understanding the metallurgy of aluminum alloys during fuel drying. In this study, the temperature range from 100 deg. C to 300 deg. C was analyzed. Thermodynamic models predict that AA1100 will not experience significant phase changes while the more highly alloyed AA6061 and AA5052 may experience significant phase changes. These thermodynamic measurements establish a potential for phase changes during drying, however they do not predict the kinetics for such processes. Phase 1 of the experimental program has initiated and results are forthcoming. The test program will examine aluminum oxidation under anticipated dry storage conditions (temperature and humidity). Examination of localized corrosion due to tight crevices and galvanic contact (with stainless steel) will be included. Finally, water deliquescence will be assessed using thermogravimetric analysis with dynamic humidity profiles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

teemi: An open-source literate programming approach for iterative design-build-test-learn cycles in bioengineering

Synthetic biology dictates the data-driven engineering of biocatalysis, cellular functions, and organism behavior. Integral to synthetic biology is the aspiration to efficiently find, access, interoperate, and reuse high-quality data on genotype-phenotype relationships of native and engineered biosystems under FAIR principles, and from this facilitate forward-engineering strategies. However, biology is complex at the regulatory level, and noisy at the operational level, thus necessitating systematic and diligent data handling at all levels of the design, build, and test phases in order to maximize learning in the iterative design-build-test-learn engineering cycle. To enable user-friendly simulation, organization, and guidance for the engineering of biosystems, we have developed an open-source python-based computer-aided design and analysis platform operating under a literate programming user-interface hosted on Github. The platform is called teemi and is fully compliant with FAIR principles. In this study we apply teemi for i) designing and simulating bioengineering, ii) integrating and analyzing multivariate datasets, and iii) machine-learning for predictive engineering of metabolic pathway designs for production of a key precursor to medicinal alkaloids in yeast. The teemi platform is publicly available at PyPi and GitHub.

59 BASIC BIOLOGICAL SCIENCES↗

Airside HVAC BESTEST: HVAC Air-Distribution System Model Test Cases for ASHRAE Standard 140

This paper summarizes recent work to develop new airside HVAC equipment model analytical verification test cases for ANSI/ASHRAE Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs. The analytical verification test method allows comparison of simulation results from a wide variety of building energy simulation programs with quasi-analytical solutions, further described below. Standard 140 is widely cited for evaluating software for use with performance-path energy efficiency analysis, in conjunction with well-known energy-efficiency standards including ASHRAE Standard 90.1, the International Energy Conservation Code, and other international standards. Airside HVAC Equipment is a common area of modelling not previously explicitly tested by Standard 140. Integration of the completed test suite into Standard 140 is in progress.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chemistry and Reactivity of Oxide Films on Aluminum Clad Test Reactor Fuels

This paper describes recent work performed to assess the degradation of aluminum spent nuclear fuel (ASNF) as part of an ongoing Department of Energy project. As part of a multi-task effort, this paper specifically describes efforts initiated in 2018 to better understand chemical phenomena and degradation in ASNF). In this paper experimental and modeling activities are described. The modeling effort presents initial results in two areas potentially influencing stability. Using an established electrolyte model based on experimental data, the solubility of aluminum as a function of temperature and pH was examined. This work describes interesting results for the minimum pH providing relevant data that was not available from the literature. It was found that solubility increases with temperature and that the minimum pH shifts to low pH with increase in temperature. The second area involves understanding the metallurgy of aluminum alloys during fuel drying. In this study, the temperature range from 100°C to 300°C was analyzed. Thermodynamic models predict that AA1100 will not experience significant phase changes while the more highly alloyed AA6061 and AA5052 may experience significant phase changes. These thermodynamic measurements establish a potential for phase changes during drying, however they do not predict the kinetics for such processes. Phase 1 of the experimental program has initiated and results are forthcoming. The test program will examine aluminum oxidation under anticipated dry storage conditions (temperature and humidity). Examination of localized corrosion due to tight crevices and galvanic contact (with stainless steel) will be included. Finally, water deliquescence will be assessed using thermogravimetric analysis with dynamic humidity profiles.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PHOSPHATE MANAGEMENT: FY2010 RESULTS OF PHOSPHATE PRECIPITATION TESTS

