Search NASASearch

SEARCH · Search NASA

Results for “Class D”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

LCROSS: A High Return, Small Satellite Mission

Early in 2006, the NASA Exploration Systems Mission Directorate (ESMD) held a competition for NASA Centers to propose innovative ideas for a secondary payload mission to launch with the Lunar Reconnaissance Orbiter (LRO) to the Moon. The successful proposal could cost no more than $80 million dollars (less was preferred), would have to be ready to launch with the LRO in 31 months, could weigh no more than 1000 kg (fuelled), and would be designated a risk-tolerant "Class D" mission. In effect, NASA was offering a fixed-price contract to the winning NASA team to stay within a cost and schedule cap by accepting an unusually elevated risk position. To address this Announcement of Opportunity to develop a cost-and-schedule-capped secondary payload mission to fly with LRO, NASA Ames Research Center (ARC) in Moffett Field, CA, USA embarked on a brainstorming effort termed "Blue Ice" in which a small team was asked to explore a number of mission scenarios that might have a good chance for success and still fit within the stated programmatic constraints. From this work, ARC developed and submitted six of the nineteen mission proposals received by ESMD from throughout the Agency, one of which was LCROSS - a collaborative effort between ARC and its industrial partner, Northrop-Grumman (NG) in Redondo Beach, CA, USA.

Andrews, Daniel R.

OPALS: A COTS-based Tech Demo of Optical Communications

I. Objective: Deliver video from ISS to optical ground terminal via an optical communications link. a) JPL Phaeton/Early Career Hire (ECH) training project. b) Implemented as Class-D payload. c) Downlink at approx.30Mb/s. II. Flight System a) Optical Head Beacon Acquisition Camera. Downlink Transmitter. 2-axis Gimbal. b) Sealed Container Laser Avionics Power distribution Digital I/O board III. Implementation: a) Ground Station - Optical Communications Telescope Laboratory at Table Mountain Facility b) Flight System mounted to ISS FRAM as standard I/F. Attached externally on Express Logistics Carrier.

optical communications

Resource Prospector Lander: Architecture and Trade Studies

NASA's Resource Prospector (RP) is a multi-center and multi-institution collaborative project to investigate the polar regions of the Moon in search of volatiles. The mission is rated Class D and is approximately 10 days. The RP vehicle comprises three elements: the Lander, the Rover, and the Payload. The Payload is housed on the Rover and the Rover is on top of the Lander. The focus of this paper is on the Lander element for the RP vehicle. The design of the Lander was requirements driven and focused on a low-cost approach. To arrive at the final configuration, several trade studies were conducted. Of those trade studies, there were six primary trade studies that were instrumental in determining the final design. This paper will discuss each of these trades in further detail and show how these trades led to the final architecture of the RP Lander.

Moore, Josh

Gas Chromatograph Method Optimization Trade Study for RESOLVE: 20-meter Column v. 8-meter Column

RESOLVE is the payload on a Class D mission, Resource Prospector, which will prospect for water and other volatile resources at a lunar pole. The RESOLVE payload's primary scientific purpose includes determining the presence of water on the moon in the lunar regolith. In order to detect the water, a gas chromatograph (GC) will be used in conjunction with a mass spectrometer (MS). The goal of the experiment was to compare two GC column lengths and recommend which would be best for RESOLVE's purposes. Throughout the experiment, an Inficon Fusion GC and an Inficon Micro GC 3000 were used. The Fusion had a 20m long column with 0.25mm internal diameter (Id). The Micro GC 3000 had an 8m long column with a 0.32mm Id. By varying the column temperature and column pressure while holding all other parameters constant, the ideal conditions for testing with each column length in their individual instrument configurations were determined. The criteria used for determining the optimal method parameters included (in no particular order) (1) quickest run time, (2) peak sharpness, and (3) peak separation. After testing numerous combinations of temperature and pressure, the parameters for each column length that resulted in the most optimal data given my three criteria were selected. The ideal temperature and pressure for the 20m column were 95 C and 50psig. At this temperature and pressure, the peaks were separated and the retention times were shorter compared to other combinations. The Inficon Micro GC 3000 operated better at lower temperature mainly due to the shorter 8m column. The optimal column temperature and pressure were 70 C and 30psig. The Inficon Micro GC 3000 8m column had worse separation than the Inficon Fusion 20m column, but was able to separate water within a shorter run time. Therefore, the most significant tradeoff between the two column lengths was peak separation of the sample versus run time. After performing several tests, it was concluded that better detection via good peak separation with a longer run time is a better asset than moderate peak separation with a shorter run time. Even given that RESOLVE is highly interested in water and that mission timeline is of significant importance given the short seven-to-ten-day mission timeline, worse detection with an 8m column may lead to overlooking other substances existing on the moon that could advance planetary science. Thus, I recommend the 20m column. However, if mission timeline and water separation are deemed the highest priority, the 8m column should be selected due to its ability to separate water within a shorter run time than the 20m column.

