Search NASA⌕ Search

SEARCH · Search NASA

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Tactical Action Plan: Powering the Energy Frontier (An Appendix to the Strategic Roadmap 2024)

The Tactical Action Plan identifies and describes the Western-wide tasks and activities, existing and new, needed to fully achieve the goals in Strategic Roadmap 2024. Each activity in the TAP chart is briefly described in this document and also linked to the Critical Pathway it supports. As the TAP is a list of specific strategies and actions susceptible to changing environments and needs, the TAP will be updated more frequently as Western progresses towards its goals. The TAP is organized into seven Strategic Target Areas that serve as Western’s priorities and areas of focus for the next two to three years. These Target Areas are: Power and Transmission Related Services; Energy Infrastructure; Partnership and Innovation; Asset Management; Safety and Security; Communication; and Human Capital Management and Organization Structure. Target Areas are also used to create the agency’s annual performance targets, which measure progress and implementation of the TAP, and the status of which will be reported regularly.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PV Operations Software Transparency: A PVMAC Industry Snapshot

The rapid growth of photovoltaic (PV) deployment has increased reliance on software platforms for monitoring, workflow automation, diagnostics, and performance analytics. As these tools play a central role in asset management and operations and maintenance (O&M), greater transparency in methodologies, data handling, and validation practices benefits the broader PV ecosystem. To better understand current practices and identify opportunities for improved clarity and interoperability, 24 software providers contributed detailed responses through the PV O&M Analytics Collaborative (PVMAC) initiative, the first structured questionnaire of its kind in the industry, covering onboarding, interoperability, data quality, diagnostics, AI/ML, and other operational categories. These providers represent over 1.1 TW of solar assets under management. The analysis shows broad adoption of digital twins, AI/ML, and API integrations, but also highlights challenges in onboarding processes, inconsistent definitions and methodologies, variability in key performance indicator (KPI) calculations, and limited independent validation. Greater standardization, clearer documentation, and stronger validation frameworks could improve transparency, comparability, and trust across PV operations software platforms.

14 SOLAR ENERGY↗

Connecting Minds: AI Use Cases to Bridge Power Systems and Large Language Models for Practical Applications

Recent advances in artificial intelligence (AI) and development of large language models (LLMs) present the opportunity to develop a new generation of power systems applications. In contrast with early power system AI applications based on structured numerical data, LLMs offer unique capabilities to perform logical reasoning using text documents, unstructured data, and application programming interface (API) calls to computational software. This paper seeks to bridge the knowledge gap between power systems engineers and LLM developers through a crosscutting explanation of use cases, characteristics, requirements, practical considerations from the perspectives of both LLM capabilities and industry needs. Specific focus is given to applications that can be realistically deployed by electric utilities. After introducing the architecture of LLMs and unique challenges of the power systems domain, this paper proposes twenty representative LLM applications grouped into categories of 1) power system operations, 2) asset management, 3) system planning and analytics, and 4) energy management and protection systems. Five use cases are presented within each category with descriptions of the motivation, objectives, approaches, example inputs / outputs, and benefits of each use case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Autonomous Satellite Command and Control through the World Wide Web: Phase 3

NASA's New Millenium Program (NMP) has identified a variety of revolutionary technologies that will support orders of magnitude improvements in the capabilities of spacecraft missions. This program's Autonomy team has focused on science and engineering automation technologies. In doing so, it has established a clear development roadmap specifying the experiments and demonstrations required to mature these technologies. The primary developmental thrusts of this roadmap are in the areas of remote agents, PI/operator interface, planning/scheduling fault management, and smart execution architectures. Phases 1 and 2 of the ASSET Project (previously known as the WebSat project) have focused on establishing World Wide Web-based commanding and telemetry services as an advanced means of interfacing a spacecraft system with the PI and operators. Current automated capabilities include Web-based command submission, limited contact scheduling, command list generation and transfer to the ground station, spacecraft support for demonstrations experiments, data transfer from the ground station back to the ASSET system, data archiving, and Web-based telemetry distribution. Phase 2 was finished in December 1996. During January-December 1997 work was commenced on Phase 3 of the ASSET Project. Phase 3 is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer; (2) Support prioritized handling of multiple PIs as well as associated payload experimenters; (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft; (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware; (5) Implement a beacon monitoring test; (6) Implement an experimental blackboard controller for space system management; (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals is examined in the next section. Significant sections of this report were also published as a conference paper.

