Search NASA⌕ Search

SEARCH · Search NASA

Results for “Common Cause Failure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Introduction of Diverse Manual Actuation Design for APR1400

APR1400 is an Advanced Light Water Reactor (ALWR) design with enhanced plant safety and advanced design features. One unit is in commercial operation and 11 are currently under construction, 4 abroad and 7 in Korea. APR1400 adopts full digitalized Man-Machine Interface System (MMIS) to perform the function of control, indication and alarming for safety and non-safety systems APR1400 MMIS is designed to operate the plant from the Main Control Room (MCR) under all anticipated operating conditions including design basis accidents. This advanced MMIS is designed to meet the latest codes, standards and regulatory requirements including the defense-in-depth and diversity requirements, which is intended to mitigate the consequence of a total failure of the digital safety system caused by a software Common Cause Failure (CCF) coupled with anyone of the Design Basis Events. The redundancy of the safety system could be defeated during this CCF condition and the protective function could be rendered inoperable.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

VIPER project

The VIPER project has so far produced a formal specification of a 32 bit RISC microprocessor, an implementation of that chip in radiation-hard SOS technology, a partial proof of correctness of the implementation which is still being extended, and a large body of supporting software. The time has now come to consider what has been achieved and what directions should be pursued in the future. The most obvious lesson from the VIPER project was the time and effort needed to use formal methods properly. Most of the problems arose in the interfaces between different formalisms, e.g., between the (informal) English description and the HOL spec, between the block-level spec in HOL and the equivalent in ELLA needed by the low-level CAD tools. These interfaces need to be made rigorous or (better) eliminated. VIPER 1A (the latest chip) is designed to operate in pairs, to give protection against breakdowns in service as well as design faults. We have come to regard redundancy and formal design methods as complementary, the one to guard against normal component failures and the other to provide insurance against the risk of the common-cause failures which bedevil reliability predictions. Any future VIPER chips will certainly need improved performance to keep up with increasingly demanding applications. We have a prototype design (not yet specified formally) which includes 32 and 64 bit multiply, instruction pre-fetch, more efficient interface timing, and a new instruction to allow a quick response to peripheral requests. Work is under way to specify this device in MIRANDA, and then to refine the spec into a block-level design by top-down transformations. When the refinement is complete, a relatively simple proof checker should be able to demonstrate its correctness. This paper is presented in viewgraph form.

Kershaw, John↗

Survey of Aging and Monitoring Concerns for Cables and Splices Due to Cable Repair and Replacement

The purpose of this report is to survey aging and monitoring concerns for electrical cable splices in nuclear power plants (NPPs) in long term operation. As portions of existing electrical cable runs in nuclear are replaced over time due to localized events, the total number of splices in NPPs is expected to increase. Relative to cables, the body of knowledge regarding aging of splices and splices in combination with aging cables in nuclear service environments in long-term operations is low. A few reports have considered the aging of cable system components other than cables (Jacobus 1990; Nelson 1998; Villaran and Lofaro 2002), but the nuclear industry has two decades of operating experience since these were published to further enlighten this issue. Herein we discuss electrical cables and splices commonly found in U.S. nuclear power plants, their qualification in safety-related application, and methods for monitoring their health condition. Common environmental stresses that can give rise to cable and splice failure are discussed. The Nuclear Regulatory Commission (NRC) Licensee Event Reports (LER) database was used to identify documented issues of cable and splice failure. The trend in the resultant data over time is considered to see if failures are increasing as plants age. Observations and conclusions of this work include: 1. Cables and splices are highly reliable components. Occurrence rates for events of interest were low and nearly constant over the last 20 years. 2. Common-cause failure for evaluated cable events of interest was observed to primarily be associated with loose connections, which may manifest associated with workmanship issues, thermal cycling, and/or vibration. 3. Replacement of cables is more common than repair, leading to an increase in proportion of new generation cables in the plant over time. 4. Splices on degraded cables have been observed to be problematic. Due to aging NPP infrastructure, including electrical cables, it is expected that such issues will continue to increase. 5. Condition monitoring approaches, while shown to be fruitful for cables, have been shown to be insensitive to degradation of splice sleeves, which are critical to the continued performance of splices. Additional condition monitoring (CM) work is needed to evaluate methods which are sensitive to the degradation of splice components. 6. Extended Material Degradation Assessment (EMDA) knowledge gaps for electrical cables (Bernstein et al. 2014) have not been investigated for splices but may represent similar concerns such as for the accelerated aging process historically used in environmental qualification.

