Search NASA⌕ Search

SEARCH · Search NASA

Results for “Verification study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

A Technique for Verification of Isocenter Position in Tangential Field Breast Irradiation

Treatment verification and reproducibility of the breast treatment portals play a very important role in breast radiotherapy. We propose a simple technique to verify the planned isocenter position during treatment using an electronic portal imaging device. Ten patients were recruited in this study and (CT) computed tomography-based planning was performed with a conventional tangential field technique. For verification purposes, in addition to the standard medial (F1) and lateral (F2) tangential fields, a field (F3) perpendicular to the medial field was used for verification of the treatment portals. Lead markers were placed along the central axis of the 2 defined fields (F1 and F3) and the separation between the markers was measured on the portal images and verified with the marker separation on the digitally reconstructed radiographs (DRRs). Any deviation will identify the shift in the planned isocenter position during treatment. The average deviation observed between the markers measured from the DRR and portal image was 1.6 and 2.1 mm, with a standard deviation of 0.4 and 0.9 mm for fields F1 and F3, respectively. The maximum deviation observed was 3.0 mm for field F3. This technique will be very useful in patient setup for tangential breast radiotherapy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Verification and Validation of the ENDF/B-VII.1 v4.3m1 MPACT 51-Group Cross Section Library

The MPACT neutronics module of the Consortium for Advanced Simulation of Light Water Reactors (CASL) core simulator is a 3-D whole core transport code being developed for the Virtual Environment for Reactor Analysis (VERA) CASL toolset. Key characteristics of the MPACT code include (1) a subgroup method for resonance selfshielding and (2) a whole-core transport solver with a 2-D/1-D synthesis method. The MPACT code requires a cross section library to support all of its core simulation capabilities; a cross section library would be MPACT’s most influencing component for simulation accuracy. Due to the limitation of computing capacity even in high performance computing, the cross section library must be developed to enhance computational efficiency in memory and computing time without losing accuracy and generality. This requires a very coarse energy group structure with about 50 groups. Multigroup (MG) neutron cross section libraries for the CASL VERA-CS neutronics simulator MPACT have been created by using the AMPX/SCALE code package developed at Oak Ridge National Laboratory (ORNL). A new 51-group structure was developed for efficient simulation to be applicable for both pressurized water reactor (PWR) and boiling water reactor (BWR) simulations. New v4.3m1 MPACT 51-group library with the ENDF/B- VII.1 nuclear data were developed for MPACT. Since SCALE KENO has some issues in the probability table and has a low cutoff energy for the free gas model, this issue has been corrected. This study focused on the development of the ENDF/B-VII.1 v4.3m1 MPACT MG library, including verification and validation. This document includes the library generation methodology and procedure, the verification procedure, and benchmark results compared to continuous energy Monte Carlo results using newly developed cross section libraries.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Feasibility Study of Glass Dosimeter for In Vivo Measurement: Dosimetric Characterization and Clinical Application in Proton Beams

Purpose: To evaluate the suitability of the GD-301 glass dosimeter for in vivo dose verification in proton therapy. Methods and Materials: The glass dosimeter was analyzed for its dosimetrics characteristic in proton beam. Dosimeters were calibrated in a water phantom using a stairlike holder specially designed for this study. To determine the accuracy of the glass dosimeter in proton dose measurements, we compared the glass dosimeter and thermoluminescent dosimeter (TLD) dose measurements using a cylindrical phantom. We investigated the feasibility of the glass dosimeter for the measurement of dose distributions near the superficial region for proton therapy plans with a varying separation between the target volume and the surface of 6 patients. Results and Discussion: Uniformity was within 1.5%. The dose-response has good linearity. Dose-rate, fading, and energy dependence were found to be within 3%. The beam profile measured using the glass dosimeter was in good agreement with the profile obtained from the ionization chamber. Depth-dose distributions in nonmodulated and modulated proton beams obtained with the glass dosimeter were estimated to be within 3%, which was lower than those with the ionization chamber. In the phantom study, the difference of isocenter dose between the delivery dose calculated by the treatment planning system and that measured by the glass dosimeter was within 5%. With in vivo dosimetry, the calculated surface doses overestimated measurements by 4%-16% using glass dosimeter and TLD. Conclusion: It is recommended that bolus be added for these clinical cases. We also believe that the glass dosimeter has considerable potential for use with in vivo patient proton dosimetry.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Evaluation of magnetic flux distribution from magnetic domains in [Co/Pd] nanowires by magnetic domain scope method using contact-scanning of tunneling magnetoresistive sensor

