At least 91 records · Page 5

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NE-COST plug-in: Expanding ACCERT's Capabilities for Life-Cycle Cost Modeling

The Algorithm for the Capital Cost Estimation of Reactor Technologies (ACCERT) is a structured methodology and software tool designed to simplify and standardize cost estimation for nuclear reactor technologies [1]. By utilizing a relational database structure and modular cost estimation algorithms, ACCERT delivers a robust, flexible, and scalable framework for evaluating costs across various reactor types and configurations [2]. The recent integration of the NE-COST plugin further expands ACCERT’s scope by introducing detailed life-cycle cost modeling and probabilistic analysis of uncertainties. This addition enables users to evaluate costs across front-end processes such as uranium enrichment and fabrication, as well as back-end activities including waste disposal and geologic storage. Through Monte Carlo statistical cost simulations, the plugin provides probabilistic insights into cost ranges, offering critical decision-making support for stakeholders including reactor developers, policymakers, and researchers.

Zhou, Jia↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

2024 Buildings Technology Baseline: Dataset Documentation

The Buildings Technology Baseline is a curated and regularly updated dataset of current and projected performance, retail, and installed price data for all major building energy technologies needed to enable cost/benefit analyses. Building technology analyses require an up-to-date understanding of installation costs and cost-effectiveness of key building energy efficiency technologies. The dataset was assembled by Guidehouse during fiscal year 2024. Data was gathered from the 2024 National Residential Efficiency Measures Database (NREMDB), the 2023 Energy Information Administration Updated Buildings Sector Appliance and Equipment Costs and Efficiencies ("EIA Building Data Report"), DOE Lighting Market Model, the 2023 RSMeans database, and the 2020 Grid-Interactive Efficient Building Technology Cost, Performance, and Lifetime Characteristics ("GEB Data Report"), Lawrence Berkeley National Laboratory, various literature, as well as new data from online retailers, stakeholder interviews, and contractor databases in 2023 and 2024. The dataset has been reviewed by subject matter experts at NREL and DOE. The 2024 dataset release is intended to be a starting point for interested users to provide feedback. This database is not intended to provide specific cost estimates for a specific project. The cost estimates do not include any rebates or tax incentives that may be available for the measures. Rather, it is meant to help determine which measures may be more cost-effective. The National Renewable Energy Laboratory (NREL) makes every effort to ensure accuracy of the data; however, NREL does not assume any legal liability or responsibility for the accuracy or completeness of the information.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nationwide cost and capacity estimates for sedimentary basin geothermal power and implications for geologic CO 2 storage

Sedimentary basins are naturally porous and permeable subsurface formations that underlie approximately half of the United States. In addition to being targets for geologic CO 2 storage, these resources could supply geothermal power: sedimentary basin geothermal heat can be extracted with water or CO 2 and used to generate electricity. The geothermal power potential of these basins and the accompanying implication for geologic CO 2 storage are, however, understudied. Here, we use the Sequestration of CO 2 Tool (SCO2T PRO ) and the generalizable GEOthermal techno-economic simulator (genGEO) to address this gap by a) estimating the cost and capacity of sedimentary basin geothermal power plants across the United States and b) comparing those results to nationwide CO 2 sequestration cost and storage potential estimates. We find that across the United States, using CO 2 as a geothermal heat extraction fluid reduces the cost of sedimentary basin power compared to using water, and some of the lowest cost capacity occurs in locations not typically considered for their geothermal resources (e.g., Louisiana, South Dakota). Additionally, using CO 2 effectively doubles the sedimentary basin geothermal resource base, equating to hundreds of gigawatts of new capacity, by enabling electricity generation in geologies that are otherwise (with water) too impermeable, too thin, too cold, or not deep enough. We find there is competition for the best sedimentary basin resources between water- and CO 2 -based power, but no overlap between the lowest-cost resources for CO 2 storage and CO 2 -based power. In this way, our results suggest that deploying CO 2 -based power may increase the cost of water based systems (by using the best resources) and the cost of CO 2 storage (by storing CO 2 in locations that otherwise may not be targeted). As such, our findings demonstrate that determining the best role for sedimentary basins within the energy transition may require balancing tradeoffs between competing priorities.

