Search NASA⌕ Search

SEARCH · Search NASA

Results for “Costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Equivalent Mass versus Life Cycle Cost for Life Support Technology Selection

The decision to develop a particular life support technology or to select it for flight usually depends on the cost to develop and fly it. Other criteria such as performance, safety, reliability, crew time, and technical and schedule risk are considered, but cost is always an important factor. Because launch cost would account for much of the cost of a future planetary mission, and because launch cost is directly proportional to the mass launched, equivalent mass has been used instead of cost to select advanced life support technology. The equivalent mass of a life support system includes the estimated mass of the hardware and of the spacecraft pressurized volume, power supply, and cooling system that the hardware requires. The equivalent mass of a system is defined as the total payload launch mass needed to provide and support the system. An extension of equivalent mass, Equivalent System Mass (ESM), has been established for use in the Advanced Life Support project. ESM adds a mass-equivalent of crew time and possibly other cost factors to equivalent mass. Traditional equivalent mass is strictly based on flown mass and reflects only the launch cost. ESM includes other important cost factors, but it complicates the simple flown mass definition of equivalent mass by adding a non-physical mass penalty for crew time that may exceed the actual flown mass. Equivalent mass is used only in life support analysis. Life Cycle Cost (LCC) is much more commonly used. LCC includes DDT&E, launch, and operations costs. For Earth orbit rather than planetary missions, the launch cost is less than the cost of Design, Development, Test, and Evaluation (DDTBE). LCC is a more inclusive cost estimator than equivalent mass. The relative costs of development, launch, and operations vary depending on the mission destination and duration. Since DDTBE or operations may cost more than launch, LCC gives a more accurate relative cost ranking than equivalent mass. To select the lowest cost technology for a particular application we should use LCC rather than equivalent mass.

Jones, Harry↗

The Recent Large Reduction in Space Launch Cost

The development of commercial launch systems has substantially reduced the cost of space launch. NASA’s space shuttle had a cost of about $1.5 billion to launch 27,500 kg to Low Earth Orbit (LEO), $54,500/kg. SpaceX’s Falcon 9 now advertises a cost of $62 million to launch 22,800 kg to LEO, $2,720/kg. Commercial launch has reduced the cost to LEO by a factor of 20. This will have a substantial impact on the space industry, military space, and NASA. Existing launch providers are reducing their costs and so are satellite developers. The military foresees an opportunity to rapidly replace compromised space assets that provided communications, weather, surveillance, and positioning. NASA supported the development of commercial space launch and NASA science anticipates lower cost missions, but human space flight planning seems unreactive. Specifically, it has been claimed that commercial spaceflight has not reduced the cost to provide cargo to the International Space Station (ISS). The key factor is that the space shuttle can provide cargo and crew to ISS while the Falcon 9 must also use the Dragon capsule, which adds cost and reduces payload. The cost of a Falcon 9 and Dragon capsule mission to ISS is about $140 million with a payload of 6,000 kg, $23,300/kg. The shuttle payload to ISS is less than to LEO, 16,050 kg, so its cost is also higher at $93,400/kg. The launch cost to ISS has been reduced by a factor of 4. Calculations that show commercial launch provides no cost reduction to ISS assume half the usually cited shuttle cost and allocate it to the actual delivered payload, about half the full capacity. In a split mission, with crew and pressurized cargo launched separately from hardware and materials, the higher Falcon 9 plus Dragon costs would apply only to a fraction of the launch mass. A 4 to 1 cost reduction saves most, 75%, of the total cost. A further reduction to 10 or 20 to 1 saves 90 or 95%, but this is only a small, 15 or 20%, portion of the original cost. The recently reduced space launch cost can be expected to substantially impact human space flight.