Current-driven magnetic domain wall motions in magnetic nanowires have attracted great interests for physical studies and engineering applications. The magnetic force microscope (MFM) is widely used for indirect verification of domain locations in nanowires, where relative magnetic force between the local domains and the MFM probe is used for detection. However, there is an occasional problem that the magnetic moments of MFM probe influenced and/or rotated the magnetic states in the low-moment nanowires. To solve this issue, the “magnetic domain scope for wide area with nano-order resolution (nano-MDS)” method has been proposed recently that could detect the magnetic flux distribution from the specimen directly by scanning of tunneling magnetoresistive field sensor. In this study, magnetic domain structure in nanowires was investigated by both MFM and nano-MDS, and the leakage magnetic flux density from the nanowires was measured quantitatively by nano-MDS. Specimen nanowires consisted from [Co (0.3)/Pd (1.2)]{sub 21}/Ru(3) films (units in nm) with perpendicular magnetic anisotropy were fabricated onto Si substrates by dual ion beam sputtering and e-beam lithography. The length and the width of the fabricated nanowires are 20 μm and 150 nm. We have succeeded to obtain not only the remanent domain images with the detection of up and down magnetizations as similar as those by MFM but also magnetic flux density distribution from nanowires directly by nano-MDS. The obtained value of maximum leakage magnetic flux by nano-MDS is in good agreement with that of coercivity by magneto-optical Kerr effect microscopy. By changing the protective diamond-like-carbon film thickness on tunneling magnetoresistive sensor, the three-dimensional spatial distribution of leakage magnetic flux could be evaluated.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Proceedings of the Second NASA Formal Methods Symposium

This publication contains the proceedings of the Second NASA Formal Methods Symposium sponsored by the National Aeronautics and Space Administration and held in Washington D.C. April 13-15, 2010. Topics covered include: Decision Engines for Software Analysis using Satisfiability Modulo Theories Solvers; Verification and Validation of Flight-Critical Systems; Formal Methods at Intel -- An Overview; Automatic Review of Abstract State Machines by Meta Property Verification; Hardware-independent Proofs of Numerical Programs; Slice-based Formal Specification Measures -- Mapping Coupling and Cohesion Measures to Formal Z; How Formal Methods Impels Discovery: A Short History of an Air Traffic Management Project; A Machine-Checked Proof of A State-Space Construction Algorithm; Automated Assume-Guarantee Reasoning for Omega-Regular Systems and Specifications; Modeling Regular Replacement for String Constraint Solving; Using Integer Clocks to Verify the Timing-Sync Sensor Network Protocol; Can Regulatory Bodies Expect Efficient Help from Formal Methods?; Synthesis of Greedy Algorithms Using Dominance Relations; A New Method for Incremental Testing of Finite State Machines; Verification of Faulty Message Passing Systems with Continuous State Space in PVS; Phase Two Feasibility Study for Software Safety Requirements Analysis Using Model Checking; A Prototype Embedding of Bluespec System Verilog in the PVS Theorem Prover; SimCheck: An Expressive Type System for Simulink; Coverage Metrics for Requirements-Based Testing: Evaluation of Effectiveness; Software Model Checking of ARINC-653 Flight Code with MCP; Evaluation of a Guideline by Formal Modelling of Cruise Control System in Event-B; Formal Verification of Large Software Systems; Symbolic Computation of Strongly Connected Components Using Saturation; Towards the Formal Verification of a Distributed Real-Time Automotive System; Slicing AADL Specifications for Model Checking; Model Checking with Edge-valued Decision Diagrams; and Data-flow based Model Analysis.

Munoz, Cesar↗

Feasibility of an image planning system for kilovoltage image-guided radiation therapy