The Phosphate Management program seeks to develop treatment options for caustic phosphate solutions resulting from the caustic leaching of the bismuth phosphate sludge. The SRNL subtask investigated the precipitation of phosphate salts from caustic solutions through addition of fluoride and by crystallization. The scoping tests examined the: precipitation of phosphate by the addition of sodium fluoride to form the sodium fluorophosphate double salt, Na{sub 7}F(PO{sub 4}){sub 2} {center_dot} 19H{sub 2}O, crystallization of phosphate by reducing the temperature of saturated phosphate solutions, and combinations of precipitation and crystallization. A simplified leachate simulant was used in the study produced by dissolving sodium phosphate in 1 M to 3.5 M sodium hydroxide solutions. The results show that all three processes; precipitation with sodium fluoride, crystallization, and combined precipitation/crystallization can be effective for removing large amounts of phosphate from solution. The combined process of precipitation/crystallization showed >90% removal of phosphate at all hydroxide concentrations when cooling a non-saturated phosphate solution from 65 C to 25 C. Based on the measured solubility of sodium phosphate, pH adjustment/caustic addition will also remove large amounts of phosphate from solution (>80%). For all three processes, the phosphate concentration in the caustic solution must be managed to keep the phosphate from becoming too concentrated and thereby potentially forming a solid mass of sodium phosphate after an effective phosphate removal process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Low-Yield Nuclear Monitoring (LYNM) Experimental Science Plan

The Low-Yield Nuclear Monitoring (LYNM) Program is a long-term NNSA research and development effort designed to improve the United States’ explosion monitoring capabilities, particularly with respect to low-yield and potentially evasive underground nuclear testing. The LYNM Program focuses on researching, discovering, and exploiting unique and useful signatures, from all available technologies and sensors (e.g., seismic, acoustic, electromagnetic, gases, and particulates (both stable and radioactive)). Four Department of Energy laboratories participate in LYNM and together are referred to as the ‘quad-lab’. The R&D program execution is performed under NNSA defined structures known as “ventures”. Four science ventures were established: 1) Explosion Source Functions; 2) Containment of Low-Yield Underground Tests; 3) Local Signatures; 4) Dynamic Monitoring Networks. To organize and execute the large field scale experiment a fifth venture was established: 5) Physics Experiment One (PE-1). As part of the LYNM Program, a series of experiments are planned at various scales and levels of venture involvement. These vary from those that involve a subset of labs and/or LYNM ventures (e.g., small experiments), to full quad-lab LYNM Program field-scale integrated experiments. Such experiments may involve chemical explosions with tracer materials or other means of simulating the expected signals from a nuclear explosion. The LYNM Program does not conduct actual nuclear explosions. Since 1992, the U.S. has observed a moratorium on underground nuclear explosions. This document is intended to provide the underlying scientific basis for the LYNM planned experimental work. Each specific LYNM experiment will develop a goals, objectives, and requirements (GOR) plan following the guidance in this document. The LYNM technical staff will define the numbers and types of experiments required over the course of the Program based on technical needs and within funding constraints. As with any scientific experiment series, the number and types of experiments may change based upon the experimental results obtained. An experiment that agrees with models/codes/software signature predictions may need fewer repetitions/variations, depending upon the level of statistical rigor desired, as compared to one in which the predictions and experimental data do not match. The large LYNM field-scale integrated experiments require the longest lead-time for planning, and these are discussed in more detail near the end of this document.

