Search NASA⌕ Search

SEARCH · Search NASA

Results for “camera response”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

880 records · Page 49

Investigation of Pressurized Entrained-Flow Kraft Black Liquor Gasification in an Industrially Relevant Environment

The University of Utah's project 'Investigation of Pressurized Entrained-Flow Kraft Black Liquor Gasification in an Industrially Relevant Environment' (U.S. DOE Cooperative Agreement DE-FC26-04NT42261) was a response to U.S. DOE/NETL solicitation DE-PS36-04GO94002, 'Biomass Research and Development Initiative' Topical Area 4-Kraft Black Liquor Gasification. The project began September 30, 2004. The objective of the project was to improve the understanding of black liquor conversion in high pressure, high temperature reactors that gasify liquor through partial oxidation with either air or oxygen. The physical and chemical characteristics of both the gas and condensed phase were to be studied over the entire range of liquor conversion, and the rates and mechanisms of processes responsible for converting the liquor to its final smelt and syngas products were to be investigated. This would be accomplished by combining fundamental, lab-scale experiments with measurements taken using a new semi-pilot scale pressurized entrained-flow gasifier. As a result of insufficient availability of funds and changes in priority within the Office of Biomass Programs of the U.S. Department of Energy, the research program was terminated in its second year. In total, only half of the budgeted funding was made available for the program, and most of this was used during the first year for construction of the experimental systems to be used in the program. This had a severe impact on the program. As a consequence, most of the planned research was unable to be performed. Only studies that relied on computational modeling or existing experimental facilities started early enough to deliver useful results by the time to program was terminated Over the course of the program, small scale (approx. 1 ton/day) entrained-flow gasifier was designed and installed at the University of Utah's off-campus Industrial Combustion and Gasification Research Facility. The system is designed to operate at pressures as high as 32 atmospheres, and at temperatures as high as 1500 C (2730 F). Total black liquor processing capacity under pressurized, oxygen-blown conditions should be in excess of 1 ton black liquor solids per day. Many sampling ports along the conversion section of the system will allow detailed analysis of the environment in the gasifier under industrially representative conditions. Construction was mostly completed before the program was terminated, but resources were insufficient to operate the system. A system for characterizing black liquor sprays in hot environments was designed and constructed. Silhouettes of black liquor sprays formed by injection of black liquor through a twin fluid (liquor and atomizing air) nozzle were videoed with a high-speed camera, and the resulting images were analyzed to identify overall characteristics of the spray and droplet formation mechanisms. The efficiency of liquor atomization was better when the liquor was injected through the center channel of the nozzle, with atomizing air being introduced in the annulus around the center channel, than when the liquor and air feed channels were reversed. Atomizing efficiency and spray angle increased with atomizing air pressure up to a point, beyond which additional atomizing air pressure had little effect. Analysis of the spray patterns indicates that two classifications of droplets are present, a finely dispersed 'mist' of very small droplets and much larger ligaments of liquor that form at the injector tip and form one or more relatively large droplets. This ligament and subsequent large droplet formation suggests that it will be challenging to obtain a narrow distribution of droplet sizes when using an injector of this design. A model for simulating liquor spray and droplet formation was developed by Simulent, Inc. of Toronto. The model was able to predict performance when spraying water that closely matched the vendor specifications. Simulation of liquor spray indicates that droplets on the order 200-300 microns can be expected, and that higher liquor flow will result in better distribution of liquor in the reactor.

09 BIOMASS FUELS↗

SPRUCE Vegetation Phenology in Experimental Plots from PhenoCam Imagery, 2015-2024

This data set consists of PhenoCam data from the SPRUCE experiment from the beginning of whole ecosystem warming (Hanson et al. 2017) in August 2015 through March 31 of 2025 (2015-08-24 to 2025-03-31), with start- and end-of-season phenological transition dates derived through the end of autumn 2024. Digital cameras, or phenocams, installed in each SPRUCE enclosure track seasonal variation in vegetation “greenness”, a proxy for vegetation phenology and associated physiological activity. Three separate regions of interest (ROIs) were defined for each camera field of view, corresponding to different vegetation types and demarcating (1) Picea trees (vegetation type EN, for evergreen needleleaf); (2) Larix trees (vegetation type DN, for deciduous needleleaf); and (3) the mixed shrub layer (vegetation type SH). This data set consists of three sets of data files: (1) 3-day summary product files: One file for each camera and each ROI (i.e. vegetation type), characterizing vegetation color at a 3-day time step. • Contains 36 files in *.csv format inside a compressed (*.zip) file. (2) Transition date file: Estimates “greenness rising” (spring) and “greenness falling” (autumn) transition dates derived from the smoothed daily green chromatic coordinate (GCC) values, for each camera and each ROI (i.e., vegetation type). • Contains one file in *.csv format. (3) Snow flag files: Indicate days with snow on trees or snow on ground for each experimental enclosure. • Contains two files in *.csv format, one for snow on trees and one for snow on ground. This data set consists of two sets of companion files: (1) Accompanying HTML files show the 90th quantiles of the mean GCC plotted together with transition dates for each vegetation type and plot. • Contains three files in HTML format, one for each vegetation type. • One additional file in HTML format with the transition dates plotted for each vegetation type, by year. (2) R files for processing PhenoCam files and flags. • Contains five files in R file(*.R) format and the components of the phenocamr package (Version 1.1.4) used for calculating transition dates for 2015-2024. These are contained in a compressed (*.zip) file. User Note: All imagery is posted in near-real time to the PhenoCam Project web page (https://phenocam.nau.edu), where it is publicly available. Scroll to “spruce” in the Gallery or link directly to the 29 SPRUCE cameras at https://tinyurl.com/sprucecams. This data set is based on the complete camera record from SPRUCE and supersedes all previously released PhenoCam datasets (see Related Data Sets). The estimated transition dates for previously released datasets may differ slightly (in most cases, by ±3 days or less), because following standard PhenoCam processing protocols (Richardson et al. 2018, Scientific Data), smoothing and interpolation, outlier removal, and transition date estimation are always conducted using the full data record.