Purpose: Image guidance has become a standard of care for many treatment scenarios in radiation therapy. This is most typically accomplished by use of kV x-ray devices mounted onto the linear accelerator (Linac) gantry that yield planar, fluoroscopic, and cone-beam computed tomography (CBCT) images. Image acquisition parameters are chosen via preset techniques that rely on broad categorizations in patient anatomy and imaging goal. However, the optimal imaging technique results in detectability of the features of interest while exposing the patient to minimum dose. Herein, the authors present an investigation into the feasibility of developing an image planning system (IPS) for radiotherapy.Methods: In this first phase, the authors focused on developing an algorithm to predict tissue contrast produced by a common radiotherapy planar imaging chain. Input parameters include a CT dataset and simulated planar imaging technique settings that include kV and mAs. Energy-specific attenuation through each voxel of the CT dataset was calculated in the algorithm to derive a net transmitted intensity. The response of the flat panel detector was integrated into the image simulation algorithm. Verification was conducted by comparing simulated and measured images using four phantoms. Comparisons were made in both high and low contrast settings, as well as changes in the geometric appearance due to image saturation. Results: The authors studied a lung nodule test object to assess the planning system's ability to predict object contrast and detectability. Verification demonstrated that the slope of the pixel intensities is similar, the presence of the nodule is evident, and image saturation at high mAs values is evident in both images. The appearance of the lung nodule is a function of the image detector saturation. The authors assessed the dimensions of the lung nodule in measured and simulated images. Good quantitative agreement affirmed the algorithm's predictive capabilities. The invariance of contrast with kVp and mAs prior to saturation was predicted, as well as the gradual loss of object detectability as saturation was approached. Small changes in soft tissue density were studied using a mammography step wedge phantom. Data were acquired at beam qualities of 80 and 120 kVp and over exposure values ranging from 0.04 to 500 mAs. The data showed good agreement in terms of the absolute value of pixel intensities predicted, as well as small variations across the step wedge pattern. The saturation pixel intensity was consistent between the two beam qualities studied. Boney tissue contrast was assessed using two abdominal phantoms. Measured and calculated values agree in terms of predicting the mAs value at which detector saturation, and subsequent loss of contrast occurs. The lack of variation in contrast over mAs values lower than 10 suggests that there is wide latitude for minimizing patient dose. Conclusions: The authors developed and tested an algorithm that can be used to assist in kV imaging technique selection during localization for radiotherapy. Phantom testing demonstrated the algorithm's predictive accuracy for both low and high contrast imaging scenarios. Detector saturation with subsequent loss of imaging detail, both in terms of object size and contrast were accurately predicted by the algorithm.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Bison Verification and Validation Activities for TRISO

Numerical modeling and simulation (M&S) tools play a key role in the research, development, and overall safety assessments of next-generation nuclear energy systems. One such tool, Bison, is a nuclear fuel performance code that is applicable to many fuel forms (e.g., light-water reactor fuel, oxide and metallic fuel for fast reactors, tri-structural isotropic (TRISO) fuel, and plate fuel), and it uses the finite element method to model the thermo- mechanical response of nuclear fuels. One fuel form widely utilized in Generation-IV high-temperature gas-cooled and fluoride- salt-cooled nuclear reactor concepts is TRISO fuel. Recently, Bison’s capabilities were significantly expanded to enable it to model the performance of TRISO particles and compacts. It is important that Bison’s computational results be reliable and predictive, since this code is used to inform high-consequence decisions. The various processes developed to address this issue generally entail two fundamental steps: verification and validation (V&V). Verification ensures that the code functions correctly and is reliable. Code/solution verification, code benchmark, and software quality assurance exercises are examples of verification activities. On the other hand, validation is the process of assessing a code’s capability to accurately model physical problems. Comparisons between code results and experiments quantify the validation level. Application of V&V procedures is crucial to the development of computational tools that are free of coding mistakes and can accurately represent reality. The current study presents an overview of Bison V&V activities relevant to the TRISO fuel concept, which include code/solution verification exercises, CRP-6 Benchmark—a Coordinated Research Program through the International Atomic Energy Agency (IAEA)—exercises, and validation exercises with the Advanced Gas Reactor (AGR)- 1/2/3/4 experiment series.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Space Station automated systems testing/verification and the Galileo Orbiter fault protection design/verification

Aspects of Space Station automated systems testing and verification are discussed, taking into account several program requirements. It is found that these requirements lead to a number of issues of uncertainties which require study and resolution during the Space Station definition phase. Most, if not all, of the considered uncertainties have implications for the overall testing and verification strategy adopted by the Space Station Program. A description is given of the Galileo Orbiter fault protection design/verification approach. Attention is given to a mission description, an Orbiter description, the design approach and process, the fault protection design verification approach/process, and problems of 'stress' testing.

