Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ariane”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Launch vehicle and power level impacts on electric GEO insertion

Solar Electric Propulsion (SEP) has been shown to increase net geosynchronous spacecraft mass when used for station keeping and final orbit insertion. The impact of launch vehicle selection and power level on the benefits of this approach were examined for 20 and 25 kW systems launched using the Ariane 5, Atlas IIAR, Long March, Proton, and Sea Launch vehicles. Two advanced on-board propulsion technologies, 5 kW ion and Hall thruster systems, were used to establish the relative merits of the technologies and launch vehicles. GaAs solar arrays were assumed. The analysis identifies the optimal starting orbits for the SEP orbit raising/plane changing while considering the impacts of radiation degradation in the Van Allen belts, shading, power degradation, and oblateness. This use of SEP to provide part of the orbit insertion results in net mass increases of 15 - 38% and 18 - 46% for one to two month trip times, respectively, over just using SEP for 15 years of north/south station keeping. SEP technology was shown to have a greater impact on net masses of launch vehicles with higher launch latitudes when avoidance of solar array and payload degradation is desired. This greater impact of SEP could help reduce the plane changing disadvantage of high latitude launch sites. Comparison with results for 10 and 15 kW systems show clear benefits of incremental increases in SEP power level, suggesting that an evolutionary approach to high power SEP for geosynchronous spacecraft is possible.

Oleson, Steven R.↗

The X-33/VentureStar Program

The VentureStar reusable launch vehicle is discussed in this viewgraph presentation. The objectives of the VentureStar program are reviewed: (1) expendables cost too much, (2) commercial space market is growing (3) meets NASA's goals, (4) Users want fast ground turnaround, (5) users want quick access to space, (6) the offline payload processing saves time, (7) low cost access to space will enable new markets. Flight tests of the X-33, which was designed to test the technology and is pictured in several slides, built credibility for VentureStar. One slide shows the dimensions, weight, length, LEO payload capacity, and the propulsion, in comparison for the X-33, the VentureStar, the Space Shuttle, the Proton D-1e, and the Ariane V. Yet other slides outline the vehicle's features, the plan for the operation of the vehicle, from the runway, to the pad, to orbit. The planned containerized payload operation will allow for a 7 day turnaround for the system, which will allow for the planned 40 flights per year.

Laube, J.↗

Non-Toxic Orbital Maneuvering System Engine Development

Recent results using the Aestus engine operated with LOx/ethanol propellant are presented. An experimental program at Rocketdyne Propulsion and Power is underway to adapt this engine for the Boeing Reusable Space Systems Division non-toxic Orbital Maneuvering System/Reaction control System (OMS/RCS) system. Daimler-Chrysler Aerospace designed the Aestus as an nitrogen tetroxide/monomethyl hydrazine (NTO/MMH) upper-stage engine for the Ariane 5. The non-toxic OMS/RCS system's preliminary design requires a LOx/ethanol (O2/C2H5OH) engine that operates with a mixture ratio of 1.8, a specific impulse of 323 seconds, and fits within the original OMS design envelope. This paper describes current efforts to meet these requirements including, investigating engine performance using LOx/ethanol, developing the en-ine system sizing package, and meeting the vehicle operation parameters. Data from hot-fire testing are also presented and discussed.

