Galileo Software Interface Specification -- Spacecraft Event File (SEF) Phase 2
This Software Interface Specification (SIS) describes the form and syntax of each S/C Event File (SEF) which is a product of the Mission Sequence System (MSS).
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This Software Interface Specification (SIS) describes the form and syntax of each S/C Event File (SEF) which is a product of the Mission Sequence System (MSS).
The Clementine RRELAX radiation monitor chip consists of a p-FET total dose monitor and a 4-kbit SRAM particle spectrometer. Eight of these chips were included in the RRELAX and used to detect the passage of the Clementine (S/C) and the innerstage adapter (ISA) through the earth's radiation belts and the 21-Feb 1994 solar flare. This is the first space flight for this 1.2 micron rad-soft custom CMOS radiation monitor. This paper emphasizes results from the SRAM particle detector which showed that it a) has a detection range of five orders of magnitude relative to the 21-Feb solar flare, b) is not affected by electrons, and c) detected microflares occurring with a 26.5 day period.
From the initial era or lunar exploration, we have learned that many processes active on the early Moon are common to most terrestrial planets, including the record of early and late impact bombardment. Since most major geologic activity ceased on the Moon approx. 3 Gy ago, the Moon's surface provides a record of the earliest era of terrestrial planet evolution. The type and composition of minerals that comprise a planetary surface are a direct result of the initial composition and subsequent thermal and physical processing. Lunar mineralogy seen today is thus a direct record of the early evolution of the lunar crust and subsequent geologic processes. Specifically, the distribution and concentration of specific minerals is closely tied to magma ocean products, lenses of intruded or remelted plutons, basaltic volcanism and fire-fountaining, and any process (e.g. cratering) that might redistribute or transform primary and secondary lunar crustal materials. The Moon Mineralogy Mapper (M3, or "m-cube") is a state-of-the-art imaging spectrometer that will fly on Chandrayaan-1, the Indian Space Research Organization (ISRO) mission to be launched late 2007 to early 2008. M3 is one of several foreign instruments chosen by ISRO to be flown on Chandrayaan-1 to complement the strong ISRO payload package. M3 was selected through a peer-review process as part of NASA s Discovery Program. It is under the oversight of PI Carle Pieters at Brown University and is being built by an experienced team at the Jet Propulsion Laboratory. Data analysis and calibration are carried out by a highly qualified and knowledgeable Science Team. To characterize diagnostic properties of lunar minerals, M3 acquires high spectral resolution reflectance data from 700 to 3000 nm (optional to 430 nm). M3 operates as a pushbroom spectrometer with a slit oriented orthogonal to the S/C orbital motion. Measurements are obtained simultaneously for 640 cross track spatial elements and 261 spectral elements. This translates to 70 m/pixel spatial resolution from a nominal 100 km polar orbit for Chandrayaan-1 . The primary science goal of M3 is to characterize and map lunar surface mineralogy in the context of its geologic evolution as outlined above. This translates into several sub-topics that focus on exploring the mineral character of the highland crust, characterizing the diversity basaltic volcanism, and identifying potential volatile concentrations near the poles. The primary exploration goal is to assess and map lunar mineral resources at high spatial resolution to support planning for future, targeted missions.
We have performed several simulations of black hole systems (non-rotating, black hole spin parameter a = 0.0 and rapidly rotating, a = 0.95) with a geometrically thin Keplerian disk using the newly developed RAISHIN code. The simulation results show the formation of jets driven by the Lorentz force and the gas pressure gradient. The jets have mildly relativistic speed (greater than or equal to 0.4 c). The matter is continuously supplied from the accretion disk and the jet propagates outward until each applicable terminal simulation time (non-rotating: t/tau S = 275 and rotating: t/tau S = 200, tau s equivalent to r(sub s/c). It appears that a rotating black hole creates an additional, faster, and more collimated inner outflow (greater than or equal to 0.5 c) formed and accelerated by the twisted magnetic field resulting from frame-dragging in the black hole ergosphere. This new result indicates that jet kinematic structure depends on black hole rotation.
