Search NASA⌕ Search

SEARCH · Search NASA

Results for “Baseline estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

An a priori model for the reduction of nutation observations: KSV(1994.3) nutation series

We discuss the formulation of a new nutation series to be used in the reduction of modern space geodetic data. The motivation for developing such a series is to develop a nutation series that has smaller short period errors than the IAU 1980 nutation series and to provide a series that can be used with techniques such as the Global Positioning System (GPS) that have sensitivity to nutations but can directly separate the effects of nutations from errors in the dynamical force models that effect the satellite orbits. A modern nutation series should allow the errors in the force models for GPS to be better understood. The series is constructed by convolving the Kinoshita and Souchay rigid Earth nutation series with an Earth response function whose parameters are partly based on geophysical models of the Earth and partly estimated from a long series (1979-1993) of very long baseline interferometry (VLBI) estimates of nutation angles. Secular rates of change of the nutation angles to represent corrections to the precession constant and a secular change of the obliquity of the ecliptic are included in the theory. Time dependent amplitudes of the Free Core Nutation (FCN) that is most likely excited by variations in atmospheric pressure are included when the geophysical parameters are estimated. The complex components of the prograde annual nutation are estimated simultaneously with the geophysical parameters because of the large contribution to the nutation from the S(sub 1) atmospheric tide. The weighted root mean square (WRMS) scatter of the nutation angle estimates about this new model are 0.32 mas and the largest correction to the series when the amplitudes of the ten largest nutations are estimated is 0.18 +/- 0.03 mas for the in phase component of the prograde 18. 6 year nutation.

Herring, T. A.↗

Metrology system for Space Interferometry Mission system testbed 3

In a 3-baseline interferometer fourteen metrology gauges are used to monitor changes in the two baselines and calculate the length of the third. Simulation for estimating the third baseline indicates measurement capability of better than 1 nm error.

interferometry↗

Spacelab baseline ECS trace contaminant removal test program

An estimate of the Spacelab Baseline Environmental Control System's contaminated removal capability was required to allow determination of the need for a supplemental trace contaminant removal system. Results from a test program to determine this removal capability are presented.

Ray, C. D.↗

Baseline Vector Repeatability at the Sub-Millimeter Level Enabled by Radio Interferometer Phase Delays of Intra-Site Baselines

We report the results of position ties for short baselines at eight geodetic sites based on phase delays that are extracted from global geodetic very-long-baseline interferometry (VLBI) observations rather than dedicated short-baseline experiments. An analysis of phase delay observables at X band from two antennas at the Geodetic Observatory Wettzell, Germany, extracted from 107 global 24-hr VLBI sessions since 2019 yields weighted root-mean-square scatters about the mean baseline vector of 0.3, 0.3, and 0.8 mm in the east, north, and up directions, respectively. Position ties are also obtained for other short baselines between legacy antennas and nearby, newly built antennas. They are critical for maintaining a consistent continuation of the realization of the terrestrial reference frame, especially when including the new VGOS network. The phase delays of the baseline WETTZ13N–WETTZELL enable an investigation of sources of error at the sub-millimeter level. We found that a systematic variation of larger than 1 mm can be introduced to the Up estimates of this baseline vector when atmospheric delays were estimated. Although the sub-millimeter repeatability has been achieved for the baseline vector WETTZ13N–WETTZELL, we conclude that long term monitoring should be conducted for more short baselines to assess the instrumental effects, in particular the systematic differences between phase delays and group delays, and to find common solutions for reducing them. This will be an important step toward the goal of global geodesy at the 1 mm level.

geodetic VLBI↗

Solar central electric power generation - A baseline design

The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.

Powell, J. C.↗

Ground-based measurements of water vapor in the middle atmosphere

We present measurements of the middle atmospheric water vapor mixing ratio profile obtained using the ground-based Naval Research Laboratory (NRL) water vapor millimeter-wave spectrometer (WVMS) instrument at the Jet Propulsion Laboratory (JPL) Table Mountain Observatory. The measurements cover a period of 262 days from January 23, 1992, to October 13, 1992. During this campaign it was possible to retrieve useful daily mixing ratio profiles for 186 days. We thus have a nearly continuous record of water vapor mixing ratios for altitudes from approximately equals 35 to 75 km. The retrievals are obtained using the optimal estimation method. Details of the error analysis are presented, and a technique is introduced that reduces baseline effects and helps to estimate the baseline error. The high-altitude (greater than or approx. equal to 65 km) data show a sharp rise prior to the expected maximum near the summer solstice and a gradual decline in the following months. The mixing ratios generally peak between 55 and 65 km, at which point the mixing ratios are 6 - 7 parts per million by volume. The highest peaks occur in January, May, and October.