Green, Christopher↗

Mission Design Overview for Mars 2003/2005 Sample Return Mission

In May 2003, a new and exciting chapter in Mars exploration will begin with the launch of the first of three spacecraft that will collectively contribute toward the goal of delivering samples from the Red Planet to Earth. This mission is called Mars Sample Return (MSR) and will utilize both the 2003 and 2005 launch opportunities with an expected sample return in October 2008. NASA and CNES are major partners in this mission. The baseline mission mode selected for MSR is Mars orbit rendezvous (MOR), analogous in concept to the lunar orbit rendezvous (LOR) mode used for Apollo in the 1960s. Specifically, MSR will employ two NASA-provided landers of nearly identical design and one CNES-provided orbiter carrying a NASA payload of rendezvous sensors, orbital capture mechanisms, and an Earth entry vehicle (EEV). The high-level concept is that the landers will launch surface samples into Mars orbit, and the orbiter will retrieve the samples in orbit and then carry them back to Earth. The first element to depart for Mars will be one of the two landers. Currently, it is proposed that an intermediate class launch vehicle, such as the Boeing Delta 3 or Lockheed Martin Atlas 3A, will launch this 1800-kg lander from Cape Canaveral during the May 2003 opportunity. The lander will utilize a Type-1 transfer trajectory with an arrival at Mars in mid-December 2003. Landing will be aided by precision approach navigation and a guided hypersonic entry to achieve a touchdown accuracy of 10 km or better. Although the exact landing site has not yet been determined, it is estimated that lander resource constraints will limit the site to between 15 degrees north and south latitudes. Following touchdown, the lander will deploy a six-wheeled, 60-kg rover carrying an extensive suite of instruments designed to aid in the analysis of the local terrain and collection of core samples from selected rocks. The surface mission is currently designed around a concept called the surface traverse. Each traverse will involve the rover exploring a selected area of terrain up to 100 meters from the lander, the collection of rock core samples, and the delivery of the samples from the traverse back to a sample canister on the lander. Planning estimates indicate that up to three traverses may be possible during the expected 90-sol lifetime of the lander. The canister that will receive the samples from the rover will be attached to the top stage of a small solid-fueled rocket mounted to the deck of the lander. This rocket is called the Mars Ascent Vehicle (MAV) and consists of three stages weighing a total of about 140 kg. After the conclusion of the surface mission, the MAV will lift-off and insert the sample canister into a near-circular orbit with an altitude of about 600 km and inclination of 45 degrees. The sample canister will wait in this orbit until it is retrieved by the orbiter sometime in early 2007. In August 2005, the second lander and a CNES-provided orbiter weighing 2700 kg will depart for Mars. Currently, it is proposed that a single Ariane 5 provided by CNES will launch both of these two elements onto a Type-2 transfer trajectory. Although the orbiter and lander will be launched together, they will separate shortly after injection and will fly to Mars as two independent spacecraft. However, both spacecraft will perform a maneuver between 10 and 15 days after launch so that their arrival times at Mars differ by between 12 and 24 hours. This scheme will reduce the operational complexity at the encounter date. A set of four 60-kg surface probes will ride piggyback on the orbiter to Mars. These CNES-provided probes are called Netlanders and will serve as surface stations for scientific investigations independent of the Mars Sample Return goals. Starting approximately one month prior to arrival at Mars, the orbiter will begin to release the Netlanders one at a time. Each release cycle will take several days, and will include time for precision navigation to execute one or two maneuvers that will target the Netlanders to their proper landing site. All four deployment cycles will be completed prior to 10 days before arrival. Both the orbiter and lander will arrive in late-July 2006. Upon arrival, the lander will perform a precision landing and surface mission similar in concept to the one that was executed during the 2003 opportunity. Although the landing site for the 2005 opportunity has not been selected, it is expected to be different from the 2003 site to enhance the diversity of the collected samples. The orbiter's arrival at Mars will be highlighted by the first use of aerocapture to insert a spacecraft into a capture orbit around another planet. The choice of aerocapture, as opposed to a propulsive orbit insertion, was considered mission enabling due to a reduction of over 2000 m/s in mission AV. Aerocapture will be targeted to produce a 250 km x 1400 km capture orbit with an inclination of 45 degrees. Current analysis indicates that achieving this goal will require approximately six minutes of flight deep in the atmosphere with a targeted periapsis of approach of about 43 km. After factoring into account the penalty for carrying a heat shield to survive aerocapture, the net savings compared to a propulsive orbital insertion amounts to several hundred kilograms.