54 ENVIRONMENTAL SCIENCES↗

Autonomous Ocean World Exploration: Advancement of a Virtual Testbed

The search for life (extinct or extant) and potentially habitable bodies in our solar system and beyond is one of the 12 priority science questions outlined in the National Acadamies’ 2022 decadal survey [5]. Extraterrestrial destinations containing liquid water present an opportunity to search for life as we know it, and in recent years an increasing number of such locations have been discovered within our solar system. Several Jovian moons—Europa, Ganymede, and Callisto [10]—and the Saturnian moons Enceladus [8] and Titan [9] are known or suspected to harbor massive subsurface oceans. Of these "ocean worlds", Europa is the focus of at least one planned NASA orbiter mission, Europa Clipper [4], and an early lander mission concept, the Europa Lander [2, 3]. Whereas most robotic missions to the Moon and Mars (e.g. orbiters, rovers, landers) to date have had ground controllers on Earth tightly involved in mission operations, missions to more distant worlds will require a high degree of onboard autonomy due to long communication lags and blackouts, harsh environments (radiation, cold), and more limited battery and hardware life. The past decade has seen great advances in both AI technologies and computing scalability and performance that offer promising solutions for spacecraft autonomy and motivate the software system and research programs described in this paper. The Ocean Worlds Autonomy Testbed for Exploration, Research, and Simulation (OceanWATERS) [1], which has been in development at the NASA Ames Research Center since 2018, is a virtual environment for testing lander autonomy solutions. It is built on the Robot Operating System (ROS), runs on consumer-grade Linux workstations, and was released as open source in 2020. OceanWATERS provides a physical and visual simulation of a prototypical lander in a Europa-like environment (Figure 1). The lander was modeled after requirements and specifications made in JPL’s Europa Lander Study of 2016 [3]. Simulated lander systems include stereo cameras and spotlights mounted on an antenna mast that pans and tilts, a 6 degrees of freedom (DoF) robotic arm with a force-torque sensor and two interchangeable end effectors, and a battery pack power system. The environment consists of multiple terrain models including a highly detailed model sourced from the FROST dataset [11], simulation of surrounding planetary bodies based on an ephemeris model, and lighting from the sun with associated surface illumination, reflectance, and shadows. Operations supported by OceanWATERS include panoramic and directed imaging of the environment and lander workspace, Cartesian and joint-level arm commanding, grinding of the terrain surface (e.g. digging a trench), and scooping of ground material (Figure 2) which can be discarded or collected as science samples in a receptacle that can be emptied (science operations themselves are not simulated). These operations are realized as ROS Actions and are complimented by a wide selection of telemetry that is continually produced by each lander subsystem. The power system model is driven by the open-source Generic Software Architecture for Prognostics (GSAP) [11] that predicts the battery’s remaining useful life and other characteristics. As a testbed for high-level autonomy, OceanWATERS provides an execution framework based on PLEXIL [12], an open-source plan specification language and execution engine developed largely at Ames. NASA's initial development of OceanWATERS, as well the Ocean Worlds Lander Autonomy Testbed (OWLAT) [6], a complimentary physical testbed developed at JPL, was the first step in a plan for realizing candidate onboard autonomy solutions for such planetary landers. In 2020 NASA solicited applications for its Autonomous Robotics Research for Ocean Worlds (ARROW) program, and in 2021 the similar Concepts for Ocean worlds Life Detection Technology (COLDTech) program. Collectively six research teams, based in universities and companies across the United States, were awarded grants to develop and demonstrate autonomy solutions on OceanWATERS and OWLAT. These 1–2-year projects have now finished or are nearing completion, and a wide variety of autonomy challenges in ocean world surface missions were addressed. Prototyped and demonstrated solutions have included autonomous discovery, response and adaptation to system faults and unexpected environmental events, world model synthesis through perception, plan synthesis using learned models, methods to optimize sample target selection and prioritize science data transmission, extension of PLEXIL for stochastic decision-making, and an integration of a model of JPL’s mission-ready COLDArm [7]. Technologies used in these projects include many forms of machine learning, causal reasoning, automated planning, Markov decision processes, formal methods, and other advanced techniques. A more detailed summary of the ARROW and COLDTech projects is given herein. OceanWATERS has had significant enhancements since its open-source release in 2020. Many of its new features were driven or shaped by feedback from the ARROW and COLDTech teams and requirements of their projects. In support of enabling autonomous adaptation to spacecraft faults (a specific capability solicited by both programs), a fault injection and detection framework was developed that supports a wide and growing range of fault types such as locked joints, image loss, and battery failures. The power system model was completed and integrated into the simulator, starting as a single-cell battery model and later upgraded to a multi-cell model with associated faults such as cell disconnection. Arm/terrain interaction was improved by adding a force-torque sensor and associated faults, and an analytic dig force model based on the Balovnev bucket force equations. Environment fidelity was increased by modeling terrain deformation resulting from digging and scooping; visual improvements were made in textures, lighting, and shadows. To facilitate interoperation with OWLAT, a unified command and telemetry interface between the testbeds was developed at the ROS level, along with a PLEXIL interface. The number of lander operations was greatly expanded (e.g. with Cartesian-based arm and antenna movement), and a framework was designed for users to build their own lander actions. A GUI for PLEXIL plan selection was created (Figure 3), and an expansive set of plans were added, such as those that illustrate patterns for fault handling. This paper provides a self-contained high-level description of OceanWATERS, focusing on more detailed coverage of the aforementioned enhancements. It provides a high-level summary of the projects undertaken by participants in the ARROW and COLDTech programs and how these efforts have helped shape OceanWATERS. Finally, potential future work and directions for the testbed are listed, as likely informed by the recent planetary science decadal survey [5].

