Search NASA⌕ Search

SEARCH · Search NASA

Results for “Booster”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Beam Based RF Voltage Measurements and Longitudinal Beam Tomography at the Fermilab Booster

Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two decades. Therefore, understanding the Booster in great detail is important as we continue to improve its performance. For example, it is important to know accurately the available RF power in the Booster by carrying out beam-based measurements in order to specify the needed upgrades to the Booster RF system. Since the Booster magnetic field is changing continuously measuring/calibrating the RF voltage is not a trivial task. Here, we present a beam based method for the RF voltage measurements. Data analysis is carried out using computer programs developed in Python and MATLAB. The method presented here is applicable to any RCS which do not have flat-bottom and flat-top in the acceleration magnetic ramps. We have also carried out longitudinal beam tomography at injection and extraction energies with the data used for RF voltage measurements. Beam based RF voltage measurements and beam tomography were never done before for the Fermilab Booster. The results from these investigations will be very useful in future intensity upgrades.

43 PARTICLE ACCELERATORS↗

Design study of the CEPC booster

Design study of the CEPC booster is reported. The booster provides 120 GeV beams for the collider with topup injection frequency of 0.1 Hz. To save cost, energy of the linac injector for the booster is chosen as 6GeV, corresponding to the magnetic field of 30 Gs. In this paper, lattice of the booster is described; the low injection energy issues are studied; beam transfer from linac to booster and from booster to collider are discussed.

43 PARTICLE ACCELERATORS↗

The liquid rocket booster and its potential for the STS

Results of the liquid rocket booster study initiated by NASA to define an alternative to solid rocket boosters, are presented. The prime study contractors, Martin Marietta Corporation and General Dynamics, have identified liquid rocket booster configurations that can increase shuttle performance to 70 klb. These boosters will provide improved reliability, hold down, verification prior to vehicle release, engine-out and abort capabilities. Phasing of these boosters into Space Transportation System (STS) operations without adversely affecting flight rate is described.

Space Shuttle↗

Informing the Space Launch System Booster Separation Initial CFD Run Matrix with Observed Parametric Sensitivity

It currently requires significant computational cost to simulate the flow physics of the booster separation event on the Space Launch System. This comes from the large parametric space in which the event occurs, as pre-separation flight conditions and separated booster core-relative trajectories can vary. Functionally removing the risk of core-booster collision mandates careful assessment of the fluid dynamics in terms of several trajectory parameters. However, simulating the entire trajectory envelope is computationally intractable given the high parametric dimension. In order to reduce the uncertainty in the resulting low-parametric-resolution aerodynamic booster separation database, a data-driven approach was developed to select which breakpoints should be studied by simulations and experiments and which should be relegated to a regression-based interpolation procedure. This technique works by simulating cases where the flow physics are most sensitive to changes in the parameters and leaving the less parametrically sensitive regions for interpolation. The result is a booster separation run matrix whose computational cost is comparable to that of previous database generations but has lower interpolation errors.

SLS↗

Informing the Space Launch System Booster Separation Initial CFD Run Matrix with Observed Parametric Sensitivity

It currently requires significant computational cost to simulate the flow physics of the booster separation event on the Space Launch System. This comes from the large parametric space in which the event occurs, as pre-separation flight conditions and separated booster core-relative trajectories can vary. Functionally removing the risk of core-booster collision mandates careful assessment of the fluid dynamics in terms of several trajectory parameters. However, simulating the entire trajectory envelope is computationally intractable given the high parametric dimension. In order to reduce the uncertainty in the resulting low-parametric-resolution aerodynamic booster separation database, a data-driven approach was developed to select which breakpoints should be studied by simulations and experiments and which should be relegated to a regression-based interpolation procedure. This technique works by simulating cases where the flow physics are most sensitive to changes in the parameters and leaving the less parametrically sensitive regions for interpolation. The result is a booster separation run matrix whose computational cost is comparable to that of previous database generations but has lower interpolation errors.

SLS↗

Superconducting racetrack booster for the ion complex of MEIC

The current design of the Medium-energy Electron-Ion Collider (MEIC) project at Jefferson lab features a single 8 GeV/c figure-8 booster based on super-ferric magnets. Reducing the circumference of the booster by switching to a racetrack design may improve its performance by limiting the space charge effect and lower its cost. We consider problems of preserving proton and deuteron polarizations in a superconducting racetrack booster. We show that using magnets based on hollow high-current NbTi composite superconducting cable similar to those designed at JINR for the Nuclotron guarantees preservation of the ion polarization in a racetrack booster up to 8 GeV/c. The booster operation cycle would be a few seconds that would improve the operating efficiency of the MEIC ion complex.

