A Proposal for Standardized MMOD Shielding for Robotic Spacecraft

NASA robotic spacecraft are required to assess the potential for small debris induced failure for all disposal-critical components. Additional shielding might then be necessary in order to meet the acceptable risk requirement for the overall mission. Traditionally this requirement had been met with little or no additional shielding. Since the introduction of a high density debris population in ORDEM 3.0, some missions, especially those in higher portions of Low Earth Orbit, have needed additional MMOD-specific shielding in order for the mission to meet the requirement. This is a costly design effort when performed late in the project life cycle, which adds unexpected mass to the spacecraft components during the integration phase, and could disrupt thermal management.A proposal is discussed to develop a more cost-effective approach to MMOD-shielding, which can be employed earlier in the hardware design phase. The development and adoption of standardized shielding assemblies allows early tailoring of the shielding around a component, so that the mass is accounted for, as well as the small particle penetration risk, at a point in the design phase when the cost and schedule impact are more manageable. A set of several assemblies can be developed with a range of protection thresholds, in order to control mass where less shielding is needed. Such shielding assemblies would be developed in collaboration with blanket assembly specialists and thermal control engineers to ensure manufacturability and thermal performance challenges are known and acceptable. One clear benefit of such an approach is that hypervelocity testing can be performed on each of the standard shield assemblies to refine and confirm their performance prior to use.The challenges inherent in designing supplemental MMOD shielding will be discussed, including variations in the orbital debris environment and performance prediction. The benefits of a standardized shielding approach and example applications will also be presented.

Hull, Scott M.

A Proposal for Standardized MMOD Shielding for Robotic Spacecraft

NASA robotic spacecraft are required to assess the potential for small debris induced failure for all disposal-critical components. Additional shielding might then be necessary in order to meet the acceptable risk requirement for the overall mission. Traditionally this requirement had been met with little or no additional shielding. Since the introduction of a high density debris population in ORDEM 3.0, some missions, especially those in higher portions of Low Earth Orbit, have needed additional MMOD-specific shielding in order for the mission to meet the requirement. This is a costly design effort when performed late in the project life cycle, which adds unexpected mass to the spacecraft components during the integration phase, and could disrupt thermal management. A proposal is discussed to develop a more cost-effective approach to MMOD-shielding, which can be employed earlier in the hardware design phase. The development and adoption of standardized shielding assemblies allows early tailoring of the shielding around a component, so that the mass is accounted for, as well as the small particle penetration risk, at a point in the design phase when the cost and schedule impact are more manageable. A set of several assemblies can be developed with a range of protection thresholds, in order to control mass where less shielding is needed. Such shielding assemblies would be developed in collaboration with blanket assembly specialists and thermal control engineers to ensure manufacturability and thermal performance challenges are known and acceptable. One clear benefit of such an approach is that hypervelocity testing can be performed on each of the standard shield assemblies to refine and confirm their performance prior to use.The challenges inherent in designing supplemental MMOD shielding will be discussed, including variations in the orbital debris environment and performance prediction. The benefits of a standardized shielding approach and example applications will also be presented.

Hull, Scott M.

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable

Hall, Timothy A.

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg

The successful management of programs for human factors certification of advanced aviation technologies

In recent years there have been immense pressures to enact changes on the air traffic control organizations of most states. In addition, many of these states are or have been subject to great political, sociological and economic changes. Consequently, any new schemes must be considered within the context of national or even international changes. Europe has its own special problems, and many of these are particularly pertinent when considering human factors certification programs. Although these problems must also be considered in the wider context of change, it is usually very difficult to identify which forces are pressing in support of human factors aspects and which forces are resisting change. There are a large number of aspects which must be taken into account if human factors certification programs are to be successfully implemented. Certification programs would be new ventures, and like many new ventures it will be essential to ensure that managers have the skills, commitment and experience to manage the programs effectively. However, they must always be aware of the content and the degree of certainty to which the human factors principles can be applied - as Debons and Horne have carefully described. It will be essential to avoid the well known pitfalls which occur in the implementation of performance appraisal schemes. While most appraisal schemes are usually extremely well thought out, they often do not produce good results because they are not implemented properly and staff therefore do not have faith in them. If the manager does not have the commitment and interest in his/her staff as human beings, then the schemes will not be effective. Thus, one aspect of considering human factors certification schemes is within the context of a managed organization. This paper outlines some of the management factors which need to be considered for the air traffic control services. Many of the points received attention during the plenary sessions while others were covered by the working groups when the question arose of how various aspects of human factors certification programs would be managed. Management and organizational issues will certainly need to be included in any frame of reference by those who may be involved in developing certification programs.