Cantwell, Brian↗

Washington State Highway Seismic Screening Tool (HSST)

The U.S. Department of Homeland Security’s Regional Resiliency Assessment Program (RRAP) undertook the Washington State Transportation Systems RRAP project in 2017 to assess the seismic vulnerabilities of that state’s transportation system to a Cascadia Subduction Zone (CSZ) earthquake. The specific goal of that project was to assess the vulnerability of, and prioritize, transportation infrastructure for moving goods and supplies from Incident Support Bases to Federal Staging Areas within Washington State following a CSZ earthquake. As part of this analysis, Argonne National Laboratory (Argonne), with input and support from the Washington State Department of Transportation (WSDOT) maintenance and pavements offices and state geotechnical engineer, developed the Highway Seismic Screening Tool (HSST) to inform a system-level analysis of highway recovery and reopening times. This report provides a full discussion of the HSST’s development, implementation, and results for the CSZ scenario earthquake. The primary outcome of the HSST is to determine the approximate reopening times of highway segments or bridges damaged by a CSZ magnitude 9.0 seismic event. This is done by calculating the permanent ground deformation (PGD) caused by soil liquefaction along state highways, which can cause significant damage or displacement of highway pavement structures. The term “reopening time” is different from “restoration time” and is intended to represent the approximate amount of time that would be needed to return highways to a minimum state of repair sufficient to support the limited movement of emergency and response vehicles. Additionally, the HSST is referred to as a “screening tool,” as it uses network- or system-level asset management information that WSDOT provided to assess seismic-related hazards and vulnerabilities of highways; it does not conduct an asset-level engineering analysis of seismic-related vulnerabilities. Accordingly, the results of the HSST analysis should only be used for system- or corridor-level planning and investment, and not for engineering or management decisions at the asset level. The HSST is also applied to assess the exposure of statewide rail systems to soil liquefaction and PGD hazards. However, little information is available about the sensitivity or vulnerability of railways and rail yards to such hazards, and therefore researchers were unable to determine approximate reopening times for the state’s rail system following a CSZ earthquake.

58 GEOSCIENCES↗

Management Academy LANL Business Systems: Property Management, Course #31036

Los Alamos National Laboratory (LANL) is responsible for the efficient economical management of all government property in its stewardship. This training explains the role LANL managers have in managing, controlling, and disposing of government property. The Laboratory's goal is good asset management. By properly managing property across the facility, Laboratory managers can help ASM improve government property utilization and extend asset life, while reducing asset-related operating costs and expenditures.

99 GENERAL AND MISCELLANEOUS↗

Distributed water desalination and purification systems: perspective and future directions

Distributed water treatment and desalination (DWTD) systems are critical for the development of a diverse water portfolio of the desired quality and intended use at the target location. Widespread adoption of DWTD has been hampered given the need for round-the-clock monitoring and the lack of local technical expertise for system management. However, self-adaptive operation, real-time remote monitoring, supervisory control, and asset management of DWTD systems are now feasible with the implementation of advanced local system control, cyberinfrastructure that facilitates real-time cloud-based analytics, data management, and artificial intelligence–powered decision support. Such an approach will introduce transformative virtual networks of DWTD systems to provide needed water to locations that are not served by centralized and satellite water treatment and desalination systems.

Cohen, Yoram [University of California, Los Angele↗

Categorizing Plug Load Solutions by Ease of Implementation

Plug loads account for a growing share of U.S. commercial building electricity use, projected to rise from 16% today to 21% by 2050. Managing these loads presents a substantial opportunity for reducing energy costs while providing additional operational benefits, such as improved asset management and occupant comfort. Despite their potential, plug loads are numerous, diverse, and highly occupant-dependent, making control challenging. This publication organizes plug load control strategies by level of effort, offering building owners and operators a staged approach to implement interventions ranging from smart outlets and automatic receptacle controls to behavioral strategies. By following these actionable steps, building stakeholders can reduce energy consumption, lower utility bills, and realize broader operational advantages.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of Margin-Based Methods to Assess System Health

Health management of complex systems such as nuclear power plants is an essential task to guarantee system reliability. This task can be greatly enhanced by constantly monitoring asset status and performances and process such data (through anomaly detection, diagnostic, and prognostic computational algorithms) to identify asset degradation trends and faulty states. While such information and data are typically available for many of the assets, they are not propagated from the asset to the system level in order to identify the most critical assets and prioritize maintenance and surveillance activities. The main reason is driven by the fact that current reliability modeling techniques are inadequate to process such information/data. This is due to the nature of these techniques which are based on the concept of failure rate/probability that do not serve an operational context where quantitative asset health information is available. Simply stated, current reliability techniques serve a run-to-failure operational setting and not a predictive maintenance one where the goal is to perform maintenance and surveillance activities only when they are needed based on asset health. The risk informed asset management (RIAM) project is focusing on the development of a different kind of reliability modeling techniques designed to adequately serve a predictive operational setting. Such reliability techniques move aways from a failure rate/probability to a margin-based mindset where margin is here used as a metric to quantify asset health based only on current and past operational experience of the asset under consideration. In addition, margin-based reliability techniques are able to propagate asset health information from the component to system level and provide importance measure to each asset. This report summarizes a recent activity performed in collaboration with plant modernization pathway designed to integrate monitoring data into margin-based reliability models. Such activity focuses on a specific system of an existing nuclear power plant where large amount of historic monitoring data is used to monitor asset and system health.