CPG↗

Advanced Instrumentation Testbed (AIT) - antiNeutrino Experiment One (NEO) (Q1 FY2021)

In anticipation of the planned June 2021 design review, conceptual design, costing, and documentation efforts continued. The quarter was highlighted by the completion of three significant milestones: 1) 50% conceptual design and costing of the AIT facility, 2) bottom-up cost estimates for NEO, and 3) parametric NEO performance estimates (via the Big Trade Study). Because cost estimates exceed available funding levels, the project team started (late Dec 2020) a value engineering/pivot exercise to align costs with available funds. This exercise is anticipated to consume the project team for most of Q2. The end-result expectation (of the exercise) is a programmatically feasible and scientifically relevant AIT-NEO conceptual design that is aligned with available funds.

42 ENGINEERING↗

Manufacturing Cost Analysis for PEM Electrolyzers and Perspectives for Future Cost Reduction

Electrolyzer capital costs strongly influence the total levelized cost of hydrogen production and have implications for hydrogen deployment. Current electrolyzer costs are high, and large cost reductions may be needed to achieve competitive hydrogen costs and targets. Understanding pathways for cost reduction via R&D and deployment is a critical research area for informed energy planning and enabling hydrogen use. This work presents bottom-up cost estimates of polymer electrolyte membrane (PEM) electrolyzer systems tied to design specifications and discusses perspectives for cost reduction opportunities based on ongoing research. We use a detailed manufacturing and process model for a 1 MW PEM electrolyzer stack and balance of plant (BOP) for rigorous cost estimation. This allows for robust estimates of component and manufacturing costs and examination of key cost contributors. Stack costs are dominated by material costs such as iridium and platinum catalysts, especially at high manufacturing rates; power electronics and hydrogen purification equipment are the largest contributors to BOP cost. At higher manufacturing rates, better equipment utilization could reduce stack costs significantly, and we estimate that experience and bulk purchasing will allow for cost reductions to some BOP components. Still, many well-established BOP technologies and stack material costs are less likely to see significant cost reductions at high manufacturing rates. As such, manufacturing scale is limited in how much it can reduce electrolyzer costs, and additional advances for cost reduction may be needed to achieve cost targets. It will likely take many combined strategies to achieve significant cost reductions for electrolyzers and enable low-cost hydrogen production. We can use our manufacturing cost model to quantify potential cost reductions from the considerations described above and demonstrate pathways to lower cost electrolyzers. This allows for better understanding of cost reduction strategies and enables more informed research, development, and deployment for electrolyzers.

cost↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Site-specific Design Case Study for Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels

Hydrothermal liquefaction (HTL) is a thermal process that converts wet biomass to renewable hydrocarbon fuel blendstocks (i.e., renewable naphtha, renewable diesel, and sustainable aviation fuel (SAF)). It can utilize a wide range of pure and blended wet feedstocks, including sewage sludge from water resource recovery facilities (WRRF), food and agriculture wastes, algae, fats, oils and greases (FOG) and blends of dry and wet wastes/feedstocks. Historically, techno-economic analysis (TEA) and annual state of technology (SOT) assessments with standard economic assumptions used by the Bioenergy Technologies Office (BETO) were conducted for the wet waste HTL pathway leveraging experimental data collected from Pacific Northwest National Laboratory’s (PNNL) continuous flow reactor systems. The objective of the SOT assessment has been to guide and track progress of BETO’s HTL research and development (R&D) toward reduced cost and greenhouse gas (GHG) emissions for the pathway. However, gaps exist between BETO’s traditional SOT updates and the needs of key external stakeholders that – if addressed – will accelerate technology adoption. This Business Case Study aims to bridge this gap by providing an updated design, TEA, and LCA based on PNNL’s FY23 R&D with added analyses and information that provide enhanced relevance for stakeholders of the HTL technology. This includes specific siting, regional wet waste resource inventory and transportation cost analyses, fuel market information, sustainable fuel policy impacts, economic metrics of net present value (NPV) and internal rate of return (IRR), greenhouse gas (GHG) emissions analysis, and statistical analysis of cost and technical uncertainties of the HTL plant design. The study focuses on the “Detroit combined statistical area (CSA)” region for siting of a wet waste HTL plant adjacent to the Great Lakes Water Authority (GLWA) facility with guidance from industry participants. Regional resource and siting analyses were conducted to identify feedstock availability, scale, and cost, as well as a beneficial site location. TEA with detailed rigorous capital cost estimation for the specific site application was conducted to evaluate the key economic metrics of most value to industrial partners. These include total capital investment, operating costs, minimum fuel selling price (MFSP) of the biocrude and fuel blendstock, and NPV and internal rate of return IRR with sustainable fuel credits. Life cycle analysis was conducted to evaluate the supply chain greenhouse gas (GHG) emissions for the wet waste HTL process as compared with petroleum derived diesel. This study is also informed by years of R&D and process de-risking learnings and was conducted with a basic engineering HTL plant design and costing that akin to a “first-of-a-kind” plant economics. This differs from our conventional “nth plant ” SOT assessments. Specifically, the HTL process model has been updated with more operationally reliable methods for feed heating and phase separations. Further, we have implemented additional spare equipment for redundancy, a more rigorous installed equipment cost estimation approach, and additional costs associated with feed formatting and delivery, building, piping and site development. An Excel-based cost sheet based on the basic engineering design is also released alongside the report that allows users to conduct customized TEA with their own feed composition and financial assumptions.