Baldwin, Rod

Best Practices for Grid Communications

As the grid evolves, the communications architecture will need to evolve with it. That architecture affords a structured means by which the evolving complexities of the modern electric grid can be managed. This document provides best practices that can be implemented in the grid of today and evolve towards the grid and grid architecture of the future. The evolving grid and its control communications increasingly rely on commercial communications providers and a variety of technologies, from wireless (e.g., 5G, microwave, Wi-Fi) to wireline (fiber, copper) to radio communications (P25, other repeater-based systems), and all these communications systems rely on electric power. A reliable and resilient grid must account for this complex set of interdependencies in its planning activities, especially those involving restoration and recovery. The participation of all relevant parties in both planning and exercising of plans can prevent unexpected conditions that impede the reliable operation and recovery of the grid. Best practices for grid communications include using a Network Management System to document the operational state, define and monitor baselines, detect changes, and accelerate response to abnormalities. If transitioning from SONET to IP/packet-based systems, translating grid requirements into communications requirements for latency, bandwidth and throughput, IP packet delay variation, packet loss, and availability should inform and drive technology planning and selection as well as that communication system’s Quality of Service (QoS) policies and Service Level Agreements (SLAs). Secure and reliable timing is another key component of a reliable and resilient grid that can operate through adverse events. A trusted internal NTP configuration, an integrated and diverse timing delivery system, optimizing the timing architecture based on the transport technologies of the communications system, and using established standards can deliver the level of timing accuracy required by a range of time-sensitive power system applications.

24 POWER TRANSMISSION AND DISTRIBUTION

Systems engineering and integration of control centers in support of multiple programs

The NASA Johnson Space Center's new Multiprogram Control Center (MPCC) addresses the control requirements of complex STS payloads as well as unmanned vehicles. An account is given of the relationship of the MPCC to the STS Mission Control Center, with a view to significant difficulties that may be encountered and solutions thus far devised for generic problems. Examples of MPCC workstation applications encompass telemetry decommutation, engineering unit conversion, data-base management, trajectory processing, and flight design.

Miller, David N.

Ubiquitous CM and DM

Ubiquitous is a real word. I thank a former Total Quality Coach for my first exposure some years ago to its existence. My version of Webster's dictionary defines ubiquitous as "present, or seeming to be present, everywhere at the same time; omnipresent." While I believe that God is omnipresent, I have come to discover that CM and DM are present everywhere. Oh, yes; I define CM as Configuration Management and DM as either Data or Document Management. Ten years ago, I had my first introduction to the CM world. I had an opportunity to do CM for the Space Station effort at the NASA Lewis Research Center. I learned that CM was a discipline that had four areas of focus: identification, control, status accounting, and verification. I was certified as a CMIl graduate and was indoctrinated about clear, concise, and valid. Off I went into a world of entirely new experiences. I was exposed to change requests and change boards first hand. I also learned about implementation of changes, and then of technical and CM requirements.

Crowley, Sandra L.

Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

Hunt, Charles D.

Transport delay compensation for computer-generated imagery systems

In the problem of pure transport delay in a low-pass system, a trade-off exists with respect to performance within and beyond a frequency bandwidth. When activity beyond the band is attenuated because of other considerations, this trade-off may be used to improve the performance within the band. Specifically, transport delay in computer-generated imagery systems is reduced to a manageable problem by recognizing frequency limits in vehicle activity and manual-control capacity. Based on these limits, a compensation algorithm has been developed for use in aircraft simulation at NASA Ames Research Center. For direct measurement of transport delays, a beam-splitter experiment is presented that accounts for the complete flight simulation environment. Values determined by this experiment are appropriate for use in the compensation algorithm. The algorithm extends the bandwidth of high-frequency flight simulation to well beyond that of normal pilot inputs. Within this bandwidth, the visual scene presentation manifests negligible gain distortion and phase lag. After a year of utilization, two minor exceptions to universal simulation applicability have been identified and subsequently resolved.

Mcfarland, Richard E.

Transport delay compensation for computer-generated imagery systems

In the problem of pure transport delay in a low-pass system, a trade-off exists with respect to performance within and beyond a frequency bandwidth. When activity beyond the band is attenuated because of other considerations, this trade-off may be used to improve the performance within the band. Specifically, transport delay in computer-generated imagery systems is reduced to a manageable problem by recognizing frequency limits in vehicle activity and manual-control capacity. Based on these limits, a compensation algorithm has been developed for use in aircraft simulation at NASA Ames Research Center. For direct measurement of transport delays, a beam-splitter experiment is presented that accounts for the complete flight simulation environment. Values determined by this experiment are appropriate for use in the compensation algorithm. The algorithm extends the bandwidth of high-frequency flight simulation to well beyond that of normal pilot inputs. Within this bandwidth, the visual scene presentation manifests negligible gain distortion and phase lag. After a year of utilization, two minor exceptions to universal simulation applicability have been identified and subsequently resolved.

Mcfarland, Richard E.

