Search NASA⌕ Search

SEARCH · Search NASA

Results for “geosynchronous orbits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Advanced Electric Propulsion for Space Solar Power Satellites

The sun tower concept of collecting solar energy in space and beaming it down for commercial use will require very affordable in-space as well as earth-to-orbit transportation. Advanced electric propulsion using a 200 kW power and propulsion system added to the sun tower nodes can provide a factor of two reduction in the required number of launch vehicles when compared to in-space cryogenic chemical systems. In addition, the total time required to launch and deliver the complete sun tower system is of the same order of magnitude using high power electric propulsion or cryogenic chemical propulsion: around one year. Advanced electric propulsion can also be used to minimize the stationkeeping propulsion system mass for this unique space platform. 50 to 100 kW class Hall, ion, magnetoplasmadynamic, and pulsed inductive thrusters are compared. High power Hall thruster technology provides the best mix of launches saved and shortest ground to Geosynchronous Earth Orbital Environment (GEO) delivery time of all the systems, including chemical. More detailed studies comparing launch vehicle costs, transfer operations costs, and propulsion system costs and complexities must be made to down-select a technology. The concept of adding electric propulsion to the sun tower nodes was compared to a concept using re-useable electric propulsion tugs for Low Earth Orbital Environment (LEO) to GEO transfer. While the tug concept would reduce the total number of required propulsion systems, more launchers and notably longer LEO to GEO and complete sun tower ground to GEO times would be required. The tugs would also need more complex, longer life propulsion systems and the ability to dock with sun tower nodes.

Oleson, Steve↗

Design study of an integrated aerobraking orbital transfer vehicle

An aerobraking orbital transfer vehicle (AOTV) concept, which has an aerobrake structure that is integrated with the propulsion stage, is discussed. The concept vehicle is to be assembled in space and is space-based. The advantages of aeroassist over an all propulsive vehicle are discussed and it is shown that the vehicle considered is very competitive with inflatable and deployable concepts from mass and performance aspects. The aerobrake geometry is an ellipsoidally blunted, raked-off, elliptical wide-angle cone with a toroidal skirt. Propellant tanks, engines, and subsystems are integrated into a closed, isogrid aerobrake structure which provides rigidity. The vehicle has two side-firing, gimbaled RL-10 type engines and carries 38,000 kg of useable propellant. The trajectory during aerobraking is determined from an adaptive guidance logic, and the heating is determined from engineering correlations as well as 3-D Navier-Stokes solutions. The AOTV is capable of placing 13,500 kg payload into geosynchronous Earth orbit (GEO) or carrying a LEO-GEO-LEO round-trip payload of 7100 kg. A two-stage version considered for lunar missions results in a lunar surface delivery capability of 18,000 kg or a round-trip capability of 6800 kg with 3860 kg delivery-only capability.

Scott, C. D.↗

System Concepts for the Advanced Post-TRMM Rainfall Profiling Radars

Global rainfall is the primary distributor of latent heat through atmospheric circulation. The recently launched Tropical Rainfall Measuring Mission satellite is dedicated to advance our understanding of tropical precipitation patterns and their implications on global climate and its change. The Precipitation Radar (PR) aboard the satellite is the first radar ever flown in space and has provided. exciting, new data on the 3-D rain structures for a variety of scientific uses. However, due to the limited mission lifetime and the dynamical nature of precipitation, the TRMM PR data acquired cannot address all the issues associated with precipitation, its related processes, and the long-term climate variability. In fact, a number of new post-TRMM mission concepts have emerged in response to the recent NASA's request for new ideas on Earth science missions at the post 2002 era. This paper will discuss the system concepts for two advanced, spaceborne rainfall profiling radars. In the first portion of this paper, we will present a system concept for a second-generation spaceborne precipitation radar for operations at the Low Earth Orbit (LEO). The key PR-2 electronics system will possess the following capabilities: (1) A 13.6/35 GHz dual frequency radar electronics that has Doppler and dual-polarization capabilities. (2) A large but light weight, dual-frequency, wide-swath scanning, deployable antenna. (3) Digital chirp generation and the corresponding on-board pulse compression scheme. This will allow a significant improvement on rain signal detection without using the traditional, high-peak-power transmitters and without sacrificing the range resolution. (4) Radar electronics and algorithm to adaptively scan the antenna so that more time can be spent to observe rain rather than clear air. and (5) Built-in flexibility on the radar parameters and timing control such that the same radar can be used by different future rain missions. This will help to reduce the overall instrument development costs. In the second portion of this paper, we will present a system concept for a geostationary rainfall monitoring radar for operations at the geosynchronous Earth Orbit (GEO). In particular, the science requirements, the observational strategy, the instrument design, and the required technologies will be discussed.