Column

NASA Propulsion Sub-System Concept Studies and Risk Reduction Activities for Resource Prospector Lander

NASA's exploration roadmap is focused on developing technologies and performing precursor missions to advance the state of the art for eventual human missions to Mars. One of the key components of this roadmap is various robotic missions to Near-Earth Objects, the Moon, and Mars to fill in some of the strategic knowledge gaps. The Resource Prospector (RP) project is one of these robotic precursor activities in the roadmap. RP is a multi-center and multi-institution project to investigate the polar regions of the Moon in search of volatiles. The mission is rated Class D and is approximately 10 days, assuming a five day direct Earth to Moon transfer. Because of the mission cost constraint, a trade study of the propulsion concepts was conducted with a focus on available low-cost hardware for reducing cost in development, while technical risk, system mass, and technology advancement requirements were also taken into consideration. The propulsion system for the lander is composed of a braking stage providing a high thrust to match the lander's velocity with the lunar surface and a lander stage performing the final lunar descent. For the braking stage, liquid oxygen (LOX) and liquid methane (LCH4) propulsion systems, derived from the Morpheus experimental lander, and storable bi-propellant systems, including the 4th stage Peacekeeper (PK) propulsion components and Space Shuttle orbital maneuvering engine (OME), and a solid motor were considered for the study. For the lander stage, the trade study included miniaturized Divert Attitude Control System (DACS) thrusters (Missile Defense Agency (MDA) heritage), their enhanced thruster versions, ISE-100 and ISE-5, and commercial-off-the-shelf (COTS) hardware. The lowest cost configuration of using the solid motor and the PK components while meeting the requirements was selected. The reference concept of the lander is shown in Figure 1. In the current reference configuration, the solid stage is the primary provider of delta-V. It will generate 15,000-lbf of thrust with a single burn of ~ 80's seconds. The lander stage is a bi-propellant, pressure-regulated, pulsing liquid propulsion system to perform all other functions.

Trinh, Huu P.

Instrumentation for Lunar Volatile Analysis

Understanding the available lunar resources is key to incorporating their availability into exploration architectures. Previous lunar missions have provided insight into the potential resources on the moon as an initial step enabling in-situ resource utilization (ISRU). Orbiting missions, such as Clementine and Lunar Prospector, have mapped the lunar polar region and found enhanced hydrogen signals on kilometer-scale resolution. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission provided the first direct measurement of water ice in a permanently shadowed region. Future missions will provide ground truth data to measure and quantify lunar volatiles.One approach to exploration capitalizes on commercial partnerships for Class D risk aware missions. Partnerships with commercial partners enable rapid design cycles, leveraging the investment of the commercial industry in instrument development. Modified Commercial off the Shelf (COTS) hardware can be utilized to enhance capabilities in exploration missions. The hardware under development at the Kennedy Space Center for availability within the Commercial Lunar Payload Services opportunities capitalizes on modified COTS, enabling an aggressive delivery schedule and low-cost development. The modified hardware has been integrated and tested in a thermal vacuum environment, with final flight modifications currently in work. The use of a modified COTS instruments will be discussed for space applications.

Captain, J.

En Route Detect and Avoid Well Clear in Terminal Area Landing Pattern

A fast time simulation was conducted to test the detect and avoid Well Clear definition designed for en route use when an unmanned aircraft (UA) is approaching the landing pattern of the terminal area. Measures focused on were loss of well clear and alerts intended to help the pilot avoid loss of well clear. Data indicated warning-level alerts will occur outside the typical Class D airspace which may prevent the UA from normal operations in the terminal airspace. Other aircraft on 45o entry could result in “nuisance” alerts which may also prevent the UA from normal operations in the terminal airspace. However, eliminating horizontal proximity (τmod) has the potential to increase “nuisance” alerts on the 45o entry and downwind legs. Overall, this suggests that a more stringent definition of Well Clear may be advisable in the landing pattern of the terminal area.

Trujillo, Anna C.