97 MATHEMATICS AND COMPUTING↗

Autonomous Satellite Command and Control Through the World Wide Web

The Automated Space System Experimental Testbed (ASSET) system is a simple yet comprehensive real-world operations network being developed. Phase 3 of the ASSET Project was January-December 1997 and is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer. (2) Support prioritized handling of multiple (PIs) Principle Investigators as well as associated payload experimenters. (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft. (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware. (5) Implement a beacon monitoring test. (6) Implement an experimental blackboard controller for space system management. (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals are examined. Significant sections of this report were also published as a conference paper. Several publications produced in support of this grant are included as attachments. Titles include: 1) Experimental Initiatives in Space System Operations; 2) The ASSET Client Interface: Balancing High Level Specification with Low Level Control; 3) Specifying Spacecraft Operations At The Product/Service Level; 4) The Design of a Highly Configurable, Reusable Operating System for Testbed Satellites; 5) Automated Health Operations For The Sapphire Spacecraft; 6) Engineering Data Summaries for Space Missions; and 7) Experiments In Automated Health Assessment And Notification For The Sapphire Microsatellite.

Cantwell, Brian↗

Industrial Scale Demonstration of Smart Manufacturing, Achieving Transformational Energy Productivity Gains

While many U.S. manufacturing operations utilize optimization for individual unit processes, smart manufacturing (SM) systems that integrate manufacturing intelligence in real time across an entire production operation are rare in large companies and virtually nonexistent in smaller organizations. One example of an area where SM systems can be applied is in the management of waste heat. A smart system that not only seeks to recover waste heat, but also to use energy more efficiently, is a more cost-effective approach because energy use, waste energy loss and product output are optimized together. The overall objective of this project was to develop an industry-accepted SM Platform that enables smart systems by accelerating and lowering the cost of development and implementation scales for use in diverse sets of manufacturing industry sectors, manufacturing operations and company sizes. Specifically, the project (1) designed and demonstrated the application of a prototype SM Platform for two diverse commercial test beds, (2) demonstrated at one and estimated for the other test bed the potential reduction in waste heat generation, and (3) worked with leading automation vendors to catalyze low-cost commercialization of the technology developed. The Smart Manufacturing Application and Data Platform (SM Platform) developed during this project is an innovative approach that marries IT virtualization technologies with operational data and modeling system requirements to construct a ready-to-go platform for enabling sensor – data – modeling – actuation systems, driven by real-time plant data and performance metrics. This SM Platform allows manufacturing organizations, regardless of their industry or size, to assemble new operational systems at a much lower cost, optimizing process knowledge and improving energy productivity by integrating with existing process control and automation systems. Also developed during this project is a methodology for developing energy productivity metrics that use real-time process information and provide comparisons for potential, practical, and actual performance, as well as examples and the methodology for provisioning of an Energy Dashboard that displays alternatives to optimize energy use within specific business contexts aimed at helping improve energy productivity and reduce emissions in U.S. manufacturing. The SM Platform designed utilizes current manufacturing, operational and IT industry standards. The platform can be used to expedite sensor – data – model – actuation system development and deployment in a cloud-based environment using a novel end-to-end workflow as a service capability that is already integrated with data connection, ingestion, and contextualization services. In addition, the methodology for development of energy productivity metrics and reusable application templates called Toolkits have been defined so that they can be tailored to a specific business situation. The project’s two test beds, one in a hydrogen production plant and the other in a forging, heat treatment, and machining operation, utilize sensor-driven modeling, measurement, and simulation systems. In these two test beds, the implementation of these as a comprehensive system has made it possible for energy productivity to be managed in real-time throughout the plant and enterprise using an energy dashboard. The development pathway to direct machine actuation was articulated. During the first year, the project team developed the most highly instrumented steam-methane reformer (SMR) in the U.S. using infrared cameras and thermocouples. Real-time data are streamed to high fidelity and reduced-order models for analysis. A high fidelity CFD model, parallelized in the SM Platform cloud environment, was demonstrated for operational use. This is the first real-time operational productivity system of a steam methane reformer using both high fidelity and data-driven models together in a real time situation to balance natural gas flow to the reformer tubes. An infrared camera system was developed and shown to outperform thermocouples in coverage, accuracy, reliability, and cost effectiveness for use in a high temperature, harsh environment. A forging, heat-treating, machining line operation test bed includes new instrumentation for data capture analysis, modeling, and simulation and will be integrated into SM Platform workflows so that business performance can be managed in real-time. Composable metrics were developed using the SM Platform to drive improvements in energy productivity, environmental performance, safety, asset management, costs, and overall operations. A major focus of the SM systems developed was optimization of energy productivity at the enterprise level, which resulted in reductions in waste heat generation for the two project test beds. Reductions in the waste heat generated will result in greater energy savings than will waste heat recovery due to inefficiencies in the heat transfer process. For the SMR test bed an efficiency improvement of 1 – 2% with a corresponding waste heat reduction of 5% were demonstrated. It should be noted that the test bed SMR unit had an efficiency of more than 90% as compared to 70 to 80% efficiencies of most SMR units. So implementation of similar SM systems at typical SMR units could yield more than 15 to 25% waste heat reductions. Similarly the forging, heat-treating, machining line operation test bed is a DOE AMO Platinum Level Superior Energy Performance plant with a much higher than typical overall operating efficiency. For this test bed heat integration using recuperators is estimated to result in fuel savings of 15.9% due to waste heat recovery compared to the base case without recuperators with negligible changes in part exit conditions. This results in an 18.9% energy efficiency improvement. The project team estimates that broad multi-sector adoption of the developed technology could reduce waste heat generation by an amount equivalent to 1.3% of total U.S. energy use. This waste heat reduction is associated with 69 million tons reduction in annual carbon dioxide emissions. Other potential benefits include reducing process times, solid and liquid wastes, environmental impacts, and water use. It is estimated that this investment has an anticipated payback period of less than one year in energy-intensive applications. The SM Platform could also reduce the costs of deploying SM systems by 50% in manufacturing operations. Commercialization of the SM Platform will require significant cross-industry collaboration and technology provider market changes. Steps taken toward commercialization included 1) analyzing savings from deployment of the SM Platform and 2) holding SM Platform workshops, webinars, and conferences with targeted individual industry segments, with a focus on small and medium-sized organizations. An upgraded community website has been established as a portal for accessing and distributing information. Most importantly, the SM platform enabling technology developed during this project and its commercialization will continue, evolve and expand under the Clean Energy Smart Manufacturing Innovation Institute (CESMII).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Importance of Inventory for Informing Waste Strategy - 20280