Im, Eastwood↗

Weather Considerations for Ground-Based Optical Space Situational Awareness Site Selection

Continuous surveillance of the night sky with ground-based optical sensors requires a number of sites distributed around the globe. Due to variable cloud cover, the number of sites required to guarantee nightly observation of all Geosynchronous Earth Orbit slots is greater than that simply required to provide partial coverage. Combining this consideration with the requirements for dark sky sites and adequate supporting infrastructure presents additional limitations on where ground- based telescopes can be located. The authors examine this problem and present results of an optimization approach that can both recommend sites and networks of sites, as well as provide insight into the utility of any individual geographic location.

54 ENVIRONMENTAL SCIENCES↗

Possible routes to a strong science case for a joint CLEoPATRA-Roman microlensing survey

The Contemporaneous LEnsing Parallax and Autonomous TRansient Array (CLEoPATRA) is a mis sion concept for a space-based microlensing survey, proposed to enhance science for the Roman Space Telescope (RST) microlensing survey. From CLEoPATRA’s planned vantage point in geosynchronous equatorial orbit (GEO), it will observe microlensing events simultaneously and from a different point of view to RST at L2. This joint L2-GEO observation baseline gives a projected angular separation of order the size of the characteristic angular lensing scale of Free-Floating-Planets (FFPs) in the Galaxy, making it powerful for constraining FFP properties. We find that a strong science case will demonstrate which parts of the FFP parameter space a joint RST-CLEoPATRA survey will give lead ing lens constraints compared with competing ground- and space- based RST observatory companions (e.g., PRIME, Euclid). Both the simulations and framework that connect telescope capabilities to physical constraints already exist for RST FFPs and can be used to demonstrate the power of joint RST-CLEoPATRA survey, with the addition of a simulated CLEoPATRA event blending distribution. Population-level FFP constraints could also be calculated by adapting ongoing black hole microlensing research at Lawrence Livermore National Laboratory. We also find that considering CLEoPATRA as a third space-based observatory (in addition to RST and Euclid/PRIME), which will break microlensing degeneracies leading to unambiguous FFP constraints, is worth investigating as part of a science case. Finally, we highlight possible auxiliary CLEoPATRA science cases including relieving tension between the RST Core Community Surveys.

79 ASTRONOMY AND ASTROPHYSICS↗

Circular earth orbits attainable with fixed two-impulse expendable tug

The performance of solid rocket motors in expendable stages as an alternative concept for Shuttle interim upper stage applications is assessed from the standpoint of mission flexibility. The system comprises two stages and a payload, released from a circular Shuttle orbit at 160 naut miles altitude. The stages are sized to deliver a given payload mass to synchronous equatorial orbit. Only nonreturn missions are considered. A parametric sweep was made with small increments of pitch and yaw to compute the possible transfer orbits with an apogee greater than 160 naut miles. At several points on each transfer orbit the possibility of attaining a circular orbit with the second burn impulse of 6000 fps was assessed. Constraints on the vertical component of the second impulse and on the total velocity after firing determine the pitch angle for second burn. Results indicate a fixed two-impulse system designed to place a payload into synchronous equatorial orbit from the Shuttle orbit can deliver the payload mass into any lower circular orbit at any inclination within about 30 deg of the Shuttle orbit. The only apparent disadvantage of the system is an inability to achieve circular orbits above geosynchronous altitudes with the design payload.

Porter, R. F.↗

Candidate solar cell materials for photovoltaic conversion in a solar power satellite /SPS/

In recognition of the obstacles to solar-generated baseload power on earth, proposals have been made to locate solar power satellites in geosynchronous earth orbit (GEO), where solar energy would be available 24 hours a day during most of the time of the year. In an SPS, the electricity produced by solar energy conversion will be fed to microwave generators forming part of a planar phase-array transmitting antenna. The antenna is designed to precisely direct a microwave beam of very low intensity to one or more receiving antennas at desired locations on earth. At the receiving antenna, the microwave energy will be safely and efficiently reconverted to electricity and then be transmitted to consumers. An SPS system will include a number of satellites in GEO. Attention is given to the photovoltaic option for solar energy conversion in GEO, solar cell requirements, the availability of materials, the implication of large production volumes, requirements for high-volume manufacture of solar cell arrays, and the effects of concentration ratio on solar cell array area.