The ESA-funded "Cross-Scale Technology Reference Study has been carried out with the primary aim to identify and analyse a mission concept for the investigation of fundamental space plasma processes that involve dynamical non-linear coupling across multiple length scales. To fulfill this scientific mission goal, a constellation of spacecraft is required, flying in loose formations around the Earth and sampling three characteristic plasma scale distances simultaneously, with at least two satellites per scale: electron kinetic (~10 km), ion kinetic (~100-2000 km), magnetospheric fluid (~3000-15000 km). The key Cross-Scale mission drivers identified are the number of S/C, the space segment configuration, the reference orbit design, the transfer and deployment strategy, the inter-satellite localization and synchronization process and the mission operations. This paper presents a comprehensive overview of the mission design and analysis for the Cross-Scale concept and outlines a technically feasible mission architecture for a multi-dimensional investigation of space plasma phenomena. The main effort has been devoted to apply a thorough mission-level trade-off approach and to accomplish an exhaustive analysis, so as to allow the characterization of a wide range of mission requirements and design solutions.
Europe's first polar-orbiting weather satellite, METOPA, was launched by a Soyuz launcher from Baikonur Cosmodrome on the 19th of October of 2006. The routine operations of METOP-A are conducted by EUMETSAT (European Organization for Exploitation of Meteorological Satellites) in the frame of the European Polar System mission (EPS). The METOP-A Launch and Early Orbit Phase (LEOP) operations have been performed by ESA/ESOC. The Flight Dynamics Orbit Determination and Control team (OD&C) at ESOC was in charge of correcting the S/C orbit as delivered by the launcher in such a way that EUMETSAT would be able to acquire the reference orbit with a drift-stop manoeuvre approximately two weeks after a LEOP of 3 days and Hand-Over to the EUMETSAT Control Centre (EUMETSAT-CC) in Darmstadt, Germany. The various strict constraints and the short amount of time available for ESOC operations made this task challenging. Several strategies were prepared before launch and analysed during LEOP based on the achieved injection orbit. This paper presents the different manoeuvre strategies investigated and finally applied to acquire the operational orbit, reporting as well the details of its execution and final achieved state.
During its three month long technology validation mission, Space Technology 5 (ST-5) returned high quality multi-point measurements of the near-Earth magnetic field. Its three micro-satellites were launched into a 300 x 4500 km, dawn - dusk, sun synchronous orbit (inclination = 105.60) orbit with a period of 138 min by a Pegasus launch vehicle on March 22, 2006. The spacecraft were maintained in a "pearls on a sting" constellation with controlled spacings ranging from just over 5000 km down to under 50 km. The individual micro-satellites were 48 cm tall octagons with diameters of 50 cm. They were spin-stabilized at approximately 20 rpm at deployment and slowly spun-down to about 15 rpm by the end of the mission. Each spacecraft carried a miniature tri-axial fluxgate magnetometer (MAG) provided by the University of California at Los Angeles mounted at the end of a ultra-low mass 72 cm boom. These data allow, for the first time, the separation of temporal and spatial variations in field-aligned current (FAC) perturbations measured in low-Earth orbit on time scales of 10 sec to 10 min. The constellation measurements are used to directly determine field-aligned current sheet motion, thickness. and current density. Two multi-point methods for the inference of FAC current density that have not previously been possible in low-Earth orbit are demonstrated: 1) the -standard method." based upon s/c velocity, but corrected for FAC current sheet motion. and 2) the "gradiometer method" which uses simultaneous magnetic field measurements at two points with known separation. Future studies will apply these methods to the entire ST-5 data sct and expand to include horizontal ionospheric currents. ULF waves and geomagnetic field gradient analyses.
