Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communications Services Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Establishing a Near Term Lunar Farside Gravity Model via Inexpensive Add-on Navigation Payload

The Space Communications and Navigation, Constellation Integration Project (SCIP) is tasked with defining, developing, deploying and operating an evolving multi-decade communications and navigation (C/N) infrastructure including services and subsystems that will support both robotic and human exploration activities at the Moon. This paper discusses an early far side gravitational mapping service and related telecom subsystem that uses an existing spacecraft (WIND) and the Lunar Reconnaissance Orbiter (LRO) to collect data that would address several needs of the SCIP. An important aspect of such an endeavor is to vastly improve the current lunar gravity model while demonstrating the navigation and stationkeeping of a relay spacecraft. We describe a gravity data acquisition activity and the trajectory design of the relay orbit in an Earth-Moon L2 co-linear libration orbit. Several phases of the transfer from an Earth-Sun to the Earth-Moon region are discussed along with transfers within the Earth-Moon system. We describe a proposed, but not integrated, add-on to LRO scheduled to be launched in October of 2008. LRO provided a real host spacecraft against which we designed the science payload and mission activities. From a strategic standpoint, LRO was a very exciting first flight opportunity for gravity science data collection. Gravity Science data collection requires the use of one or more low altitude lunar polar orbiters. Variations in the lunar gravity field will cause measurable variations in the orbit of a low altitude lunar orbiter. The primary means to capture these induced motions is to monitor the Doppler shift of a radio signal to or from the low altitude spacecraft, given that the signal is referenced to a stable frequency reference. For the lunar far side, a secondary orbiting radio signal platform is required. We provide an in-depth look at link margins, trajectory design, and hardware implications. Our approach posed minimum risk to a host mission while maintaining a very low implementation and operations cost.

Folta, David↗

Autonomous Navigation of a Lunar Relay Using GNSS and Other Measurements

Many of the highest priority destinations at the Moon lack a continuous view of Earth, such as the lunar poles or lunar far side. Exploration of these sites will require spacecraft in cislunar space to relay communications and provide position, navigation, and timing (PNT) services. Accurate knowledge of relay position, velocity, and time is essential to these services. This paper describes a concept for a PNT Instrument being developed for the Lunar Communications Relay and Navigation Systems (LCRNS) Project. The instrument is intended as a payload that would enable autonomous, on-board, real-time navigation and timing using Global Navigation Satellite System (GNSS), optical navigation, and one-way measurements from Earth-based ground stations. Hardware-in-the-loop simulations using flight software are used to realistically characterize performance on hardware platforms with a path to flight. These results provide preliminary validation of the proposed PNT Instrument, demonstrate the benefits of augmenting GNSS with other measurements, and serve as an insightful reference for the design of future lunar missions, including those that will operate within the LunaNet framework of standards. This instrument concept relies on several technologies developed at NASA Goddard Space Flight Center (GSFC). For GNSS observables, the instrument relies on the high-altitude NavCube 3 mini (NC3m) GNSS receiver specifically designed for cislunar applications. The autoNGC system, which consists of flight software and a hardware platform, is responsible for fusing the observables using its extended Kalman filter, the Goddard Enhanced Onboard Navigation System (GEONS). Optical navigation observables are processed within autoNGC (“autonomous Navigation, Guidance, and Control”) using the Goddard Image Analysis & Navigation Tool (GIANT) which is also responsible for simulating high-fidelity images for test and analysis. In addition to describing the PNT Instrument and its components, the paper will present predicted performance based on simulation results. As a baseline, it will present GNSS-only hardware-in-the loop results using a NC3m test unit to process Spirent-simulated GPS signals in a potential lunar relay trajectory: a 12-hour elliptical frozen lunar orbit (ELFO). GEONS then processes the GPS pseudorange and time differenced carrier phase measurements to estimate and propagate the relay state (position, velocity, and time). These results extend previously published work that showed preliminary ELFO performance. Previous work has shown the importance of other measurement types, so additional simulations are performed which augment GNSS with ground station observables and several methods of optical navigation, including celestial navigation, limb-finding (e.g., observations of the lunar horizon), and terrain relative navigation (TRN). TRN involves correlating simulated predicted images of the lunar surface with actual imagery; misalignments of landmarks identified in each image are translated into relay state updates. TRN is valuable as a measurement of the relay’s state relative to the Moon, especially during GNSS outages or after maneuvers. One-way Pseudorange and Doppler measurements from Earth-based ground stations are also simulated. The full set of observables is processed using autoNGC. These simulations make use of autoNGC and NC3m test units, a lab atomic clock, and a pulse-per-second (PPS) generation and distribution system. This combination of subsystems, and the hardware platforms used in this analysis, represents a PNT Instrument that could be flown on a lunar relay. Results from the hardware-in-the-loop simulations presented in this paper provide a preliminary assessment of the achievable navigation performance of this instrument concept. PNT Instrument performance is compared to the GPS-only performance, and a discussion is provided on the apparent merits and challenges of each measurement type.