NASA Glenn SmallSat/CubeSat Activities and Capabilities

This presentation provides an overview of recent activities at NASA Glenn Research Center (GRC) in the development and performance test characterization of electric propulsion subsystems intended for small satellite (SmallSat) and cubesat missions. The status and recent progress of several on-going development activities related to smallsat/cubesat missions at GRC will be discussed. These projects and activities include Sub-Kilowatt Electric Propulsion (SKEP), iodine compatibility testing of Hall thruster components, performance testing of a cold gas propulsion system for BioSentinel, and performance testing of the Massachusetts Institute of Technology electrospray propulsion units. The functions and capabilities of GRC's Electric Propulsion Systems Branch will be covered. These capabilities are available to provide propulsion subsystem manufacturers independent, third-party assessments of their technologies for use on future NASA missions. A plan to generate standards for the development of smallsat/cubesat propulsion systems for Class D missions has been initiated and will be outlined in this presentation.

Pencil, Eric

An Exploratory Evaluation of UAS Detect and Avoid Operations in the Terminal Environment

New technical standards for Unmanned Aircraft Systems (UAS) detect and avoid (DAA) systems mark recent progress toward realizing the goal of full integration of UAS into the National Airspace System (NAS). The DAA system is intended to provide a means of compliance with operating regulations that required pilots on board manned aircraft to remain "well clear" of other aircraft which is accomplished through out-the-window visual acquisition of other aircraft and application of a subjective judgment of safe separation. The requirements for the DAA system, including the specification of a DAA well clear threshold as well as functional requirements for detecting, tracking, alerting and guidance processing, and displays, are specified in DO-365, Minimum Operational Performance Standards (MOPS) for DAA Systems developed within RTCA (Radio Technical Commission for Aeronautics) Special Committee 228 (SC-228). Intended as the first in a series of phased versions, these requirements are frequently referred to as the "Phase 1" DAA system. The Phase 1 DAA system is limited for use by aircraft transitioning to and from Class A or special use airspace, through Class D, E, and G airspace. In particular, the Phase 1 DAA MOPS are not intended for terminal airspace operations, a critical gap for enabling a full range of UAS operations. The application of the Phase 1 DAA system and DAA well clear threshold within the terminal area is predicted to result in a high number of unnecessary alerts when the UAS is safely separated from other traffic. The goal of the present study was to examine pilot performance and operational issues related to the operation of the Phase 1 DAA system in a terminal area. This experiment was intended as an exploratory study that would be used to inform the development of a new terminal area-specific DAA well clear definition, and associated alerting and guidance requirements. The two main objectives of this study were to: 1) characterize pilot behavior in the terminal environment with the Phase 1 DAA system, and 2) investigate the effect of modifications to the Phase 1 DAA alerting and guidance structure. In particular, the authors were interested in determining whether the removal of specific alerting and guidance levels, without changing the DAA well clear definition or alerting thresholds, would impact pilot performance while conducting terminal operations. The results indicate that the Phase 1 well clear definition and alerting and guidance resulted in frequent alerting that degraded pilots' ability to discriminate between encounters where another aircraft was safely separated versus when a maneuver was necessary. The resulting impact on pilot performance was slower response times and higher frequency and severity of losses of DAA well clear compared to those observed for experiments examining pilot performance in the en route environment. There was no significant effect of alerting and guidance display configuration on pilot performance.

terminal area

An Exploratory Evaluation of UAS Detect and Avoid Operations in the Terminal Environment

New technical standards for Unmanned Aircraft Systems (UAS) detect and avoid (DAA) systems mark recent progress toward realizing the goal of full integration of UAS into the National Airspace System (NAS). The DAA system is intended to provide a means of compliance with operating regulations that required pilots on board manned aircraft to remain "well clear" of other aircraft which is accomplished through out-the-window visual acquisition of other aircraft and application of a subjective judgment of safe separation. The requirements for the DAA system, including the specification of a DAA well clear threshold as well as functional requirements for detecting, tracking, alerting and guidance processing, and displays, are specified in DO-365, Minimum Operational Performance Standards (MOPS) for DAA Systems developed within RTCA Special Committee 228 (SC-228). Intended as the first in a series of phased versions, these requirements are frequently referred to as the "Phase 1" DAA system. The Phase 1 DAA system is limited for use by aircraft transitioning to and from Class A or special use airspace, through Class D, E, and G airspace. In particular, the Phase 1 DAA MOPS are not intended for terminal airspace operations, a critical gap for enabling a full range of UAS operations. The application of the Phase 1 DAA system and DAA well clear threshold within the terminal area is predicted to result in a high number of unnecessary alerts when the UAS is safely separated from other traffic. The goal of the present study was to examine pilot performance and operational issues related to the operation of the Phase 1 DAA system in a terminal area. This experiment was intended as an exploratory study that would be used to inform the development of a new terminal area-specific DAA well clear definition, and associated alerting and guidance requirements. The two main objectives of this study were to: 1) characterize pilot behavior in the terminal environment with the Phase 1 DAA system, and 2) investigate the effect of modifications to the Phase 1 DAA alerting and guidance structure. In particular, the authors were interested in determining whether the removal of specific alerting and guidance levels, without changing the DAA well clear definition or alerting thresholds, would impact pilot performance while conducting terminal operations. The results indicate that the Phase 1 well clear definition and alerting and guidance resulted in frequent alerting that degraded pilots' ability to discriminate between encounters where another aircraft was safely separated versus when a maneuver was necessary. The resulting impact on pilot performance was slower response times and higher frequency and severity of losses of DAA well clear compared to those observed for experiments examining pilot performance in the en route environment. There was no significant effect of alerting and guidance display configuration on pilot performance.