42 ENGINEERING↗

Bayesian And Human Reliability Analysis (hra)-aided Method For The Reliability Analysis Of Software (bahamas)

The purpose of the BAHAMAS code is to provide a simplified process for performing quantitative evaluations of software reliability. The Bayesian and Human Reliability Analysis (HRA)-Aided method for the Reliability Analysis of software (BAHAMAS) was developed specifically to perform quantification under limited data conditions, i.e., when limited testing or operational data are available, such as during early development stages. BAHAMAS essentially examines the quality of a software development life cycle to determine the probability of specific types of software failure. BAHAMAS will have modules to support user input for detailed and simplified analyses. The user interface will also support software common cause failure analysis.

Wang, Congjian (0000000207789927)↗

ESTIMATION OF THE PROBABILITY OF HYDROGEN TRANSFER LINE RUPTURE AT THE HIGH FLUX ISOTOPE REACTOR COLD NEUTRON SOURCE

The probability has been estimated for a sudden release of cryogenic hydrogen from the cryogenic hydrogen circulating system into the reactor building of the High Flux Isotope Reactor. Experience data for cryogenic transfer line failures in laboratory settings was obtained from several research facilities around the world. Results (with uncertainty) were obtained by using the Monte Carlo Equation option in the Data Module of the Riskman probabilistic risk assessment software, yielding a mean of 4.25E-05 per year with a 5th percentile of 6.13E-6 and a 95th percentile of 1.16E-4 per year. Point estimates are included in the report for clarity. The dominant contributors to the likelihood of a release of hydrogen inside the reactor building are design basis (or beyond) seismic events and the probability of a failure in one of the three Johnston couplings inside the shield tunnel. The dominant contributor to the conditional probability of hydrogen being released from the transfer line is common cause failure of the vacuum and helium blanket relief valves. When the seismic risk is removed, the remaining probability of releasing hydrogen in the building is approximately 2.6E-06 per year (point estimate) with the dominant contributor being Johnston coupling failure in the shield tunnel.

08 HYDROGEN↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

This study examines three different methodologies for producing loss-of-mission (LOM) and loss-of-crew (LOC) risks estimates for probabilistic risk assessments (PRA) of crewed spacecraft. The three bottom-up, component-based PRA approaches examined are a traditional static fault tree, a dynamic Monte Carlo simulation, and a fault tree hybrid that incorporates some dynamic elements. These approaches were used to model the reaction control system thruster pod of a generic crewed spacecraft and mission, and a comparative analysis of the methods is presented. The methodologies are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The system modeling process is compared in terms of the effort required to generate the initial model, update the model in response to design changes, and support mass-versus-risk trade studies. The results are compared by examining the top-level LOM/LOC estimates and the relative risk driver rankings at the failure mode level. The fidelity of each modeling methodology is discussed in terms of its capability to handle real-world system dynamics such as cold-sparing, changes in mission operations due to loss of redundancy, and common cause failure modes. The paper also discusses the applicability of each methodology to different phases of system development and shows that a single methodology may not be suitable for all of the many purposes of a spacecraft PRA. The fault tree hybrid approach is shown to be best suited to the needs of early assessments during conceptual design phases. As the design begins to mature, the level of detail represented in the risk model must go beyond redundancy and nominal mission operations to include dynamic, time- and state-dependent system responses as well as diverse system capabilities. This is best accomplished using the dynamic simulation approach, since these phenomena are not easily captured by static methods. Ultimately, once the design has been finalized and the goal of the PRA is to provide design validation and requirement verification, more traditional, static fault tree approaches may become as appropriate as the simulation method.