Ben Ashman↗

Overcoming the Technical Challenges of Coordinating Distributed Load Resources at Scale (Final Report)

Significant recent research has investigated the potential for loads to provide balancing services to the grid. However, this research has not addressed key issues that may arise when such schemes are applied at scale including: 1. Distribution Network Issues. Coordination of large numbers of loads could result in power flows that violate distribution network constraints; 2. Stability Issues. Certain strategies to control loads can exhibit nonlinearity in the form of period-adding bifurcations and chaos. Other control strategies can potentially synchronize the behavior of large numbers of loads. In both cases, the outcome can be power oscillations and instability; 3. Communication Network Issues. Bidirectional low-latency communication channels between a central controller (or several distributed controllers) and each resource are expensive and likely not necessary for effective coordination. Our research questions were: What network, stability, and communication issues might arise in practice when we coordinate large aggregations of loads? How can we coordinate loads to achieve performance objectives in a cost effective manner while avoiding these issues? The ultimate technical goal of the project was the development of network-aware, communication-constrained, non-disruptive load control strategies with stability guarantees that achieve the performance requirements of typical balancing services at a sufficiently low cost to enable the load aggregator and customer to profit. The overall goal was to establish credibility for load control at scale and contribute to U.S. energy security and environmental goals. The team succeeded in answering these research questions and developing these control strategies. The overall approach was based on the development of three testing environments: a simulation testbed, an experimental testbed (20 physical model houses with window-box air conditioners) coupled with the simulation testbed, and a field testbed (100 actual homes in Austin, TX) coupled with the simulation testbed, which enabled controller testing, identification of issues, controller development, and controller validation. The resulting controller was used to demonstrate fast timescale grid balancing (frequency regulation) by aggregations of physical and virtual air conditioners, with sufficient quality to participate in the electricity market. Cost benefit analysis showed overall benefits to the participating households, load aggregators, and the grid, especially if the control technology was integrated directly into existing programmable communicating thermostats. The project provides a variety of wider benefits. Our technology transfer and outreach activities lead us to choose an open-source licensing commercialization pathway, enabling the project results to be available to researchers, industry, and the public. Furthermore, new grid balancing technologies will increase grid flexibility and will enable higher penetrations of intermittent renewable energy resources, such as wind and solar, to be connected to the grid, reducing its environmental impact, and mitigating climate change to the benefit of society.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Overview

The main objective of the Total and Spectral solar Irradiance Sensor (TSIS) is to acquire measurements to determine the direct and indirect effects of solar radiation on climate. TSIS total solar irradiance measurements will extend a 37-year long uninterrupted measurement record of incoming solar radiation, the dominant energy source driving the Earths climate and the most precise indicator of changes in the Suns energy output. TSIS solar spectral irradiance measurements will determine the regions of the Earths multi-layered atmosphere that are affected by solar variability, from which the solar forcing mechanisms causing changes in climate can be quantified. TSIS includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload. The TSIS TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. TSIS was originally planned for the nadir-pointing National Polar-orbiting Operational Environmental Satellite System (NPOESS) spacecraft. The TSIS instrument passed a Critical Design Review (CDR) for NPOESS in December 2009. In 2010, TSIS was re-planned for the Joint Polar Satellite System (JPSS) Polar Free Flyer (PFF). The TSIS TIM, SIM, and associated electronics were built, tested, and successfully completed pre-ship review as of December 2013.In early 2014, NOAA and NASA agreed to fly TSIS on the International Space Station (ISS). In the FY16 Presidents Budget, NASA assumes responsibility for the TSIS mission on ISS. The TSIS project includes requirements, interface, design, build and test of the TSIS payload, including an updated pointing system, for accommodation on the ISS. It takes advantage of the prior development of the TSIS sensors and electronics. The International Space Station (ISS) program contributions include launch services and robotic installation of the TSIS payload onto an ISS Express Logistics Carrier, mission operations, and communications. Total and Spectral solar irradiance data products will be produced, calibrated, and made publically available through the Goddard Earth Science Data and Information Services Center (GES DISC).The NASA GSFC TSIS project at GSFC is responsible for project management, system engineering, safety and mission assurance, and engineering oversight for the TSIS payload. The TSIS project has contracted with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS, support for ISS integration, science operations of the TSIS instrument, data processing, data evaluation and delivery to the GES DISC. TSIS will be delivered to Kennedy Space Center for integration in 2017, with launch and installation onto ISS planned for late 2017-early 2018. After a 90-day check-out period, NASA plans five years of TSIS operations.