09 BIOMASS FUELS↗

Supporting data for Site-specific Design Case Study for Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels

Hydrothermal liquefaction (HTL) is a thermal process that converts wet biomass to renewable hydrocarbon fuel blendstocks (i.e., renewable naphtha, renewable diesel, and sustainable aviation fuel (SAF)). It can utilize a wide range of pure and blended wet feedstocks, including sewage sludge from water resource recovery facilities (WRRF), food and agriculture wastes, algae, fats, oils and greases (FOG) and blends of dry and wet wastes/feedstocks. Historically, techno-economic analysis (TEA) and annual state of technology (SOT) assessments with standard economic assumptions used by the Bioenergy Technologies Office (BETO) were conducted for the wet waste HTL pathway leveraging experimental data collected from Pacific Northwest National Laboratory’s (PNNL) continuous flow reactor systems. The objective of the SOT assessment has been to guide and track progress of BETO’s HTL research and development (R&D) toward reduced cost and greenhouse gas (GHG) emissions for the pathway. However, gaps exist between BETO’s traditional SOT updates and the needs of key external stakeholders that – if addressed – will accelerate technology adoption. This Business Case Study aims to bridge this gap by providing an updated design, TEA, and LCA based on PNNL’s FY23 R&D with added analyses and information that provide enhanced relevance for stakeholders of the HTL technology. This includes specific siting, regional wet waste resource inventory and transportation cost analyses, fuel market information, sustainable fuel policy impacts, economic metrics of net present value (NPV) and internal rate of return (IRR), greenhouse gas (GHG) emissions analysis, and statistical analysis of cost and technical uncertainties of the HTL plant design. The study focuses on the “Detroit combined statistical area (CSA)” region for siting of a wet waste HTL plant adjacent to the Great Lakes Water Authority (GLWA) facility with guidance from industry participants. Regional resource and siting analyses were conducted to identify feedstock availability, scale, and cost, as well as a beneficial site location. TEA with detailed rigorous capital cost estimation for the specific site application was conducted to evaluate the key economic metrics of most value to industrial partners. These include total capital investment, operating costs, minimum fuel selling price (MFSP) of the biocrude and fuel blendstock, and NPV and internal rate of return IRR with sustainable fuel credits. Life cycle analysis was conducted to evaluate the supply chain greenhouse gas (GHG) emissions for the wet waste HTL process as compared with petroleum derived diesel. This study is also informed by years of R&D and process de-risking learnings and was conducted with a basic engineering HTL plant design and costing that akin to a “first-of-a-kind” plant economics. This differs from our conventional “nth plant ” SOT assessments. Specifically, the HTL process model has been updated with more operationally reliable methods for feed heating and phase separations. Further, we have implemented additional spare equipment for redundancy, a more rigorous installed equipment cost estimation approach, and additional costs associated with feed formatting and delivery, building, piping and site development. An Excel-based cost sheet based on the basic engineering design is also released alongside the report that allows users to conduct customized TEA with their own feed composition and financial assumptions.

