Search NASA⌕ Search

SEARCH · Search NASA

Results for “Controllable grid interface”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Highly Reliable Multi-Port Smart Inverter Modules for PV-Based Energy Systems

Generally, large electrolytic capacitors (E-caps) are required to decouple the double-line frequency power fluctuation inherent in all single-phase dc-ac or ac-dc converters. These E-caps pose the weak link in the photovoltaic (PV) inverter because they have poor reliability as a result of short life expectancy and higher equivalent series resistance (ESR) which leads to lower system efficiency. In this paper, multiport smart dual-inverter modules are proposed for residential PV inverter systems with balanced outputs to eliminate the requirement of large decoupling capacitors, thus leading to more reliable and highly efficient inverter modules. The balanced dual outputs are controlled in phase quadrature such that the double frequency current is completely eliminated. One phase supports the standalone residential loads, and the other phase interfaces with the grid, which is synchronized to the utility grid. Also, the proposed modular configuration is scalable to accommodate higher power rating by stacking and paralleling multiple modules. Simulation results for the dual-inverter modules rated for 1 kW each are presented to validate the proposed concept. Experimental results from a controller hardware-in-the-loop (CHIL) platform also verify its feasibility.

14 SOLAR ENERGY↗

RLC4CLR (Reinforcement Learning Controller for Critical Load Restoration Problems)

RLC4CLR demonstrates using a reinforcement learning controller (RLC) to solve a critical load restoration (CLR) problem, which improves the grid resilience after a substation outage event. RLC4CLR consists of two parts. (1) RL environment: This environment encapsulates the CLR problem to be solved and provides interfacing functions to follow the standard OpenAI Gym format. A power system simulator, i.e., OpenDSS, is included to provide the power flow solution. Controller inputs and outputs (RL state and action) as well as the reward are defined in this environment as well. In summary, the RL environment is the problem formulation from which the RL agent can learn. (2) RL training script: The training script enables the RL agent to learn its control policy by interacting with the RL environment. For RL training, an open-sourced RL library, i.e., RLlib, is leveraged which is based on a distributed computing framework (Ray). The training script is designed to be able to be run on both local machine or the NREL HPC system. Other components of RLC4CLR include input data, e.g., grid model (standard IEEE test feeders), and other files used for results analysis.

Zhang, Xiangyu↗

Grid Integration of Small-Scale Photovoltaic Systems in Secondary Distribution Network—A Review

The relative share of renewable energy, specifically the solar photovoltaic (PV), is increasing exponentially in the world electric energy sector. This is a cumulative result of reduction in the cost of solar panels, improvement in the panel efficiency, and advancement in the associated power electronics. Among different types of PV plants, installation of small-scale rooftop PV is growing rapidly due to direct end-user benefits and lucrative governmental incentives. There are various standards developed in regards to grid integration of PVs and other distributed generations (DGs). Different power converter topologies are developed to interface the PV panel with the utility grid. To keep up with the stringent regulations imposed by the standards, various control strategies and grid synchronization methods have been developed. This review article amalgamates and summarizes all of the aforementioned aspects of a grid-integrated PV system including various standards, power stage architectures, grid synchronization methods, operation under extreme events, and control methodologies, pertaining to small-scale PV plants. This article will help freshman researchers to gain some familiarity with the topic and introduce them to some of the key issues encountered in this field.

14 SOLAR ENERGY↗

A Framework to Demonstrate a DNP3 Interface With a CIM-Based Data Integration Platform: Preprint

The contemporary electrical grid is characterized by its complexity and abundance of data. A control-rich environment supported by information and communication technologies within an Advanced Distribution Management System (ADMS) presents a viable and cost-effective option for utility companies aiming to implement advanced real-time analytical schemes for monitoring and remotely controlling distribution feeders. Modular platform-based approaches to distribution operations require a structured framework for acquiring field device measurements, performing analytics, converting the setpoint to the correct protocol, and sending it on the appropriate communications network to the field devices. We present the development and deployment of an application service to integrate an open-source standardsbased platform with an ADMS test bed with field devices using the Distributed Network Protocol (DNP3) for data exchange. The step-by-step procedure for establishing the DNP3-Master service on an open-source distribution platform is outlined, comprehensively explaining the Master setup process. Moreover, sample use case results highlight the capabilities of the DNP3- Master service setup. Results demonstrate the scalability and configurability of the DNP3-Master service, making it adaptable for integration with other relevant applications, thus providing potential opportunities for real-world field trials and real-time assessments.

ADMS↗

Hardware-in-the-Loop Testing of Wide-Area Damping Controller for Field Implementation in Large-scale Power Grid

In our previous work, an adaptive measurement-driven wide-area damping controller (WADC) for suppressing inter-area oscillations has been proposed and a hardware prototype was developed and validated through hardware-in-the-loop tests. As a continuation of the work, this paper introduces a WADC software prototype to handle the realistic challenges for field implementation in the control room of the power grid. The WADC software is developed and operated as an openPDC adapter with a graphical user interface (GUI) to monitor the WADC inputs and output, the communication delays and other variables. The software prototype has been fully tested through an enhanced hardware-in-the-loop (HIL) test setup. Its performance is verified under various realistic communication uncertainties, such as random time delays and data losses, with different communication protocols. The experiment results have proven the WADC software can deliver sufficient damping to suppress the targeted oscillation mode in handling various communication uncertainties for future field deployment.

