Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

Hunt, Charles D.↗

Cost Estimates of Roll-to-Roll Production of Organic Light Emitting Devices for Lighting

White organic light emitting devices (WOLEDs) offerdistinct advantages as solid state lighting sources, including high energy efficiency, superior color quality,and a flexible, thin profile that can accommodate a vast array of possible fixture designs. Recent advances in device lifetime and high speed deposition suggest that mass production of WOLED panels is approaching an inflection point. To understand the tradeoffs in the volume manufacturing of WOLED lighting panels, in this work, we estimate the cost of white WOLED panel production based on vacuum and vapor phase deposition in a roll-to-roll production line envisioned to yield an annual capacity of at least 6 × 10 6 m 2 . Assuming a WOLED operating luminance at 10 klm/m 2 , we anticipate a $\$12.5$ /klm cost of a WOLED light engine that includes the cost of the current driverand packaging. With incremental reduction in material and driver costs and improved luminance, the costof WOLED lighting can be reduced to $\$6.3$ /klm in thenear term, potentially positioning WOLEDs for use innumerous premium lighting applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cost Estimation of a Permanent Magnet Synchronous Machine for Use in Adjustable Speed-Pumped Storage Hydropower

Electric machine design has become an easier process with the availability of computers in recent decades. However, the interest in electric machine design among students has declined. University-level design courses must compete with courses perceived as more desirable by the potential job market. Hence, the power system engineers with this expertise are very few and are nearing retirement. Contrarily, renewable energy has been picking up in the past few decades. The indeterminacy and variation of renewable energy sources require a balancing mechanism to maintain the constant voltage and frequency of the grid. Adjustable-Speed Pumped-Storage Hydropower plants are considered the contender for future energy storage, providing large capacity and fast-acting response. Large-scale hydropower applications depend on the natural characteristics of each project site, making less expensive, off-the-shelf generators unfeasible. This work gives a shortcut to estimate the cost of constructing a permanent magnet generator for low-volume manufacturing.

13 HYDRO ENERGY↗

Cost estimation for unmanned lunar and planetary programs

A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost data were collected and analyzed for eight lunar and planetary programs. Total cost was separated into the following components: labor, overhead, materials, and technical support. The study determined that direct labor cost of unmanned lunar and planetary programs comprises 30 percent of the total program cost. Twelve program categories were defined for modeling: six spacecraft subsystem categories (science, structure, propulsion, electrical power, communications, and guidance and integration, test and quality assurance, launch and flight operations, ground equipment, systems analysis and engineering, and program management). An analysis showed that on a percentage basis, direct labor cost and direct labor manhours compare on a one-to-one ratio. Therefore, direct labor hours is used as the parameter for predicting cost, with the advantage of eliminating the effect of inflation on the analysis.

Dunkin, J. H.↗

Conceptual Cost Estimating

Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

Brown, J. A.↗

System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5). Volume 3: Cost estimates and work breakdown structure/dictionary, phase 1 and 2

Technology payoffs of representative ground based (Phase 1) and space based (Phase 2) mid lift/drag ratio aeroassisted orbit transfer vehicles (AOTV) were assessed and prioritized. A narrative summary of the cost estimates and work breakdown structure/dictionary for both study phases is presented. Costs were estimated using the Grumman Space Programs Algorithm for Cost Estimating (SPACE) computer program and results are given for four AOTV configurations. The work breakdown structure follows the standard of the joint government/industry Space Systems Cost Analysis Group (SSCAG). A table is provided which shows cost estimates for each work breakdown structure element.

Source record↗

Satellite servicing mission preliminary cost estimation model

The cost model presented is a preliminary methodology for determining a rough order-of-magnitude cost for implementing a satellite servicing mission. Mission implementation, in this context, encompassess all activities associated with mission design and planning, including both flight and ground crew training and systems integration (payload processing) of servicing hardward with the Shuttle. A basic assumption made in developing this cost model is that a generic set of servicing hardware was developed and flight tested, is inventoried, and is maintained by NASA. This implies that all hardware physical and functional interfaces are well known and therefore recurring CITE testing is not required. The development of the cost model algorithms and examples of their use are discussed.

