SCALE Procedure for Verified, Archived, Library of Inputs and Data (VALID)

This procedure provides a framework for preparing, reviewing, and storing model inputs and derived data so that individuals with authorized access to the Verified, Archived, Library of Inputs and Data (VALID) repository can use the inputs and data with confidence in their analyses. This procedure uses documented checks and reviews to ensure that the inputs and data were correctly generated using appropriate references. Configuration management is implemented to prevent inadvertent modification of the inputs and data or inclusion of models that have not been reviewed. This procedure also provides guidance to be followed if errors are identified or if input or data revisions are needed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Software Quality Assurance for the MOOSE-Based Open-Source Multiphysics Code Cardinal - An Expanded CI Testing Suite

Cardinal is a wrapping of the GPU-oriented spectral element Computational Fluid Dynamics (CFD) code NekRS and the Monte Carlo particle transport code OpenMC within the Multiphysics Object-Oriented Simulation Environment (MOOSE). Cardinal provides high-resolution thermal-hydraulics and/or radiation transport feedback to MOOSE multiphysics simulations. Multiphysics feedback is implemented in a geometry-agnostic manner which eliminates the need for rigid one-to-one mappings. A generic data transfer implementation also allows NekRS and OpenMC to couple to any MOOSE application, enabling a broad set of multiphysics capabilities. Cardinal simulations can also leverage combinations of MPI, OpenMP, and GPU resources. Cardinal continuous development and improvement efforts have led to the software being considered as a high-fidelity design and licensing tool for key areas of nuclear reactor relevant physics, including neutron transport, fluid flow, heat transfer, and mechanical processes. The fast development and expansion of the software from a pure R&D framework towards its application in the nuclear industry and regulation require a focus on developing, enhancing and, maintaining Cardinal’s software quality through strict adherence to a Software Quality Assurance (SQA) framework and SQA program. To facilitate compliance with SQA standards, the Cardinal SQA Program has been initiated during Fiscal Year 2023 (FY23). During the development of the Cardinal SQA Program, multiple gaps have been identified. These gaps are primarily related to model verification and code pedigree as they relate to the use of Cardinal as a safety analysis tool. These gaps have been captured in a report published in 2023. A second report highlighted the progress made during Fiscal Year 2024 (FY24) and described Argonne’s effort to document and integrate software verification within Cardinal’s software development process. This report documents a snapshot of the verification test cases currently available for Cardinal and NekRS in their assimilation into a Continuous Integration (CI) platform. Following the CI practice permits the integrating of source code changes frequently and ensuring that the integrated codebase clears the verification testing for the software. It should be noted that the SQA program itself, including the program plans, procedures, configuration management, and testing strategies, need to be developed in a future step of this task.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Toroid Signal Processing Container with Redis Integration

This report presents the research, design, and implementation of a Toroid Signal Processing Container with Redis Integration, conducted during my internship assignment. The project focused on developing a modular signal processing sys- tem capable of performing baseline correction, droop compensation, and real- time data communication for beam diagnostic signals. Using Redis as a message broker and configuration manager, the system ensures modularity, scalability, and efficient inter-process communication. Signal correction algorithms, such as Asymmetric Least Squares (ALS) baseline smoothing and a numerical droop correction approach, were implemented and tested using Linac beam data. The results confirm that this system improves signal fidelity and supports real-time analysis requirements, offering valuable contributions to the field of beam instrumentation and data acquisition systems.

Bowers, Elliot [Cabrillo Coll.]↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Insights Gained for Updating an Analog I&C System to a Digital System

Licensees at both Nuclear Power Plants (NPPs) and Non-Power Reactors (NPRs) are increasing their use of state-of-the-art digital technology in instrumentation and control (I&C) systems because digital systems offer improved reactor control, information processing, and information storage over analog. Digital I&C systems can range from experimental systems for reactor control research (at NPRs), to measurement and display systems, to complete reactor console replacements. Because of the increasing difficulty in finding spare parts for their original analog I&C systems, many licensees have begun or have plans to upgrade, refurbish, or replace their old analog I&C systems with digital systems. The perception is that upgrading to a digital I&C system will solve all of a facility s obsolescence problems. However, licensees need to be aware of several issues associated with upgrading to a digital system including obsolescence of the digital system (hardware and software) because of the short product life cycle and the associated cost to acquire, store, and maintain a long-term supply of spare parts. Configuration management and cyber security are also vitally important for any upgrade. Further, it must be recognized that the introduction of software and microprocessors could create new failure mechanisms, such as software errors and increased susceptibility to electromagnetic interference. In fact, experience has shown that these failure mechanisms may cause the reactor to malfunction in a way not previously considered. Thus, a conversion from analog to digital I&C systems solves some problems while potentially introducing others. Recognition of the additional risks coupled with good design, engineering, review, and testing can identify and minimize these risks.