Jia, Xinlan↗

Improving Frequency Stability and Minimizing Load Shedding Events by Adopting Grid-Scale Energy Storage with Grid Forming Inverters

The upward adoption trend of renewable generation not only means cleaner energy integrated into modern power grids, but also that most new generation sources are based on front-end inverter bridges, used as interfaces to most wind generation and all the solar PV. It is well known that due to their power electronics-based construction rather than rotational shafts, these sources do not provide inertia inherently, nor substantial amounts of short-circuit currents. However, stable energy such as what can be stored in energy storage systems, although interfaced via inverters, can be controlled to respond to system disturbances in a manner that emulates inertial behavior. This paper focuses on the application of such energy storage systems to augment inertia in the island of Puerto Rico. To do so, a user defined inverter model that contains grid forming capabilities and fast frequency response is modeled and integrated into the real transmission system in power flow and dynamics software. Energy storage is then connected to two selected areas so that it not only provides frequency regulation to avoid widespread load shedding events, but also other tangible benefits. The simulated cases suggest that even relatively small energy storage systems can avert load shedding events if adequately placed in the transmission network.

Grid-forming inverters, IBR, Inertia↗

Controller Requirements for Managing Community Microgrids

Microgrid control systems are central to the functioning of a microgrid. They are responsible for managing distributed energy resources (DER) in both grid-connected and islanded modes of operation. Although microgrids are being developed and deployed by many utilities, several questions are being raised about the control system that manages them. This document provides the detailed list of requirements for a feeder-level microgrid controller to manage various islanded and grid-connected use cases. Functionally, the use cases include control scenarios that require the controller to maintain energy balance, prevent constraint violations, manage switching equipment, manage grid-forming (GFM) and grid-following (GFL) DER, manage critical/non-critical loads, and coordinate with peer systems to operate joined island areas. In addition to detailed requirements, the document includes interface and performance metrics for functional evaluation. These requirements can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; requirements also apply to third-party managed microgrid controllers that coordinate with the utility- and customer-owned equipment. The document can also be used by technology developers and project developers in industry to specify desired control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deadband Voltage Control and Power Buffering for Extreme Fast Charging Station

Voltage fluctuation is one of the most common challenges that electric vehicle charging station (EVCS) may introduce to the power grid. Local reactive power compensation (Q-compensation) capability of bi-directional electric vehicle (EV) chargers can mitigate the steady-state voltage violations caused by the EV charging itself or changes in the neighboring loads. Power buffering, using energy storage system (ESS), can be utilized to address the voltage transients (sags and swells) as a result of EV charging at the EVCS. To address PI controller’s ‘hunting’ issue, this paper proposes a Q-sign triggered deadband voltage control (V-control) method at the point of common coupling (PCC). In addition, to ensure the ramp rate of EV charging is within the allowable limits set forth by the grid code, a ramp rate control is proposed that uses the ESS as a ‘power buffer’. Lastly, different from most reported work in the literature where no explicit limit of the power electronic converters (PECs) is considered, this work considers a reasonable apparent power capacity limit of the PECs when achieving the V-control. This limit also affects the amount of active power that can be obtained from the grid, and subsequently may require ESS to function as ‘load sharing’ device to provide supplemental active power to satisfy EV load. A case study simulated in MATLAB (interfaced with PLECS) is presented to demonstrate the effectiveness of the proposed approaches for EVCS operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Electronics as an Enabler of the Current and Future Grid: Control Instead of Copper

Power electronics are becoming more pervasive in the power system. Solar, wind and battery energy storage systems regularly connect to the grid using power electronic interfaces. Loads are also increasingly power electronic-based. These changes, coupled with the change in the power system's operating characteristics as more and more renewable energy is integrated into the power system, offer a challenge to power electronic and power system engineers alike - how do we design and operate the power system moving forward?

direct connect↗

Power-Hardware-in-the-Loop Interfaces for Inverter-Based Microgrid Experiments Including Transitions

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such interfaces are particularly challenging when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents two PHIL interfaces for such microgrids and the preliminary experimental results.

experiments↗

Inertia Emulation Control using Demand Response via 5G Communications

Building energy equipment is moving rapidly towards Internet of Things (IoT)-driven devices to provide consumer connectivity and device management. These device-level interfaces along with 5G communications will be leveraged to develop control architectures to engage a large number of monitoring and control devices and provide real-time and reliable energy services. Emerging 5G networks have high potential to provide the communication technology for demand response, with fast transfer speed, high reliability, and high number of connections. Guaranteed inertial response to limit frequency fluctuations is one of the main challenges in modern power systems due to the increased penetration of renewable generation, and it is largely affected by communication delays and packet losses. This paper analyzes inertial response and rate of change of frequency in a power system model with inverter-interfaced air conditioners. The control loop considers time delays and packet losses to show the need to switch to 5G networks in future smart grids.