Lee, Wayne J.↗

Mars Orbit Rendezvous Strategy for the Mars 2003/2005 Sample Return Mission

The primary objective of the Mars 2003/2005 Sample Return Project is to return Martian surface materials to Earth from two different sites by the year 2008. The baseline mission plan relies heavily on the use of a Mars orbit rendezvous strategy similar to the lunar orbit rendezvous scheme used for the Apollo missions. The 2003 mission consists of a single spacecraft comprised of a Lander, Rover, and Mars ascent vehicle (MAV). The 2003 mission will be launched on a Delta-III-class launch vehicle in May/June 2003 and arrive at Mars in December 2003/January 2004. The Lander deploys the Rover to collect surface samples from several sites and return them to the Lander where they are transferred to a sample canister onboard the MAV. The MAV is launched into a low Mars orbit (targeted for 600 km circular, 45 deg inclination) and releases the sample canister to await retrieval by an Orbiter launched in 2005. (The sample canister is a passive vehicle with no maneuvering capability.) The duration of Mars surface operations is at most about 90 days. The 2005 mission consists of two separate spacecraft: a Lander/Rover/MAV spacecraft identical to that used for the 2003 mission and an Orbiter carrying an Earth Entry Vehicle (EEV). Both spacecraft will be launched on a single Ariane-5 in August 2005 and arrive at Mars in July/August 2006. A second sample canister is delivered to Mars orbit using the same scenario as was used for the 2003 mission. The Orbiter uses aerocapture for insertion into Mars orbit (targeted for 250 x 1400 km, 45 deg inclination). During its approximately one-year stay at Mars, the Orbiter will search for and attempt to rendezvous first with the 2003 sample canister and then with the 2005 sample canister. After retrieval, each sample canister is transferred to the EEV. The Orbiter departs Mars in July 2007 and returns to Earth in October 2008 on a trajectory targeted for landing at the Utah Test and Training Range (UTTR). After deploying the EEV, the Orbiter performs a deflection maneuver to avoid reentry into Earth's atmosphere.

DAmario, Louis A.↗

Mars surface gas chromatograph mass spectrometer

A Mars surface lander Gas Chromatograph Mass Spectrometer (GCMS) is described to measure the chemical composition of abundant and trace volatile species and isotope ratios for noble gases and other elements. These measurements are relevant to the study of atmospheric evolution and past climatic conditions. A Micromission plan is under study where a surface package including a miniaturized GCMS would be delivered to the surface by a solar heated hot air balloon based system. The balloon system would be deployed about 8 km above the surface of Mars, wherein it would rapidly fill with Martian atmosphere and be heated quickly by the sun. The combined buoyancy and parachuting effects of the solar balloon result in a surface package impact of about 5 m/sec. After delivery of the package to the surface, the balloon would ascend to about 4 km altitude, with imaging and magnetometry data being taken for the remainder of the daylight hours as the balloon is blown with the Martian winds. Total atmospheric entry mass of this mission is estimated to be approximately 50 kg, and it can fit as an Ariane 5 piggyback payload.

Mahaffy, P.↗

2005 Earth-Mars Round Trip

This paper presents, in viewgraph form, the 2005 Earth-Mars Round Trip. The contents include: 1) Lander; 2) Mars Sample Return Project; 3) Rover; 4) Rover Size Comparison; 5) Mars Ascent Vehicle; 6) Return Orbiter; 7) A New Mars Surveyor Program Architecture; 8) Definition Study Summary Result; 9) Mars Surveyor Proposed Architecture 2003, 2005 Opportunities; 10) Mars Micromissions Using Ariane 5; 11) Potential International Partnerships; 12) Proposed Integrated Architecture; and 13) Mars Exploration Program Report of the Architecture Team.

Source record↗

The Mars Micromission Spacecraft

The concept of a small common Mars Micromission spacecraft design, using the Ariane-5 GTO piggyback launch opportunities has been studied over the past year by NASA/JPL and CNES. The study is based on the 200 kg ASAP twin configuration, due to its clear performance and cost advantages for planetary missions over the 100-kg ASAP configuration. The spacecraft design commonalty has been explored for the Mars 2003, 2005, and 2007 launch opportunities and for three main mission types: Probe Carrier missions, with one or more probes, measuring 40-80 cm in diameter. Science Orbiter missions, with additional fuel for orbit insertion. and Telecommunication Relay Orbiter missions, with optimal data return link.