Mattenberger, Christopher J.↗

Conical Seat Shut-Off Valve

A moveable valve for controlling flow of a pressurized working fluid was designed. This valve consists of a hollow, moveable floating piston pressed against a stationary solid seat, and can use the working fluid to seal the valve. This open/closed, novel valve is able to use metal-to-metal seats, without requiring seat sliding action; therefore there are no associated damaging effects. During use, existing standard high-pressure ball valve seats tend to become damaged during rotation of the ball. Additionally, forces acting on the ball and stem create large amounts of friction. The combination of these effects can lead to system failure. In an attempt to reduce damaging effects and seat failures, soft seats in the ball valve have been eliminated; however, the sliding action of the ball across the highly loaded seat still tends to scratch the seat, causing failure. Also, in order to operate, ball valves require the use of large actuators. Positioning the metal-to-metal seats requires more loading, which tends to increase the size of the required actuator, and can also lead to other failures in other areas such as the stem and bearing mechanisms, thus increasing cost and maintenance. This novel non-sliding seat surface valve allows metal-to-metal seats without the damaging effects that can lead to failure, and enables large seating forces without damaging the valve. Additionally, this valve design, even when used with large, high-pressure applications, does not require large conventional valve actuators and the valve stem itself is eliminated. Actuation is achieved with the use of a small, simple solenoid valve. This design also eliminates the need for many seals used with existing ball valve and globe valve designs, which commonly cause failure, too. This, coupled with the elimination of the valve stem and conventional valve actuator, improves valve reliability and seat life. Other mechanical liftoff seats have been designed; however, they have only resulted in increased cost, and incurred other reliability issues. With this novel design, the seat is lifted by simply removing the working fluid pressure that presses it against the seat and no external force is required. By eliminating variables associated with existing ball and globe configurations that can have damaging effects upon a valve, this novel design reduces downtime in rocket engine test schedules and maintenance costs.

Farner, Bruce↗

Digital Sensor Technology

The nuclear industry has been slow to incorporate digital sensor technology into nuclear plant designs due to concerns with digital qualification issues. However, the benefits of digital sensor technology for nuclear plant instrumentation are substantial in terms of accuracy and reliability. This paper, which refers to a final report issued in 2013, demonstrates these benefits in direct comparisons of digital and analog sensor applications. Improved accuracy results from the superior operating characteristics of digital sensors. These include improvements in sensor accuracy and drift and other related parameters which reduce total loop uncertainty and thereby increase safety and operating margins. An example instrument loop uncertainty calculation for a pressure sensor application is presented to illustrate these improvements. This is a side-by-side comparison of the instrument loop uncertainty for both an analog and a digital sensor in the same pressure measurement application. Similarly, improved sensor reliability is illustrated with a sample calculation for determining the probability of failure on demand, an industry standard reliability measure. This looks at equivalent analog and digital temperature sensors to draw the comparison. The results confirm substantial reliability improvement with the digital sensor, due in large part to ability to continuously monitor the health of a digital sensor such that problems can be immediately identified and corrected. This greatly reduces the likelihood of a latent failure condition of the sensor at the time of a design basis event. Notwithstanding the benefits of digital sensors, there are certain qualification issues that are inherent with digital technology and these are described in the report. One major qualification impediment for digital sensor implementation is software common cause failure (SCCF).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Failure Mechanism Traceability and Application in Human System Interface of Nuclear Power Plants using RESHA

In recent years, there has been considerable effort to modernize existing and new nuclear power plants with digital instrumentation and control systems (DI&C). However, there has also been considerable concern both by industry and regulatory bodies for the risk and consequence analysis of these systems. Of particular concern are digital common cause failures (CCFs) specifically related to software defects. These “misbehaviors” by the software can occur in both the control and monitoring of a system. While many new methods have been proposed to identify potential software failure modes, such as Systems-theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), etc., these methods are focused primarily on the control action pathway of a system. In contrast, the information feedback pathway lacks unsafe control actions (UCAs), which are typically related to software basic events; thus, assessment of software basic events in such systems is unclear. In this work, we present the idea of intermediate processors and unsafe information flow (UIF) to help safety analysts trace failure mechanisms in the feedback pathway and how they can be integrated into a fault tree for improved assessment capability. The concepts presented are demonstrated in two comprehensive case studies, a smart sensor integrated platform for unmanned autonomous vehicles and another on a representative advanced human system interface (HSI) for safety critical plant monitoring. The qualitative software basic events are identified, and a fault tree analysis is conducted based on a modified Redundancy-guided Systems-theoretic Hazard Analysis (RESHA) methodology. The case studies demonstrate the use of UIF and intermediate processors in the fault tree to improve traceability of software failures in highly complex digital instrumentation feedback. The improved method can also clarify fault tree construction when multiple component dependencies are present in the system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Failure Mechanism Traceability and Application in Human System Interface of Nuclear Power Plants using RESHA

