Search NASA⌕ Search

SEARCH · Search NASA

Results for “BLACKOUT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Modeling of a Passive Endothermic Reaction Cooling System

Passive reactor core cooling systems can mitigate the effects of station blackout conditions and avoid accidents similar to what occurred at the Fukushima Dai-ichi reactors. Advanced nuclear reactor designs such as the Advanced Heavy Water Reactor (AHWR) and others include passive cooling systems. The AHWR utilizes water storage tanks that can remove decay heat for more than 50 days after station blackout. While these systems do not rely on electricity, they do rely on passive valves to function during an emergency situation. The purpose of the present work is to determine the feasibility of a passive endothermic reaction cooling system (PERCS). The PERCS relies on an endothermic reaction that does not proceed until it reaches a threshold temperature. Thus, a vessel filled with chemicals that undergo an endothermic reaction can be directly connected to the reactor core without any valves and only react once accident conditions raise the temperature past the threshold temperature. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A simulation of I 2 S-LWR selected transients

The Integral Inherently Safe (I 2 S-LWR) reactor was designed to improve the safety performance of PWR types reactors, and several design basis accidents were eliminated using innovative approaches to the I 2 S-LWR plant layout. However, some accidents such as station blackout (SBO), main steam line break (MSLB) type accident – the secondary hot leg break (SHLB) – were deemed statistically relevant, and the work performed here was to simulate these events using the system thermal–hydraulics code RELAP5 coupled to the 3D spatial kinetics code PARCS. The safety response of the reactor to a station blackout is predicted to be acceptable at both beginning of cycle (BOC) and end of cycle EOC core conditions with either the UO 2 or U 3 Si 2 fuel options considered here. In the analysis of the SHLB performed here, an unprotected (no SCRAM) condition was assumed to highlight the I 2 S-LWR capabilities. Results indicate that with the UO 2 core, the fuel temperatures rise notably, but no fuel melting was predicted and departure from nucleate boiling ratio (DNBR) limits were not exceeded. Similarly, the U 3 Si 2 fuel performed well, but with lower fuel temperatures and decreased DNBR. Following the break of the steam line in the I 2 S-LWR, shutdown is achieved after about two minutes via negative reactivity from loss of primary flow. In all cases considered, the I 2 S-LWR appears to accomplish the goals of increased safety performance. Further design improvements and other fuel options may marginally improve on the observed safety performance. Additionally, higher fidelity analysis with the next generation subchannel, Computational Fluid Dynamics (CFD), or full core transport may be useful in refining the prediction of the peak fuel and cladding temperatures, as well limiting DNBR during the accidents.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Phenomena identification and categorization by the required level of multiphysics coupling in FHR modeling and simulation

Here, this study identifies the phenomena that impact the accuracy of the multiphysics analysis of fluoride salt-cooled high temperature reactors (FHR) and categorizes the level of coupling needed to model these phenomena with sufficient accuracy in the context of three scenarios, namely, normal operation, station blackout, and simultaneous withdrawal of all control rods. Such a study is a necessary step prior to developing or extending existing multiphysics modeling and simulation tools. The identified multiphysics phenomena are categorized into the groups requiring ‘‘tight” and ‘‘loose” coupling. ‘‘Tight” coupling refers to phenomena that require iterative feedback between multiple physics modules/methods whereas ‘‘loose” coupling refers to phenomena that require only data from other physics that can be pre-calculated and shared in tabular or functional form. For the station blackout scenario, it was determined that no identified phenomena required tight coupling. For the rod withdrawal and normal operation scenarios, it is found that there is a large number of phenomena that require tight coupling between neutronics and thermal hydraulics.