The Space Technology 5 (ST-5) mission successfully placed three micro-satellites in a 300 x 4500 km dawn-dusk orbit on 22 March 2006. Each spacecraft carried a boom-mounted vector fluxgate magnetometer that returned highly sensitive and accurate measurements of the geomagnetic field. These data allow, for the first time, the separation of temporal and spatial variations in field-aligned current (FAC) perturbations measured in low-Earth orbit on time scales of approximately 10 sec to 10 min. The constellation measurements are used to directly determine field-aligned current sheet motion, thickness and current density. In doing so, we demonstrate two multi-point methods for the inference of FAC current density that have not previously been possible in low-Earth orbit; 1) the "standard method," based upon s/c velocity, but corrected for FAC current sheet motion, and 2) the "gradiometer method" which uses simultaneous magnetic field measurements at two points with known separation. Future studies will apply these methods to the entire ST-5 data set and expand to include geomagnetic field gradient analyses as well as field-aligned and ionospheric currents.
This presentation discusses fractured leads on field-programmable gate array (FPGA) during flight vibration. Actions taken to determine root cause and resolution of the failure include finite element analysis (FEA) and vibration testing and scanning electron microscopy (with X-ray microanalysis) and energy dispersive spectrometry (SEM/EDS) failure assessment. Bonding methods for surface mount parts is assessed, including critical analysis and assessment of random fatigue damage. Regarding ceramic quad flat pack (CQFP) lead fracture, after disassembling the attitude control electronics (ACE) configuration, photographs showed six leads cracked on FPGA RTSX72SU-1 CQ208B package located on the RWIC card. An identical package (FPGA RTSX32SU-1 CQ208B) mounted on the RWIC did not results in cracked pins due to vibration. FPGA lead failure theories include workmanship issues in the lead-forming, material defect in the leads of the FPGA packages, and the insecure mounting of the board in the card guides, among other theories. Studies were conducted using simple calculations to determine the response and fatigue life of the package. Shorter packages exhibited more response when loaded by out-of-plane displacement of PCB while taller packages exhibit more response when loaded by in-plane acceleration of PCB. Additionally, under-fill did not contribute to reducing stress in leads due to out-of-plane PCB loading or from component twisting, as much as corner bonding. The combination of corner bond and under-fill is best to address mechanical and thermal S/C environment. Test results of bonded parts showed reduced (dampened) amplitude and slightly shifted peaks at the un-bonded natural frequency and an additional response at the bonded frequency. Stress due to PCBB out-of-plane loading was decreased on in the corners when only a corner bond was used. Future work may address CQFP fatigue assessment, including the investigation of discrepancy in predicted fatigue damage, as well as comparing fatigue life and fatigue damage cycle ration computed using FEA and Miner's rule to results from a fatigue assessment software program.
I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.
Features: Hardware: a) Xilinx Virtex-5 (GSFC Space Cube 2); b) 2 x 400MHz PPC; c) 100MHz Bus; d) 2 x 512MB SDRAM; e) Dual Gigabit Ethernet. Support Linux kernel 2.6.31 (gcc version 4.2.2). Support software running in stand alone mode for better performance. Can stream raw data up to 800 Mbps. Ready for operations. Software Application Examples: Band-stripping Algiotrhmsl:cloud, sulfur, flood, thermal, SWIL, NDVI, NDWI, SIWI, oil spills, algae blooms, etc. Corrections: geometric, radiometric, atmospheric. Core Flight System/dynamic software bus. CCSDS File Delivery Protocol. Delay Tolerant Network. CASPER /onboard planning. Fault monitoring/recovery software. S/C command and telemetry software. Data compression. Sensor Web for Autonomous Mission Operations.
