EPAct Alternative Fuel Transportation Program [Brochure]
This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2012/fiscal year 2013.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2012/fiscal year 2013.
The Nuclear Regulatory Commission's (NRC) current fire protection regulatory framework was initiated in response to a cable fire that occurred at the Browns Ferry Nuclear Power Station in 1975. Following the issuance of several guidance documents, in 1981 the Commission codified deterministic requirements to provide reasonable assurance that fire would not jeopardize reactor safety (10 CFR 50.48 "Fire Protection" and Appendix R to 10 CFR 50). Since then, the results of plant operating experience, NRC inspection activities and cable fire testing programs have served to clarify the application of these requirements. In 2004, the NRC amended 10 CFR Part 50.48 to add a new subsection, 10 CFR 50.48(c), that endorses, with exceptions, the National Fire Protection Association's 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants — 2001 Edition," as a voluntary alternative for demonstrating compliance with Appendix R. To date, approximately half of all operating plants have transitioned to a risk-informed approach under 10 CFR 50.48(c). Regardless of the selected approach, each operating nuclear power plant should establish a comprehensive fire protection program that includes features needed to minimize the likelihood and consequence of firesl. To achieve this objective, fire protection programs integrate the NRC's long-held safety concept of defense-in-depth (DID) by providing multiple barriers against potentially unacceptable consequences of fire. To minimize the frequency and size of fires, the first lines of defense include controls for fire prevention, such as controlling combustibles and ignition sources and fire mitigation features, such as fire detection and suppression systems. In the unlikely event that a fire should start and continue to grow in spite of these features, appropriate fire protection features, such as fire-rated barriers are provided as necessary to ensure the accomplishment of essential shutdown functions. This handbook was specifically developed for NRC inspectors that may be assigned to perform elements of Inspection Procedure (IP) 71111.05T, "Fire Protection (Triennial)," including, (a) "Protection of Safe Shutdown Capabilities," (e) "Alternative Shutdown Capability," and (f) "Circuit Analyses." Thus, the document concentrates solely on the final element of defense-in-depth— ensuring reactor safety will not be compromised in the event of a serious fire. In addition to describing how the NRC's regulatory framework has evolved since the Browns Ferry Fire, the handbook illustrates the content and scope of various analyses typically referenced in a plant's fire protection licensing basis and includes techniques and insights for assessing the plant's conformance to those criteria.
One of the goals of the Marginal Ice Zones Observations and Processes Experiment (MIZOPEX) NASA Earth science mission was to show the operational capabilities of Unmanned Aircraft Systems (UAS) when deployed on challenging missions, in difficult environments. Given the extreme conditions of the Arctic environment where MIZOPEX measurements were required, the mission opted to use a radar to provide a ground-based detect-and-avoid (GBDAA) capability as an alternate means of compliance (AMOC) with the see-and-avoid federal aviation regulation. This paper describes how GBDAA safety assurance was provided by interpreting and applying the guidelines in the national policy for UAS operational approval. In particular, we describe how we formulated the appropriate safety goals, defined the processes and procedures for system safety, identified and assembled the relevant safety verification evidence, and created an operational safety case in compliance with Federal Aviation Administration (FAA) requirements. To the best of our knowledge, the safety case, which was ultimately approved by the FAA, is the first successful example of non-military UAS operations using GBDAA in the U.S. National Airspace System (NAS), and, therefore, the first nonmilitary application of the safety case concept in this context.
Formal methods can be applied to many of the development and verification activities required for civil avionics software. RTCA/DO-178B, Software Considerations in Airborne Systems and Equipment Certification, gives a brief description of using formal methods as an alternate method of compliance with the objectives of that standard. Despite this, the avionics industry at large has been hesitant to adopt formal methods, with few developers have actually used formal methods for certification credit. Why is this so, given the volume of evidence of the benefits of formal methods? This presentation will explore some of the challenges to using formal methods in a certification context and describe the effort by the Formal Methods Subgroup of RTCA SC-205/EUROCAE WG-71 to develop guidance to make the use of formal methods a recognized approach.
This is a presentation that describes the UAS Traffic Management Approach to an alternate means of compliance with 91.113 right of way regulations. UTM is an "air traffic management" ecosystem for uncontrolled operations.