Adams, A.↗

Advanced Nuclear Technology. Using Technology for Small Modular Reactor Staff Optimization, Improved Effectiveness, and Cost Containment, 3002007071

Through this grant, the U.S. Department of Energy (DOE) will review several functional areas within a nuclear power plant, including fire protection, operations and operations support, refueling, training, procurement, maintenance, site engineering, and others. Several functional areas need to be examined since there appears to be no single staffing area or approach that alone has the potential for significant staff optimization at new nuclear power plants. Several of the functional areas will require a review of technology options such as automation, remote monitoring, fleet wide monitoring, new and specialized instrumentation, human factors engineering, risk informed analysis and PRAs, component and system condition monitoring and reporting, just in time training, electronic and automated procedures, electronic tools for configuration management and license and design basis information, etc., that may be applied to support optimization. Additionally, the project will require a review key regulatory issues that affect staffing and could be optimized with additional technology input. Opportunities to further optimize staffing levels and staffing functions by selection of design attributes of physical systems and structures need also be identified. A goal of this project is to develop a prioritized assessment of the functional areas, and R&D actions needed for those functional areas, to provide the best optimization

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The CMS online cluster: Setup, operation and maintenance of an evolving cluster

The CMS online cluster consists of more than 2700 computers running about 15000 application instances. These applications implement the necessary services to run the data acquisition of the CMS experiment. In this paper the IT solutions employed on the cluster are reviewed. Details are given on the adopted solutions which include the following topics: implementation of reduction and load balanced network and core IT services; deployment and configuration management infrastructure and its customization; a new monitoring infrastructure. Special emphasis will be put on the scalable approach allowing to increase the size of the cluster with no administration overhead. Finally, the lessons learnt from the two years of running will be presented.

Coarasa, J. A.↗

Flexible and Scalable Data-Acquisition Using the artdaq Toolkit

The Real-Time Systems Engineering Department of the Scientific Computing Division at Fermilab is developing a flexible, scalable, and powerful data-acquisition (DAQ) toolkit which serves the needs of experiments from bench-top hardware tests to large high-energy physics experiments. The toolkit provides data transport and event building capabilities with the option for experimenters to inject art analysis code at key points in the DAQ for filtering or monitoring. The toolkit also provides configuration management, run control, and low-level hardware communication utilities. Firmware blocks for several commercial data acquisition boards are provided, allowing experimenters to approach the DAQ from a high level. A fully-functional DAQ "solution" of the toolkit is provided in otsdaq, sacrificing some flexibility in favor of being ready-to-use. artdaq is being used for several current and upcoming experiments, and will continue to be refined and expanded for use in the next generation of neutrino and muon experiments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

54 ENVIRONMENTAL SCIENCES↗

Software Bill of Materials in the Nuclear Industry

Nuclear power plants (NPP) have thousands of digital assets throughout their facility. Typically, NPPs have asset and configuration management programs that capture the make, model, and version of a component. This information, however, usually only includes first- or second-tier components and does not capture the complete enumeration of software components and their dependencies within operational technology (OT) equipment. As seen with recent cyberattacks, this level of detail is insufficient for identifying if and where an exploitable vulnerability exists within a facility. A software bill of materials (SBOM) provides this detailed enumeration. Further, integrating SBOMs with vulnerability data sources and vulnerability attestation reports can provide improved awareness leading to better cyber risk management and incident response. Preferably, SBOMs are provided by the supplier; however, when an NPP already owns a device, it is less likely they will have a supplier provided-SBOM. Fortunately, SBOMs can be generated on installed digital assets. This paper provides an introduction to the U.S. Department of Energy Office of Nuclear Energy paper titled “Towards Software Bill of Materials in the Nuclear Industry,” which describes the SBOM ecosystem and provides a suggested approach to methodically and seamlessly integrate an SBOM program in an NPP.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Engineering Challenges for the In Situ Disposal (ISD) of the 20 MWe Nuclear Power Demonstration (NPD) Reactor - 19407