Spacecraft computer resource margin management

The conduction of the Project Galileo Orbiter, with 18 microcomputers and the equivalent of 360K 8-bit bytes of memory contained within two major engineering subsystems and eight science instruments, requires that the key onboard computer system resources be managed in a very rigorous manner. Attention is given to the rationale behind the project policy, the development stage, the preliminary design stage, the design/implementation stage, and the optimization or 'scrubbing' stage. The implementation of the policy is discussed, taking into account the development of the Attitude and Articulation Control Subsystem (AACS) and the Command and Data Subsystem (CDS), the reporting of margin status, and the response to allocation oversubscription.

Larman, B. T.

Pitfalls and Precautions When Using Predicted Failure Data for Quantitative Analysis of Safety Risk for Human Rated Launch Vehicles

Launch vehicle reliability analysis is largely dependent upon using predicted failure rates from data sources such as MIL-HDBK-217F. Reliability prediction methodologies based on component data do not take into account risks attributable to manufacturing, assembly, and process controls. These sources often dominate component level reliability or risk of failure probability. While consequences of failure is often understood in assessing risk, using predicted values in a risk model to estimate the probability of occurrence will likely underestimate the risk. Managers and decision makers often use the probability of occurrence in determining whether to accept the risk or require a design modification. Due to the absence of system level test and operational data inherent in aerospace applications, the actual risk threshold for acceptance may not be appropriately characterized for decision making purposes. This paper will establish a method and approach to identify the pitfalls and precautions of accepting risk based solely upon predicted failure data. This approach will provide a set of guidelines that may be useful to arrive at a more realistic quantification of risk prior to acceptance by a program.

Hatfield, Glen S.

ChargeX OCPI Recommendations

The Open Charge Point Interface (OCPI) is an open protocol that enables electric vehicle (EV) charging systems to work together across networks. It supports communication and data sharing between Charge Point Operators (CPOs), who manage charging stations, and e-Mobility Service Providers (eMSPs), who provide charging services to EV drivers. OCPI facilitates functions like user authorization, remote charge point control, charging session data exchange, and billing through Charge Detail Records (CDRs). This allows EV roaming, so drivers can charge at different networks without multiple accounts. As the EV market grows due to increased adoption and technological advancements, OCPI faces higher demands. This has revealed issues with CDR format consistency, timestamp standardization across regions, transmission of EV-side error codes for troubleshooting, and support for new use cases. These challenges can affect operations and user experience, particularly as the industry starts considering Vehicle-to-Grid (V2G) systems, where EVs supply energy to the grid, and Vehicle-to-Everything (V2X) technologies for broader energy interactions. Using feedback from the ChargeX Diagnostics taskforce discussions, industry 1-on-1 meetings, technical standards, and OCPI’s evolution through versions (e.g., OCPI 2.1.1, 2.2, and 2.2.1), this report identifies these issues and suggests practical recommendations. These aim to improve interoperability, streamline operations, and prepare OCPI for future trends in the EV charging ecosystem.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert

MCC level C formulation requirements. Shuttle TAEM targeting

The level C requirements for the shuttle orbiter terminal area energy management (TAEM) guidance and flight control functions to be incorporated into the Mission Control Center entry profile planning processor are described. This processor is used for preentry evaluation of the entry through landing maneuvers, and includes a simplified three degree-of-freedom model of the body rotational dynamics that is necessary to account for the effects of attitude response on the trajectory dynamics. This simulation terminates at TAEM-autoland interface.

Carman, G. L.

Space Transportation System/Spacelab accommodations

A description is provided of the capabilities offered by the Spacelab design for doing research in space. The Spacelab flight vehicle consists of two basic elements including the habitable pressurized compartments and the unpressurized equipment mounting platforms. Spacelab services to payloads are considered, taking into account payload mass, electrical power and energy, heat rejection for Spacelab and payload, aspects of Spacelab data handling, and the extended flight capability. Attention is also given to the Spacelab structure, crew station and habitability, the electrical power distribution subsystem, the command and data management subsystem, the experiment computer operating system, the environmental control subsystem, the experiment vent assembly, the common payload support equipment, the instrument pointing subsystem, and details concerning the utilization of Spacelab.

De Sanctis, C. E.

Report on ISS O2 Production, Gas Supply and Partial Pressure Management

Oxygen is used on International Space Station (ISS) for metabolic support and denitrogenation procedures prior to Extra-Vehicular Activities. Nitrogen is used to maintain total pressure and account for losses associated with leakage and operational losses. Oxygen and nitrogen have been supplied by various visiting vehicles such as the Progress and Shuttle in addition to the on-orbit oxygen production capability. Starting in 2014, new high pressure oxygen/nitrogen tanks are available to launch on commercial cargo vehicles and will replace the high pressure gas source that Shuttle used to provide. To maintain a habitable atmosphere the oxygen and nitrogen partial pressures are controlled between upper and lower bounds. The full range of the allowable partial pressures along with the increased ISS cabin volume are utilized as a buffer allowing days to pass between oxygen production or direct addition of oxygen and nitrogen to the atmosphere from reserves. This paper summarizes the amount of gas supplied and produced from all of the sources and describes past experience of managing partial pressures along with the range of management options available to the ISS.