Report on the completion of the procurement of the first heat of Alloy 709

This report provides details on the completion of the procurement of the first commercial-sized heat of Alloy 709. The report is a Level 3 deliverable in FY17 (M3AT- 17OR1602053), under the Work Package AT-17OR160205, “Advanced Alloy Development” performed by Oak Ridge National Laboratory, as part of Advanced Structural Materials Program for the Advanced Reactor Technologies (ART). This work project supports the fabrication scale up effort for Alloy 709 that was started in FY16. The effort culminated in the placement of a Purchase Order in August 2016 with a commercial vendor to melt an Alloy 709 heat using industrial melt practice. Four ingots, totaling about 45,000 lb, had been bottom-poured from the melt in September 2016. Two of the ingots were hot rolled into 1.2”x60”x155” and 1.1”x60”x100” plates using standard hot rolling process in FY17. Some small test pieces were cut from the asrolled plates and sent to Argonne National Laboratory (ANL) for archival. The plates were then heat treated and surface pickled by the vendor. The plates were subsequently delivered to ANL and Oak Ridge National Laboratory (ORNL). Properties and microstructure screening were performed on these plates upon delivery in February 2017 at ANL. Several samples were cut from the as-rolled and heattreated plates and were analyzed for their microstructures, hardness values, grain sizes, and room temperature tensile properties. The results indicate that the scaled-up heat of Alloy 709 fabricated using commercial practice exhibit tensile properties that exceed the minimum values specified in the ASME Code Case for commercial heat of NF709. These plates will be used to support base metal testing for the 650°C, 100,000-h Alloy 709 Code Case development, for fabrication of weldments, and for the NEUP projects.

36 MATERIALS SCIENCE↗

Effects of Notches on the Intermediate Creep-Rupture Life of Alloy 617 Weldment

A Code Case has recently been completed that adds Alloy 617 to Section III, Division 5 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, which covers high temperature nuclear components. However, additional information is needed to address concerns raised by the Nuclear Regulatory Commission that are not covered by the Code Case. The effects of notches (geometric discontinuities) and multiaxial stress on the expected creep life of a component are among these concerns. This report covers the current state of testing of Alloy 617 notched specimens at Idaho National Laboratory, with particular focus on intermediate length (8,000 – 20,000 hours) creep tests of Alloy 617 weld metal. While most of this testing is ongoing, the current state of the tests indicate that the multi-axial stress state imposed by the notch geometry does not negatively impact the creep rupture life of the Alloy 617 weld metal. While the weld metal is notch strengthening in short-term (1,000 – 2,000 hours) testing, it is not clear if this characteristic will continue to hold for intermediate and long-term testing. Ongoing tests will provide additional information to address this concern of a crossover from notch strengthening to notch weakening for intermediate and long-term creep lives.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NDE of Novel Materials (CFRP) [Slides]

CFRP composites have not been used for nuclear safety-related applications until recently. In 2019, the ASME Boiler and Pressure Vessel Code Committee approved a new Code Case N-871 for internal repairs of Class 2 and 3 safety-related piping using CFRP for Service Levels A, B, C, and D for a service life of 50 years. The NRC did not review N-871 for inclusion in the Code Case Regulatory Guides. This project focuses on evaluating the capabilities and limitations of Nondestructive Evaluation (NDE) methods for examining the Carbon Fiber Reinforced Polymer (CFRP) repairs in commercial nuclear power plants (NPPs). This Report summarizes the work done on this project until the end of FY24.

36 MATERIALS SCIENCE↗

Fatigue and Creep-Fatigue Evaluation of Alloy 709 at 760 and 816°C

A significant research and development effort is underway to support the qualification of Alloy 709 as a Class A construction material in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors. This initiative includes a comprehensive Alloy 709 code qualification plan aimed at generating extensive material testing data crucial for compiling the code case data package. The data package is essential in establishing material-specific design parameters for Alloy 709 to be used as Section III, Division 5 Class A construction material for fast reactors, molten salt reactors and gas-cooled reactors. An ASME Section III, Division 5 material code case requires the evaluation of mechanical properties from a minimum of three commercial heats, covering anticipated compositional ranges. A key part of the data package involves fatigue and creep-fatigue testing at elevated temperatures, needed for developing the fatigue design curves and the damage envelope of the creep-fatigue interaction diagram (D-diagram). This paper summarizes the strain-controlled fatigue testing on three commercial heats of Alloy 709 at 760 and 816°C with strain ranges between 0.25% and 3%. The fatigue failure data are used to generate a preliminary fatigue design curve. Additionally, the creep-fatigue testing results at 816°C with tensile hold times of 10, 30, and 60 minutes are presented in support of developing the D-diagram for Alloy 709.