Li, Shuyun↗

Microreactor Optimization Using Simulation And Economics (mouse)

Microreactor Optimization Using Simulation and Economics (MOUSE) is a tool that integrates both nuclear microreactor design and reactor economics to provide comprehensive evaluations and optimizations. This tool enables stakeholders to explore the interplay between technical and economic variables, guiding them towards effective and competitive microreactor solutions. For the reactor core simulations, MOUSE leverages the OpenMC Monte Carlo Particle Transport Code to perform detailed core simulations for various microreactor designs. The included OpenMC models are 2D core designs of a Liquid Metal Thermal Microreactor (LMTR), a Gas-Cooled TRISO-Fueled Microreactor (GCMR), and a Heat Pipe Microreactor. Beyond core design, MOUSE includes simplified calculations for: - Calculating the masses of heat exchangers within the system. - Mechanical power of pumps. - Estimating the area occupied by various buildings within the nuclear plant. For the economic analysis, MOUSE provides detailed bottom-up cost estimates, encompassing a wide range of costs including preconstruction costs, direct costs, indirect costs, training costs, financial costs, operation & maintenance (O&M) costs, and fuel costs. These cost estimations are developed using data from the MARVEL project and additional literature sources, enabling the calculation of total capital costs and levelized cost of energy for both first-of-a-kind and nth-of-a-kind microreactors. MOUSE also enables analysis of the cost drivers and competitiveness in the electricity market. MOUSE allows users to modify a wide array of technical and economic parameters to evaluate different scenarios and their impacts. Examples of these parameters include: Fuels, coolants, or reflector materials Enrichment levels Control drum materials and geometry Fuel pin geometry and materials Moderator pin geometry and materials Reactor core and reflector dimensions Packing factor for the TRISO particles Nuclear reactor power and reactor burnup Number of sensors Shielding thickness Reactor vessel and guard vessel dimensions Operational staff requirements Number of emergency shutdowns Levelization period Interest rate Construction duration Since MOUSE is powered by the WATTS toolkit, it supports optimization studies, parametric analyses, and uncertainty calculations/propagation. The optimization techniques enable users to identify optimal design and economic configurations. The parametric analysis tools allow users to explore the sensitivity of various parameters, while uncertainty propagation helps quantify the impact of uncertainties on overall performance and cost. User Interface and Workflow: Currently, MOUSE is a command-line-based tool. Users can input various reactor design or economic parameters, modify the designs, run simulations, and visualize results through comprehensive data visualization and reporting capabilities. The typical workflow involves setting up the reactor model, defining economic parameters, running simulations, and analyzing the results to make informed decisions. By combining advanced design calculations with detailed economic modeling, MOUSE provides a robust framework for optimizing nuclear microreactor technologies, enhancing their competitiveness, and guiding stakeholders towards innovative and cost-effective solutions.

Hanna, Botros [Idaho National Laboratory (INL), Id↗

Production of Carbon Nanomaterials and Sorbents from Domestic U.S. Coal (Final Report)