spectral emission↗

S&MA Internship to Support Orion and the European Service Module

As a University Space Research Association (USRA) intern for NASA Johnson Space Center (JSC) during the summer 2016 work term, I worked on three main projects for the Space Exploration Division (NC) of the Safety and Mission Assurance (S&MA) Directorate. I worked on all three projects concurrently. One of the projects involved facilitating the status and closure of technical actions that were created during European Service Module (ESM) safety reviews by the MPCV Safety & Engineering Review Panel (MSERP). The two main duties included accurately collecting and summarizing qualitative data, and communicating that information to the European Space Agency (ESA) and Airbus (ESA's prime contractor) in a clear, succinct and precise manner. This project also required that I create a report on the challenges and opportunities of international S&MA. With its heavy emphasis on soft skills, this project taught me how to communicate better, by showing me how to present and share information in an easy-to-read and understandable format, and by showing me how to cooperate with and culturally respect international partners on a technical project. The second project involved working with the Orion Thermal Protection System (TPS) Process Failure Modes and Effects Analysis (PFMEA) Working Group to create the first full version of the Orion TPS PFMEA. The Orion TPS PFMEA Working Group met twice a week to analyze the Avcoat block installation process for failure modes, the failure modes effects, and how such failure modes could be controlled. I was in charge of implementing changes that were discussed in meeting, but were not implemented real time. Another major task included creating a significant portion of the content alongside another team member outside the two weekly meetings. This project caused me to become knowledgeable about TPS, heatshields, space-rated manufacturing, and non-destructive evaluation (NDE). The project also helped me to become better at working with a small team and helped improved my technical communication skills. My main duty for the third project was creating a Safety Verification Tracking Log (SVTL) for the Orbital Maneuvering System Engine (OMS-E), and contacting subject matter experts to close Hazard Report (HR) control verifications. This project also required me to support other OMS-E safety process tasks, like monitoring OMS-E vibration testing for Quality Assurance (QA) purposes. This project helped me become even more proficient in Excel. Throughout the project, I gained knowledge about the OMS-E system and improved my understanding of pressure systems and propellant systems. In terms of education goals, this work term has affirmed my desire to take a few more space-related courses, like orbital mechanics, so that I can have a better understanding of human spaceflight and the industry surrounding it. However, the work term did not persuade me to pursue a master's degree. In terms of career goals, this work term has helped me clarify the direction I would like to head in the future. The perspective of three summer terms working for NASA in S&MA has allowed me to observe that most S&MA employees joined S&MA after working in other NASA directorates, such as Engineering or Flight Operations. It is my belief that it would be advantageous for both NASA and I for me to broaden my knowledge base and technical skill set by completing hands-on technical work on human spaceflight projects, and for me to integrate my safety experience directly into technical work in other directorates. The other significant advantage to this proposed situation is that if I were to eventually return to S&MA, I would be returning with a substantial set of hands-on technical experience and knowledge, which would be a significant resource for S&MA tasks and projects.