K Michael Dalal↗

EPISODIC STAR FORMATION COUPLED TO REIGNITION OF RADIO ACTIVITY IN 3C 236

We present Hubble Space Telescope Advanced Camera for Surveys and STIS FUV/NUV/optical imaging of the radio galaxy 3C 236, whose relic {approx}4 Mpc radio jet lobes and inner 2 kpc compact steep spectrum (CSS) radio source are evidence of multiple epochs of active galactic nucleus (AGN) activity. Consistent with previous results, our data confirm the presence of four bright knots of FUV emission in an arc along the edge of the inner circumnuclear dust disk in the galaxy's nucleus, as well as FUV emission cospatial with the nucleus itself. We interpret these to be sites of recent or ongoing star formation. We present photometry of these knots, as well as an estimate for the internal extinction in the source using line ratios from archival ground-based spectroscopy. We estimate the ages of the knots by comparing our extinction-corrected photometry with stellar population synthesis models. We find the four knots cospatial with the dusty disk to be young, of order {approx}10{sup 7} yr old. The FUV emission in the nucleus, to which we do not expect scattered light from the AGN to contribute significantly, is likely due to an episode of star formation triggered {approx}10{sup 9} yr ago. We argue that the young {approx}10{sup 7} yr old knots stem from an episode of star formation that was roughly coeval with the event resulting in reignition of radio activity, creating the CSS source. The {approx}10{sup 9} yr old stars in the nucleus may be associated with the previous epoch of radio activity that generated the 4 Mpc relic source, before being cut off by exhaustion or interruption. The ages of the knots, considered in the context of both the disturbed morphology of the nuclear dust and the double-double morphology of the 'old' and 'young' radio sources, present evidence for an AGN/starburst connection that is possibly episodic in nature. We suggest that the AGN fuel supply was interrupted for {approx}10{sup 7} yr due to a minor merger event and has now been restored. The resultant nonsteady flow of gas in the disk is likely responsible for both the new episode of infall-induced star formation and also the multiple epochs of radio activity.

79 ASTRONOMY AND ASTROPHYSICS↗

Phyllosilicate Decomposition on Bennu Due to Prolonged Surface Exposure

The Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx) mission to carbonaceous asteroid (101955) Bennu performed detailed mapping with a suite of instruments to characterize the composition and geology of its surface. Here we use data from the OSIRIS-REx Thermal Emission Spectrometer (OTES) instrument to investigate the relationship of OTES-derived spectral indices to other derived data products from OTES, the OSIRIS-REx Camera Suite (OCAMS), and the OSIRIS-REx Visible and InfraRed Spectrometer (OVIRS) at global and local scales. We quantitatively confirm that high values of the OTES silicate stretching slope (from ∼10 to ∼12 μm) in midday spectra that are indicative of thin and/or patchy dust cover are strongly associated with low thermal inertia (high porosity), low albedo boulders on Bennu. These high porosity boulders have brecciated textures with embedded clasts that likely originated on Bennu's parent body or during its disruption. The high porosity of these boulders is a key factor in the local production of the dust or its entrapment, as some large, brecciated boulders with a lower porosity have little evidence of dust. A second OTES spectral parameter, the silicate bending band depth near 22.7 μm applied to early evening spectra, is not correlated to thermal inertia, but is weakly to strongly correlated to albedo, OVIRS-derived 1.05 μm and 2.74 μm band depths, OVIRS-derived hydrogen abundance, and modeled nanophase troilite abundance. In several regions on Bennu there is a strong spatial relationship between these parameters, whereby areas with shallower silicate bending bands also have shallower 1.05 μm and 2.74 μm bands and lower albedo with higher nanophase troilite abundances. These correlations, combined with analysis of the silicate bending band in laboratory experiments of space weathered and mildly heated carbonaceous chondrites, suggests that decreased silicate bending band depths signify decomposition of phyllosilicates, likely Fe-bearing, due to space weathering or mild heating (<600 °C) via solar radiation during Bennu's time in near-Earth space. There is a strong association of larger silicate bending band depths in areas dominated by small rocks and unresolved material and in areas with small (≤ 25 m) craters identified as the spectrally reddest on Bennu, suggesting that this material has been more recently exposed due to impact and/or mass wasting processes. The shallowest silicate bending depths are associated with larger rocks and boulders that appear to have the longest surface exposure history, although there is band depth variation among them suggesting either initial composition variation that resulted in different responses to space weathering or heating, or varied exposure history of individual boulders themselves. We predict that any grains returned from Bennu with a significant surface exposure history will be characterized by shallower 22.7 μm, 1.05 μm and 2.7 μm band depths and increased sulfide (troilite) abundance, as well as textural and chemical evidence for phyllosilicate dehydration.