This document is a flight test report from the operational perspective for the No Chase Certificate of Waiver or Authorization (COA) flights, or NCC flights, a major milestone of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. Discussions of a demonstration event began as early as 2014 and the actual flight of the Ikhana UAS into the NAS without a safety chase vehicle in Class A, E, and D airspace was accomplished on 12 June, 2018. The major goal of this flight was to demonstrate an alternate means of compliance to the see and avoid regulations for a UAS using Detect and Avoid (DAA) technology. Participants in this flight activity and planning included the National Aeronautics and Space Administration (NASA) Ames Research Center, NASA Armstrong Flight Research Center, General Atomics Aeronautical Systems, Inc. (GA-ASI), Honeywell International, Inc., and the Federal Aviation Administration (FAA).
American Airlines and NASA Ames Research Center have a long-standing partnership to conduct human factors fatigue research in airline operations. Since 2016, using a mechanism known as a Space Act Agreement, NASA Ames’ Fatigue Countermeasures Laboratory has worked with the American’s Fatigue Risk Management team to gather sleep and alertness data from volunteer flight crew members. Operations studied include long-range transpacific flights, timing of inflight rest breaks during augmented flights, and rates of acclimation related to flights making theater changes. This mutually beneficial collaborative working arrangement allows American to conduct operations of specific interest under the FAA’s Alternative Means of Compliance process and provides NASA with a means to gather and analyze data that can be used to inform operational safety-related decisions. Earlier this year, results from the study of inflight rest breaks was published in the journal Aerospace Medicine and Human Performance. A total of 500 American pilots responded to a survey with landing crew reporting more and better-quality sleep during break 2 than break 3. Subsequent ratings of sleepiness and alertness at TOD were significantly better for crew who used break 2. Findings from this study were reported to the FAA leading to an inflight fatigue mitigation capability for many pilots in the industry. An upcoming study is to evaluate workload and alertness levels during Caribbean Turn (DFW-SJO-DFW) operations. For this study, the FRMS team and NASA will ask volunteers to collect data on sleep, workload, performance, and alertness using scientifically valid methods The information gained in this study will help inform how workload and fatigue interact with duty duration during short-haul, daytime operations.
The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlined tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a downgradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood events provided the impetus to investigate other aspects of the hydrologic system, including the unsaturated zone, naturally reduced (sulfidic) zones, and evaporite deposits. New site conceptual models, field and laboratory studies, and numerical models are being developed to explain how biogeochemical sediment–water interactions contribute to plume persistence and flood-related increases in groundwater concentrations. Updated human health and ecological risk assessments are progressing to evaluate the risk to human health and the environment based on current site conditions. Groundwater concentrations may remain above US Environmental Protection Agency maximum concentration limits beyond the 100-year natural flushing regulatory time frame. LM in its capacity as a long-term steward continues to monitor the site to ensure protectiveness is maintained and to determine the feasibility of alternative compliance and remediation strategies.
The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlined tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a down-gradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood events provided the impetus to investigate other aspects of the hydrologic system, including the unsaturated zone, naturally reduced (sulfidic) zones, and evaporite deposits. New site conceptual models, field and laboratory studies, and numerical models are being developed to explain how biogeochemical sediment-water interactions contribute to plume persistence and flood-related increases in groundwater concentrations. Updated human health and ecological risk assessments are progressing to evaluate the risk to human health and the environment based on current site conditions. Groundwater concentrations may remain above US Environmental Protection Agency maximum concentration limits beyond the 100-year natural flushing regulatory time frame. LM in its capacity as a long-term steward continues to monitor the site to ensure protectiveness is maintained and to determine the feasibility of alternative compliance and remediation strategies. (authors)
Sampling Period: July 14-15, 2016 The 2004 Long-Term Surveillance Plan for the Shirley Basin South (UMTRCA Title II) Disposal Site, Carbon County, Wyoming, requires annual monitoring to verify continued compliance with the pertinent alternate concentration limits (ACLs) and Wyoming Class III (livestock use) groundwater protection standards. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Point-of-compliance (POC) wells 19-DC, 5-DC, and 5-SC, and monitoring wells 10-DC, 110-DC, 112-DC, 113-DC, 40-SC, 54-SC, 100-SC, 102-SC, and K.G.S.#3 were sampled. POC well 51-SC and downgradient well 101-SC were dry at the time of sampling. The water level was measured at each sampled well. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted in accordance with the Sampling and Analysis Plan for the U S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and analysis-plan-us-department-energy-office-legacy-management-sites). ACLs are approved for cadmium, chromium, lead, nickel, radium-226, radium-228, selenium, thorium-230, and uranium in site groundwater. Time-concentration graphs of the contaminants of concern in POC wells are included in Attachment 3, Data Presentation. The only ACL exceedance in a POC well was radium-228 in well 5-DC where the concentration was 30.7 picocuries per liter (pCi/L), exceeding the ACL of 25.7 pCi/L. Concentrations of sulfate and total dissolved solids continue to exceed their respective Wyoming Class III groundwater protection standards for livestock use in wells 5-DC, 5-SC, and 54-SC as they have done throughout the sampling history; however, there is no livestock use of the water from these aquifers at the site, and no constituent concentrations exceed groundwater protection standards at the wells near the site boundary.