The main goal of this project was to produce high-value carbon nanomaterials and carbon sorbents from domestic coal resources in a cost-effective manner. Four types of domestic coal samples were processed through a combination of deashing, devolatilization, oxidation, reduction, and activation treatments to produce graphene oxide (GO), reduced graphene oxide (RGO), and activated carbon (AC). The precursors and developed materials were extensively characterized by various methods to investigate the impact of the coal feedstock type on the yield and quality of each product. A commercial graphite-based GO sample was included in the experimental work as the baseline material for comparison with the coal-based materials developed in this work. The performed work also included a technoeconomic analysis and cost estimation for a plant processing 20 tons/day coal, a market evaluation for the graphene materials, and a technology gap analysis. A simple process by concentrated nitric acid oxidation is used to oxidize coal precursors for the production of GO. Fine oxidized coal particles that were separated from larger oxidized coal particles had significantly higher oxygen contents and were identified as coal-based GO samples. Coarse oxidized coal particles were used as precursors for production of AC. Based on the Raman spectroscopy results, coal-based GO samples exhibited G and D bands similar to those of graphite-based GO samples. X-ray photoelectron spectroscopy revealed that coal-based GO samples had surface oxygen contents of ~26-35% that were higher than the oxygen contents of graphite-based GO samples. Larger particles of oxidized coal samples were activated under different conditions to produce high surface area functionalized AC. Prepared materials had surface areas exceeding 1,500 m 2 /g and pore volumes more than 1 cm 3 /g with different pore size distributions. Reduced graphene oxide samples were prepared by thermal reduction of both coal-based and graphite-based GO samples at 170-2800 ºC. Coal-based and graphite-based RGO samples exhibited similar carbon contents, Raman spectra, and XRD profiles. Heat treatment above 1500 ºC shifted RGO to synthetic graphite. Among anthracite, bituminous, subbituminous, and lignite coals tested, anthracite was the best precursor to produce carbon nanomaterials exhibiting properties similar to those of graphite-based materials. Anthracite-based carbon nanomaterials also had the highest production yields. Technoeconomic analysis estimated the production cost of GO and RGO for anthracite-based samples at about 2,600 and 4,200 $/ton, respectively, which is about two orders of magnitude lower than the current estimated price of graphite-based materials. Several gaps to further develop the proposed technology were identified and discussed that include process and equipment optimization, process integration, need for additional bench- and pilot-scale experiments, and other items to reduce the scale up risk. Market analysis reports suggested a compound annual growth rate of 40% for graphene and related materials. Short-term applications include composites, inks, and coatings. However, energy storage applications appear to be the dominant potential long-term applications. Different applications of coal-based GO and RGO need to be explored and clear metrics and standards for each application need to be developed.

01 COAL, LIGNITE, AND PEAT↗

ACCERT

The main function of ACCERT (The Algorithm for the Capital Cost Estimation of Reactor Technologies) is to provide an item-by-item estimate of the cost of a facility, at present a nuclear reactor complex, primarily nuclear power stations. The core of ACCERT is the large number of algorithms that have been developed and will continue to be developed. ACCERT is also a general methodology for identifying and organizing the individual items that are estimated using the ACCERT algorithms. ACCERT also summarize status and results; to save results and pull information from previous analyses; and to provide an interactive dynamic graphical user interface for a wide range of functions and visualizations.

Zhou, Jia [Argonne National Laboratory (ANL), Argo↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

Patterns, drivers, and a predictive model of dam removal cost in the United States

Given the burgeoning dam removal movement and the large number of dams approaching obsolescence in the United States, cost estimating data and tools are needed for dam removal prioritization, planning, and execution. We used the list of removed dams compiled by American Rivers to search for publicly available reported costs for dam removal projects. Total cost information could include component costs related to project planning, dam deconstruction, monitoring, and several categories of mitigation activities. We compiled reported costs from 455 unique sources for 668 dams removed in the United States from 1965 to 2020. The dam removals occurred within 571 unique projects involving 1–18 dams. When adjusted for inflation into 2020 USD, cost of these projects totaled $\$1.522$ billion, with per-dam costs ranging from $\$1$ thousand (k) to $\$268.8$ million (M). The median cost for dam removals was $\$157$k, $\$823$k, and $\$6.2$M for dams that were< 5 m, between 5–10 m, and > 10 m in height, respectively. Geographic differences in total costs showed that northern states in general, and the Pacific Northwest in particular, spent the most on dam removal. The Midwest and the Northeast spent proportionally more on removal of dams less than 5 m in height, whereas the Northwest and Southwest spent the most on larger dam removals > 10 m tall. We used stochastic gradient boosting with quantile regression to model dam removal cost against potential predictor variables including dam characteristics (dam height and material), hydrography (average annual discharge and drainage area), project complexity (inferred from construction and sediment management, mitigation, and post-removal cost drivers), and geographic region. Dam height, annual average discharge at the dam site, and project complexity were the predominant drivers of removal cost. The final model had an R 2 of 57% and when applied to a test dataset model predictions had a root mean squared error of $\$5.09$M and a mean absolute error of $\$1.45$M, indicating its potential utility to predict estimated costs of dam removal. We developed a R shiny application for estimating dam removal costs using customized model inputs for exploratory analyses and potential dam removal planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