Hutcheson, Connor↗

Initial Criticality Assessments to Guide FMEAs on Rocket Engine Hot Fire Testing

Presented is an explanation of the use of the Initial Criticality Assessment (ICA) technique, a triage process for prioritizing required Failure Modes and Effects Analysis (FMEAs), for the European Service Module's main propulsion system's hot-fire test bed at White Sands New Mexico. Rather than instinctively performing many FMEAs of subsystems, or one large system level FMEA where every subcomponent is analyzed, the ICA guided an informed analysis of only the hardware that had a large impact to hazards. The low criticality hardware was documented via the ICA and no FMEA was performed; the work could then focus on the high criticality hardware. Thus a savings of Program resources was achieved. The experiences gained in creating these ICAs for this international collaborative project confirmed that the need for continuous communication across the technical teams is one of the greatest areas of emphasis. The European Space Agency (ESA) is developing the European Service Module (ESM), with its primary contractor, Airbus Defence and Space in Germany, for delivery to the National Aeronautics and Space Administration (NASA). The module will be equipped with a total of 21 engines to support NASA’s Orion spacecraft: one U.S. Space Shuttle Orbital Maneuvering System-Engine (OMS-E), eight auxiliary thrusters and 12 smaller RCS (Reaction Control System) thrusters. The main ESM propulsion system, used for large translational maneuvers, consists of one OMS-E... To qualify the design of the ESM propulsion subsystem (PSS) an all-steel Propulsion Qualification Module (PQM) structure is used to test the propulsion systems on Orion, including “hot firing” of the OMS engine, thrusters, and RCS. The PQM has been developed as a hot-fire test bed to be tested at the NASA White Sands Test Facility (WSTF). One of the objectives of the testing is to assure that the OMS-E can be safely operated with the PQM. Testing will also demonstrate that the PQM can set the proper upstream pressures and temperatures for the OMS-E to operate nominally given the PQM has never been tested in hot-fire operation with OMS-E before. In order to safely conduct the test campaign, hardware such as the engine subassembly, fluid feed lines, valves, electrical power lines, instrumentation, stiff links, installation Ground Support Equipment (GSE), and diffuser [whose objectives are to collect the exhaust of the OMS-E to actively cool down the exhaust gases, reduce thermal exchanges, and create a vacuum at OMS-E level before igniting], had to be analyzed for any hazards and failure modes.

Fault Tolerance↗

NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 49: Becoming an aerospace engineer: A cross-gender comparison

We conducted a mail (self-reported) survey of 4300 student members of the American Institute of Aeronautics and Astronautics (AIAA) during the spring of 1993 as a Phase 3 activity of the NASA/DoD Aerospace Knowledge Diffusion Research Project. The survey was designed to explore students' career goals and aspirations, communications skills training, and their use of information sources, products, and services. We received 1723 completed questionnaires for an adjusted response rate of 42%. In this article, we compare the responses of female and male aerospace engineering students in the context of two general aspects of their educational experience. First, we explore the extent to which women and men differ in regard to factors that lead to the choice to study aerospace engineering, their current level of satisfaction with that choice, and their career-related goals and aspirations. Second, we examine students' responses to questions about communications skills training and the helpfulness of that training, and their use of and the importance to them of selected information sources, products, and services. The cross-gender comparison revealed more similarities than differences. Female students appear to be more satisfied than their male counterparts with the decision to major in aerospace engineering. Both female and male student respondents consider communications skills important for professional success, but females place a higher value than males do on oral communications skills. Women students also place a higher value than men do on the roles of other students and faculty members in satisfying their needs for information.

Hecht, Laura M.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Commercial space policy - Theory and practice

NASA policy toward commercial space ventures is summarized and illustrated with a proposed system for mobile communications through satellite links (MSAT). The government's, i.e., NASA's, role in commercial space ventures is to provide funding and expertise to high risk projects with prospective large returns, provided no vital public services are displaced. MSAT would be realized with a relay spacecraft in GEO, linking mobile radios costing in the range $500-2500. The experimental ATS-6 satellite would be the first generation relay. It is estimated that by the 1990s a spacecraft with a 20-55 m antenna could provide transmission relays for between 640,000 to about 2.5 million nonurban communications units.

Freibaum, Jerry↗

Developing an Advanced Environment for Collaborative Computing

Knowledge management in general tries to organize and make available important know-how, whenever and where ever is needed. Today, organizations rely on decision-makers to produce "mission critical" decisions that am based on inputs from multiple domains. The ideal decision-maker has a profound understanding of specific domains that influence the decision-making process coupled with the experience that allows them to act quickly and decisively on the information. In addition, learning companies benefit by not repeating costly mistakes, and by reducing time-to-market in Research & Development projects. Group-decision making tools can help companies make better decisions by capturing the knowledge from groups of experts. Furthermore, companies that capture their customers preferences can improve their customer service, which translates to larger profits. Therefore collaborative computing provides a common communication space, improves sharing of knowledge, provides a mechanism for real-time feedback on the tasks being performed, helps to optimize processes, and results in a centralized knowledge warehouse. This paper presents the research directions. of a project which seeks to augment an advanced collaborative web-based environment called Postdoc, with workflow capabilities. Postdoc is a "government-off-the-shelf" document management software developed at NASA-Ames Research Center (ARC).