Jones, Harry W.↗

Cost Scaling of a Real-World Exhaust Waste Heat Recovery Thermoelectric Generator: A Deeper Dive

Cost is equally important to power density or efficiency for the adoption of waste heat recovery thermoelectric generators (TEG) in many transportation and industrial energy recovery applications. In many cases the system design that minimizes cost (e.g., the $/W value) can be very different than the design that maximizes the system's efficiency or power density, and it is important to understand the relationship between those designs to optimize TEG performance-cost compromises. Expanding on recent cost analysis work and using more detailed system modeling, an enhanced cost scaling analysis of a waste heat recovery thermoelectric generator with more detailed, coupled treatment of the heat exchangers has been performed. In this analysis, the effect of the heat lost to the environment and updated relationships between the hot-side and cold-side conductances that maximize power output are considered. This coupled thermal and thermoelectric treatment of the exhaust waste heat recovery thermoelectric generator yields modified cost scaling and design optimization equations, which are now strongly dependent on the heat leakage fraction, exhaust mass flow rate, and heat exchanger effectiveness. This work shows that heat exchanger costs most often dominate the overall TE system costs, that it is extremely difficult to escape this regime, and in order to achieve TE system costs of $1/W it is necessary to achieve heat exchanger costs of $1/(W/K). Minimum TE system costs per watt generally coincide with maximum power points, but Preferred TE Design Regimes are identified where there is little cost penalty for moving into regions of higher efficiency and slightly lower power outputs. These regimes are closely tied to previously-identified low cost design regimes. This work shows that the optimum fill factor Fopt minimizing system costs decreases as heat losses increase, and increases as exhaust mass flow rate and heat exchanger effectiveness increase. These findings have profound implications on the design and operation of various thermoelectric (TE) waste heat 3 recovery systems. This work highlights the importance of heat exchanger costs on the overall TEG system costs, quantifies the possible TEG performance-cost domain space based on heat exchanger effects, and provides a focus for future system research and development efforts.

cost analysis↗

Equivalent Mass versus Life Cycle Cost for Life Support Technology Selection

The decision to develop a particular life support technology or to select it for flight usually depends on the cost to develop and fly it. Other criteria - performance, safety, reliability, crew time, and risk - are considered, but cost is always an important factor. Because launch cost accounts for most of the cost of planetary missions, and because launch cost is directly proportional to the mass launched, equivalent mass has been used instead of cost to select life support technology. The equivalent mass of a life support system includes the estimated masses of the hardware and of the pressurized volume, power supply, and cooling system that the hardware requires. The equivalent mass is defined as the total payload launch mass needed to provide and support the system. An extension of equivalent mass, Equivalent System Mass (ESM), has been established for use in Advanced Life Support. A crew time mass-equivalent and sometimes other non-mass factors are added to equivalent mass to create ESM. Equivalent mass is an estimate of the launch cost only. For earth orbit rather than planetary missions, the launch cost is usually exceeded by the cost of Design, Development, Test, and Evaluation (DDT&E). Equivalent mass is used only in life support analysis. Life Cycle Cost (LCC) is much more commonly used. LCC includes DDT&E, launch, and operations costs. Since LCC includes launch cost, it is always a more accurate cost estimator than equivalent mass. The relative costs of development, launch, and operations vary depending on the mission design, destination, and duration. Since DDT&E or operations may cost more than launch, LCC may give a more accurate cost ranking than equivalent mass. To be sure of identifying the lowest cost technology for a particular mission, we should use LCC rather than equivalent mass.