42 ENGINEERING↗

Equation-based object-oriented modeling and simulation of data center cooling systems

In this paper, we introduce a newly developed open source data center package in the Modelica Buildings library to support modeling and simulation of cooling and control systems of data centers. The data center package contains major thermal and control component models, such as Computer Room Air Handler, Computer Room Air Conditioner, models of different subsystem configurations such as chillers with differently configured waterside economizers, as well as templates for different systems. Two case studies based on this package are performed to investigate the performances of the cooling and electrical system under normal conditions and emergency situations such as a blackout: one is for a data center powered by conventional energy, and the other is for a data center powered by renewable energy. Simulation results show that the dynamic modeling and multi-domain simulation in the Modelica-based tool make it convenient for users to investigate both normal and emergent operations for conventional and renewable data centers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Resilience assessment and planning in power distribution systems: Past and future considerations

High impact low probability (HILP) events such as hurricanes, heat waves, and floods have instigated widespread power outages and blackouts around the globe in the past decade. With the increasing challenges concerning the threats to the power distribution systems and the growing need to mitigate the impacts of the HILP events, resilience has become a crucial requirement for the power grid infrastructures. Numerous efforts have been made to define, measure, and characterize the resilience of power distribution systems. This study thoroughly reviews the state-of-the-art methods on the existing resilience evaluation framework and metrics. Here, the desirable characteristics of resilience metrics are highlighted, and the challenges associated with formulating, developing, and calculating such metrics are discussed. Next, we detail the state-of-the-art literature on planning solutions to ensure distribution system resilience. This paper aims to extract a deep insight into this challenging and critical research area and envision future opportunities that can guide the power distribution system operators/planners to formulate more effective mitigation strategies to enhance the resilience of power distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying Distribution System Resilience From Utility Data: Large Event Risk and Benefits of Investments

We focus on blackouts in electric distribution systems that have a large cost to customers. To quantify resilience to these events, we show how to calculate risk metrics from the historical outage data routinely collected by utilities' outage management systems. Risk is defined using a customer cost exceedance curve. The exceedance curve has a heavy tail that implies large fluctuations in large blackout costs, and this makes estimating the mean large cost in the usual way impractical. To avoid this problem, we use new resilience metrics describing the large event risk; these metrics are the probability of a large cost event, the annual log cost resilience index, and the average of the logarithm of the cost of large-cost events or the slope magnitude of the tail on a log–log exceedance curve. Resilience can be improved by planned investments to upgrade system components or speed up restoration. The benefits that these investments would have had if they had been made in the past can be quantified by “rerunning history” with the effects of the investment included, and then recalculating the large event risk to find the improvement in resilience. An example using utility data shows a 2% reduction in the probability of a large cost event due to 10% wind hardening and 6%–7% reduction due to 10% faster restoration in two different areas of a distribution utility. This new data-driven approach to quantify resilience and resilience investments is realistic and much easier to apply than complicated approaches based on modeling all the phases of resilience. Moreover, an appeal to improvements to past lived experience may well be persuasive to customers and regulators in making the case for resilience investments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An insurance perspective on U.S. electric grid disruption costs

Large yet infrequent disruptions of electrical power can impact tens of millions of people in a single event, triggering significant economic damages, portions of which are insured. Small and frequent events are also significant in the aggregate. This article explores the role that insurance claims data can play in better defining the broader economic impacts of grid disruptions in the U.S. context. We developed four case studies, using previously unpublished data for specific actual grid disruptions. The cases include the 1977 New York City blackout, the 2003 Northeast blackout, multi-year national annual lightning-related electrical damage and multi-year national line-disturbance events. Insured losses represent between 3 and 64 per cent of total loss costs across the case studies. Here, the household sector emerges as a larger locus of costs than indicated in previous studies, and short-lived events emerge as important sources of loss costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optical noise in a free-space quantum communications link from natural and nuclear disturbed environments*

Satellite communications at radio frequencies can experience a ‘blackout’ period following the atmospheric detonation of a nuclear weapon. The wavelengths used for free-space quantum communications will not incur the same ‘blackout’ effects from a nuclear detonation, but the optical systems will suffer from a phenomenon called redout. Redout occurs in an optical detector when ambient light scatters into the optical receiver, causing elevated background photon counts in the detector such that background noise overwhelms the signal. In this work, the duration of the redout effect is quantified from a nuclear disturbed environment on a ground-to-space quantum optical link. In addition, we comment on various techniques for reducing ambient and nuclear disturbed background counts in a quantum free-space optical link. For low-altitude nuclear detonations (i.e., under 50 km), the maximum interference time will be less than 1 min. Implementing a telescope, timing gate, and wavelength filter to the detector can reduce the background counts in the detector significantly. Aerosol levels and ground albedo are major contributors to background noise in a ground-to-satellite quantum channel, and ground station location should factor in both variables.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Modernizing Distribution System Restoration to Achieve Grid Resiliency Against Extreme Weather Events: An Integrated Solution