58 GEOSCIENCES↗

Field Demonstration of Enhanced Sorbent Injection for Mercury Control

Alstom Power Inc. has conducted a DOE/NETL-sponsored program (under DOE Cooperative Agreement No. DE-FC26-04NT42306) to demonstrate Mer-Cure{trademark}, one of Alstom's mercury control technologies for coal-fired boilers. Mer-Cure{trademark} utilizes a small amount of Mer-Clean{trademark} sorbent that is injected into the flue gas stream for oxidation and adsorption of gaseous mercury. Mer-Clean{trademark} sorbents are carbon-based and prepared with chemical additives that promote oxidation and capture of mercury. Mer-Cure{trademark} is unique in that the sorbent is injected into an environment where the mercury capture kinetics is accelerated. This full-scale demonstration program was comprised of three seven-week long test campaigns at three host sites including PacifiCorp's 240-MW{sub e} Dave Johnston Unit No.3 burning a Powder River Basin (PRB) coal, Basin Electric's 220-MW{sub e} Leland Olds Unit No.1 burning a North Dakota lignite, and Reliant Energy's 170-MW{sub e} Portland Unit No.1 burning an Eastern bituminous coal. All three boilers are equipped with electrostatic precipitators. The goals for this Round 2 program, established by DOE/NETL under the original solicitation, were to reduce the uncontrolled mercury emissions by 50 to 70% at a cost 25 to 50% lower than the previous target of $60,000/lb mercury removed. The results for all three host sites indicated that Mer-Cure{trademark} technology could achieve mercury removal of 90%. The estimated mercury removal costs were 25-92% lower than the benchmark of $60,000/lb mercury removed. The estimated costs for control, at sorbent cost of $1.25 to $2.00/lb respectively, are as follows: (1) Dave Johnston Unit No.3--$2,650 to $4,328/lb Hg removed (92.8% less than $60k/lb); (2) Leland Olds Unit No.1--$8,680 to $13,860/lb Hg removed (76.7% less than $60k/lb); and (3) Portland Unit No.1--$28,540 to $45,065/lb Hg removed (24.9% less than $60k/lb). In summary, the results from demonstration testing at all three host sites show that the goals established by DOE/NETL were exceeded during this test program. Mercury removal performance4 of greater than 90% reduction was above the 50-70% reduction goal, and mercury removal cost of 25-92% lower than the benchmark was above the 25 to 50% cost reduction goal.

01 COAL, LIGNITE, AND PEAT↗

Laboratory Instrument Software Controlled Spread Spectrum Time Domain Reflectometry for Electrical Cable Testing

This research discusses development of a software-controlled laboratory instrument based spread spectrum time domain reflectometry system (SSTDR). This constitutes one task within PNNL’s Light Water Sustainability Program (LWRS) whose mission includes advancing nondestructive examination (NDE) techniques for off-line and on-line in-situ cable condition monitoring. In 2022, PNNL evaluated SSTDR for detection and characterization of a number of cable anomalies (Glass et al. 2022). The review included comparison of SSTDR to Frequency Domain Reflectometry (FDR) techniques which have enjoyed encouraging feedback and are starting to be used in nuclear power plants for periodic cable condition monitoring of cable systems as part of the plant’s overall cable aging management program. The FDR test introduces a broad-band chirp onto the cable at the cable end then listens for any reflection from a change of impedance along the cable caused by a damaged conductor or insulation, splices, contact with moisture, or other cable anomalies. The signal is captured in the frequency domain then transformed back to the time domain using an inverse Fourier transform (IFT). Based on the velocity of propagation, the impedance response signal is plotted against distance along the cable. Peak locations along the X-axis indicate the distance along the cable where a portion of the signal has been reflected back to the instrument as a result of a cable anomaly. The FDR test is considered the gold standard of reflectometry however it does require the cable to be de-energized to perform the test. The LIVEWIRE commercial SSTDR produces a similar plot to the FDR however all processing is in the time domain. A pseudo-random noise code (PN code) is input onto the cable conductor and the instrument listens for any reflected response from cable anomalies. The SSTDR processes the signal as an autocorrelation comparing the input PN code to any reflected signal detected. The autocorrelation analysis for thermal aging, water and water ingress detection, ground fault and phase-to-phase fault detection at various locations along the cable and with the cable attached and detached from a motor load, and on both energized and un-energized conditions were performed. These results were contrasted to Frequency Domain Reflectometry (FDR) measurements of the un-energized cable. Results were encouraging but indicated more work was warranted – particularly with the SSTDR, it seemed that the insulation damage would likely be better evaluated with multiple bandwidth cable tests particularly including larger bandwidths than were possible with the current commercial instrument. The commercial instrument’s bandwidth was set at 6, 12, 24, and 48MHz but note that SSTDR and FDR definitions of bandwidth trend similarly but are not the same. The FDR response could be more broadly adjusted, and the bandwidth of 100 to 500 MHz produced the best responses. FDR responses to anomalies were clearer than SSTDR responses and indications were that a broader bandwidth SSTDR may lead to improved SSTDR detection capability. This project used a laboratory instrument based SSTDR (primarily using an Arbitrary Waveform Generator (AWG) and a digital oscilloscope plus Python in-house software) that allowed software adjustment of the SSTDR bandwidth, window functions applied to the exciting Pseudo-random Noise (PN) code plus and other aspects of the SSTDR signal processing. Hereafter, this will be referred to as the PNNL SSTDR. Evaluating specific performance of the PNNL SSTDR is left to a separate report. This report documents hardware and software development to produce the SSTDR cable test system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scoping Study for Fast Flux Testing in the Advanced Test Reactor