Morovati, Samaneh↗

An Inner-Loop Control Method for the Filter-less, Voltage Sensor-less, and PLL-less Grid-Following Inverter-Based Resource

This paper presents a novel inner-loop control method for the inverter-based resource (IBR). The innovative concepts include removing the voltage sensors at the point of common coupling (PCC), removing the inverter interface inductance, and removing the traditional phase-locked loop (PLL) circuits. Simulation is conducted to verify the feasibility of the method. Furthermore, the virtual impedance is applied to the control loop to improve the current THD and dynamics. Compared to the traditional control, the proposed one helps offload the system by reducing the bulky inductors and voltage sensors without compromising the control performance.

grid-forming inverter, inner-loop control, filterl↗

Power Hardware-in-the-Loop Interfaces for Inverter-Based Microgrid Experiments Including Transitions: Preprint

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop (HIL) simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such microgrid interfaces are particularly challenging to model when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents two PHIL interfaces for such microgrids and the preliminary experimental results: One interface is suitable for those who have access to a power amplifier that can operate as a controllable current source, and the other is for those who need a solution that uses a voltage-mode power amplifier.

battery energy storage system↗

A Two-Step Restoration Scheme with DER Controllability for Resilient Distribution Systems

Modern distribution systems have increasing integration of distributed energy resources (DERs). A large number of distribution system DERs are interfaced through a power electronic converter. During grid contingency scenarios these resources have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid's restoration after an adverse event and hence enhancing resilience. In distribution systems, system restoration is an important problem, especially in face of high-impact low-frequency events. This paper proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in DERs for mitigating voltage problems. Simulation studies are performed on the IEEE-123 node feeder system to demonstrate the effectiveness of the proposed method for various cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Robust Method to Secure Multi-Inverter Grid Tied PV and Battery Energy Storage Systems Against Cyber Intrusions

This paper details a robust method to secure a multi-inverter grid tied system that interfaces photovoltaic (PV) and battery energy storage against potential cyber-attacks. The method can be applied to any third-party inverter systems without a need to modify their internal controls. A small random private excitation signal termed "watermark" is injected into the DC input voltage terminals (via a series transformer) connected to the PV/battery inverter system. An external robust cyber intrusion detector (CID) hardware consisting of a digital signal processor (DSP) generates the "watermark" and also receives the sensor signals that control the setpoints of the PV/battery grid tied system. The CID algorithm is shown to detect all possible cyber intrusions (such as false data injection(FDI)) on external sensor signals such as P and Q measured by a smart meter that control the overall system operation. The proposed CID computes online system ID and two variance tests in real time on each sensor signal and is able pinpoint intrusion location in a multi-inverter system. Results on a hardware in the loop (HIL) of a two-inverter grid connected system demonstrate effectiveness of the proposed CID system for FDI and unobservable FDI. Test results on a laboratory prototype will be discussed in the conference presentation.

Ibrahim, Hasan↗

Impacts of Control, Penetration, and Distribution of Embedded Storage Network in Bulk Power System

The current shift in generation mix from fossil fuel plants towards variable and intermittent renewable energy sources is poised to create a future grid with reduced physical inertia and mismatch between generation and demand. Embedded storage, which is a concept of a coordinated network of storage units sited at the interface between the transmission and distribution system, is proposed as a mechanism to provide a buffer between generation and demand. This paper proposes an automated framework to model and integrate embedded storage in large-scale power systems with industry-grade grid-following (GFL) and grid-forming (GFM) control technologies. More importantly, the developed framework is used to explore the impacts of embedded storage control, penetration, location, and capacity in providing fast frequency response to the grid under contingency events such as generator trips and faults. The framework and study are conducted using the transient-stability simulation tool PSS/E and a realistic model of the Puerto Rico grid as a chosen test system. The simulation results show that GFL and GFM embedded storage, distributed throughout the system, with sufficient penetration and capacity, can effectively improve primary frequency response of the system under the studied contingency events.

Battery Energy Storage, embedded storage, grid-for↗

Synchronous Wind: Evaluating the Grid Impact of Inverterless Grid-Forming Wind Power Plants: Preprint

Grid-forming (GFM) control of Type-3 and Type-4 wind turbine generators have attracted substantial attention in power system research. However, the limited over-current capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. This paper developed the generic model of synchronous wind power generators, also known as Type-5 wind turbines, for the power system integration studies. The Type-5 wind turbine interface to the grid through a synchronous generator; hence, its operation and consequent grid impacts are similar to a conventional power plant. Based on the developed model, a Type-5 wind power plant is integrated into IEEE 14-bus testbed to evaluate its control and operation with a bulk power system. Finally, the stability properties of Type-5 wind turbine generators are compared with Type-3 wind turbines in GFM control mode through impedance characterization.

grid strength↗