Recent severe power outages caused by extreme weather hazards have highlighted the importance and urgency of improving the resilience of the electric power grid. As the distribution grids still remain vulnerable to natural disasters, the power industry has focused on methods of restoring distribution systems after disasters in an effective and quick manner. The current distribution system restoration practice for utilities is mainly based on predetermined priorities and tends to be inefficient and suboptimal, and the lack of situational awareness after the hazard significantly delays the restoration process. As a result, customers may experience an extended blackout, which causes large economic loss. On the other hand, the emerging advanced devices and technologies enabled through grid modernization efforts have the potential to improve the distribution system restoration strategy. However, utilizing these resources to aid the utilities in better distribution system restoration decision-making in response to extreme weather events is a challenging task. Therefore, this paper proposes an integrated solution: a distribution system restoration decision support tool designed by leveraging resources developed for grid modernization. We first review the current distribution restoration practice and discuss why it is inadequate in response to extreme weather events. Then we describe how the grid modernization efforts could benefit distribution system restoration, and we propose an integrated solution in the form of a decision support tool to achieve the goal. The advantages of the solution include improving situational awareness of the system damage status and facilitating survivability for customers. The paper provides a comprehensive review of how the existing methodologies in the literature could be leveraged to achieve the key advantages. The benefits of the developed system restoration decision support tool include the optimal and efficient allocation of repair crews and resources, the expediting of the restoration process, and the reduction of outage durations for customers, in response to severe blackouts due to extreme weather hazards.

Automated feeder switch↗

Efficient Modeling of HIL Multi-Grid System for Scalability & Concurrency in CPS Security Testbed

Cyber-event-triggered power grid blackout compels utility operators to intensify cyber-aware and physics-constrained recovery and restoration process. Recently, coordinated cyber attacks on the Ukrainian grid witnessed such a cyber-event-triggered power system blackout. Various cyber-physical system (CPS) testbeds have attempted with multitude designs to analyze such interdependent events and evaluate remedy measures. However, resource constraints and modular integration designs have been significant barriers while modeling large-scale grid models (scalability) and multi-grid isolated models (concurrency) under a single real-time execution environment for the hardware-in-the-loop (HIL) CPS security testbeds. This paper proposes a meticulous design and effective modeling for simulating large-scale grid models and multi-grid isolated models in a HIL realtime digital simulator environment integrated with industry-grade hardware and software systems. We have used our existing HIL CPS security testbed to demonstrate scalability by the realtime performance of a Texas-2000 bus US synthetic grid model and concurrency by the real-time performance of simultaneous ten IEEE-39 bus grid models and an IEEE-118 bus grid model. The experiments demonstrated significant results by 100% realtime performance with zero overruns, low latency while receiving and executing control signals from SEL Relays via IEC-61850 protocol and low latency while computing and transmitting grid data streams including stability measures via IEEE C37.118 synchrophasor data protocol to SEL Phasor Data Concentrators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transactive Emergency Power Allocation

The devastating impacts of extreme weather events, many of which are climate-change related, are increasingly evident through the frequency and duration of outages on power grids, especially the distribution systems. One of the major modern-day concerns of utilities is dealing with such extreme supply outages where operators have used rolling blackouts as a contingency plan balance supply and demand while serving critical loads. Such events have significant repercussions social and economic costs. Such blackouts practices are a blunt instrument, depriving customers with low-capacity high-priority loads (i.e. refrigeration, water, telecommunication, etc.) that provide high marginal amenity. Our contribution presented in this work is a transactive emergency allocation mechanism that would provide some minimum level of service to all of the customers while enabling preference-based trading of this initial allocation. This is in contrast to the state-of-art TE mechanisms that allocate resources to customers solely based on their willingness-to-pay. The effectiveness of the proposed mechanism is demonstrated through simulation-based evaluation on a prototypical distribution system experiencing 12-hour scarcity-based emergency event due to extreme operating conditions. Simulation results clearly demonstrate the capability of the proposed transactive emergency allocation mechanism in effectively utilizing the available energy and providing some level of service to all customers to operate their high-priority loads throughout the extreme scarcity event while being economically efficient in allowing trading of allocation based on customer preferences.