Glaser, P. E.↗

NATO-3C/Delta launch

NATO-3C, the third in a series of NATO defense-related communication satellites, is scheduled to be launched on a delta vehicle from the Eastern Test Range no earlier than November 15, 1978. NATO-3A and -3B were successfully launched by Delta vehicles in April 1976 and January 1977, respectively. The NATO-3C spacecraft will be capable of transmitting voice, data, facsimile, and telex messages among military ground stations. The launch vehicle for the NATO-3C mission will be the Delta 2914 configuration. The launch vehicle is to place the spacecraft in a synchronous transfer orbit. The spacecraft Apogee Kick motor is to be fired at fifth transfer orbit apogee to circularize its orbit at geosynchronous altitude of 35,900 km(22,260 miles) above the equator over the Atlantic Ocean somewhere between 45 and 50 degrees W longitude.

Source record↗

Development of long life lightweight nickel-cadmium cells and batteries

The paper describes the development of a high-specific energy Ni-Cd cell for a lightweight battery. After preliminary cycling tests on laboratory and commercial cells, a cell was produced that features electrochemically impregnated positive and negative electrodes, a single terminal, and increased amount of electrolyte. This cell weighed an average of 948 g and had a measured specific energy of over 50 Wh/kg at a C/2 discharge to 1.0 V. The epoxy graphite case capable of withstanding internal pressures in excess of 300 psig represents a 35% weight reduction from a lightweight 0.30 mm Ni-Cd case. A pack of these cells was cycled at 70% maximum depth of discharge beyond 10 simulated geosynchronous orbit-eclipse seasons, and high end-of-charge voltages were obtained. A prototype battery consisting of 14 such cells was fabricated and has a measured specific energy of 46 Wh/kg.

Ritterman, P. F.↗

Electron and proton absorption calculations for a graphite/epoxy composite model

The Bethe-Bloch stopping power relations for inelastic collisions were used to determine the absorption of electron and proton energy in cured neat epoxy resin and the absorption of electron energy in a graphite/epoxy composite. Absorption of electron energy due to bremsstrahlung was determined. Electron energies from 0.2 to 4.0 MeV and proton energies from 0.3 to 1.75 MeV were used. Monoenergetic electron energy absorption profiles for models of pure graphite, cured neat epoxy resin, and graphite/epoxy composites are reported. A relation is determined for depth of uniform energy absorption in a composite as a function of fiber volume fraction and initial electron energy. Monoenergetic proton energy absorption profiles are reported for the neat resin model. A relation for total proton penetration in the epoxy resin as a function of initial proton energy is determined. Electron energy absorption in the composite due to bremsstrahlung is reported. Electron and proton energy absorption profiles in cured neat epoxy resin are reported for environments approximating geosynchronous earth orbit.

Long, E. R., Jr.↗

Intelsat satellite scheduled for launch

The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.

Source record↗

Low-energy electron effects on tensile modulus and infrared transmission properties of a polypyromellitimide film

Infrared (IR) spectroscopy and tensile modulus testing were used to evaluate the importance of experimental procedure on changes in properties of pyromellitic dianhydride-p,p prime-oxydianiline film exposed to electron radiation. The radiation exposures were accelerated, approximate equivalents to the total dose expected for a 30 year mission in geosynchronous Earth orbit. The change in the tensile modulus depends more on the dose rate and the time interval between exposure and testing than on total dose. The IR data vary with both total dose and dose rate. A threshold dose rate exists below which reversible radiation effects on the IR spectra occur. Above the threshold dose rate, irreversible effects occur with the appearance of a new band. Post-irradiation and in situ IR absorption bands are significantly different. It is suggested that the electron radiation induced metastable, excites molecular states.

Ferl, J. E.↗

Delta's role in reaching the fourth environment

The Delta launch vehicle has played a significant role in spaceand airborne studies since its first launch in 1960, and a high volume period of service is planned for the 1980s. The historical role played by Delta in launching satellites from 1960 to the present is discussed, and vehicle modifications made during this period are summarized. It is shown that out of 154 launches, 143 proved successful for an overall reliability of 93%. The forecasted launch schedule through 1985 is also presented. Various modifications are now under way to provide spacecraft interchangeability with the Shuttle: a Payload Assist Module (PAM) is proposed to provide an orderly transition from the Delta expendable vehicle to the Shuttle reusable vehicle; the new Delta 3920 Improved Second Stage is the result of a need for improved Delta performance to meet 3910 payload capabilities; the firing sequence of the solid rocket motors was altered from five at liftoff and four during ascent to a sequence of six and three, thereby increasing spacecraft weight in geosynchronous transfer orbit. Potential future improvements discussed include the Delta 4920, 9-ft-diam fairing, booster engine performance, PAM solid motor performance, a universal second stage, a hydrogen-oxygen second stage, and large strap-on solids.

