Planning for a Large Space Weather Event: Preparation for and Lessons Learned from the 2024 Space Weather Interagency Tabletop Exercise

On May 8-9 2024, the Space Radiation Analysis Group (SRAG) at NASA/Johnson Space Center participated in a joint exercise with DoD, FEMA, OSTP, DOE and other agencies to assess their ability to respond to a large hypothetical space weather event. SRAG is a uniquely skilled group of scientists and engineers tasked with mitigating impacts of radiation exposure to the astronaut crew aboard the International Space Station and upcoming missions beyond Low Earth Orbit (LEO). In meeting this objective, the team has developed expertise in both modeling the impacts of an enhanced space environment and in the real-time operational support of the Flight Control Team when assessing a response to the environment. Several members of SRAG worked with the Tabletop Exercise (TTX) planners to define a realistic large event and to model the resulting radiation exposure on an Artemis crew. SRAG members participating in the TTX were blinded to the results of this analysis. As the event unfolded during the TTX, SRAG provided their assessment of the likely impact on the crew and recommendations for crew actions. During the exercise, the team tracked lessons learned for their own planning, currently in work, for Artemis-II and subsequent missions.

Janet Barzilla↗

The NASA Turbulent Heat Flux Experiments: Summary and Lessons Learned

The Turbulent Heat Flux (THX) experiments were conducted at NASA Glenn Research Center (GRC) in order to collect measurements of velocities and temperatures for computational fluid dynamics (CFD) validation of heated flows, with a focus on propulsion system components. The experiments spanned 5 phases; four of which were conducted in the GRC AeroAcoustic Propulsion Laboratory (AAPL) using the Small Hot Jet Flow Rig (SHJAR). In addition to making velocity measurements with Particle Image Velocimetry (PIV), the THX experiments introduced a new Raman-scattering based capability to measure temperatures. Computational studies were also conducted for each of the experimental configurations, in order to provide a baseline of expected CFD results and conduct an assessment of the capability of various CFD approaches for calculating flows where the turbulent transport of heat was important. Two of the collected sets of data were used for American Institute of Aeronautics and Astronautics (AIAA) Propulsion Aerodynamic Workshops (PAWs). The data set from the 5th phase, collected for heated supersonic jets, was also used to construct new validation cases for the NASA Turbulence Model Resource (TMR). This paper provides an overview of the experiments and associated computations for each of the 5 test phases. Key experimental findings are presented. Lessons learned are provided concerning the effect of computational modeling choice on accuracy of predicting turbulent flows where thermal transport is important. Emphasis is placed on comparing Reynolds- averaged Navier-Stokes approaches with large-eddy simulation approaches. The benefits of utilizing a conjugate heat transfer method in conjunction with CFD solver for film cooling is demonstrated.

RANS↗

The NASA Turbulent Heat Flux (THX) Experiments: Summary and Lessons Learned

The Turbulent Heat Flux (THX) experiments were conducted at NASA Glenn Research Center (GRC) in order to collect measurements of velocities and temperatures for computational fluid dynamics (CFD) validation of heated flows, with a focus on propulsion system components. The experiments spanned 5 phases; four of which were conducted in the GRC AeroAcoustic Propulsion Laboratory (AAPL) using the Small Hot Jet Flow Rig (SHJAR). In addition to making velocity measurements with Particle Image Velocimetry (PIV), the THX experiments introduced a new Raman-scattering based capability to measure temperatures. Computational studies were also conducted for each of the experimental configurations, in order to provide a baseline of expected CFD results and conduct an assessment of the capability of various CFD approaches for calculating flows where the turbulent transport of heat was important. Two of the collected sets of data were used for American Institute of Aeronautics and Astronautics (AIAA) Propulsion Aerodynamic Workshops (PAWs). The data set from the 5th phase, collected for heated supersonic jets, was also used to construct new validation cases for the NASA Turbulence Model Resource (TMR). This paper provides an overview of the experiments and associated computations for each of the 5 test phases. Key experimental findings are presented. Lessons learned are provided concerning the effect of computational modeling choice on accuracy of predicting turbulent flows where thermal transport is important. Emphasis is placed on comparing Reynolds-averaged Navier-Stokes approaches with large-eddy simulation approaches. The benefits of utilizing a conjugate heat transfer method in conjunction with CFD solver for film cooling is demonstrated.