Rorie, Conrad

Planetary Science with Small Satellites: Opportunities and Challenges

Small satellites aren't anything particularly new. Earth orbiting small satellites go back 30 years or more. What is new is the proliferation and access to small satellite technologies and flight opportunities. This has been in large part due to the advent of the "cubesat" model, initially a means to develop student's engineering skills, but has since evolved into an industry and accepted method within government space agencies. Until very recently these smallsats were limited to Earth orbiting missions, but with the successful flight of the MarCO spacecraft and the upcoming launch of EM-1 cubesats, the Moon, Mars and beyond are now within reach. While all this is good news, we still have a ways to go before smallsats become true planetary science tools. One could argue that Deep Space 2 was the first planetary smallsat, launched in 1999 and having a mass of 2.3 kg (each probe) it hoped to demonstrate that "real" science could be done with a small (and less expensive) package. The DS2 failure shelved the idea of smallsats (even chilling some to "Class D" planetary missions in general) for nearly two decades. NASA has slowly come back around to smallsats for planetary missions, going so far as to support a range of mission studies (the Planetary Science Deep Space SmallSat Studies, or PSDS3, Program) and the creation of a new Program (SIMPLEx) to developed such missions for opportunistic flights. The MarCO success was hugely important in maintaining (and building) this forward momentum. However, we still have yet to demonstrate "real" science from a planetary smallsat and there are some fundamental disconnects between expectation and reality. This talk will discuss some of the opportunities and challenges that reside with planetary smallsats, focusing on two examples: LunaH-Map (the first SIMPLEx cubesat) and Aeolus (a Mars PSDS3 smallsat concept).

Colaprete, Anthony

NASA Lunar Lander Reference Design

With increased emphasis on lunar exploration and scientific investigation, there is a desire to deliver a wide variety of payloads to the lunar surface. Many of these payloads will require the use of surface mobility capability such as a rover. NASA has combined spacecraft and subsystem engineers from across the Agency to develop a ‘pallet’ lander design intended to deliver and easily deploy a medium-sized payload (~300 kg) to the polar regions of the Moon. The lander provides power to the payload from transit soon after lunar landing. The lander is not intended to survive the lunar night. The design of the lander was based on a minimum set of level 1 requirements where traditional risk, mass, and performance trade parameters were weighed lower than cost. In other words, the team did not sacrifice ‘good enough’ for ‘better’ or ‘best.’ As a NASA class D spacecraft (as defined in NPR 8705.4, Risk Classification for NASA Payloads, the lander employs single-string (i.e., zero-fault-tolerant) systems as a baseline. The design utilizes existing technologies and components where possible, though some enhancements have been targeted in areas such as precision autonomous landing and low-cost structural design/fabrication. It is important to note that these and other derived technologies are extensible to other lander designs and missions. This TP describes the requirements and approaches upon which the lander design is based; discusses key design decisions, analyses, and trades used to derive the design; provides a snapshot of each major subsystem; and identifies open items, issues, and challenges for which work is continuing.

L D Kennedy

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and will serve as a staging point for deep space exploration. In January 2020, NASA Headquarters contacted Goddard Space Flight Center (GSFC) with a request that they provide a Heliophysics instrumentation package for Gateway. This package would later become known as the Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES). HERMES consists of four high-heritage instruments – a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), a Solar Probe Analyzer-Ions (SPAN-I), and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two magneto-inductive magnetometers. Launching HERMES with Gateway would provide an opportunity to conduct early science experiments on Gateway, but the plan to develop HERMES concurrently with Gateway and launch with the co-manifested vehicle brought numerous technical challenges for the pathfinder payload. HERMES was intended to be a low-cost, tailored Class-D mission, and maintaining that programmatic position proved difficult as the technical challenges grew. The effects of Coronavirus Disease 2019 (COVID-19) were not factored in from the beginning and also created programmatic challenges. This paper will discuss what’s being done to overcome the technical and programmatic challenges to put HERMES on track for a 2024 Launch Readiness Date (LRD).