Leschly, Kim↗

Spectroscopic Capabilities and Possibilities of the Far Infrared and Submillimeter Telescope Mission

The Far Infrared and Submillimeter Telescope (FIRST) mission is the fourth European Space Agency corner stone mission. FIRST will be an observatory with a passively cooled (80 Kelvin) 3.5 meter class telescope and three cryogenic instruments covering the 670 to 80 mm spectral region. The mission is slated for a 4.5 year operational lifetime in an L2 orbit. It will share an Arian 5 launch with PLANCK in early 2007. The three payload instruments include the Spectral and Photometric Imaging Receiver (SPIRE), which is a bolometer array with Martin-Puplett FTS for 200-670 microns, the Photoconductor Array Camera and Spectrometer (PACS), which is a photoconductor array with a grating spectrometer for 80-210 microns and the Heterodyne Instrument for FIRST (HIFI), which is a series of seven heterodyne receivers covering 480-1250 GHz and portions of 1410-1910 GHz and 2400-2700 GHz. FIRST will make many detailed spectral surveys of a wide variety of objects previously obscured by the atmosphere and in regions of the spectrum seldom used for astronomical observations, With all of the spectroscopic capability on FIRST a great deal of laboratory spectroscopic support will be needed for accurate interpretation of the spectral data.

Pearson, J. C.↗

A Survey and Recent Development of Lunar Gravity Assist

Earth's moon is the largest in the solar system relative to its parent body, the Earth, and can have significant effect on the path of a spacecraft flying close by. This effect, when planned to benefit a specific mission, is called lunar gravity assist (LGA) , and assumes that one aims the spacecraft towards the Moon in such a way that the Moon's gravitational pull will alter the spacecraft's course in a favorable manner. The first application of LGA was in the Apollo program, where the command and lunar modules (and astronauts) were propelled to the Moon such that, if no additional course changes were made, they would swing around the backside of the Moon at a certain altitude and be flung back to Earth to enter the atmosphere at a specified location in the Pacific ocean. This LGA was an essential element saving the lives of the astronauts on Apollo 13. This paper will illustrate the basic mechanics of gravity assist, and list the many applications where it has been used effectively over the past 30 some years. These include missions to the sun and Earth libration points, redirecting a spacecraft from one of these point to a comet encounter, and enhancing payloads by providing an energy boost by the Moon. More recently, studies and actual missions have shown the benefits of LGA in: (1) assisting lunar capture, (2) repositioning geosynchronous communications satellites, (3) boosting spacecraft to Earth escape and departure to planets and other solar system bodies, and (4) allowing small spacecraft to be launched as secondary payloads and released into almost a random orbit from which each may depart and maneuver in space with gravity assists from the Earth and Moon to perform a specific planetary or other mission. This latter application is a recent development by the author and is being applied in 2002 and later years, with piggyback flights on the Ariane 5 which launches comsats to GEO.