Nedoluha, Gerald E.↗

Preliminary study of VTO thrust requirements for a V/STOL aircraft with lift plus lift/cruise propulsion

A preliminary assessment was made of the VTO thrust requirements for a supersonic (Type B) aircraft with a Lift plus Lift/Cruise propulsion system. A baseline aircraft with a takeoff gross weight (TOGW) of 13 608 kg (30,000 lb) was assumed. Pitch, roll, and yaw control thrusts (i.e., the thrusts needed for aircraft attitude control in the flight hover mode) were estimated based on a specified set of maneuver acceleration requirements for V/STOL aircraft. Other effects (such as installation losses, suckdown, reingestion, etc.), which add to the thrust requirements for VTO were also estimated. For the baseline aircraft, the excess thrust required for attitude control of the aircraft during VTO and flight hover was estimated to range from 36.9 to 50.9 percent of the TOGW. It was concluded that the total thrust requirements for the aircraft/propulsion system are large and significant. In order to achieve the performance expected of this aircraft/propulsion system, reductions must be made in the excess thrust requirements.

Turney, G. E.↗

Very long baseline IPS observations of the solar wind speed in the fast polar streams

Observations of intensity scintillation (IPS) with two or more spaced antennas have been widely used to measure the solar wind velocity. Such methods are particularly valuable in regions which spacecraft have not yet penetrated, but they are also very useful in improving the spatial temporal sampling of the solar wind, even in regions where spacecraft data are available. The principle of the measurement is to measure the time delay tau(sub d) between the scintillations observed with an antenna baseline b. The velocity estimate is just V = b/tau(sub d). The error in estimation of the time delay delta tau(sub d) is independent of the baseline length, thus the error in the velocity estimate delta V given by delta(V)/V approximately equals to (delta tau(sub d))/tau(sub d) is inversely proportional to tau(sub d) and hence to b. However the use of a long baseline b has a less obvious advantage; it provides a means for separating fast and slow contributions when both are present in the scattering region. Here we will present recent observations made using the large cylinder antenna at Ooty in the Nilgiri Hills of South India, and one of the 45 m dishes of GMRT near Pune in West-Central India. The baseline of 900 km is, by a considerable margin, the longest ever used for IPS and provides excellent velocity resolution. These results compared with the ULYSSES observations and other IPS measurements made closer to the sun with higher frequency instruments such as EISCAT and the VLBA will provide a precise measure of the velocity profile of the fast north-polar stream.

Rao, A. Pramesh↗

An assessment of the benefits of the use of NASA developed fuel conservative technology in the US commercial aircraft fleet

Cost and benefits of a fuel conservative aircraft technology program proposed by NASA are estimated. NASA defined six separate technology elements for the proposed program: (a) engine component improvement (b) composite structures (c) turboprops (d) laminar flow control (e) fuel conservative engine and (f) fuel conservative transport. There were two levels postulated: The baseline program was estimated to cost $490 million over 10 years with peak funding in 1980. The level two program was estimated to cost an additional $180 million also over 10 years. Discussions with NASA and with representatives of the major commercial airframe manufacturers were held to estimate the combinations of the technology elements most likely to be implemented, the potential fuel savings from each combination, and reasonable dates for incorporation of these new aircraft into the fleet.

Source record↗

Developing New Beam Constraints to Improve Sterile Neutrino Searches at NOvA

NOvA is a long-baseline neutrino oscillation experiment utilizing two functionally identical liquid scintillator detectors located 14 mrad off-axis from the NuMI beam at Fermilab. The position of the Near Detector (ND), 1 km from the neutrino production target, means it sees a range of off-axis angles (12.6-17.2 mrad), resulting in a noticeable energy gradient across the detector face. In addition, the neutrino production points vary widely along the decay pipe, which leads to a distribution of true neutrino baselines (L), and limits the sensitivity of our current sterile neutrino searches. This work presents a new "baseline reconstruction" technique designed to exploit our off-axis position to triangulate the precise origin of neutrinos within the NuMI beamline. By projecting the total momentum vector of Charged Current (CC) and Neutral Current (NC) interactions back to the central beam axis, we estimate the individual baseline for each event. We describe the technique, evaluate its performance, and demonstrate how this can improve the sensitivity of future searches for sterile neutrinos through reduced flux systematic uncertainties and improved L/E resolution.