transactive energy, power system economics, emerge↗

Blackstart Capability and Survivability of Wind Turbines with Fully Rated Converters

We report the blackstart capability of wind turbines is critical for the recovery of wind-dominant power systems from blackouts. If wind power plants are not able to restore a power system, the incorporation of wind resources into electric grids could be limited by blackstart capability. This paper tackles this problem by setting forth a grid-forming controller for Type 4 wind turbines which employ fully rated power converters. To this end, we engineer two-axis anti-windup proportional-integral regulators that serve to ride through restoration disturbances. We also design an active protection system to prevent wind turbines from stalling during recovery from blackouts. We demonstrate in a high-fidelity simulation environment that Type 4 wind turbines with the developed controllers and protection subsystem can: (i) re-energize a notional wind-dominant grid; (ii) ride through asymmetrical faults; and (iii) survive low wind speed events.

17 WIND ENERGY↗

Transactive Energy Rationing in Islanded Electric Power Systems

Extreme weather events, many of which are climate change related, are occurring with increasing frequency and intensity and causing catastrophic outages. One of the major modern-day concerns of utilities is dealing with such extreme outages and consequently, its repercussions on the lives of people in society and social aspects. Traditionally, operators have been using rolling blackouts as a contingency plan to serve critical loads during such events when electricity supply is scarce. However, such blackouts practices are executed on a last-minute mandatory basis, depriving customers having low-capacity high priority loads (i.e. refrigeration, water, telecommunication, etc) that should also be serviced if at all possible. Historically, policymakers have often adopted quota-based regulatory actions or rationing for other commodities (such as gasoline, butter, sugar) to handle scarcity situations. Motivated from such quota based systems, our contribution presented in this work is an alternative transactive rationing mechanism that would provide some minimum level of service to all of the customers and serve the critical loads using market-based control during such scarcity-based contingencies. This is in contrast to the state-of-art TE mechanisms that allocate resources to customers solely based on their willingness-to-pay. The effectiveness of the proposed mechanism is demonstrated through simulation-based evaluation on two real-life use cases having feeder-level and microgrid-level configurations respectively. The simulation results clearly demonstrate the capability of the rationing scheme to serve customers’ high-priority loads through prolonged outages even during extreme scarcity scenarios.