Penzo, Paul A.↗

Zero Boil Off Cryogen Storage for Future Launchers

Zero boil off (ZBO) cryogen storage using both cryocoolers and passive insulation technologies will enable long-term exploration missions by allowing designers to optimize tankage without the need for excess cryogen storage to account for boil off. Studies of ZBO (zero boil off) have been on-going in the USA for several years. More recently, a review of the needs of advanced space propulsion took place in Europe. This showed the interest of the European community in cryogenic propulsion for planetary missions as well as the use of liquid hydrogen for large power electric propulsion (manned Mars missions). Although natural boiling could be acceptable for single leg missions, passive insulation techniques yield roughly a I% per month cryogen loss and this would not be cost effective for robotic planetary missions involving storage times greater than one year. To make economic sense, long-term exploration missions require lower tank capacity and longer storage times. Recent advances in cryocooler technology, resulting in vast improvements in both cooler efficiency and reliability, make ZBO is a clear choice for planetary exploration missions. Other, more near term applications of ZBO include boil-off reduction or elimination applied to first and upper stages of future earth-to-orbit (ETO) launchers. This would extend launch windows and reduce infrastructure costs. Successors to vehicles like Ariane 5 could greatly benefit by implementing ZBO. Zero Boil Off will only be successful in ETO launcher applications if it makes economic sense to implement. The energy cost is only a fraction of the total cost of buying liquid cryogen, the rest being transportation and other overhead. Because of this, higher boiling point cryogens will benefit more from on-board liquefaction, thus reducing the infrastructure costs. Since hydrogen requires a liquefier with at least a 17% efficiency just to break even from a cost standpoint, one approach for implementing ZBO in upper stages would be to actively cool the shield in the hydrogen tank to reduce the parasitic losses. This would allow the use of less expensive, presently available coolers (80 K vs. 20 K) and potentially simplify the system by requiring only a single compressor on the pad amd a single disconnect line. The compressor could be a hefty commercial unit, with only the cold head requiring expensive flight development and qualification. While this is actually a reduced boil off configuration rather than a zero-boil off case, if the cryogen loss could be cut significantly, the increase in hold time and reduced need for draining and refilling the propellant tanks could meet the vehicle operations needs in the majority of instances.Bearing in mind the potential benefits of ZBO, NASA AMES and SNECMA Moteurs decided to exchange their technical views on the subject. This paper will present a preliminary analysis for a multi-mission module using a fairly low thrust cryogenic engine and ZBO during cruise. Initial mass is 5.5. tons (in ETO). The cryogenic engine will be used near each periapsis in order to minimize the AV requirement. The payload obtained by this propulsion system is compared to a classical storable bipropellant propulsion system for several cases (e. g. Mars lander, Jupiter orbiter, Saturn orbiter). For the Jupiter and Saturn cases, the power source could be an RTG or a large parabolic mirror illuminating a solar panel. It is shown -that - due to its much larger specific impulse - the cryogenic ZBO solution provides much higher payloads, especially for exploration missions involving landing on planets, asteroids, comets, or other celestial bodies.

Valentian, D.↗

Getting to L1 the Hard Way: Triana's Launch Options

Over the past four years, NASA's Goddard Space Flight Center has built and tested the Triana observatory, which will be the first Earth observing science satellite to take advantage of the unique perspective offered by a Lissajous orbit about the first Earth-Sun Lagrange Point (L1). Triana was originally meant to fly on the U.S. Space Transportation System (a.k.a. the Space Shuttle but complications with the shuttle manifest have forced Triana into a 'wait and see' attitude. The observatory is currently being stored at NASA's Goddard Space Flight Center, where it waits for an appropriate launch opportunity to surface. To that end, several possible alternatives have been considered, including variations on the nominal shuttle deployment scenario, a high inclination Delta-type launch from Vandenberg Air Force Base, a Tsyklon class vehicle launched from Baikonur, Kazakhstan, and a ride on a French Ariane vehicle out of French Guiana into a somewhat arbitrary geostationary transfer orbit (GTO). This paper chronicles and outlines the pros and cons of how each of these opportunities could be used to send Triana on its way to L1.

Houghton, Martin B.↗

Getting to L1 the Hard Way: Triana's Launch Options

Over the past four years, NASA's Goddard Space Flight Center has built and tested the Triana observatory, which will be the first Earth observing science satellite to take advantage of the unique perspective offered by a Lissajous orbit about the first Earth-Sun Lagrange Point (L1). Triana was originally meant to fly on the U.S. Space Transportation System (a.k.a. the Space Shuttle), but complications with the shuttle manifest have forced Triana into a "wait and see" attitude. The observatory is currently being stored at NASA's Goddard Space Flight Center, where it waits for an appropriate launch opportunity to materialize. To that end, several possible alternatives have been considered, including variations on the nominal shuttle deployment scenario, a high inclination Delta-type launch from Vandenberg Air Force Base, a Tsyklon class vehicle launched from Baikonur, Kazakhstan, and a ride on a French Ariane vehicle out of French Guiana into a somewhat arbitrary geostationary transfer orbit (GTO). This paper chronicles and outlines the pros and cons of how each of these opportunities could be used to send Triana on its way to L1.