The value of fast spectrum reactors remains prominent in the nuclear technology portfolio. The performance of these reactors can be maximized with advancements in nuclear fuel technologies, but development of these technologies is currently held back by lack of fast spectrum test reactors available to the United States. Spectral modification of experiment positions in the thermal spectrum Advanced Test Reactor (ATR) has long been used to support fast reactor fuel development, but these methods have not been progressed to their full potential. This study investigated the use of concentric rings of aluminum-clad fuel plates in ATR flux traps and thermal neutron absorbing filters to increase fast neutron flux on test specimens. This concept was termed the Boosted Energy Advanced Spectrum Test (BEAST). This approach will enable irradiation of advanced fuel designs in prototypic-length fuel pins and representative flux environment to support post irradiation exams, enable transient testing, and produce the type of data that will permit lead test assembly irradiations in true Sodium Fast Reactors (SFRs) when they become available. Neutronic predictions were performed to investigate BEAST design options and thermal hydraulic models were produced to ensure feasibility of BEAST. Two versions were considered based on the geometric limitations of ATR’s small and large flux traps. The small version was found to be preferable due to slightly higher fast flux and fast-to-thermal neutron ratio. Perhaps more influentially, the small flux trap option was also preferred to avoid conflict with ongoing very high temperature reactor fuel irradiation programs in ATR’s large northeast flux trap. The small flux trap option provided less than half the test volume of the large version, but still had adequate volume for seven SFR pins in cross section which could be stacked two-high in ATR’s 1.2m long core to accommodate up to 14 EBR-II size pins. The preference for the small flux trap configuration should be revisited if additional collaborative test programs emerge with the need to irradiate a significant volume of additional specimens. Calculations were performed regarding a lithium deuteride ring to convert thermal neutrons into 14 MeV fusion neutrons. At the time this report was written these calculations were partially complete and it remains to be seen whether the concept would be worth including in BEAST. Given the preference for the small flux trap option, which does not afford enough room for the 14 MeV ring, it was concluded to defer future work on the lithium deuteride ring. This decision could be revisited if fusion material research programs emerge for collaborative testing in BEAST. A cadmium-lined specimen holder design was found to be adequate in filtering thermal neutrons and preferred over other neutron absorbers based on past experience with cadmium baskets. It was acknowledged that cadmium-bearing hardware would become depleted and need to be replaced occasionally, which appeared feasible from a mechanical design perspective. Neutronic studies investigated different enrichment levels in the booster fuel using uranium-molybdenum alloy dispersion fuel which has performed well in past ATR irradiations. Both options were able to drive fuel pins to SFR-like fission heating rates. The high enriched booster fuel option outperformed the low enriched option by ~20% on key metrics including fast flux and fast-to-thermal ratio, but the low enriched option was favored in order to broaden options for potential fuel suppliers. The preferred BEAST design options including cadmium filter with low enriched booster fuel in the small flux trap configuration was predicted to achieve 6.2E14 n/cm2sec fast flux (>0.1 MeV) with a fast-to-thermal ratio of 44.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Rotating Detonation Combustion for Gas Turbines: Modeling and System Synthesis to Exceed 65% Efficiency Goal (Phase II)