Asteroids, surfaces↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Computer-Vision-Based Vibration Tracking Using a Digital Camera: A Sparse-Optical-Flow-Based Target Tracking Method

Computer-vision-based target tracking is a technology applied to a wide range of research areas, including structural vibration monitoring. However, current target tracking methods suffer from noise in digital image processing. In this paper, a new target tracking method based on the sparse optical flow technique is introduced for improving the accuracy in tracking the target, especially when the target has a large displacement. The proposed method utilizes the Oriented FAST and Rotated BRIEF (ORB) technique which is based on FAST (Features from Accelerated Segment Test), a feature detector, and BRIEF (Binary Robust Independent Elementary Features), a binary descriptor. ORB maintains a variety of keypoints and combines the multi-level strategy with an optical flow algorithm to search the keypoints with a large motion vector for tracking. Then, an outlier removal method based on Hamming distance and interquartile range (IQR) score is introduced to minimize the error. The proposed target tracking method is verified through a lab experiment—a three-story shear building structure subjected to various harmonic excitations. It is compared with existing sparse-optical-flow-based target tracking methods and target tracking methods based on three other types of techniques, i.e., feature matching, dense optical flow, and template matching. The results show that the performance of target tracking is greatly improved through the use of a multi-level strategy and the proposed outlier removal method. The proposed sparse-optical-flow-based target tracking method achieves the best accuracy compared to other existing target tracking methods.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Demonstration Assessment of Light Emitting Diode (LED) Commercial Garage Lights In the Providence Portland Medical Center, Portland, Oregon

This U.S. Department of Energy GATEWAY Demonstration project studied the applicability of light-emitting diode (LED) luminaires for commercial parking garage applications. High-pressure sodium (HPS) area luminaires were replaced with new LED area luminaires. The project was supported under the U.S. Department of Energy (DOE) Solid State Lighting Program. Other participants in the demonstration project included Providence Portland Medical Center in Portland, Oregon, the Energy Trust of Oregon, and Lighting Sciences Group (LSG) Inc. Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. PNNL manages GATEWAY demonstrations for DOE and represents their perspective in the conduct of the work. Quantitative and qualitative measurements of light and electrical power were taken at the site for both HPS and LED light sources. Economic costs were estimated and garage users’ responses to the new light sources were gauged with a survey. Six LED luminaires were installed in the below-ground parking level A, replacing six existing 150W HPS lamps spread out over two rows of parking spaces. Illuminance measurements were taken at floor level approximately every 4 ft on a 60-ft x 40-ft grid to measure light output of these LED luminaires which were termed the “Version 1” luminaires. PNNL conducted power measurements of the circuit in the garage to which the 6 luminaires were connected and determined that they drew an average of 82 W per lamp. An improved LED luminaire, Version 2, was installed in Level B of the parking garage. Illuminance measurements were not made of this second luminaire on site due to higher traffic conditions, but photometric measurements of this lamp and Version 1 were made in an independent testing laboratory and power usage for Version 2 was also measured. Version 1 was found to produce 3600 lumens and Version 2 was found to produce 4700 lumens of light and to consume 78 Watts. Maximum and minimum light levels were measured for the HPS and LED Version 1 luminaires and projected for the Version 2 luminaires. Maximum light levels were 23.51 foot candles, 20.54 fc, and 26.7 fc respectively and minimum light levels were 1.49 fc, 1.45 fc, and 1.88 fc. These results indicate very similar or even slightly higher light levels produced by the LED lamps, despite the higher lumen output of the HPS lamp. The LED lamps provide higher luminaire efficacy because all of the light is directed down and out. None of it is “lost” in the fixture. Also the HPS luminaire had poorly designed optics and a plastic covering that tended to get dirty and cracked, further decreasing the realized light output.[is this an accurate way to say this?] Consumer perceptions of the Version 2 LED were collected via a written survey form given to maintenance and security personnel. More than half felt the LED luminaires provided more light than the HPS lamps and a majority expressed a preference for the new lamps when viewing the relamped area through a security camera. Respondents commented that the LED luminaires were less glary, created less shadows, had a positive impact on visibility, and improved the overall appearance of the area. PNNL conducted an economic analysis and found that the Version 1 lamp produced annual energy savings of 955 kWh and energy cost savings of $76.39 per lamp at electricity rates of 6.5 cents per kWh and $105.03 at 11 cents per kWh. PNNL found that the Version 2 lamp produced annual energy savings of 991 kWh and energy cost savings of $79.26 per lamp at electricity rates of 6.5 cents per kWh and $108.98 at 11 cents per kWh. PNNL also calculated simple payback and found that Version 1 showed paybacks of 5.4 yrs at 6.5c/kWh and 4.1 yrs at 11c/kWh while Version 2 showed paybacks of 5.2 yrs at 6.5c/kWh and 3.9 yrs at 11c/kWh.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2010 Neutron Review: ORNL Neutron Sciences Progress Report