A waste inventory aims to present the best available information about the nature, quantity and location of radioactive wastes and materials at a facility, site or in a country. Quality inventory data is necessary for developing appropriate strategies and plans for managing radioactive wastes and materials, with high standards of protection for people and the environment. The inventory of wastes will change over time due to a wide range of technical, commercial or policy reasons, for example, if reactor lifetimes are extended, if decommissioning strategies change or if new technologies are introduced for managing waste. Inventory information can also improve as better waste characterisation data becomes available. At a facility or site level, good quality inventory data are needed to underpin decision making about the waste management options and to demonstrate compliance with the chosen treatment or disposal route. At a site and country level, knowledge of the inventory can drive the improvement to waste strategy; waste management asset and service planning; and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal Energy Dispatch of Distributed PVs for the Next Generation of Distribution Management Systems

Advanced Distribution Management Systems (ADMS) are being widely adopted by electric utilities for managing and optimizing the operations of their distribution systems. Distributed photovoltaic (DPV) systems with smart inverters can be controlled to adjust active power and reactive power outputs, and they are envisioned to become a part of (centrally or distributed) controllable assets managed by the ADMS for optimizing grid operations. This paper proposes an optimal energy dispatch strategy controlling DPV systems for regulating distribution voltages and achieving conservation voltage reduction. A convex optimization model is proposed with the use of linearized power flow, and the gradient projection algorithm is used to solve the optimal active power and reactive power outputs of smart inverters. The proposed optimal energy dispatch is implemented using an open-source ADMS platform, and simulation results have demonstrated the effectiveness of the proposed approach on improving distribution grid operations.