As of May 2019, all RDE test hardware and test operations were completed for this program. Over 700 hot fire tests were conducted at 4 facilities with 7 RDE assemblies, with the data available for future analysis. In particular, measured static and dynamic pressure and computational fluid dynamics (CFD) provided basis for pressure gain combustion (PGC) analysis of the Engineering Scale RDE. It was demonstrated via measurements and CFD that a carefully designed diffuser can recover some total pressure of the highly oscillatory RDE exhaust. In general, the isolator/injector is largest contributor of pressure losses; however a low loss design was demonstrated that improves significantly on previous natural-gas/air RDEs. Also, a tailored injector and mixing technique was demonstrated that allowed NG-air RDE operation with overall equivalence ratio of less than 0.6. CFD models by AR, the UofM and Purdue University were extensively used throughout the program to refine diffuser design for improved pressure recovery, to simulate injection and mixing, to estimate turbine interaction, to estimate combustor pressure gain anchored with test data and to provide input to other design and analytical tasks. CFD analyses were completed for many of the configurations tested at Purdue with the 13.4” RDE including the shark fin and low area ratio isolators. Results were compared favorably to available hot fire test particle image velocimetry (PIV) measurements and wave speeds. The results of these CFD analyses suggest a modest pressure gain of 33% with a sufficiently low area ratio isolator. A thermodynamic power plant system model was set up which utilizes an RDE combustor. The performance of the RDE combustor module was scaled based on measurements from the Engineering Scale RDE tests with low loss injector and tailored fuel flow. This combined model indicates potential for significant plant efficiency improvement. The successful tailored fuel injection test result with lower than .6 equivalence ratio has implication that a power plant can use a RDE combustor configuration where all the air flows through the combustion zone thereby not requiring a bypass mixer. In this configuration, the results of the natural gas combined cycle (NGCC) plant system indicate net efficiency of 66.4%.

02 PETROLEUM↗

Warm Magnetic Field Measurements of LARP HQ Magnet

The US-LHC Accelerator Research Program is developing and testing a high-gradient quadrupole (HQ) magnet, aiming at demonstrating the feasibility of Nb{sub 3}Sn technologies for the LHC luminosity upgrade. The 1 m long HQ magnet has a 120 mm bore with a conductor-limited gradient of 219 T/m at 1.9 K and a peak field of 15 T. HQ includes accelerator features such as alignment and field quality. Here we present the magnetic measurement results obtained at LBNL with a constant current of 30 A. A 100 mm long circuit-board rotating coil developed by FNAL was used and the induced voltage and flux increment were acquired. The measured b{sub 6} ranges from 0.3 to 0.5 units in the magnet straight section at a reference radius of 21.55 mm. The data reduced from the numerical integration of the raw voltage agree with those from the fast digital integrators.

43 PARTICLE ACCELERATORS↗

FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.

Source record↗

Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

43 PARTICLE ACCELERATORS↗

Calendar Year 2020 Post-Closure Monitoring Report for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Underground Test Area, Nevada National Security Site, Nevada (Rev. 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain (RM/SM), at the Nevada National Security Site (NNSS), Nevada. This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]), and verification of use restrictions (URs), institutional controls, and water usage. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area Closure Report (CR) for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada National Security Site, Nevada (DOE/EMNV, 2020). Rainier Mesa (RM) was the site of 61 underground nuclear tests, and Shoshone Mountain (SM) was the site of 6 underground nuclear tests. As a result of these activities, which took place from 1957 to 1992, radionuclides (RNs) were released in the subsurface in the vicinity of the detonations. These 67 underground nuclear tests are associated with 66 specific corrective action site (CAS) numbers, as listed in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). Two tests, HURON LANDING and DIAMOND ACE (conducted simultaneously), are included within one CAS. The CR (DOE/EMNV, 2020) establishes the regulatory boundaries and regulatory boundary objectives, monitoring program, UR boundaries and URs, and other institutional controls agreed to by EM Nevada Program and the Nevada Division of Environmental Protection (NDEP) for closure of CAU 99. Regulatory boundaries for the RM/SM CAU were established to protect receptors of groundwater from RN contamination within the three downgradient groundwater basins that receive recharge from RM. The SM regulatory boundary was established to verify that RN contamination does not reach the lower carbonate aquifer below SM. The UR boundaries were established based on contaminant simulation forecasts from the flow and transport simulations with consideration of site-specific topographical controls. The URs associated with the UR boundaries were identified to protect onsite workers and the public from inadvertent exposure to contaminated groundwater as forecasted to occur assuming current conditions. The UR is intended to restrict activities that might expose workers to contaminated groundwater within the UR area. In addition to the URs, other institutional controls are established to monitor and limit access to groundwater. These include federal ownership and management in perpetuity, controlled access of the NNSS and surrounding areas, and reporting water use on the NNSS and surrounding hydrographic basins.

54 ENVIRONMENTAL SCIENCES↗