During 2010, the Neutron Sciences Directorate focused on producing world-class science, while supporting the needs of the scientific community. As the instrument, sample environment, and data analysis tools at High Flux Isotope Reactor (HFIR ) and Spallation Neutron Source (SNS) have grown over the last year, so has promising neutron scattering research. This was an exciting year in science, technology, and operations. Some topics discussed are: (1) HFIR and SNS Experiments Take Gordon Battelle Awards for Scientific Discovery - Battelle Memorial Institute presented the inaugural Gordon Battelle Prizes for scientific discovery and technology impact in 2010. Battelle awards the prizes to recognize the most significant advancements at national laboratories that it manages or co-manages. (2) Discovery of Element 117 - As part of an international team of scientists from Russia and the United States, HFIR staff played a pivotal role in the discovery by generating the berkelium used to produce the new element. A total of six atoms of ''ununseptium'' were detected in a two-year campaign employing HFIR and the Radiochemical Engineering Development Center at Oak Ridge National Laboratory (ORNL) and the heavy-ion accelerator capabilities at the Joint Institute for Nuclear Research in Dubna, Russia. The discovery of the new element expands the understanding of the properties of nuclei at extreme numbers of protons and neutrons. The production of a new element and observation of 11 new heaviest isotopes demonstrate the increased stability of super-heavy elements with increasing neutron numbers and provide the strongest evidence to date for the existence of an island of enhanced stability for super-heavy elements. (3) Studies of Iron-Based High-Temperature Superconductors - ORNL applied its distinctive capabilities in neutron scattering, chemistry, physics, and computation to detailed studies of the magnetic excitations of iron-based superconductors (iron pnictides and chalcogenides), a class of materials discovered in 2008. This research is yielding new insights into the relationship between magnetism and superconductivity and has established several key features of this family of high-temperature superconducting (HTS ) materials: the maximum magnetic field at which they can function, the nature of the electrons involved in the superconductivity, the dependence of the properties upon chemical substitution, and the character of the magnetic fluctuations in the material. The results suggest that despite important differences between these materials and the HTS copper oxides, a universal mechanism may be responsible for the unconventional superconductivity. (4) Coal Sequestration Research: A New Home for Greenhouse Gases - One possibility for slowing down the increasing levels of carbon dioxide (CO{sub 2}) in the atmosphere is to capture the gas in natural underground features such as coal seams. Critical to the feasibility of this technology is determining how much CO{sub 2} can be stored, no method for which has been found - until now. (5) Accelerator Reliability Passes 92% - In December 2010, SNS set a new record for itself when the accelerator ran at 1 MW with 100% reliability. Target Performance Exceeds All Expectations - The mercury target used at SNS is the first of its kind. During the design and planning for SNS, many people were skeptical that the target would work. In 2010, it was confirmed that the target was working not only well but much better than anyone would have imagined. (6) Changing the World of Data Acquisition - Researchers at SNS are starting to benefit from event-based data analysis. Event data mode captures and stores an individual data set for every single neutron that strikes a detector - precisely when and where the neutron is detected. This technique provides numerous advantages over traditional methods. Event data mode allows researchers to process their data at the highest resolution possible with no loss of data. This method of data collection provides a much more efficient way for users to gather data and get the most from their beam time. (7) New Laboratories for Users - The HFIR and SNS user communities continue to grow dramatically. In 2010, HFIR hosted 862 users and SNS 796, outpacing projections for both facilities. To meet the needs of those users, a new complex of 13 laboratories is now open for users at SNS. (8) Innovative Detectors Provide Relief from Helium-3 Shortage - Helium-3 ({sup 3}He) has been the gas of choice for gaseous detectors since the early days of neutron science. About two years ago, detector scientists worldwide faced the reality that stockpiles of {sup 3}He are dwindling rapidly, while demand for it has risen by a factor of five. The Neutron Sciences Detectors Group has developed two new types of detectors that don't rely on {sup 3}He: the Anger camera and the wavelength shifting fiber neutron detector, both of which use lithium ({sup 6}Li).