Filatov, Yu↗

Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System (Final Paper)

SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervals-where the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

43 PARTICLE ACCELERATORS↗

Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System - Oral Presentation [Slides]

SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervals-where the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

43 PARTICLE ACCELERATORS↗

Physics Studies for High Intensity Proton Beams at the Fermilab Booster

We present the results of the studies of the physics of high intensity proton seams at the 8 GeV Fermilab Booster RCS carried out in Spring 2019. The Booster studies span a variety of beam physics topics - The discovery of a new convective beam instability, an investigation of power-supply ripple in the Booster gradient dipoles, a characterization of space-charge induced emittance growth, optimization of adiabatic capture, a study of periodicity in the Booster, nonlinear chromaticity measurements, and transverse impedance measurements. The results will help prepare the Booster for the upcoming PIP-II intensity upgrades and inform next-generation RCS design.

43 PARTICLE ACCELERATORS↗

Longitudinal Phase Space Tomography for the Booster Synchrotron

Efforts in the study of the longitudinal behavior of charged particles in the Fermilab Booster can be catalyzed with an image of the two-dimensional phase space distribution. In the past, tomography has been extensively employed in the reconstruction of the phase space in accelerators such as the Recycler at Fermilab and the Proton Synchrotron Booster at CERN. However, such a capability had yet to realize for the Fermilab Booster synchrotron. In this work, the first successful tomographic phase space reconstruction of a low-energy Booster bunch is presented along with validation metrics. A numerical turn-by-turn model of the longitudinal particle dynamics in the Booster has been implemented, which utilizes a fast, map-based particle transport algorithm. Using a sinogram generated from the Wall Current Monitor, the iterative reconstruction algorithm recovers a discretized image of the original phase space distribution at variable resolution. The reconstruction result shows low root-mean-square error and a rapid convergence toward the solution, providing strong evidence of accuracy. Future and ongoing work includes modeling high-energy bunches above transition and using tomography to infer certain machine parameters such as synchronous phase, peak gap voltage, and synchronous energy in addition to the phase space distribution.

Ebeid, Safi [Unlisted]↗

Longitudinal Phase Space Tomography for the Booster Synchrotron (Abstract Only)

Efforts in the study of the longitudinal behavior of charged particles in the Fermilab Booster can be catalyzed with an image of the two-dimensional phase space distribution. In the past, tomography has been extensively employed in the reconstruction of the phase space in accelerators such as the Recycler at Fermilab and the Proton Synchrotron Booster at CERN. However, such a capability had yet to realize for the Fermilab Booster synchrotron. In this work, the first successful tomographic phase space reconstruction of a low-energy Booster bunch is presented along with validation metrics. A numerical turn-by-turn model of the longitudinal particle dynamics in the Booster has been implemented, which utilizes a fast, map-based particle transport algorithm. Using a sinogram generated from the Wall Current Monitor, the iterative reconstruction algorithm recovers a discretized image of the original phase space distribution at variable resolution. The reconstruction result shows low root-mean-square error and a rapid convergence toward the solution, providing strong evidence of accuracy. Future and ongoing work includes modeling high-energy bunches above transition and using tomography to infer certain machine parameters such as synchronous phase, peak gap voltage, and synchronous energy in addition to the phase space distribution.

Ebeid, Safi [Unlisted, US]↗

Multiturn injection of EBIS ions in booster

Ions from EBIS are injected into Booster after acceleration by an RFQ and a Linac. The velocity of the ions at Booster injection is c{beta} where c is the velocity of light and (1) {beta} = 0.0655. The kinetic energy is (2) W = mc{sup 2}({gamma}-1) where m is the ion mass and (3) {gamma} = (1-{beta}{sup 2}){sup -1/2}. Putting in numbers one gets a kinetic energy of approximately 2 MeV per nucleon for each ion. The revolution period at injection is 10.276 {micro}s. The ions in the EBIS trap are delivered in a beam pulse that ranges from 10 to 40 {micro}s in length. This amounts to 1 to 4 turns around the machine. The transverse emittance (un-normalized) of EBIS beams just prior to injection into Booster is 11{pi} mm milliradians in both planes. This is an order of magnitude larger than the nominal 1{pi} mm milliradians for Tandem beams. Injection proceeds by means of an electrostatic inflector in the C3 straight section and four programmable injection dipoles in the C1, C3, C7, and D1 straights. These devices have been in use for many years for the injection of ions from Tandem as described in [1] and [2]. The inflector brings the incoming beam to the edge of the Booster acceptance and the dipoles produce a closed orbit bump that initially places the closed orbit near the septum at the in ector exit. During injection the orbit bump must be collapsed at a rate that keeps the injected beam from hitting the septum while continuing to allow beam to be injected into the machine acceptance. The process is discussed in [2] and [3]. There it is assumed that the injected beam moves with the closed orbit as the bump collapses. In the present report this is shown to be a valid approximation if the bump collapses sufficiently slowly. It is also shown that by judiciously choosing the horizontal tune and the initial distance of the closed orbit from the septum one can inject up to 4 turns of EBIS beams without loss on the septum. The reason for wanting to inject over a period of 4 rather than fewer turns is that this allows the beam to be distributed over a larger area of the Booster acceptance, thereby reducing the space charge force on the beam particles.