Grimes, D. W.↗

SPS attitude control and stationkeeping: Requirements and tradeoffs

The dominant control requirements of solar power satellites change appreciably relative to small contemporary spacecraft. Trade studies and analyses illustrated preferred control approaches. It was found that the geosynchronous equatorial orbit is preferred over the alternative orbits considered, that the solar pressure orbit perturbation dominates stationkeeping propulsion requirements and that a combined AC and SK system using ion electric propulsion can satisfy the attitude control requirements. It was also found that control system/structural dynamic interaction stability can be obtained through frequency separation with reasonable structural dynamic requirements and simplify spacecraft design.

Oglevie, R. E.↗

Satellite power system operations

A projection of the electrical energy demands over the next 30 to 50 years, coupled with reasonable assessments of known or developable energy sources, indicates that a shortage of electrical energy will occur about the turn of the century. Recognizing the criticality of such a shortage, the Department of Energy is currently evaluating alternative power generation concepts. One of these candidate concepts is the Satellite Power System. The power levels considered during the evaluation of the various satellite systems have ranged from 5 to 10 GW. It is apparent that, with this power level, both the satellite and the rectenna must be very large and encompass a large number of complex operational system activities. Major elements of the Satellite Power System (SPS) consist of a power satellite placed in a geosynchronous equatorial orbit, and a dedicated ground receiving station (GRS) located at a selected site within the continental United States. The nominal power output of the SPS is established at 5 gigawatts (5 million kilowatts) although, because of various system constraints or losses, it may actually produce between 4 and 5 gigawatts.

Pugh, F. L.↗

WESTAR-V launch on delta

The WESTAR-V, the second in a series of second-generation, large, 24-transponder communications satellites developed for the Space Communications Company is discussed. It is scheduled to be launched on a Delta vehicle from the Eastern Space and Missile Center no earlier than June 8, 1982. The launch support for this mission will be provided by NASA, on a reimbursable basis, to the Space Communications Company for a fixed price of $25.OM. The launch vehicle for the WESTAR-V mission will be the Delta 3910 configuration which incorporates an extended long tank Thor booster, nine Castor IV strap-on motors, a TR-201 second stage, and an 8-foot fairing. The Delta launch vehicle will place the spacecraft along a suborbital trajectory. The PAM-D stage will then thrust it to a synchronous transfer orbit. Three days after launch, the spacecraft apogee kick motor will be fired to circularize its orbit at geosynchronous altitude of 19,300 NM above the equator at approxmately 75 degrees west longitude.

Source record↗

Experiences in Delta mission planning

The Delta launch vehicle has experienced 153 successful launches since 1960 and 40 more are scheduled. Relying on up-to-date technology and proven flight hardware, the Delta vehicle has been used for low to high circular and geosynchronous transfer orbits, high elliptic probes, and lunar and planetary missions. A history of Delta launches and configuration modifications is presented, noting a 92-95% success rate and its cost effective role in reimbursable missions. Elements of mission planning such as feasibility studies (1-3 yrs), spacecraft restraints manuals, reference trajectories, preliminary mission analysis, detailed test objectives, range/safety studies, guided nominal trajectory, and mission specific studies are discussed. Trajectory shaping determines vehicle and spacecraft restraints, optimizes the trajectory, and maximizes the payload capabilities. Improvements in the Delta vehicle have boosted payloads from 100 to 2890 lbs., improving the price per pound ratio, as costs have risen, only by a factor of three. Current launch schedules extend well into 1985.

Kork, J.↗

Infrared spectroscopic analysis of the effects of simulated space radiation on a polyimide

Infrared spectroscopic techniques have been used to study the effects of electron radiation on the polyimide PMDA-p,p-prime- ODA. The radiation exposures were made at various dose rates, for a total dose approximately equal to that for 30 years of exposure to electron radiation in geosynchronous earth orbit. At high dose rates the major effect was probably the formation of a polyisoimide or a charged quaternary amine, and at the low dose rates the effect was a reduction in the amount or aromatic ether linkage. In addition, the effects of dose rate for a small total dose were studied. Elevated temperatures occurred at high dose rates and were, in part, probably the cause of the radiation product. The data suggest that dose rates for accelerated simulations of the space environment should not exceed 100,000 rads/sec.

Ferl, J. E.↗