High Flux isotope reactor↗

DOE 2012 Occupational Radiation Exposure October 2013

The U.S. Department of Energy (DOE) Office of Analysis within the Office of Health, Safety and Security (HSS) publishes the annual DOE Occupational Radiation Exposure Report to provide an overview of the status of radiation protection practices at DOE (including the National Nuclear Security Administration [NNSA]). The DOE 2012 Occupational Radiation Exposure Report provides an evaluation of DOE-wide performance regarding compliance with Title 10, Code of Federal Regulations (C.F.R.), Part 835, Occupational Radiation Protection dose limits and as low as reasonably achievable (ALARA) process requirements. In addition, the report provides data to DOE organizations responsible for developing policies for protection of individuals from the adverse health effects of radiation. The report provides a summary and an analysis of occupational radiation exposure information from the monitoring of individuals involved in DOE activities. Over the past 5-year period, the occupational radiation exposure information is analyzed in terms of aggregate data, dose to individuals, and dose by site. As an indicator of the overall amount of radiation dose received during the conduct of operations at DOE, the report includes information on collective total effective dose (TED). The TED is comprised of the effective dose (ED) from external sources, which includes neutron and photon radiation, and the internal committed effective dose (CED), which results from the intake of radioactive material into the body. The collective ED from photon exposure decreased by 23% between 2011 and 2012, while the neutron dose increased by 5%. The internal dose components of the collective TED decreased by 7%. Over the past 5-year period, 99.99% of the individuals receiving measurable TED have received doses below the 2 roentgen equivalent in man (rems) (20 millisievert [mSv]) TED administrative control level (ACL), which is well below the DOE regulatory limit of 5 rems (50 mSv) TED annually. The occupational radiation exposure records show that in 2012, DOE facilities continued to comply with DOE dose limits and ACLs and worked to minimize exposure to individuals. The DOE collective TED decreased 17.1% from 2011 to 2012. The collective TED decreased at three of the five sites with the largest collective TED. u Idaho Site – Collective dose reductions were achieved as a result of continuing improvements at the Advanced Mixed Waste Treatment Project (AMWTP) through the planning of drum movements that reduced the number of times a container is handled; placement of waste containers that created highradiation areas in a centralized location; and increased worker awareness of high-dose rate areas. In addition, Idaho had the largest decrease in the total number of workers with measurable TED (1,143 fewer workers). u Hanford Site (Hanford) – An overall reduction of decontamination and decommissioning (D&D) activities at the Plutonium Finishing Plant (PFP) and Transuranic (TRU) retrieval activities resulted in collective dose reductions. u Savannah River Site (SRS) – Reductions were achieved through ALARA initiatives employed site wide. The Solid Waste Management Facility used extended specialty tools, cameras and lead shield walls to facilitate removal of drums. These tools and techniques reduce exposure time through improved efficiency, increase distance from the source of radiation by remote monitoring, shield the workers to lower the dose rate, and reduce the potential for contamination and release of material through repacking of waste. Overall, from 2011 to 2012, there was a 19% decrease in the number of workers with measurable dose. Furthermore, due to a slight decrease in both the DOE workforce (7%) and monitored workers (10%), the ratio of workers with measurable doses to monitored workers decreased to 13%. Another primary indicator of the level of radiation exposure covered in this report is the average measurable dose, which normalizes the collective dose over the population of workers who actually received a measurable dose. The average measurable TED increased by 3% from 2011 to 2012. Additional analyses show that the dose distribution in 2012 was similar to the distribution in 2011. In 2012, 13% of the monitored workers received a measurable TED and the average measurable TED, 0.069 rem, was less than 2% of the DOE limit. From 2011 to 2012, the collective TED and the number of individuals with measurable TED decreased 17.1% and 19%, respectively. These decreases were mainly due to an overall reduction of D&D activities at the PFP and TRU retrieval activities at Hanford; a 78% decrease in the number of targeted waste drums that were processed at the Idaho Site’s Accelerated Retrieval Project (ARP) from 5,566 drums in 2011 to a total of 1,211 drums processed in 2012; and ALARA initiatives employed site wide at SRS. In addition, the decreases were the result of decreased American Recovery and Reinvestment Act (ARRA) activities and continuing D&D, particularly at the DOE sites that comprise the majority of DOE collective dose. Over the past 5 years, the size of the monitored workforce has remained at a fairly stable level (within 12%), while the collective dose has varied up to 37%. No reported doses exceeded the DOE occupational limit of 5 rems TED in 2012 and no reported doses exceeded the DOE ACL of 2 rems TED.

61 RADIATION PROTECTION AND DOSIMETRY↗

Experimental Investigation of Pool Boiling Heat Transfer Enhancement in Microgravity in the Presence of Electric Fields

In boiling high heat fluxes are possible driven by relatively small temperature differences, which make its use increasingly attractive in aerospace applications. The objective of the research is to develop ways to overcome specific problems associated with boiling in the low gravity environment by substituting the buoyancy force with the electric force to enhance bubble removal from the heated surface. Previous studies indicate that in terrestrial applications nucleate boiling heat transfer can be increased by a factor of 50, as compared to values obtained for the same system without electric fields. The goal of our research is to experimentally explore the mechanisms responsible for EHD heat transfer enhancement in boiling in low gravity conditions, by visualizing the temperature distributions in the vicinity of the heated surface and around the bubble during boiling using real-time holographic interferometry (HI) combined with high-speed cinematography. In the first phase of the project the influence of the electric field on a single bubble is investigated. Pool boiling is simulated by injecting a single bubble through a nozzle into the subcooled liquid or into the thermal boundary layer developed along the flat heater surface. Since the exact location of bubble formation is known, the optical equipment can be aligned and focused accurately, which is an essential requirement for precision measurements of bubble shape, size and deformation, as well as the visualization of temperature fields by HI. The size of the bubble and the frequency of bubble departure can be controlled by suitable selection of nozzle diameter and mass flow rate of vapor. In this approach effects due to the presence of the electric field can be separated from effects caused by the temperature gradients in the thermal boundary layer. The influence of the thermal boundary layer can be investigated after activating the heater at a later stage of the research. For the visualization experiments a test cell was developed. All four vertical walls of the test cell are transparent, and they allow transillumination with laser light for visualization experiments by HI. The bottom electrode is a copper cylinder, which is electrically grounded. The copper block is heated with a resistive heater and it is equipped with 6 thermocouples that provide reference temperatures for the measurements with HI. The top electrode is a mesh electrode. Bubbles are injected with a syringe into the test cell through the bottom electrode. The working fluids presently used in the interferometric visualization experiments, water and PF 5052, satisfy requirements regarding thermophysical, optical and electrical properties. A 30kV power supply equipped with a voltmeter allows to apply the electric field to the electrodes during the experiments. The magnitude of the applied voltage can be adjusted either manually or through the LabVIEW data acquisition and control system connected to a PC. Temperatures of the heated block are recorded using type-T thermocouples, whose output is read by a data acquisition system. Images of the bubbles are recorded with 35mm photographic and 16mm high-speed cameras, scanned and analyzed using various software packages. Visualized temperature fields HI allows the visualization of temperature fields in the vicinity of bubbles during boiling in the form of fringes. Typical visualized temperature distributions around the air bubbles injected into the thermal boundary layer in PF5052 are shown. The temperature of the heated surface is 35 C. The temperature difference for a pair of fringes is approximately 0.05 C. The heat flux applied to the bottom surface is moderate, and the fringe patterns are regular. In the image a bubble penetrating the thermal boundary layer is visible. Because of the axial symmetry of the problem, simplified reconstruction techniques can be applied to recover the temperature field. The thermal plume developing above the heated surface for more intensive heating is shown. The temperature distribution in the liquid is clearly 3D, and tomographic techniques have to be applied to recover the temperature distribution in such a physical situation. A sequence of interferometric images showing the temperature distribution around the rising bubble, recorded with a high-speed camera is shown. Again, the temperature distribution is 3D, and a more complex approach to the evaluation, the tomographic reconstruction has to be taken. Measurement of the temperature distribution from the fringe pattern temperature distributions that yield important information regarding heat transfer are determined. Two algorithms that allow the quantitative evaluation of interferometric fringe patterns and the reconstruction of temperature fields during boiling have been developed at the Heat Transfer Laboratory of the Johns Hopkins University. In the first algorithm the bubble is assumed to be axially symmetrical, which significantly reduces the computational effort for quantifying the temperature distribution around the bubble. For this purpose the thermal boundary layer around the bubble is divided into equidistant concentric shells, and the refractive index is assumed to be constant in each of the shells. Since large temperature gradients are expected in the vicinity of the bubble during boiling, the deflection of the light beam cannot be neglected in boiling experiments. Since the exit angle of the light beam is known, this allows to account for the deflections and phase shifts outside the boundary layer (in the bulk fluid and in the windows of the test cell). Three dimensional temperature distributions in the vicinity of the bubble are reconstructed using tomographic techniques. In tomography, the measurement volume is sliced into 2D planes. In the present study these planes are parallel to the heated surface. The objective is to determine the values of the field parameter of interest in form of the field function in these 2D planes. The field parameter is the change of the refractive index of the liquid in the measurement volume caused by temperature changes. By superimposing data for many 2D planes recorded at the same time instant, the 3D temperature distribution in the measurement volume is recovered.