Becerra-Fernandez, Irma↗

Bandwidth Enabled Flight Operations: Examining the Possibilities

The Bandwidth Enabled Flight Operations project is a research effort at the NASA Ames Research Center to investigate the use of satellite communications to improve aviation safety and capacity. This project is a follow on to the AeroSAPIENT Project, which demonstrated methods for transmitting high bandwidth data in various configurations. For this research, we set a goal to nominally use only 10 percent of the available bandwidth demonstrated by AeroSAPIENT or projected by near-term technology advances. This paper describes the results of our research, including available satellite bandwidth, commercial and research efforts to provide these services, and some of the limiting factors inherent with this communications medium. It also describes our investigation into the needs of the stakeholders (Airlines, Pilots, Cabin Crews, ATC, Maintenance, etc). The paper also describes our development of low-cost networked flight deck and airline operations center simulations that were used to demonstrate two application areas: Providing real time weather information to the commercial flight deck, and enhanced crew monitoring and control for airline operations centers.

Pisanich, Greg↗

Using the World-Wide Web to Facilitate Communications of Non-Destructive Evaluation

The high reliability required for Aeronautical components is a major reason for extensive Nondestructive Testing and Evaluation. Here at Langley Research Center (LaRC), there are highly trained and certified personal to conduct such testing to prevent hazards from occurring in the workplace and on the research projects for the National Aeronautics and Space Administration (NASA). The purpose of my studies was to develop a communication source to educate others of the services and equipment offered here. This was accomplished by creating documents that are accessible to all in the industry via the World Wide Web.

McBurney, Sean↗

Sharing the NASA Experience

Dr. Obadiah Kegege will share his career experience with the University of Missouri _ Kansas City Students. This experience spans from academia, research and development, working on flight and ground systems for space exploration, to current work in engineering project management. Most of his NASA experience concentrates on supporting the Space Communication and Navigation Program (SCaN) program. SCaN implements, manages, and maintains communications and navigation services to existing and planned space missions. Dr. Kegege's talk will touch on topics like "how do we communicate to space," as well giving an overview of NASA's Near-Earth Network (NEN), Space Network (SN), and the Deep Space Network (DSN). Also, Dr. Kegege will answer a few questions from students, i.e applying for NASA internships, applying for jobs at NASA, etc.

Kegege, Obadiah O.↗

A step towards space-station user operations - An operational test-bed

A joint ESA/NASA project for researching and evaluating various remote payload operations for Space Station Freedom, using the ATLAS-1 Solar Constant (SOLCON) experiment as a representative payload and the MSFC Payload Operations Center (POCC) command and telemetry system as the base operations system, is described. A basic remote-user-center capability is to be implemented within the Columbus Crew Workstation facility at ESTEC in Noordwijk (NL), to demonstrate the ability to monitor real-time payload operations remotely and allow some command and control functions through the MSFC POCC. After the test-bed system is demonstrated for SOLCON, it is proposed to improve the capability and make it a standard service for Spacelab operations. This paper discusses POCC telemetry, command, and operations issues, NASA communications issues, SOLCON experiment-specific issues, NASA/ESA procedural issues, and system verification issues relating to the project.

Biddis, G. T.↗

Hierarchical Model-Free Transactive Control of Building Loads to Support Grid Services

Residential buildings consume 4.4 quads of electricity annually, approximately 37% of the total electricity consumption in the United States. This represents a vast resource that can be used for demand management and other ancillary services. This project aims to develop a robust, scalable hierarchical transactional control mechanism incorporating elements of model-free control (MFC) and game theory to harness buildings to provide ancillary services to the grid. This approach is being taken to address the challenges of incorporating traditional transactional control schemes into existing buildings. The challenges include small individual building sizes requiring aggregation of many buildings, unpredictable energy usage that makes model identification difficult, and satisfying the sensitive occupant comfort constraints. In the proposed approach, by separating the control mechanism into two layers above and below the load aggregator, MFC can be used below the aggregator to modulate flexible building loads in response to pricing signals with guaranteed performance. This allows the burden of identifying an accurate model of the system to be shifted to the above-aggregator layer, where fluctuations in individual building usage have less impact on predicted building system behavior. Game theory concepts can then be used to determine pricing curves and control signals among regional aggregators. Managing this control in a game-theoretic approach will allow us to build in financial incentives that increase customer engagement. Additionally, the usage of MFC necessitates less burdensome computational and communication requirements, thus, it is easily deployable on small, embedded devices. In a broader sense, developing a strategy capable of effectively incorporating residential and small commercial buildings will allow greater throughput of existing and emerging grid services in addition to future transactive energy grid management methods. Using MFC within a hierarchical control architecture will allow the shifting of existing forecasting challenges to an aggregate level, where dynamics are slower and more predictable. This will enable a smooth interface between the grid services requests of utilities and the reliable control required by participating buildings. MFC, which supports distributed control architecture, permits a scalable solution that can be deployed to neighborhood-size systems as well as individual buildings. This project focuses on three objectives: (1) developing the mathematical framework, algorithm toolkit, and software toolset of the two-layer transactive control testbed; (2) developing a scalable solution for application over many residential and small-size commercial buildings with sparse distributed communication; and (3) field testing and implementation on hardware of the control strategies developed in the previous two objectives. The research and development activities are focused and designed to be impactful within the relevant 2025 targets timeframe. An open-source control framework for exploiting variability and dispatchability of building loads will be delivered as the outcome of the project. This capability enables greater participation of loads in electricity markets and ancillary services that are both useful for the utility and financially beneficial for building owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technology Assessment for the Future Aeronautical Communications System