Source record↗

Statistical Analysis of Complexity Generators for Cost Estimation

Predicting the cost of cutting edge new technologies involved with spacecraft hardware can be quite complicated. A new feature of the NASA Air Force Cost Model (NAFCOM), called the Complexity Generator, is being developed to model the complexity factors that drive the cost of space hardware. This parametric approach is also designed to account for the differences in cost, based on factors that are unique to each system and subsystem. The cost driver categories included in this model are weight, inheritance from previous missions, technical complexity, and management factors. This paper explains the Complexity Generator framework, the statistical methods used to select the best model within this framework, and the procedures used to find the region of predictability and the prediction intervals for the cost of a mission.

Rowell, Ginger Holmes↗

Reusable Reentry Satellite (RRS) system design study: System cost estimates document

The Reusable Reentry Satellite (RRS) program was initiated to provide life science investigators relatively inexpensive, frequent access to space for extended periods of time with eventual satellite recovery on earth. The RRS will provide an on-orbit laboratory for research on biological and material processes, be launched from a number of expendable launch vehicles, and operate in Low-Altitude Earth Orbit (LEO) as a free-flying unmanned laboratory. SAIC's design will provide independent atmospheric reentry and soft landing in the continental U.S., orbit for a maximum of 60 days, and will sustain three flights per year for 10 years. The Reusable Reentry Vehicle (RRV) will be 3-axis stabilized with artificial gravity up to 1.5g's, be rugged and easily maintainable, and have a modular design to accommodate a satellite bus and separate modular payloads (e.g., rodent module, general biological module, ESA microgravity botany facility, general botany module). The purpose of this System Cost Estimate Document is to provide a Life Cycle Cost Estimate (LCCE) for a NASA RRS Program using SAIC's RRS design. The estimate includes development, procurement, and 10 years of operations and support (O&S) costs for NASA's RRS program. The estimate does not include costs for other agencies which may track or interface with the RRS program (e.g., Air Force tracking agencies or individual RRS experimenters involved with special payload modules (PM's)). The life cycle cost estimate extends over the 10 year operation and support period FY99-2008.

Source record↗

Updated Conceptual Cost Estimating

16-page report discusses development and use of NASA TR-1508, the Kennedy Space Center Aerospace Construction Price Book for preparing conceptual, budget, funding, cost-estimating, and preliminary cost-engineering reports. Updated annually from 1974 through 1985 with actual bid prices and government estimates. Includes labor and material quantities and prices with contractor and subcontractor markups for buildings, facilities, and systems at Kennedy Space Center. While data pertains to aerospace facilities, format and cost-estimating techniques guide estimation of costs in other construction applications.

Brown, J. A.↗

Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development: Program Cost estimates - volume 3

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

McCurry, J. B.↗

Taking the Evolutionary Road to Developing an In-House Cost Estimate

This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

Jacintho, David↗

Literature Review of Advanced Reactor Cost Estimates

This report provides a comprehensive review of existing literature on advanced reactor cost estimations in the form of a ‘meta-study’. Over 30 references were evaluated and considered as part of this effort. The information is then distilled into different tiers, each with varying levels of detail and granularity. The recommendations consist of low/medium/high estimates for capital and operating costs that can be adjusted using various correction factors (based on learning, numbers of plants per site, etc.). In addition, reference breakdown in costs based on a code of account structure is provided for the main four types of advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commercial Crew Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned

To support annual PPBE budgets and NASA HQ requests for cost information for commercial crew transportation to the International Space Station (ISS), the NASA ISS ACES team developed system development and per flight cost estimates for the potential providers for each annual PPBE submit from 2009-2014. This paper describes the cost estimating processes used, challenges and lessons learned to develop estimates for this key NASA project that diverted from the traditional procurement approach and used a new way of doing business

Battle, Rick↗

Improving and Expanding NASA Software Cost Estimation Methods

Estimators and analysts are increasingly being tasked to develop better models and reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods for cost estimation, there is very little focus on the use of cost models based on analogy and clustering algorithms. In this paper we summarize the results of our research in developing an analogy method for estimating NASA spacecraft flight software using spectral clustering on system characteristics (symbolic nonnumerical data) and evaluate its performance by comparing it to a number of the most commonly used estimation methods. The strengths and weaknesses of each method based on their performance are also discussed. The paper concludes with an overview of the analogy estimation tool (ASCoT) developed for use within NASA that implements the recommended analogy algorithm.

Hihn, Jairus↗