Herman, Cila↗

A LABOCA SURVEY OF THE EXTENDED CHANDRA DEEP FIELD SOUTH-SUBMILLIMETER PROPERTIES OF NEAR-INFRARED SELECTED GALAXIES

Using the 330 hr ESO-MPG 870 {mu}m survey of the Extended Chandra Deep Field South (ECDF-S) obtained with the Large Apex BOlometer CAmera (LABOCA) on the Atacama Pathfinder EXperiment (APEX), we have carried out a stacking analysis at submillimeter (submm) wavelengths of a sample of 8266 near-infra-red (near-IR) selected (K {sub vega} {<=} 20) galaxies, including 893 BzK galaxies, 1253 extremely red objects (EROs), and 737 distant red galaxies (DRGs), selected from the Multi-wavelength Survey by Yale-Chile (MUSYC). We measure average 870 {mu}m fluxes of 0.22 {+-} 0.01 mJy (22.0{sigma}), 0.48 {+-} 0.04 mJy (12.0{sigma}), 0.39 {+-} 0.03 mJy (13.0{sigma}), and 0.43 {+-} 0.04 mJy (10.8{sigma}) for the K {sub vega} {<=} 20, BzK, ERO, and DRG samples, respectively. For the BzK, ERO, and DRG sub-samples, which overlap to some degree and are likely to be at z {approx_equal} 1-2, this implies an average far-IR luminosity of {approx}(1-5) x 10{sup 11} L{sub sun} and star formation rate (SFR) of {approx}20-90 M{sub sun} . Splitting the BzK galaxies into star-forming (sBzK) and passive (pBzK) galaxies, the former is significantly detected (0.50 {+-} 0.04 mJy, 12.5{sigma}) while the latter is only marginally detected (0.34 {+-} 0.10 mJy, 3.4{sigma}), thus confirming that the sBzK and pBzK criteria to some extent select obscured, star-forming, and truly passive galaxies, respectively. The K {sub vega} {<=} 20 galaxies are found to contribute 7.27 {+-} 0.34 Jy deg{sup -2} (16.5% {+-} 5.7%) to the 870 {mu}m extragalactic background light (EBL). sBzK and pBzK galaxies contribute 1.49 {+-} 0.22 Jy deg{sup -2} (3.4% {+-} 1.3%) and 0.20 {+-} 0.14 Jy deg{sup -2} (0.5% {+-} 0.3%) to the EBL. We present the first delineation of the average submm signal from the K {sub vega} {<=} 20 selected galaxies and their contribution to the submm EBL as a function of (photometric) redshift, and find a decline in the average submm signal (and therefore IR luminosity and SFR) by a factor {approx}2-3 from z {approx} 2 to z {approx} 0. This is in line with a cosmic star formation history in which the star formation activity in galaxies increases significantly at z {approx}> 1. A linear correlation between the average 24 {mu}m and 870 {mu}m flux densities is found for the K {sub vega} {<=} 20 galaxies with 24 {mu}m fluxes {approx}<350 {mu}Jy (corresponding to L {sub IR} {approx_equal} 1.5 x 10{sup 12} L{sub sun} at z {approx_equal} 2), while at higher 24 {mu}m fluxes there is no correlation. This behavior suggests that star formation, and not active galactic nuclei (AGNs), is in general responsible for the bulk of the mid-IR emission of L {sub IR} {approx}< 1.5 x 10{sup 12} L{sub sun} systems, while in more luminous systems the AGN makes a significant contribution to the 24 {mu}m emission. By mapping the stacked 870 {mu}m signal across the B - z versus z - K diagram we have confirmed the ability of the sBzK selection criterion to select star-forming galaxies at z > 1, although our analysis suggests that the subset of sBzK galaxies which are also EROs are responsible for >80% of the submm emission from the entire sBzK population.