The HERRO concept allows real time investigation of planets and small bodies by sending astronauts to orbit these targets and telerobotically explore them using robotic systems. Several targets have been put forward by past studies including Mars, Venus, and near Earth asteroids. A conceptual design study was funded by the NASA Innovation Fund to explore what the HERRO concept and it's vehicles would look like and what technological challenges need to be met. This design study chose Mars as the target destination. In this way the HERRO studies can define the endpoint design concepts for an all-up telerobotic exploration of the number one target of interest Mars. This endpoint design will serve to help planners define combined precursor telerobotics science missions and technology development flights. A suggested set of these technologies and demonstrator missions is shown in Appendix B. The HERRO concept includes a crewed telerobotics orbit vehicle as well three Truck rovers, each supporting two teleoperated geologist robots Rockhounds (each truck/Rockhounds set is landed using a commercially launched aeroshell landing system.) Options include a sample ascent system teamed with an orbital telerobotic sample rendezvous and return spacecraft (S/C) (yet to be designed). Each truck rover would be landed in a science location with the ability to traverse a 100 km diameter area, carrying the Rockhounds to 100 m diameter science areas for several week science activities. The truck is not only responsible for transporting the Rockhounds to science areas, but also for relaying telecontrol and high-res communications to/from the Rockhound and powering/heating the Rockhound during the non-science times (including night-time). The Rockhounds take the place of human geologists by providing an agile robotic platform with real-time telerobotics control to the Rockhound from the crew telerobotics orbiter. The designs of the Truck rovers and Rockhounds will be described in other publications. This document focuses on the CTCV design.
The Dawn S/C, launched in September 2007, towards Vesta and Ceres, will enter into orbit about asteroid Vesta in July 2011 and will conduct science remote sensing operations for approximately one year at various orbital altitudes. Vesta navigation operations begin with early approach in May 2011 until departure to Ceres in July 2012. A key navigation aspect is optical navigation, which will be conducted at all mission phases. Here we review the optical navigation plan, imaging, methodology, data types, as well as expected performance in the context of the overall mission navigation. A key aspect of optical navigation at Dawn that will receive particular attention is the extensive use of landmark navigation during most of mission phases. In addition to supporting real-time navigation operations, optical navigation will be used to determine some key physical characteristics of Vesta, such as the asteroid's pole & shape, to assist mission design & science operations.
NASA/KSC Launch Services Division Safety (SA-D) services include: (1) Assessing the safety of the launch vehicle (2) Assessing the safety of NASA ELV spacecraft (S/C) / launch vehicle (LV) interfaces (3) Assessing the safety of spacecraft processing to ensure resource protection of: - KSC facilities - KSC VAFB facilities - KSC controlled property - Other NASA assets (4) NASA personnel safety (5) Interfacing with payload organizations to review spacecraft for adequate safety implementation and compliance for integrated activities (6) Assisting in the integration of safety activities between the payload, launch vehicle, and processing facilities
Orbital debris mitigation measures have been developed to reduce the growth of the future debris population by the international space community over the past two decades. A major component in the overall mitigation strategy is postmission disposal (PMD). A key PMD element for the low Earth orbit (LEO, the region below 2000 km altitude) satellites is the 25-year decay rule. It is intended to limit the long-term presence of massive intact objects - rocket bodies (R/Bs) and spacecraft (S/C) in the environment. The effectiveness of the 25-year rule was well demonstrated and documented during the development of the mitigation measures. The orbital debris population in LEO, unfortunately, has significantly increased since that time. The objectives of this paper are to provide an updated assessment based on the 2012 LEO environment and to highlight the importance of the global compliance of the 25-year decay rule.
The Dawn S/C was launched in September 2007 in order to perform remote sensing observations of the asteroids Vesta and Ceres. Dawn entered into orbit about Vesta in July 2011, completed successfully the mission goals, that were carried out in four different science orbits, by August 2012 and has since departed towards asteroid Ceres. An important component of the Dawn navigation was optical navigation, which was performed at almost all mission phases.Optical data types were used in the overall orbit determination process. In addition they were used to determine some key aspects of the asteroid's physical characteristics, such as the rotational axis, shape and surface morphology and gravity terms. In this paper we present an overview of the optical navigation operations at Vesta, the optical navigation planning, image acquisition strategy, data reduction methodology, and the up-to-date post operations assessment. Of particular importance is the extensive use of landmark navigation, which was performed for the first time for real-time support of operations and which comprised the bulk of the optical data processing.
The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.
The EMU (Extravehicular Mobility Unit) Garments and associated hardware were evaluated to determine if they are qualified for use in the first Lunar Landing Mission, Apollo XI (s/c 107/LM-5). It has been determined that the subject equipment is qualified for this application as summarized in this report.