In recent years, there has been considerable effort to modernize existing and new nuclear power plants with digital instrumentation and control systems (DI&C). However, there has also been considerable concern both by industry and regulatory bodies for the risk and consequence analysis of these systems. Of particular concern are digital common cause failures (CCFs) specifically related to software defects. These “misbehaviors” by the software can occur in both the control and monitoring of a system. While many new methods have been proposed to identify potential software failure modes, such as Systems-theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), etc., these methods are focused primarily on the control action pathway of a system. In contrast, the information feedback pathway lacks unsafe control actions (UCAs), which are typically related to software basic events; thus, assessment of software basic events in such systems is unclear. In this work, we present the idea of intermediate processors and unsafe information flow (UIF) to help safety analysts trace failure mechanisms in the feedback pathway and how they can be integrated into a fault tree for improved assessment capability. The concepts presented are demonstrated in two comprehensive case studies, a smart sensor integrated platform for unmanned autonomous vehicles and another on a representative advanced human system interface (HSI) for safety critical plant monitoring. The qualitative software basic events are identified, and a fault tree analysis is conducted based on a modified Redundancy-guided Systems-theoretic Hazard Analysis (RESHA) methodology. The case studies demonstrate the use of UIF and intermediate processors in the fault tree to improve traceability of software failures in highly complex digital instrumentation feedback. The improved method can also clarify fault tree construction when multiple component dependencies are present in the system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Hardware and Software Bill of Materials (HBOMs/SBOMs) Extraction Methods

Hardware and software bills of materials (HBOMs and SBOMs) provide important visibility into the components, dependencies, and supply chain relationships within programmable digital devices. This visibility is critical for advanced nuclear reactor applications, where use of common or shared hardware components, software libraries, suppliers, or manufacturing processes may create common cause failure (CCF) vulnerabilities despite apparent diversity. This paper evaluates current approaches for obtaining and analyzing HBOMs and SBOMs in support of CCF, diversity and defense-in-depth (D3) assessments, and begins to explore potential methods for artificial intelligence/machine learning-based analysis. The availability of BOM information from advanced reactor manufacturers and vendors, representative hardware and software categories found in advanced reactor systems continues to limit research [13]. This paper compares commonly used BOM formats, including CycloneDX, SPDX, and SWID. It also surveys publicly available tools for generating BOMs from source code, compiled binaries, and hardware-related information, noting limitations in language coverage, system age, and format interoperability. Finally, this paper evaluates methods for correlating BOM data with vulnerability and exploitability information, including VEX, CVE, and CWE resources. The findings indicate that publicly available nuclear-vendor BOMs are limited, making third-party extraction and research into novel analysis techniques necessary.

Cybersecurity↗

A novel priority selection system for nuclear power plant - 287

The priority selection system is an important component of security level instrument control platform for nuclear power plant, the main function of which is priority processing the manual or automatic command with various security levels and driving engineering safety features and field devices, such as pump and valve. Its stability and safety plays a crucial role in the operation of the power plant. The main objective of the present paper is to describe the new nuclear power plant-oriented priority selection system, which is developed independently by China Nuclear Control System Engineering Company. In this system, the control commands from 1E DCS, ECP and DAS systems are transmitted via hardwire, while those from NC DCS are transmitted by field-bus. The control commands experience priority output to control the field actuators. Meanwhile, in order to control key field devices when failure of the instrument control systems occurs, the issuing interface for native instructions with permissions setting is also offered. The whole system provides collection-feedback functions for field devices, high coverage self-diagnostic functions and periodic test functions for safety systems. Moreover, the feedback information of field devices, the results of self-diagnosis and periodic test will be submitted to DCS of nuclear power plant. In addition, the core part of priority selection system, namely priority selection module, is obtained by pure FPGA technology, which is different from DCS systems and could avoid common cause failure of software effectively. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INTEGRATED RISK ASSESSMENT OF DIGITAL I&C SAFETY SYSTEMS FOR NUCLEAR POWER PLANTS

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems provides the foremost means to improve performance and reduce costs for existing light-water reactors (LWRs). However, qualification of digital technologies remains a challenge?especially the issue of software common cause failure (CCF), which has been difficult to address. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, software CCFs due to design flaws might become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission (NRC) licensing procedures. In 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy?s (DOE?s) Light Water Reactor Sustainability (LWRS) Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, secure DI&C technologies for digital upgrades/designs. An integrated risk assessment for the DI&C (RADIC) process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. This paper summarizes these RISA efforts in the risk analysis of safety-related DI& systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