Wang, Yanli↗

The Initiation of Long-Term Creep Rupture Tests on the First Alloy 709 Commercial Heat

A systematic creep tests were conducted as part of a multi-lab effort to identify the material conditions for Alloy 709 Code Case Project. Nine candidate material conditions were studied with three melt conditions each with three S/A temperatures 1050, 1100 and 1150°C. The three melt conditions included AOD, ESR and ESR + Homogenization. The screening creep rupture tests were conducted under 600°C, 330MPa. AOD 1100 and ESR 1100 have been identified to be the top two material conditions for the Code Case project after a comprehensive evaluation. Long-term creep tests were initiated on AOD 1100 at the ORNL. The six creep tests were started at temperatures from 550 to 800°C, stresses from 38 to 309 MPa to target rupture time 60,000 hours. The loading strains agreed with those obtained from tensile tests at the corresponding temperatures.

36 MATERIALS SCIENCE↗

A BASIS FOR APPLYING ELASTIC PERFECTLY-PLASTIC DESIGN METHODS TO CYCLIC SOFTENING MATERIALS

Design approaches using elastic perfectly-plastic (EPP) analysis have recently been approved as Code Cases for the Section III, Division 5 design of high-temperature nuclear reactor components made from austenitic stainless steel. These methods bound the ratcheting strain and creep-fatigue damage accumulated over the life of a component with a simplified, elasticperfectly plastic analysis using a special pseudo-yield stress – often not equal to the true material yield stress. The austenitic materials specified in the existing Code cases are cyclic-hardening for all allowable operating temperatures. However, other Section III, Division 5 materials, such as Grade 91 steel, are cyclic softening at expected advanced reactor operating temperatures. This work describes the extension of EPP methods to cyclic softening materials through the use of a postulated saturated material state and softening factors to be applied to the pseudo yield stress. We demonstrate the conservatism of the modified EPP method against a series of inelastic simulations of two bar tests, using a constitutive model that captures work and cyclic softening.

Messner, Mark C.↗

A basis for applying elastic perfectly-plastic design methods to cyclic softening materials

Design approaches using elastic perfectly-plastic (EPP) analysis have recently been approved as Code Cases for the Section III, Division 5 design of high-temperature nuclear reactor components made from austenitic stainless steel. These methods bound the ratcheting strain and creep-fatigue damage accumulated over the life of a component with a simplified, elastic perfectly plastic analysis using a special pseudo-yield stress often not equal to the true material yield stress. The austenitic materials specified in the existing Code cases are cyclic-hardening for all allowable operating temperatures. However, other Section III, Division 5 materials, such as Grade 91 steel, are cyclic softening at expected advanced reactor operating temperatures. This work describes the extension of EPP methods to cyclic softening materials through the use of a postulated saturated material state and softening factors to be applied to the pseudo yield stress. We demonstrate the conservatism of the modified EPP method against a series of inelastic simulations of two bar tests, using a constitutive model that captures work and cyclic softening.

Messner, M. C.↗

Initial High Temperature Inelastic Constitutive Model for Alloy 617

This report describes progress on a Alloy 617 inelastic constitutive model slated for inclusion in the ASME Boiler & Pressure Vessel Code in Code Case N-898 “Use of Alloy 617 (UNS N06617) for Class A Elevated Temperature Construction, Section III, Division 5” as part of an appendix on inelastic modeling. This appendix will provide a reference material model for A617 for use in conjunction with the ASME design by inelastic analysis criteria. This report focuses on the implementation and evaluation of an existing Alloy 617 model developed to represent the data collected at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) as part of the Alloy 617 Code Case experimental campaign. While the model accurately captures the cyclic stress/strain behavior of Alloy 617, it fails to capture the long-term creep and lower temperature tensile data. In addition, the model form is complicated and has over 50 configurable parameters. As such, we recommend the development of a simplified model, incorporating key features of the ORNL model but reducing the model complexity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Creep and Creep-Fatigue of Alloy 617 Weldments