Landano, M. R.↗

The role of the real-time simulation facility, SIMFAC, in the design, development and performance verification of the Shuttle Remote Manipulator System (SRMS) with man-in-the-loop

The SIMFAC has played a vital role in the design, development, and performance verification of the shuttle remote manipulator system (SRMS) to be installed in the space shuttle orbiter. The facility provides for realistic man-in-the-loop operation of the SRMS by an operator in the operator complex, a flightlike crew station patterned after the orbiter aft flight deck with all necessary man machine interface elements, including SRMS displays and controls and simulated out-of-the-window and CCTV scenes. The characteristics of the manipulator system, including arm and joint servo dynamics and control algorithms, are simulated by a comprehensive mathematical model within the simulation subsystem of the facility. Major studies carried out using SIMFAC include: SRMS parameter sensitivity evaluations; the development, evaluation, and verification of operating procedures; and malfunction simulation and analysis of malfunction performance. Among the most important and comprehensive man-in-the-loop simulations carried out to date on SIMFAC are those which support SRMS performance verification and certification when the SRMS is part of the integrated orbiter-manipulator system.

Mccllough, J. R.↗

Semiclassical anomalies of the quantum mechanical systems and their modifications for the asymptotic matching

JWKB solutions to the Initial Value Problems (IVPs) of the Time Independent Schrodinger's Equation (TISE) for the Simple Linear Potentials (SLPs) with a turning point parameter have been studied according to the turning points by graphical analysis to test the results of the JWKB solutions and suggested modifications. The anomalies happening in the classically inaccessible region where the SLP function is smaller than zero and the results of the suggested modifications, which are in consistent with the quantum mechanical theories, to remove these anomalies in this region have been presented. The origins of the anomalies and verifications of the suggested modifications showing a great success in the results have also been studied in terms of a suggested M{sub ij}=S{sup {approx}}{sub i-1,j} matrix elements made up of the JWKB expansion terms, S{sub i-1,j} (where i = 1, 2, 3 and j 1, 2). The results of the modifications for the IVPs and their application to the Bound State Problems (BSPs) with an example application of the Harmonic Oscillator (HO) have been presented and their generalization for any potential function have been discussed and classified accordingly.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Face Sheet/Core Disbond Growth in Honeycomb Sandwich Panels Subjected to Ground-Air-Ground Pressurization and In-Plane Loading

Typical damage modes in light honeycomb sandwich structures include face sheet/core disbonding and core fracture, both of which can pose a threat to the structural integrity of a component. These damage modes are of particular interest to aviation certification authorities since several in-service occurrences, such as rudder structural failure and other control surface malfunctions, have been attributed to face sheet/core disbonding. Extensive studies have shown that face sheet/core disbonding and core fracture can lead to damage propagation caused by internal pressure changes in the core. The increasing use of composite sandwich construction in aircraft applications makes it vitally important to understand the effect of ground-air-ground (GAG) cycles and conditions such as maneuver and gust loads on face sheet/core disbonding. The objective of the present study was to use a fracture mechanics based approach developed earlier to evaluate the loading at the disbond front caused by ground-air-ground pressurization and in-plane loading. A honeycomb sandwich panel containing a circular disbond at one face sheet/core interface was modeled with three-dimensional (3D) solid finite elements. The disbond was modeled as a discrete discontinuity and the strain energy release rate along the disbond front was computed using the Virtual Crack Closure Technique (VCCT). Special attention was paid to the pressure-deformation coupling which can decrease the pressure load within the disbonded sandwich section significantly when the structure is highly deformed. The commercial finite element analysis software, Abaqus/Standard, was used for the analyses. The recursive pressure-deformation coupling problem was solved by representing the entrapped air in the honeycomb cells as filled cavities in Abaqus/Standard. The results show that disbond size, face sheet thickness and core thickness are important parameters that determine crack tip loading at the disbond front. Further, the pressure-deformation coupling was found to have an important load decreasing effect [6]. In this paper, a detailed problem description is provided first. Second, the analysis methodology is presented. The fracture mechanics approach used is described and the specifics of the finite element model, including the fluid-filled cavities, are introduced. Third, the initial model verification and validation are discussed. Fourth, the findings from a closely related earlier study [6] are summarized. These findings provided the basis for the current investigation. Fifth, an aircraft ascent scenario from 0 to 12192 m (0 to 40000 ft) is considered and the resulting crack tip loading at the disbond front is determined. In-plane loading to simulate maneuvers and gust conditions are also considered. Sixth, the results are shown for a curved panel, which was used to simulate potential fuselage applications. Finally, a brief summary of observations is presented and recommendations for improvement are provided.