To address emerging saturation in the VHF aeronautical bands allocated internationally for air traffic management communications, the International Civil Aviation Organization (ICAO) has requested development of a common global solution through its Aeronautical Communications Panel (ACP). In response, the Federal Aviation Administration (FAA) and Eurocontrol initiated a joint study, with the support of NASA and U.S. and European contractors, to provide major findings on alternatives and recommendations to the ICAO ACP Working Group C (WG-C). Under an FAA/Eurocontrol cooperative research and development agreement, ACP WG-C Action Plan 17 (AP-17), commonly referred to as the Future Communications Study (FCS), NASA Glenn Research Center is responsible for the investigation of potential communications technologies that support the long-term mobile communication operational concepts of the FCS. This report documents the results of the first phase of the technology assessment and recommendations referred to in the Technology Pre-Screening Task 3.1 of AP-17. The prescreening identifies potential technologies that are under development in the industry and provides an initial assessment against a harmonized set of evaluation criteria that address high level capabilities, projected maturity for the time frame for usage in aviation, and potential applicability to aviation. A wide variety of candidate technologies were evaluated from several communications service categories including: cellular telephony; IEEE-802.xx standards; public safety radio; satellite and over-the-horizon communications; custom narrowband VHF; custom wideband; and military communications.

Budinger, James M.↗

Dynamic and Responsive Distributed Energy Resource Education Solutions for Building, Fire, and Safety Department Officials (Final Technical Report)

From April 2021 through March 2024, the Interstate Renewable Energy Council (IREC) led a collaborative project to develop a free online clearinghouse of educational resources about solar photovoltaics (PV), energy storage systems (ESS), electric vehicle supply equipment (EVSE), and grid-interactive efficient building (GEB) technologies. Two websites—the Clean Energy Clearinghouse and CleanEnergyTraining.org—housed over 70 educational resources. Over the course of the three-year project, 154,272 unique visitors accessed the learning materials. Learner feedback was overwhelmingly positive. Even through the end of the project, there was sustained demand for education and communication. A primary innovation of the project was to drive multiple complementary audiences to the same place. Building owners, designers, installation contractors and developers, authorities having jurisdiction (AHJs), and fire service personnel all benefit from a shared understanding of clean energy technologies, including safety and code-related requirements. When considering the impact on the target audience, the project team worked with partners and advisors to inform resource creation and delivery in such a way as to address key motivational factors of the target audience and compel each user to seek additional information on the topic and return to the Clean Energy Clearinghouse website as their central location for more information. Resources were intentionally developed to be concise—five to 15 minutes—and accessible, meaning not overly technical. Providing basic information demystified the technologies and invited the professional to explore additional learning opportunities. Awardee and partner collaboration was key to project success. IREC facilitated collaboration among the other Topic 2 awardees, Southface and New Buildings Institute (NBI). The three awardees shared relevant information gained through discovery and validation questionnaires that informed product development and reduced duplication of effort by coordinating the development of complementary, and not competing, educational resources. Inspired by this collaboration, IREC brought on additional partners even in the final year of the project. Five regional energy efficiency organizations were part of the project, which expanded the connection between efficiency and distributed energy resources. We also included resources on the Clearinghouse that were developed through other federally funded projects, such as the Buildings Energy Efficiency Frontiers & Innovation Technologies (BENEFIT) program. The website was developed with the learner in mind, and not solely the funding source. Feedback from stakeholders throughout the project, and especially in its final year, indicated the need for continued education and facilitated communication among stakeholders to further the safe and widespread adoption of clean energy.

14 SOLAR ENERGY↗