Joe Burt

Entry, Descent, and Landing Analysis of Low Mass Martian Probe for Surface Climate Network

Aeolus is a mission to provide the first direct measurements of Martian atmospheric wind speeds and correlate them with thermal and compositional data to bring together a complete systematic description for the global energy balance and climate cycles of Mars. Objective A of the Mars Exploration Program Analysis Group (MEPAG) Goal II cites a Science Investigation Area to develop a network of surface landers to provide global, diurnal and synoptic coverage of the near-surface environment to characterize present Mars climate [1]. Aeolus will characterize the present Martian global climate system via an orbiter element and a novel surface network element. A series of low mass, low power probes will be distributed across the Martian surface and measure pressure, sky opacity, temperature, wind speed, water vapor and other trace gases. Low mass and power electrical systems designed to operate in extreme cold and daily thermal cycling for one Martian year could facilitate lower cost, Class-D science probes. Aeolus is targeting a total per-probe mass of <5 kg. Recent advances in nanofabrication of chip-scale sensors that are highly robust to temperature and shock, combined with a novel packaging concept (the deployable sensor probe [2]) originally developed by the Aerospace Corp., for the first time enables a Mars surface climate sensor network. These probes are folded flat during transit to Mars and automatically deploy into the final reentry configuration once released from the orbiter. The capability to fold for stowage significantly increases the probe quantity carried by the orbiter.

EDL

Phasing in COTS EEE parts in NASA

A number of activities within NASA and the space community, as well as growing technology needs and supply chain changes have accelerated the need to expand the use of COTS parts within NASA. While the use of COTS has been formally institutionalized and deemed acceptable for Class D space missions and those with greater tolerance for risk, there is still a lack of understanding of how to most effectively use COTS in such high risk-tolerance missions, and no apparent path towards broad use in missions with much less tolerance for risk. However, the reality is that the fundamental limitations of technology associated with the military specification system combined with the need to fly newer technologies in upcoming flagship robotic missions and human space flight missions will ultimately demand a more expansive use of COTS. The infinite nature of COTS gives rise to numerous challenges in the selection, acceptance, testing, and usage of COTS when reliable operation is essential. This presentation will highlight some of the current artifacts of a NASA Engineering and Safety Center (NESC) study on the use of COTS parts, as well as many of the historical through current facts about parts assurance within Agency to provide a path forward for reliable use of COTS for a range of space applications and risk postures.

EEE parts

Dynamic Radioisotope Power System (DRPS) Design Reference Mission (DRM) Lunar Rover

The Radioisotope Power Systems (RPS) Program tasked the Compass Team to evaluate use of Dynamic Radioisotope Power Systems (DRPS) for lunar science rovers. The object was to identify their advantages and challenges as well as to influence the technology developments with flight-type requirements. This was easily done by using the promising Volatiles Investigating Polar Exploration Rover (VIPER) solar- powered rover mission as a platform to ‘swap in’ a DRPS. The ‘pickup truck bed’ approach allowed both simplified installation and operation of the DRPS while keeping the forward lunar surface ‘blocked’ from the DRPS waste heat which could sublimate the icy surface. It was found that with the Stirling DRPS option the mass is within the planned VIPER lander capability and is very close to VIPER mass and size (the DRPS replaces large battery pack/solar arrays). The Stirling DRPS option produced ~300 Watts electrical (We) using six general purpose heat source (GPHS) bricks and eight Stirling convertors. Replacing the solar/battery power with radioisotope power allows a continuous presence (instead of 6 hours) in a permanently shadowed region (PSR) and over 18 months of operations with minimal science impact (rearward surface heating). It was also found that use of a dynamic system (instead of a thermoelectric system) reduces the heat impact on the science environment two-to-three times. The DRPS, along with a relay link (like Gateway), can provide continuous access to PSRs. The system was also found to be capable of roving for 8 hours per day with a range of over 500 km in 18 months. Preliminary cost estimates fit into a Class D mission but only assuming VIPER heritage and launch, lander, operations, nuclear specific costs [National Environmental Policy Act (NEPA), fueling, transport, Launch Services Program (LSP), etc.] and DRPS are not included.

DRPS

SMA for Highly Constrained Projects

This is a collection of presentation elements into a consolidated presentation on overall safety and mission assurance practices for highly constrained projects, such as Class D, 7120.8, or Do No Harm.

Jesse Leitner