42 ENGINEERING↗

INFORMATION: Special Report on "Management Challenges at the Department of Energy"

Responsible for some of the Nation's most important and technically advanced missions, the Department of Energy faces an array of challenges that are more wide-ranging and complex than at any time in its history. While its origins can be largely traced to the Manhattan Project, the Department has evolved into a multi-faceted agency that encompasses a broad range of scientific, environmental, and national security activities. Since its creation under the Department of Energy Organization Act in 1977, the Department has shifted its emphasis and priorities over time as the energy and security needs of the Nation have changed. The Department has recently refocused these efforts, adding particular emphasis on the science and renewable energy components of its portfolio. In this regard, the Department has taken a lead role in the implementation and execution of the energy technology initiatives related to the American Recovery and Reinvestment Act of 2009 (Recovery Act). As a means of accomplishing these initiatives, the Department received a substantial increase in its annual appropriation, rising from nearly $25 billion in 2008 to approximately $34 billion in 2009 as a result of additional funding in the Department's loan program and numerous science, energy, and national security initiatives. In addition, the Department was provided more than $36 billion in Recovery Act funding to be used over a two to three year period. Further, the Department, through existing authorities and those expanded by the Recovery Act, has been authorized to provide more than $100 billion in loan guarantees for innovative, clean energy technologies. To accomplish its vital missions, the Department employs approximately 115,000 Federal and contractor personnel and manages assets valued at more than $189 billion, including the 17 national laboratories at the heart of its science program. On an annual basis, the Office of Inspector General is required to identify what it considers to be the most significant management challenges facing the Department. Our effort addresses new or emerging issues and evaluates the Department's progress in resolving previously identified challenges. The challenges identified by this process represent risks inherent in the Department's wide ranging and complex operations, as well as those related to problems with specific management processes. As noted in past reports, we recognize that often these challenges cannot be resolved in a single year and must, therefore, be addressed through a concentrated, persistent effort over time. Consistent with our mission, the overall goal is to focus attention on significant issues with the objective of working with Department managers to enhance the effectiveness of agency programs and operations. During the past year, the Department has taken a number of actions to promote its ongoing strategy of resolving the management challenges identified in our prior reports. There have been many notable advances. However, in our judgment, on the basis of the results of our work during the past year and other risk assement tools, the following management challenges remain for Fiscal Year (FY) 2010: Contract Administration; Cyber Security; Energy Supply; Environmental Cleanup; Safeguards and Security; and Stockpile Stewardship. As with a number of Federal agencies, the Department received an unprecedented infusion of funds as a result of the Recovery Act. These funds, along with the overarching goals set forth in the Act, were transformative in nature. On a positive note, the Department and its staff have been energized by the new and evolving programmatic initiatives resulting from the Recovery Act. However, as would be expected in an effort of this magnitude, the Departmnent has experienced significantly increased management stresses and strains, impacting virtually every program and operation. In fact, the essentially unavoidable burden placed on existing human capital and other resources has, in our judgment, affected the Department's ability to resolve its existing management challenges, at least in the near term. To capture these emerging factors, as part of this report, we have added two additional Departmental management challenges: Recovery Act Implementation; and Human Capital Management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Special Report Management Challenges at the Department of Energy

With an annual appropriation of approximately $24 billion, the Department of Energy (Department) is a multi-faceted agency that encompasses a broad range of national security, scientific, and environmental activities. Since the passage of the Department of Energy Organization Act in 1977, the Department has shifted its emphasis and priorities over time as the energy and security needs of the Nation have changed. In recent years, the Department has refocused its efforts in areas such as energy efficiency and conservation, environmental cleanup, nuclear nonproliferation, and weapons stewardship. In order to accomplish its mission, the Department employs approximately 110,000 Federal and contractor personnel and manages assets valued at more than $134 billion, including a complex of national laboratories.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Integration of Data Analytics with Plant System Health Program

This report summarizes the R&D activities of the Plant Health Management (PHM) project during fiscal year 2020 (FY20). This project focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate system sources of risk. This project development lives in cooperation with the Risk Informed Asset Management (RIAM) project. The RIAM project, in fact, uses the reliability models and data generated by the PHM project to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture). This year’s activities for the PHM project focused mainly on the development of two classes of models. The first one includes a series of component reliability models which include aging, testing and maintenance. The second class includes a series of system reliability models which focus on the secondary side of exiting U.S. reactors. These models are based on fault tree logic structures such that they can be used by existing plant PRA software. We also started to focus on the management of health data and we tackled this issue in two directions. The first one focuses on the integration of monitor data with simulation models to assess component health. This approach is moving from a classical data based to a model+data based approach with the goal of improving higher component health information. The second direction focuses on linking equipment reliability data (e.g., maintenance/failure reports, component monitoring data) directly to system reliability models using a safety margin based language rather than a probability based language. The main advantage of a safety margin based language is that it can provide to system engineers more tangible information on system/component health and how it propagates to the system level.

97 MATHEMATICS AND COMPUTING↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