The United States Environmental Protection Agency (EPA) issued updated effluent limitation guidelines (ELGs) and standards for the steam electric power generation point source category in November 2015 to strengthen controls on wastewater discharges. Many of the public comments discussed concerns about reliability, and whether Best Available Technology Economically Achievable (BAT) has been adequately demonstrated under a variety of conditions; however, discussion of the cost of electricity (COE) impact of installing the technology on existing coal units was limited. To address the COE impact of installing processes to achieve compliance for wet flue gas desulfurization (FGD) wastewater at existing pulverized coal (PC) plants, this study focused on developing cost and performance estimates of multiple commercial technologies in various configurations, including alternative (non-BAT) compliance processes (e.g., zero valent iron) and overcompliance processes (e.g., brine concentration with fly ash conditioning). Exhibit ES-1 provides the net plant efficiency (η) and COE estimated for each of the selected process configurations in this study. Case 0 is the reference subcritical PC plant, which represents an existing unit discharging wet FGD wastewater to surface water. It is assumed that all existing capital assets are fully depreciated, such that any capital costs reflect only the cost of the wet FGD wastewater treatment systems and plant upgrades required to accommodate the retrofits.
A method was previously developed to predict the fracture toughness (stress intensity factor at failure) of composites in terms of the elastic constants and the tensile failing strain of the fibers. The method was applied to boron/aluminum composites made with various proportions of 0 to + or - 45 deg plies. Predicted values of fracture toughness were in gross error because widespread yielding of the aluminum matrix made the compliance very nonlinear. An alternate method was developed to predict the strain intensity factor at failure rather than the stress intensity factor because the singular strain field was not affected by yielding as much as the stress field. Strengths of specimens containing crack-like slits were calculated from predicted failing strains using uniaxial stress-strain curves. Predicted strengths were in good agreement with experimental values, even for the very nonlinear laminates that contained only + or - 45 deg plies. This approach should be valid for other metal matrix composites that have continuous fibers.
A method was previously developed to predict the fracture toughness (stress intensity factor at failure) of composites in terms of the elastic constants and the tensile failing strain of the fibers. The method was applied to boron/aluminum composites made with various proportions of 0 deg and +/- 45 deg plies. Predicted values of fracture toughness were in gross error because widespread yielding of the aluminum matrix made the compliance very nonlinear. An alternate method was develolped to predict the strain intensity factor at failure rather than the stress intensity factor because the singular strain field was not affected by yielding as much as the stress field. Far-field strains at failure were calculated from the strain intensity factor, and then strengths were calculated from the far-field strains using uniaxial stress-strain curves. The predicted strengths were in good agreement with experimental values, even for the very nonlinear laminates that contained only +/- 45 deg plies. This approach should be valid for other metal matrix composites that have continuous fibers.
Document summarizes the compliance activity of EPAct-covered state and alternative fuel provider fleets.