RANS↗

Developmental and Cryogenic Thermal Vacuum (TVAC) Testing Lessons Learned

Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.

Mackenzie Byrnes↗

LESSONS LEARNED FROM A RECENT LASER ACCIDENT

A graduate student received a laser eye injury from a femtosecond Ti:sapphire laser beam while adjusting a polarizing beam splitter optic. The direct causes for the accident included failure to follow safe alignment practices and failure to wear the required laser eyewear protection. Underlying root causes included inadequate on-the-job training and supervision, inadequate adherence to requirements, and inadequate appreciation for dimly visible beams outside the range of 400-700nm. This paper describes how the accident occurred, discusses causes and lessons learned, and describes corrective actions being taken.

42 ENGINEERING↗

Personal Reflections on the Interaction of Science and Government and Possible Lessons for the Present Crisis (450th Brookhaven Lecture)

The 450th Brookhaven Lecture, to be held today, Wednesday, May 6, will be given by BNL Distinguished Senior Physicist Nicholas Samios, director of the RIKEN BNL Research Center and former Lab Director. Samios will discuss "Personal Reflections on the Interaction of Science and Government and Possible Lessons for the Present Crisis" at 4 p.m. in Berkner Hall. As many members of his prospective audience know, Samios's distinguished achievements in science and administration qualify him more than most to take on this topic. Having received his B.A. and Ph.D. degrees in physics from Columbia University in 1953 and 1957, respectively, he joined the Lab in 1959. In addition to his work in experimental physics, he served as Physics Department Chair from 1975 to 81 and Deputy Director for High-Energy & Nuclear Physics from 1981 to 82. As a researcher, Samios made many of the particle discoveries that have helped define and lead to the acceptance of the "Standard Model" of particle physics, the accepted theory that explains known particle interactions. In particular, he is noted for the discovery of the phi meson and the omega minus hyperon, crucial elements delineating the symmetry of hadrons, which ultimately led to the quark model of elementary particles, a pillar of the Standard Model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance evolution and expectations management: lessons from Tevatron and other machines

We review the LHC luminosity progress in 2010, discuss the luminosity evolution of the Tevatron collider at different stages of the Collider Runs, emphasize general dynamics of the process, compare with the performance of the other colliders analyze planned and delivered luminosity integrals, and discuss the expectation management lessons.

43 PARTICLE ACCELERATORS↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

JLab SRF Cavity Fabrication Errors, Consequences and Lessons Learned

Today, elliptical superconducting RF (SRF) cavities are preferably made from deep-drawn niobium sheets as pursued at Jefferson Laboratory (JLab). The fabrication of a cavity incorporates various cavity cell machining, trimming and electron beam welding (EBW) steps as well as surface chemistry that add to forming errors creating geometrical deviations of the cavity shape from its design. An analysis of in-house built cavities over the last years revealed significant errors in cavity production. Past fabrication flaws are described and lessons learned applied successfully to the most recent in-house series production of multi-cell cavities.

43 PARTICLE ACCELERATORS↗

Achievements and Lessons from Tevatron

For almost a quarter of a century, the Tevatron proton-antiproton collider was the centerpiece of the world's high energy physics program - beginning operation in December of 1985 until it was overtaken by LHC in 2011. The aim of the this unique scientific instrument was to explore the elementary particle physics reactions with center of mass collision energies of up to 1.96 TeV. The initial design luminosity of the Tevatron was 10{sup 30} cm{sup -2}s{sup -1}, however as a result of two decades of upgrades, the accelerator has been able to deliver 430 times higher luminosities to each of two high luminosity experiments, CDF and D0. Tevatron will be shut off September 30, 2011. The collider was arguably one of the most complex research instruments ever to reach the operation stage and is widely recognized for many technological breakthroughs and numerous physics discoveries. Below we briefly present the history of the Tevatron, major advances in accelerator physics, and technology implemented during the long quest for better and better performance. We also discuss some lessons learned from our experience.