Chen, Zhi M.↗

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A methodology to study crystal plasticity inside a compression test sample based on image correlation and EBSD

Modified compression tests in a coarse-grained austenitic stainless steel have been carried out in order to examine the crystal plasticity behavior for large plastic deformations. The measurements of local in-plane strains provide deeper insight into the deformation process on the local scale. These measurements are performed by digital image correlation technique (DIC) in combination with local crystal orientation measurements by using the electron backscatter diffraction technique (EBSD). Split test samples are prepared to track the strong microstructural changes during deformation, which is done incrementally in 10% steps up to 60% total macroscopic strain. The clear correlation of local strains with crystal orientation changes - e.g. in the case of mechanical twinning - permits to identify the acting deformation mechanisms. Such, experimentally determined local strain maps can be used for verification of crystal plasticity finite element method simulations (CPFEM). - Research Highlights: {yields} Method to study large strain crystal plasticity inside an austenitic FeCrNi-alloy. {yields} Correlation of local strain analyses with crystal orientation measurements. {yields} Deformation mechanism changes locally from dislocation glide to mechanical twinning. {yields} Suitable to study grain-grain interactions, slip system activation and grain boundary effects. {yields} Provide essential data for crystal plasticity FEM studies.

36 MATERIALS SCIENCE↗

Development of a water source heat pump hardware-in-the-loop (HIL) testing facility for smart building applications

Over the last decade, the global fight against climate change through electrification has led to an increase in research on building heating, ventilation, and air conditioning (HVAC) systems that utilize intelligent control algorithms to provide demand-side grid service while maintaining the thermal comfort of building occupants. As the pivotalpoint between building electricity consumption and indoor thermal comfort, high-efficiency electrical heatpumps are at the center of these emerging studies, and various grid-interactive and occupant-comfort control algorithms have been developed for them. The impact of these algorithms on the heatpump operation andperformance under different weather, building load, and grid requests calls for investigation and verification via experimental tests with actual heat pumps integrated with real-time building and grid responses. This study presents a Water-Source Heat Pump Hardware-in-The-Loop (HIL) Test Facility developed with the capability to perform such tests. The hardware configuration for this testfacility introduces a hydronic system that emulates the conditions for the heat pump water-side, and a duct system that emulates conditions for the heat pump airside. Both data acquisition and emulator control are implemented through the National Instruments (NI) LabVIEW software running on an NI PXIplatform. The HIL mechanism based on the hardware-software integration that allows the testbed to communicate with a generic simulation environment is also discussed. Currently, the test facility setup includes a single heatpump and virtual building model in EnergyPlus coupled with an occupant behavioral model in MATLAB. Preliminary test results of the current setup demonstrate the building load emulator's ability to track the simulated gone temperature with a Root Mean Square Deviation (RSME) below 0.12°C (0.216°F). An uncertainty analysis based on sensor accuracies shows that the heat pump coefficient of performance (COP) can be measured with a relative uncertainty of 10.4% in cooling and 3.7% in heating. Apartfrom the current testing on a single heat pump, the test facility also provides the flexibility to include additional heat pumps to form a heat pump cluster, as well as coupling the heat pump with active thermal storage to provide enhanced demandflexibility.

Calfa, Caleb↗

Large Payload Ground Transportation and Test Considerations

Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure—roads, bridges, airframes, and buildings—necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications. Although this paper focuses on the canceled Altair spacecraft as a case study, the issues identified here have wide applicability to other large payloads, including concepts under consideration for NASA’s Evolvable Mars Campaign.

Rucker, Michelle A.↗

Visualization Study of Counterflow in Superfluid {sup 4}He using Metastable Helium Molecules

Heat is transferred in superfluid {sup 4}He via a process known as thermal counterflow. It has been known for many years that above a critical heat current the superfluid component in this counterflow becomes turbulent. It has been suspected that the normal-fluid component may become turbulent as well, but experimental verification is difficult without a technique for visualizing the flow. Here we report a series of visualization studies on the normal-fluid component in a thermal counterflow performed by imaging the motion of seeded metastable helium molecules using a laser-induced-fluorescence technique. We present evidence that the flow of the normal fluid is indeed turbulent at relatively large velocities. Thermal counterflow in which both components are turbulent presents us with a theoretically challenging type of turbulent behavior that is new to physics.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