Alloy 617 is the primary candidate material for the heat exchanger of a very high temperature gas cooled reactor intended to operate up to 950°C. While this alloy is currently qualified in the ASME Boiler and Pressure Vessel Code for non-nuclear construction, it is not currently allowed for use in nuclear designs. A draft Code Case to qualify Alloy 617 for nuclear pressure boundary applications was submitted in 1992, but was withdrawn prior to approval. Prior to withdrawal of the draft, comments were received indicating that there was insufficient knowledge of the creep and creep-fatigue behavior of Alloy 617 welds. In this report the results of recent experiments and analysis of the creep-rupture behavior of Alloy 617 welds prepared using the gas tungsten arc process with Alloy 617 filler wire. Low cycle fatigue and creep-fatigue properties of weldments are also discussed. The experiments cover a range of temperatures from 750 to 1000°C to support development of a new Code Case to qualify the material for elevated temperature nuclear design. Properties of the welded material are compared to results of extensive characterization of solution annealed plate base metal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Machining of Alloy 709 Creep-fatigue Specimens from G. O. Carlson Heat

Alloy 709 has been selected as the next candidate material for Section III, Division 5 qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) for elevated-temperature nuclear construction. The qualification data package requires an assortment of information and material data including tensile, creep, and creep-fatigue performance at elevated temperatures from different material heats. The goal of the project is to generate a dataset to support qualification of Alloy 709 material for ASME BPVC design code. Working towards the project goal, Idaho National Laboratory needs to conduct a series of tests on three different heats to support the A709 code case development. At present, there is a gap in the data package for one of the heats: Heat number 58776 manufactured by G.O. Carlson. To address this data gap, Argonne National Laboratory transmitted five plates of A709 heat 58776 manufactured by G.O. Carlson to Idaho National Laboratory. These plates were solution annealed at 1150°C and heat treated at 775°C for 10 hours. The objective of this specification is to procure a series of creep-fatigue specimens to support the qualification data package. The creep-fatigue specimen design captures the cyclic material performance at elevated temperature. The material performance data generated from specimens machined herein will support the ASME BPVC code case development and establish design limits, and design life curves for Alloy 709 material.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Review of HAYNES® 282® alloy for supercritical CO2 structural applications

In this paper, HAYNES® 282® alloy (282® alloy) properties, microstructure, high temperature oxidation resistance, weldability, and American Society of Mechanical Engineers (ASME) code case highlights are reviewed. The long term performance of high temperature, high strength, creep resistant alloys is critical to the success of supercritical carbon dioxide equipment. Several modern power generation technologies require alloys that can operate continuously at or above 700oC. 282® alloy is a precipitation strengthened nickel based super alloy that meets these requirements. The results of 282® alloy research reviewed in this paper include longterm cyclic oxidation behavior in air and sCO2, independent research and validation of 100k hour creep life, and successful welding of the alloy in the age hardened condition. The latter is critical for joining of hardened components (flanges, piping, heat exchanger internal, etc.) and field repair. Several highlights from the code case for this ASMEapproved material are also presented.

Tossey, Brett↗

FY17 Status Report on the Initial EPP Finite Element Analysis of Grade 91 Steel

This report describes a modification to the elastic-perfectly plastic (EPP) strain limits design method to account for cyclic softening in Gr. 91 steel. The report demonstrates that the unmodified EPP strain limits method described in current ASME code case is not conservative for materials with substantial cyclic softening behavior like Gr. 91 steel. However, the EPP strain limits method can be modified to be conservative for softening materials by using softened isochronous stress-strain curves in place of the standard curves developed from unsoftened creep experiments. The report provides softened curves derived from inelastic material simulations and factors describing the transformation of unsoftened curves to a softened state. Furthermore, the report outlines a method for deriving these factors directly from creep/fatigue tests. If the material softening saturates the proposed EPP strain limits method can be further simplified, providing a methodology based on temperature-dependent softening factors that could be implemented in an ASME code case allowing the use of the EPP strain limits method with Gr. 91. Finally, the report demonstrates the conservatism of the modified method when applied to inelastic simulation results and two bar experiments.

36 MATERIALS SCIENCE↗

Roof-top solar energy potential under performance-based building energy codes: The case of Spain

The quantification at regional level of the amount of energy (for thermal uses and for electricity) that can be generated by using solar systems in buildings is hindered by the availability of data for roof area estimation. In this note, we build on an existing geo-referenced method for determining available roof area for solar facilities in Spain to produce a quantitative picture of the likely limits of roof-top solar energy. The installation of solar hot water systems (SHWS) and photovoltaic systems (PV) is considered. After satisfying up to 70% (if possible) of the service hot water demand in every municipality, PV systems are installed in the remaining roof area. Results show that, applying this performance-based criterion, SHWS would contribute up to 1662 ktoe/y of primary energy (or 68.5% of the total thermal-energy demand for service hot water), while PV systems would provide 10 T W h/y of electricity (or 4.0% of the total electricity demand). (author)

14 SOLAR ENERGY↗

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pressure Safety Program Implementation at ORNL

The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According to 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.

42 ENGINEERING↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.