Houghton, Martin B.↗

Design, Development and Testing of Airplanes for Mars Exploration

The opportunity for a piggyback mission to Mars aboard an Ariane 5 rocket in the early spring of 1999 set off feverish design activity at several NASA centers. This report describes the contract work done by faculty, students, and consultants at the California Polytechnic State University in San Luis Obispo California (Cal poly/SLO) to support the NASA/Ames design, construction and test efforts to develop a simple and robust Mars Flyer configuration capable of performing a practical science mission on Mars. The first sections will address the conceptual design of a workable Mars Flyer configuration which started in the spring and summer of 1999. The following sections will focus on construction and flight test of two full-scale vehicles. The final section will reflect on the overall effort and make recommendations for future work.

Hall, David W.↗

JWST Town Meeting

The James Webb Space Telescope (JWST) Science Working Group has published the key scientific study areas for the mission: the end of the dark ages, the assembly of galaxies, the birth of stars and protoplanetary systems, and planetary systems and the origins of life. With these objectives establishing the major scientific capabilities of the observatory, the JWST Project has successfully completed major reviews of the telescope architecture and budget plan and has reached agreement on the contributions for all three international partners (NASA, ESA, and the Canadian Space Agency). Northrop Grumman Space Technologies (NGST) is the prime contractor responsible for the spacecraft, telescope, and integration. GSFC/NASA oversees the development and integration of the science instruments. The Space Telescope Science Institute is developing the JWST Science & Operations Center. The JWST will be launched to L2 2011 using an Ariane V. At this town hall, the mission's Project Scientists will present the technical and scientific status of the mission, concentrating on those areas that have changed over the last year. This will be an excellent opportunity to learn about JWST and catch up on the most recent developments. Questions from the audience will be welcomed. The town hall speakers will be John Mather, Peter Jakobsen, John Hutchings, and Peter Stockman.

Mather, John↗

James Webb Space Telescope Status

The James Webb Space Telescope (JWST) is the first deployable infrared to millimeter wave space telescopes. We will describe the progress on JWST and introduce other speakers in the session. The JWST will operate at the Sun-Earth Lagrange point L2, where radiative cooling lowers the telescope and instrument temperatures to about 35 K. It will have an 18-segment beryllium primary mirror with a 25 m2 area fitting inside a 6.6m circumscribed circle, and will provide spectroscopy and imaging over the wavelength range from 0.6 to 28 microns. It is planned for launch in 2011 on an Ariane 5 rocket. The project is a partnership of NASA, ESA, and CSA, and the prime contractor is Northrop Grumman. See http://www.jwst.nasa.gov for more details on JWST.

Mather, John C.↗

CRYOGENIC UPPER STAGE SYSTEM SAFETY

NASA s Exploration Initiative will require development of many new systems or systems of systems. One specific example is that safe, affordable, and reliable upper stage systems to place cargo and crew in stable low earth orbit are urgently required. In this paper, we examine the failure history of previous upper stages with liquid oxygen (LOX)/liquid hydrogen (LH2) propulsion systems. Launch data from 1964 until midyear 2005 are analyzed and presented. This data analysis covers upper stage systems from the Ariane, Centaur, H-IIA, Saturn, and Atlas in addition to other vehicles. Upper stage propulsion system elements have the highest impact on reliability. This paper discusses failure occurrence in all aspects of the operational phases (Le., initial burn, coast, restarts, and trends in failure rates over time). In an effort to understand the likelihood of future failures in flight, we present timelines of engine system failures relevant to initial flight histories. Some evidence suggests that propulsion system failures as a result of design problems occur shortly after initial development of the propulsion system; whereas failures because of manufacturing or assembly processing errors may occur during any phase of the system builds process, This paper also explores the detectability of historical failures. Observations from this review are used to ascertain the potential for increased upper stage reliability given investments in integrated system health management. Based on a clear understanding of the failure and success history of previous efforts by multiple space hardware development groups, the paper will investigate potential improvements that can be realized through application of system safety principles.

Smith, R. Kenneth↗

STRV Cryocooler Tip Motion Suppression

The Space Technology Research Vehicle (STRV-1b) scheduled to fly at the beginning of June 1994, has a cryocooler vibration suppression experiment aboard doing motion suppression of the tip of the coldfinger. STRV-1b is a bread box sized satellite to be launched on the next flight of the Ariane-4.

STRV piezo-electric translators applique ceramic a↗