42 ENGINEERING↗

Severe Accident Scoping Simulations of Accident Tolerant Fuel Concepts for BWRs

Accident-tolerant fuels (ATFs) are fuels and/or cladding that, in comparison with the standard uranium dioxide Zircaloy system, can tolerate loss of active cooling in the core for a considerably longer time period while maintaining or improving the fuel performance during normal operations. It is important to note that the currently used uranium dioxide Zircaloy fuel system tolerates design basis accidents (and anticipated operational occurrences and normal operation) as prescribed by the US Nuclear Regulatory Commission. Previously, preliminary simulations of the plant response have been performed under a range of accident scenarios using various ATF cladding concepts and fully ceramic microencapsulated fuel. Design basis loss of coolant accidents (LOCAs) and station blackout (SBO) severe accidents were analyzed at Oak Ridge National Laboratory (ORNL) for boiling water reactors (BWRs). Researchers have investigated the effects of thermal conductivity on design basis accidents, investigated silicon carbide (SiC) cladding, as well as the effects of ATF concepts on the late stage accident progression. These preliminary analyses were performed to provide initial insight into the possible improvements that ATF concepts could provide and to identify issues with respect to modeling ATF concepts. More recently, preliminary analyses for a range of ATF concepts have been evaluated internationally for LOCA and severe accident scenarios for the Chinese CPR1000 and the South Korean OPR-1000 pressurized water reactors (PWRs). In addition to these scoping studies, a common methodology and set of performance metrics were developed to compare and support prioritizing ATF concepts. A proposed ATF concept is based on iron-chromium-aluminum alloys (FeCrAl). With respect to enhancing accident tolerance, FeCrAl alloys have substantially slower oxidation kinetics compared to the zirconium alloys typically employed. During a severe accident, FeCrAl would tend to generate heat and hydrogen from oxidation at a slower rate compared to the zirconium-based alloys in use today. The previous study, [2], of the FeCrAl ATF concept during station blackout (SBO) severe accident scenarios in BWRs was based on simulating short term SBO (STSBO), long term SBO (LTSBO), and modified SBO scenarios occurring in a BWR-4 reactor with MARK-I containment. The analysis indicated that FeCrAl had the potential to delay the onset of fuel failure by a few hours depending on the scenario, and it could delay lower head failure by several hours. The analysis demonstrated reduced in-vessel hydrogen production. However, the work was preliminary and was based on limited knowledge of material properties for FeCrAl. Limitations of the MELCOR code were identified for direct use in modeling ATF concepts. This effort used an older version of MELCOR (1.8.5). Since these analyses, the BWR model has been updated for use in MELCOR 1.8.6, and more representative material properties for FeCrAl have been modeled. Sections 2 4 present updated analyses for the FeCrAl ATF concept response during severe accidents in a BWR. The purpose of the study is to estimate the potential gains afforded by the FeCrAl ATF concept during BWR SBO scenarios.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Core Physics and Safety Analyses Supporting the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a proposed integrated facility for investigations into the behavior of fuels and materials subjected to high, fast neutron fluxes prototypical of fast reactor environments. Detailed design of the reactor is currently being performed by a group of U.S. National Laboratories, including Argonne National Laboratory. The current design of the reactor is a 300 MW sodium-cooled pool-type fast reactor fueled with ternary U-20Pu-10Zr metallic fuel. This report documents reactor core physics and preliminary safety analyses that have been performed. The reference VTR core has 313 assembly positions, 66 of which contain fuel assemblies. The remaining assembly positions are loaded with reflector, shield, control rod duct, and test assemblies. Ten positions are available in the reference design for experimental or test assemblies, however the VTR will support test assemblies in any position in the core for alternate core loadings. The performance of the reference VTR core has been assessed for an assumed equilibrium cycle. The core power distribution and reactivity feedback coefficients have been calculated. Preliminary assessments of the reactivity coefficients have shown that each of them results in a negative reactivity change for increasing temperatures. Safety analysis of a VTR layout has been performed using the SAS4A/SASSYS-1 fast reactor safety analysis code. A model has been developed to represent the current core design and a reference heat transport system design. The model has been used to simulate and perform analysis of protected and unprotected loss of heat sink, station blackout, and transient overpower accident scenarios. These scenarios represent the three main ways to perturb the reactor core, through changes to the core inlet temperature, mass flow rate, or reactivity insertions and are credible bounding scenarios for the evaluated transient categories. The results of these simulations have been assessed against simplified criteria for Anticipated Operational Occurrences for the protected transients and for Beyond Design Basis Events for the unprotected transients. Because the primary heat transport system is able to transition quickly and effectively to natural circulation and because the shutdown heat removal system provides sufficient heat rejection capability, large margins for all criteria were predicted for all protected transients. Large margins were also predicted for the unprotected loss of heat sink and station blackout transients due to the strong negative reactivity feedbacks generated by the core. Because of the high power density in the reactor, smaller fuel melting margins are predicted for the unprotected transient overpower accident.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Winter Storm Elliott: Energy Emergency Alert Lessons Learned

Power blackouts in the United States in 2022 highlighted the need for better communication and planning among power grid stakeholders. This need was further demonstrated at a 2021 workshop held by the Grid Reliability Initiative Utilizing Data Standardization (GRIDS) Project. The GRIDS Project was established to understand and address the gaps in communication between the transmission and distribution operators. With the ongoing energy transition including electrification, distributed energy resource penetration, and so on, this project aims for improved energy emergency communications at the transmission-distribution interface. In 2022, Winter Storm Elliott affected 60% of the United States population (Weather Underground 2022), resulting in rolling blackouts in many areas of the eastern United States (Knoxville Utilities Board [KUB] 2023). Information presented here is based on the GRIDS workshop findings and subsequent research and interviews with stakeholders. After a brief summary of the effects of Winter Storm Elliott, this report covers the standard energy emergency communications processes currently in use, how the storm affected power management operations for the Tennessee Valley Authority (TVA) and its local utility companies, and related experiences in other states. The report concludes with lessons learned and recommendations for improvements and a path forward.

24 POWER TRANSMISSION AND DISTRIBUTION↗