The Nuclear Power Demonstration (NPD) reactor is the first CANDU{sup R} type power reactor to be decommissioned. This first of a kind project is to decommission the station using an In-Situ Disposal (ISD) strategy, and presents some engineering challenges to implement. Based on current technology and successful application of industry lessons learned, these challenges are being met. This paper presents a summary of those challenges, to recover from a long period of Storage With Surveillance, solve configuration management, assess the existing structure, determine the performance of the structure following seismic events during the disposal period, adapt the facility design to ISD and select a grout in-fill, and describe the regulatory and public interaction, to demonstrate the integrity of what will be a future disposal site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Toroid Signal Processing Container with Redis Integration

This report presents the research, design, and implementation of a Toroid Signal Processing Container with Redis Integration, conducted during my internship assignment. The project focused on developing a modular signal processing sys- tem capable of performing baseline correction, droop compensation, and real- time data communication for beam diagnostic signals. Using Redis as a message broker and configuration manager, the system ensures modularity, scalability, and efficient inter-process communication. Signal correction algorithms, such as Asymmetric Least Squares (ALS) baseline smoothing and a numerical droop correction approach, were implemented and tested using Linac beam data. The results confirm that this system improves signal fidelity and supports real-time analysis requirements, offering valuable contributions to the field of beam in- strumentation and data acquisition systems.

Bowers, Elliot [Cabrillo Coll.; Fermilab]↗

Digital Safety Analysis for Small Modular Nuclear Reactors (SMRs)

A Documented Safety Analysis (DSA) is a Department of Energy (DOE) construct that defines the extent to which a nuclear facility can be operated safely. It includes a description of hazards, safe boundaries, and hazard controls. The authors assert that a Digital Safety Analysis (DgSA) is far superior to a legacy DSA for several reasons: • The underling database is structured such that it is possible to perform a comprehensive design review and safety analysis by iterating systematically across a hierarchy of linked objects versus a redundant and spotty review by entities of various abilities under unknown resource and schedule constraints. • The analysis of a new design can discover elements that are similar to elements in previous designs. The discovery of similarities is made possible by using the same structure for the underlying database for each new DgSA. The “prior learning” from previous designs is then applied automatically to new designs. • Outputs from the DgSA are from a single source to ensure consistency among various views of the same information. After the DgSA is released, the continued use of a single source implements a configuration management program to ensure consistency between the design basis, the design, the built system, and system procedures. • The development of the DgSA is agile in that any change in a linked object triggers an analysis of impacts on other linked objects and updates of linked objects are made accordingly. After the DgSA is released, the continued maintenance of these links and objects automates the “unreviewed safety question” process.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and Assembly of a Large-Aperture Nb 3 Sn Cos-Theta Dipole Coil With Stress Management in Dipole Mirror Configuration

The stress-management cos-theta (SMCT) coil is a new concept which has been proposed and is being developed at Fermilab in the framework of US Magnet Development Program (US-MDP) for high-field and/or large-aperture accelerator magnets based on low-temperature and high-temperature superconductors. The SMCT structure is used to reduce large coil deformations under the Lorentz forces and, thus, the excessively large strains and stresses in the coil. A large-aperture Nb 3 Sn SMCT dipole coil has been developed and fabricated at Fermilab to demonstrate and test the SMCT concept including coil design, fabrication technology and performance. The first SMCT coil has been assembled with 60-mm aperture Nb 3 Sn coil inside a dipole mirror configuration and will be tested separately and in series with the insert coil. Here this paper summarizes the large-aperture SMCT coil design and parameters and reports the coil fabrication steps and its assembly in dipole mirror configuration.

43 PARTICLE ACCELERATORS↗

MATLAB/Simulink Framework for Modeling Complex Coolant Flow Configurations of Advanced Automotive Thermal Management Systems

The National Renewable Energy Laboratory's (NREL's) CoolSim MATLAB/Simulink modeling framework was extended by including a newly developed coolant loop solution method aimed at reducing the simulation effort for arbitrarily complex thermal management systems. The new approach does not require the user to identify specific coolant loops and their flow. The user only needs to connect the fluid network elements in a manner consistent with the desired schematic. Using the new solution method, a model of NREL's advanced combined coolant loop system for electric vehicles was created that reflected the test system architecture. This system was built using components provided by the MAHLE Group and included both air conditioning and heat pump modes. Validation with test bench data and verification with the previous solution method were performed for 10 operating points spanning a range of ambient temperatures between -2 degrees C and 43 degrees C. The largest root mean square difference between pressure, temperature, energy and mass flow rate data and simulation results was less than 7%.

30 DIRECT ENERGY CONVERSION↗