43 PARTICLE ACCELERATORS↗

Remote Systems Experience at the Oak Ridge National Laboratory--A Summary of Lessons Learned

Oak Ridge National Laboratory (ORNL) has a long history in the development of remote systems to support the nuclear environment. ORNL, working in conjunction with Central Research Laboratories, created what is believed to be the first microcomputer-based implementation of dual-arm master-slave remote manipulation. As part of the Consolidated Fuel Reprocessing Program, ORNL developed the dual-arm advanced servomanipulator focusing on remote maintainability for systems exposed to high radiation fields. ORNL also participated in almost all of the various technical areas of the U.S. Department of Energy s Robotics Technology Development Program, while leading the Decontamination and Decommissioning and Tank Waste Retrieval categories. Over the course of this involvement, ORNL has developed a substantial base of working knowledge as to what works when and under what circumstances for many types of remote systems tasks as well as operator interface modes, control bandwidth, and sensing requirements to name a few. By using a select list of manipulator systems that is not meant to be exhaustive, this paper will discuss history and outcome of development, field-testing, deployment, and operations from a lessons learned perspective. The final outcome is a summary paper outlining ORNL experiences and guidelines for transition of developmental remote systems to real-world hazardous environments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Three Mile Island Packaging, Transportation and Disposition that Apply to Fukushima Daiichi Recovery

Following the massive earthquake and resulting tsunami damage in March of 2011 at the Fukushima Daiichi nuclear power plant in Japan, interest was amplified for what was done for recovery at the Three Mile Island Unit 2 (TMI-2) in the United States following its meltdown in 1979. Many parallels could be drawn between to two accidents. This paper presents the results of research done into the TMI-2 recovery effort and its applicability to the Fukushima Daiichi cleanup. This research focused on three topics: packaging, transportation, and disposition. This research work was performed as a collaboration between Japan’s Central Research Institute of Electric Power Industry (CRIEPI) and the Idaho National Laboratory (INL). Hundreds of TMI-2 related documents were searched and pertinent information was gleaned from these documents. Other important information was also obtained by interviewing employees who were involved first hand in various aspects of the TMI-2 cleanup effort. This paper is organized into three main sections: (1) Transport from Three Mile Island to Central Facilities Area at INL, (2) Transport from INL Central Receiving Facility to INL Test Area North (TAN) and wet storage at TAN, and (3) Transport from TAN to INL Idaho Nuclear Technology and Engineering Center (INTEC) and Dry Storage at INTEC. Within each of these sections, lessons learned from performing recovery activities are presented and their applicability to the Fukushima Daiichi nuclear power plant cleanup are outlined.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Normal operation and maintenance safety lessons from the ITER US PbLi test blanket module program for a US FNSF and DEMO

A leading power reactor breeding blanket candidate for a fusion demonstration power plant (DEMO) being pursued by the US Fusion Community is the Dual Coolant Lead Lithium (DCLL) concept. The safety hazards associated with the DCLL concept as a reactor blanket have been examined in several US design studies. These studies identify the largest radiological hazards as those associated with the dust generation by plasma erosion of plasma blanket module first walls, oxidation of blanket structures at high temperature in air or steam, inventories of tritium bred in or permeating through the ferritic steel structures of the blanket module and blanket support systems, and the 210Po and 203Hg produced in the PbLi breeder/coolant. What these studies lack is the scrutiny associated with a licensing review of the DCLL concept. An insight into this process was gained during the US participation in the International Thermonuclear Experimental Reactor (ITER) Test Blanket Module (TBM) Program. In this paper we discuss the lessons learned during this activity and make safety proposals for the design of a Fusion Nuclear Science Facility (FNSF) or a DEMO that employs a lead lithium breeding blanket.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons learned from CIRFT testing on SNF vibration integrity study

A cyclic integrated reversible-bending fatigue tester (CIRFT) was developed to support U.S. NRC and DOE Used Fuel Disposition Campaign studies on high burn-up (HBU) spent nuclear fuel (SNF) transportation during normal conditions of transport (NCT). Two devices were developed; the first CIRFT was successfully installed and operated in the ORNL hot-cells in September 2013. Since hot cell testing commenced several HBU SNF samples from both Zr-4 and M5 clads were investigated. The second CIRFT device was developed in February 2014, and has been used to test clad/fuel surrogate rods (stainless steel with alumina pellet inserts). The second CIRFT machine has also been used for sensor development and test sensitivity analyses, as well as loading boundary condition parameter studies. The lessons learned from CIRFT testing will be presented in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