Jones, Harry↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

The Design-To-Cost Manifold

Design-to-cost is a popular technique for controlling costs. Although qualitative techniques exist for implementing design to cost, quantitative methods are sparse. In the launch vehicle and spacecraft engineering process, the question whether to minimize mass is usually an issue. The lack of quantification in this issue leads to arguments on both sides. This paper presents a mathematical technique which both quantifies the design-to-cost process and the mass/complexity issue. Parametric cost analysis generates and applies mathematical formulas called cost estimating relationships. In their most common forms, they are continuous and differentiable. This property permits the application of the mathematics of differentiable manifolds. Although the terminology sounds formidable, the application of the techniques requires only a knowledge of linear algebra and ordinary differential equations, common subjects in undergraduate scientific and engineering curricula. When the cost c is expressed as a differentiable function of n system metrics, setting the cost c to be a constant generates an n-1 dimensional subspace of the space of system metrics such that any set of metric values in that space satisfies the constant design-to-cost criterion. This space is a differentiable manifold upon which all mathematical properties of a differentiable manifold may be applied. One important property is that an easily implemented system of ordinary differential equations exists which permits optimization of any function of the system metrics, mass for example, over the design-to-cost manifold. A dual set of equations defines the directions of maximum and minimum cost change. A simplified approximation of the PRICE H(TM) production-production cost is used to generate this set of differential equations over [mass, complexity] space. The equations are solved in closed form to obtain the one dimensional design-to-cost trade and design-for-cost spaces. Preliminary results indicate that cost is relatively insensitive to changes in mass and that the reduction of complexity, both in the manufacturing process and of the spacecraft, is dominant in reducing cost.

Dean, Edwin B.↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Foreman, Veronica L.↗

Satellite Constellation Cost Modeling: An Aggregate Model

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗

High Reliability at Minimum Cost

This paper investigates the minimum cost of improving the reliability of complex technical systems. The two major methods to improve reliability are redesigning the system for higher reliability or providing redundant components to replace failed elements. The costs of redesign for reliability or adding redundancy are estimated. The most cost-effective combination for high reliability can be identified. The cost of increasing the intrinsic reliability of a system can be modeled as cost proportional to 1/(system failure rate) a , where the exponent “a” measures the difficulty of increasing reliability. The “a” exponent can vary from 0.25 to about 2.5. Operational reliability can also be increased by using redundant systems. The failure rate for N parallel redundant units is (system failure rate) N . The cost of redundancy is N times the system cost. The total redundant system cost is proportional to N/(system failure rate) a . The cost of redundancy increases as N gets larger, but larger N allows a higher system failure rate, which reduces the system design cost. There is a certain N, a certain level of redundancy, that has the minimum cost to achieve the required overall redundant system failure rate. The minimum cost for the redundant system is achieved at the optimum level of redundancy. The N for minimum cost is equal to -a ln (redundant system failure rate). The minimum cost of the N redundant systems is proportional to N * (original system failure rate) a . The optimum redesigned individual system failure rate is proportional to exp (-1/a), so the greater the difficulty, the higher the optimum individual system failure rate. Increasing the intrinsic reliability of a system encounters diminishing returns and at some point it becomes more cost-effective to add redundancy. The difficulty of increasing intrinsic system reliability determines the optimum design for high reliability at minimum cost.

reliability↗

High Reliability at Minimum Cost

This paper investigates the minimum cost of improving the reliability of complex technical systems. The two major methods to improve reliability are redesigning the system for higher reliability or providing redundant components to replace failed elements. The costs of redesign for reliability or adding redundancy are estimated. The most cost-effective combination for high reliability can be identified. The cost of increasing the intrinsic reliability of a system can be modeled as cost proportional to 1/(system failure rate) a , where the exponent “a” measures the difficulty of increasing reliability. The “a” exponent can vary from 0.25 to about 2.5. Operational reliability can also be increased by using redundant systems. The failure rate for N parallel redundant units is (system failure rate) N . The cost of redundancy is N times the system cost. The total redundant system cost is proportional to N/(system failure rate) a . The cost of redundancy increases as N gets larger, but larger N allows a higher system failure rate, which reduces the system design cost. There is a certain N, a certain level of redundancy, that has the minimum cost to achieve the required overall redundant system failure rate. The minimum cost for the redundant system is achieved at the optimum level of redundancy. The N for minimum cost is equal to -a ln (redundant system failure rate). The minimum cost of the N redundant systems is proportional to N * (original system failure rate) a . The optimum redesigned individual system failure rate is proportional to exp (-1/a), so the greater the difficulty, the higher the optimum individual system failure rate. Increasing the intrinsic reliability of a system encounters diminishing returns and at some point it becomes more cost-effective to add redundancy. The difficulty of increasing intrinsic system reliability determines the optimum design for high reliability at minimum cost.