43 PARTICLE ACCELERATORS↗

Determination of longitudinal and lateral directional aerodynamic characteristics of the B19B pressure-fed booster and the B19B booster/040A orbiter launch configuration

The 0.003366 scale models of the space shuttle pressure-fed booster and booster/orbiter configurations were tested in the MSFC 14-inch trisonic wind tunnel. The test was conducted as a static stability and control investigation over a Mach range of 0.60 to 5.00. The booster alone configuration was tested with various tail sizes, tail wedge angles, tail flaps, spoilers, and a body flare drag skirt. Two launch configurations were tested; one being the MSC orbiter location on the booster tank and the other being the North American Rockwell orbiter location. Orbiter buildup, longitudinal position, incidence angle, and booster tail on and off were the variables for launch configuration. Booster alone models were pitched over an angle of attack range of -4 to +14 and +20 to +60 deg at zero deg yaw angle and yawed over an angle of sideslip range of -10 to +10 deg at 52 deg angle of attack. Launch configuration models were yawed -10 to +10 deg at zero degrees angle of attack and yawed -10 to +10 deg at zero and -6 deg angle of attack. All models were rolled 45 deg during selected runs.

Mcginnis, R. F.↗

Booster recovery following premature space shuttle stage separation

Abort criteria necessary to satisfy space shuttle program requirements to include intact vehicle abort capability are discussed. Intact abort implies the ability of the booster and orbiter to separate and both continue flight to a safe landing, with a full payload aboard the orbiter. Obviously, the requirement to separate early along the ascent trajectory presupposes critical operational problems that are probably booster problems and may preclude booster recovery. On the other hand, some critical problems while mated can become manageable when separated and should result in full booster recovery. All critical orbiter problems fall into this category; since stage separation without orbiter thrust is a capability of some separation system concepts, booster stage recovery following separation is a requirement.

Hurley, M. J.↗

Space shuttle abort separation pressure investigation. Volume 1, Part A: Booster data at Mach 5

Pressure data obtained from a joint Langley Research Center (LaRC)/Marshall Space Flight Center (MSFC) Space Shuttle about stage separation wind tunnel test are presented. The .00556 scale models of the McDonnell-Douglas orbiter and booster configurations were tested in proximity in Tunnel A of the Von Karman Facility (VKF), Arnold Engineering Development Center (AEDC). Mach numbers were 5.0, 3.0, and 2.0 and nominal Reynolds numbers were 1.09, 1.60, and 1.74 million per foot, respectively. Pressure data were obtained for the booster upper surface and orbiter lower surface at angles of attack of -10 deg, -5, 0, 5, and 10 deg for zero degrees sideslip. The models were tested at incidence angles of 0 and 5 deg for several separation distances and power conditions. Plug nozzles utilizing air were used to simulate booster and orbiter plumes at various altitudes along a nominal ascent trajectory. Powered conditions were 100, 50, and 0 percent of full power for the orbiter and 100, 50 and 0 percent of full power for the booster. Data were also obtained with the booster canard off in close proximity.

Trimmer, L. L.↗

Hypersonic aerothermal characteristics of a manned low finenes ratio shuttle booster

An investigation of a winged booster model having canards and an ascent configuration comprised of the booster mounted in tandem with an orbiter model has been conducted at Mach 10.2 in the continuous flow hypersonic tunnel. Longitudinal and lateral directional force characteristics were obtained over angle of attack ranges of -12 deg to 60 deg for the booster and -11 deg to 11 deg for the ascent configuration. Interference heating effects on the booster using the phase-change coating technique were determined at 0 deg angle of attack. Some oil flow photographs of the isolated booster and orbiter and ascent configuration are also presented.

Bernot, P. T.↗

Space Shuttle system solid rocket booster.

Description of the mission and systems requirement of the solid rocket booster as it supports the Shuttle vehicle configuration. The solid booster is equipped with load skirts and linkages that can accommodate full mission loads, a solid propellant motor for delivering required performance, thrust vector control for augmentation of Shuttle vehicle ascent control, staging and separation systems, and electrical subsystems. To recover and reuse the solid booster case a recovery package is provided. The definition of these functional elements of the solid booster are discussed with the requirements placed on each element to satisfy the overall booster objective.

Thomason, H. E.↗

Space shuttle solid rocket booster processing and recovery operations at Kennedy Space Center

This paper describes the processing and recovery operations at Kennedy Space Center as applied to the Space Shuttle Solid Rocket Booster. The introductory portion covers the overall Space Shuttle launch vehicle with a description of the Solid Rocket Boosters and explanations of their functions. Processing operations begin with the arrival of the new or refurbished Solid Rocket Motor segments by rail cars from the manufacturer. Segment buildup is performed on the Mobile Launch Platform, and the completed major booster elements are functionally tested prior to their integration with other prime elements that comprise a complete Shuttle launch vehicle. The recovery operations following launch include Solid Rocket Booster separation, parachute deployment, splashdown, and the activities associated with retrieval of the reusable components of the Solid Rocket Boosters. Subsequently, the paper describes the processing required to thoroughly clean the retrieved items, the disassembly activities, and refurbishment steps planned for restoration of the hardware components to usable condition.

Dickinson, W. J.↗