Burns, Jessica [Cincinnati U.]↗

GPS Attitude Determination Using Deployable-Mounted Antennas

The primary objective of this investigation is to develop a method to solve for spacecraft attitude in the presence of potential incomplete antenna deployment. Most research on the use of the Global Positioning System (GPS) in attitude determination has assumed that the antenna baselines are known to less than 5 centimeters, or one quarter of the GPS signal wavelength. However, if the GPS antennas are mounted on a deployable fixture such as a solar panel, the actual antenna positions will not necessarily be within 5 cm of nominal. Incomplete antenna deployment could cause the baselines to be grossly in error, perhaps by as much as a meter. Overcoming this large uncertainty in order to accurately determine attitude is the focus of this study. To this end, a two-step solution method is proposed. The first step uses a least-squares estimate of the baselines to geometrically calculate the deployment angle errors of the solar panels. For the spacecraft under investigation, the first step determines the baselines to 3-4 cm with 4-8 minutes of data. A Kalman filter is then used to complete the attitude determination process, resulting in typical attitude errors of 0.50.

Osborne, Michael L.↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

A demonstration of centimeter-level monitoring of polar motion with the Global Positioning System

Daily estimates of the Earth's pole position were obtained with the Global Positioning System (GPS) by using measurements obtained during the GPS IERS (International Earth Rotation Service) and Geodynamics (GIG'91) experiment from 22 Jan. to 13 Feb. 1991. Data from a globally distributed network consisting of 21 Rogue GPS receivers were chosen for the analysis. A comparison of the GPS polar motion series with nine 24-hour very long baseline interferometry (VLBI) estimates yielded agreement in the day-to-day pole position of about 1.5 cm for both X and Y polar motion. A similar comparison of GPS and satellite laser ranging (SLR) data showed agreement to about 1.0 cm. These preliminary results indicate that polar motion can be determined by GPS independent of, and at a level comparable to, that which is obtained from either VLBI or SLR. Furthermore, GPS can provide these data with a daily frequency that neither alternative technique can readily achieve. Thus, GPS promises to be a powerful tool for determining high-frequency platform parameter variation, essential for the ultraprecise spacecraft-tracking requirements of the coming years.

Lindqwister, U. J.↗

Solar array subsystems study

The effects on life cycle costs of a number of technology areas are examined for a LEO, 500 kW solar array. A baseline system conceptual design is developed and the life cycle costs estimated in detail. The baseline system requirements and design technologies are then varied and their relationships to life cycle costs quantified. For example, the thermal characteristics of the baseline design are determined by the array materials and masses. The thermal characteristics in turn determine configuration, performance and hence life cycle cost.

Richardson, P. W.↗

Design, performance and life cycle cost relationships for a 500kW space solar array

The effects on life cycle costs of a number of technology areas are examined for a LEO, 500kW space solar array. A baseline system conceptual design is developed and the life cycle costs estimated in detail. The baseline system requirements and design technologies are then varied and their relationships to life cycle costs quantified. For example, the thermal characteristics of the baseline design are determined by the array materials and masses. The thermal characteristics in turn determine configuration, performance and hence life cycle cost.

Richardson, P. W.↗

Gallium arsenide solar array subsystem study

The effects on life cycle costs of a number of technology areas are examined for a gallium arsenide space solar array. Four specific configurations were addressed: (1) a 250 KWe LEO mission - planer array; (2) a 250 KWe LEO mission - with concentration; (3) a 50 KWe GEO mission planer array; (4) a 50 KWe GEO mission - with concentration. For each configuration, a baseline system conceptual design was developed and the life cycle costs estimated in detail. The baseline system requirements and design technologies were then varied and their relationships to life cycle costs quantified. For example, the thermal characteristics of the baseline design are determined by the array materials and masses. The thermal characteristics in turn determine configuration, performance, and hence life cycle costs.

Miller, F. Q.↗

A Kinetic Model-Driven Techno-Economic Analysis of Plastic Pyrolysis: Linking Process Dynamics to Economic Viability

This study employs a kinetic model integrated into Aspen Plus to predict pyrolysis product distribution under various conditions. A techno-economic assessment calculated the minimum selling price (MSP) of pyrolysis oil under different operating conditions for the baseline capacity of 100 kta, and across eight processing capacities ranging from 30 to 150 kta. The lowest MSP under the baseline capacity is estimated at $\$$420/ton, which is 33% lower than the 2023 average US crude oil price ($\$$74.6/bbl, equivalent to $\$$634/ton based on the density of pyrolysis oil). Under Monte Carlo simulation, accounting for variability in key economic and technical parameters, the mean MSP is estimated at $\$$1137/ton. The economic viability depends on feedstock price remaining below $\$$320/ton, defining the break-even feedstock price threshold. Sensitivity analysis further identifies capital investment and transportation cost as key economic drivers. Capacities beyond 90 kta show limited economies of scale benefits. Reducing product storage time cuts capital costs by 7% but raises operational risk. Uncertainty analysis suggests the economic feasibility of pyrolysis oil is unlikely to compete with crude oil without policy incentives.

petrochemicals↗