The research project is undertaken to better understand the changing relationship between the two basic methods of building energy code compliance – prescriptive and performance – and how those methods relate to each other with respect to advancements in building energy computer simulation standards and capabilities. The International Energy Efficiency Code (IECC) is a model code adopted by many jurisdictions across the United States. Historically, the prescriptive compliance methodology has been preferred in most jurisdictions. The prescriptive methodology requires meeting or exceeding specific efficiency minimums for each envelope component. This tends to be a simple method to teach and verify. A more involved prescriptive alternative called the Total UA alternative is sometimes used. This method requires some multiplication, summing, and comparison to compute, so it is done with a fairly simple computer program. However, advances in computer and building energy simulation technology have resulted in increased use of more detailed performance compliance methods. The performance compliance method establishes the annual energy cost threshold via hourly simulation models. The compliance threshold is determined with a comparison building model simulation with geometry similar to the proposed home and with energy feature parameters and efficiencies as specified in the IECC. This project examines relationships between the two methods of building energy code compliance, including: • Overall annual energy use based on utility bill analysis by compliance method • Code official work processes with respect to compliance methods • Gaps and issues associated with building code compliance methods • Simulated energy use difference between compliance methods • Code compliance cost as a function of compliance method • Code compliance labeling effectiveness for high performance residences • Getting to net zero energy use and net zero greenhouse gas emissions through high performance code alternatives • Electronic code permitting and compliance alternatives
Decabromodiphenyl ether (decaBDE) has been used as a flame-retardant additive in nuclear-grade electrical cable insulation. However, decaBDE has been identified as a persistent, bioaccumulative and toxic (PBT) substance, leading to regulatory scrutiny. On January 6, 2021, the Environmental Protection Agency (EPA) published a final rule to phase out decaBDE. The 2021 rule set a two-year compliance deadline for “processing and distribution in commerce of decaBDE for use in wire and cable insulation in nuclear power generation facilities.” In recognition of industry concerns following a sudden discontinuation of decaBDE-containing Class 1E wire and cable essential for nuclear power operations and the time needed for qualifying the individual components using the alternative insulation technology, an extended compliance deadline was set in the finalized amendments to the 2021 rule as published by the Environmental Appeals Board on November 12, 2024. The 2024 rule set the compliance deadline for processing and distributing decaBDE-containing wire and cable insulation until the end of the service life of these materials. Since decaBDE has long been relied upon as the flame retardant in one of the most common cross-linked polyethylene (XLPE) nuclear cable insulation formulations, RSCC Firewall III insulation, questions have naturally arisen regarding whether changes in cable performance might be expected for XLPE containing a decaBDE alternative, especially for safety-related cables that must perform their safety function in a design basis event such as a loss of coolant accident.
This report aims to provide information for owners and operators of U.S. ocean-going marine cargo vessels on the cost of different approaches to compliance with the IMO mandate to reduce the sulfur content of marine fuels (outside emission control areas) to no more than 0.5%. The IMO 2020 rule came into effect on January 1, 2020. The report discusses a suite of options for compliance including low-sulfur petroleum-based fuels and alternative fuels. Since fuel prices are a primary factor in determining the cost of the various alternatives, the document also includes a discussion of the main drivers of marine fuel prices. The cost analysis compares the average annual costs (capital and fuel) out to 2050 of each compliance approach under alternative scenarios regarding fuel prices, policy, and technology innovation. The cost calculations focus on representative U.S. fleet vessels for containership and tanker types. Even though the analysis focuses on average cost of approaches to comply with IMO 2020, the comparison of approaches also acknowledges other benefits or risks including fuel price risk and the contribution of the approach to achieving other potential environmental performance objectives or regulations.
There is increasing concern about the disjunct between the intent of higher level government goals and actual projects “on the ground” in Canada. Although strategic environmental assessment (SEA) and a wide variety of plans, policies and programmes (PPP) contain and promote goals that envision a movement towards social, economic and environmental sustainability, these goals are not necessarily upheld by large-scale projects and their environmental impact assessments (EIAs). This disconnect is often illustrated through anecdotal observations. However, to be able to overcome this disjunct it is imperative to come to a clearer understanding of the degree of sustainability or unsustainability of large-scale developments and the way in which they “measure up” in terms of the goals when compared to alternative options. This article proposes a Compliance Analysis method for investigating the level of harmonization between SEA, PPP and proposed projects and their possible alternatives (CAPPP). This method is quantified through a Likert scale which allows for comparison of alternatives for decision making and analytical purposes. The 2009 proposal for the Turcot Exchange redevelopment in Montréal, Québec, put forward by the Ministry of Transport of Québec (MTQ), as well as two alternative proposals, were utilized as a case study to clearly demonstrate the CAPPP methodology and its applicability. The approved plan for the Turcot redevelopment proposed by MTQ was found to be in poor compliance with the majority of the 178 goals in the six sectors that were examined (air quality, climate change, health, noise, socioeconomic, transport), while alternative proposals were found to be in greater accordance with the intentions of governmental SEA and PPP. Synthesis and applications: The CAPPP methodology is a versatile “watchdog” tool for the examination of the level of compliance between stated goals for regions, industrial sectors, or governments and the EIAs of concrete projects “on the ground”. CAPPP can be used as a tool for comparative analysis in decision-making situations at various scales. CAPPP is a fairly straight-forward method that can be used by policy makers, EIA experts, and members of the general public alike. Highlights: ► We investigated the level of harmonization between SEA, plans, policies and programmes and EIA projects. ► We created a new methodology: the goal compliance analysis (GCA). ► We tested it on an ongoing project, the Turcot Interchange in Montreal, Canada. ► The method is straight-forward and can be used by policy makers, EIA experts, and members of the general public alike.