79 ASTRONOMY AND ASTROPHYSICS↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

Saint Joseph's University Institute for Environmental Stewardship

Task A: Examination of the physiological, morphological, and reproductive responses of Panicum virgatum (switchgrass) cultivars identified as potential biofuel producing cultivars as well as naturally-occurring varieties of switchgrass to projected changes in climate for the central portion of the United States. This project was a multi-year project set in a field site located at the Konza Prairie Biological Station near Manhattan, KS USA. The major objective of the study was to understand the physiological and growth responses of the important biofuel grass species, Panicum virgatum (switch grass) to simulated changes in precipitation expected for the Central Plains region of the United States. Population level adaptation to broad-scale regional climates or within-population variation in genome size of this genetically and phenotypically diverse C4 grass species may influence the responses to future precipitation variability associated with climate change. Therefore, we investigated switchgrass responses to water variability between natural populations collected across latitudinal gradient and populations. P. virgatum plants from natural populations originating from Kansas, Oklahoma, and Texas received frequent, small precipitation events (“ambient’) or infrequent, large precipitation events (‘altered”) to simulate contrasting rainfall variability expected from this region. We measured leaf-level physiology, aboveground biomass varied significantly by population origin but did not differ by genome size. Our results suggest that trait variation in P. virgatum is primarily attributed to population-level adaptation across latitudinal gradient, not genome size, and that neither population-level adaptation nor genome size may be important predictors of P. virgatum responses to future climatic conditions. Based solely on the data presented here, the most important consideration when deciding what varieties of switchgrass to cultivate for biofuel feedstocks under future climate scenarios is local adaptation and not necessarily genome size as has been hypothesized in the literature. Task B: Installation of an extensive green roof system on the Science Center at Saint Joseph's University for research, research-training and educational outreach activities. An experimental green roof system was designed and installed by an outside contractor (Roofmeadows) on the roof of the Science Center at Saint Joseph's University. The roof system includes four test plots, each with a different drainage system, instrumentation to monitor storm water retention, roof deck temperature, heat flux into and out of the building, rain fall, wind speed and direction, relative humidity and heat emission from the roof system. The vegetative roof was planted with 26 species of plants, distributed throughout the roof area, to assess species/variety growth and coverage characteristics, both in terms of the different drain layer systems, and in terms of the different exposures along the north to south axis of the building. Analysis of the drain layer performance, in terms of storm water retention, shows that the aggregate (stone) drainage layer system performed the best, with the moisture management mat system second, and the geotextile drain layer and reservoir sheet layer systems coming in last. This information is of value in the planning and design of vegetative roof systems since the different types of drainage layer systems have different installation costs and different weights. The different drainage layer systems also seem to be having an impact on plant growth and spread with the test plot with the reservoir sheet layer actually having the poorest plant coverage and plant spread of all areas of the roof studied. Plant growth performance analysis is ongoing, but significant differences have been observed in the third growing season ('13) along the north to south axis, with most species doing better towards the northern end of the roof (in terms of percent ground coverage and plant spread and reproduction). Interestingly, plant growth in all four of the test plots was reduced relative to the lower areas of the roof (the lower area was ca. 2 inches lower than the test plots, due to the space needed for sensors under the plots. The lower roof area uses an aggregate drain layer comparable to that in the third test plot), even when accounting for the north to south differences. The reasons for these differences are not clear and studies are underway to examine the impact of wind scour, drainage rates, temperature, and other factors. This information will be of value to planners of extensive vegetative roof systems in the Philadelphia (and broader) region, since plant growth and roof system overall performance is influenced by local climate, making broad generalizations of performance difficult. Task C: Education and community outreach efforts by the IES involving conferences at SJU, presentations by faculty and students off campus, and educational signage. The Institute for Environmental Stewardship hosted three storm water management workshops on the SJU campus in Philadelphia, in collaboration with the Lower Merion Conservancy, a not-for-profit organization located in Montgomery County, PA. These workshops were free and open to the public. The three workshops (held each year in March) drew more than 200 participants total. The presenters included local and state government agencies, not for profit organizations involved in storm water and open space preservation, designers, engineers, planners and others. Feedback was uniformly positive and we plan to continue the workshops for the foreseeable future. Educational signage has been installed at four locations on campus to explain campus infrastructure related to storm water (rain gardens, vegetative roof and green facades), as well as detailed signage installed on the Science Center roof for the vegetative roof system. More than 100 people (from in and outside of SJU) have thus far participated in tours of the roof system. A digital signage system has been installed in the adjacent library and this system provides information about the vegetative roof project and other efforts. A web camera system for the roof has also been installed and the video will be simulcast to the digital signage and with web site (www.sju.edu/ies) in the near future.

09 BIOMASS FUELS↗