reliability↗

Identification of Flights for Cost-Efficient Climate Impact Reduction

The aircraft-induced climate impact has drawn attention in recent years. Aviation operations affect the environment mainly through the release of carbon-dioxide, nitrogen-oxides, and by the formation of contrails. Recent research has shown that altering trajectories can reduce aviation environmental cost by reducing Absolute Global Temperature Change Potential, a climate assessment metric that adapts a linear system for modeling the global temperature response to aviation emissions and contrails. However, these methods will increase fuel consumption that leads to higher fuel costs imposed on airlines. The goal of this work is to identify ights for which the environmental cost of climate impact reduction outweighs the increase in operational cost on an individual aircraft basis. Environmental cost is quanti ed using the monetary social cost of carbon. The increase in operational cost is considering cost of additional fuel usage only. For this paper, an algorithm has been developed that modi es the trajectories of ights to evaluate the e ect of environ- mental cost and operational cost of ights in the United States National Airspace System. The algorithm identi es ights for which the environmental cost of climate impact can be reduced and modi es their trajectories to achieve maximum environmental net bene t, which is the di erence between reduction in environmental cost and additional operational cost. The result shows on a selected day, 16% of the ights among eight major airlines, or 2,043 ights, can achieve environmental net bene t using weather forecast data, resulting in net bene t of around $500,000. The result also suggests that the long-haul ights would be better candidates for cost-ecient climate impact reduction than the short haul ights. The algorithm will help to identify the characteristics of ights that are capable of applying cost-ecient climate impact reduction strategy.

climate impact reduction↗

Estimating the Life Cycle Cost of Space Systems

A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.

Life cycle cost↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Launch Vehicle Production and Operations Cost Metrics

Traditionally, launch vehicle cost has been evaluated based on $/Kg to orbit. This metric is calculated based on assumptions not typically met by a specific mission. These assumptions include the specified orbit whether Low Earth Orbit (LEO), Geostationary Earth Orbit (GEO), or both. The metric also assumes the payload utilizes the full lift mass of the launch vehicle, which is rarely true even with secondary payloads.1,2,3 Other approaches for cost metrics have been evaluated including unit cost of the launch vehicle and an approach to consider the full program production and operations costs.4 Unit cost considers the variable cost of the vehicle and the definition of variable costs are discussed. The full program production and operation costs include both the variable costs and the manufacturing base. This metric also distinguishes operations costs from production costs, including pre-flight operational testing. Operations costs also consider the costs of flight operations, including control center operation and maintenance. Each of these 3 cost metrics show different sensitivities to various aspects of launch vehicle cost drivers. The comparison of these metrics provides the strengths and weaknesses of each yielding an assessment useful for cost metric selection for launch vehicle programs.

Watson, Michael D.↗

Parametric Cost Estimates of Four 20 Ton Payload Mars EDL Vehicle Concepts

Cost is one of the biggest obstacles to sending humans to Mars. Many studies have examined various vehicles and/or technologies which could be used to send humans to Mars. However, nearly all of these studies have either ignored cost or have used the mass of the vehicles as a surrogate for cost. This work presents parametric cost estimates of four Mars Entry, Descent, and Landing vehicle concepts capable of landing 20 tons of payload on the surface of Mars. The concepts are the Co-Optimization Blunt-body Re-entry Analysis-Mid lift to drag ratio Rigid Vehicle (Cobra–MRV), Adaptive Deployable Entry and Placement Technology (ADEPT), Hypersonic Inflatable Aerodynamic Decelerator (HIAD), and Capsule concepts. Two variants of the HIAD concept are studied, one with a single HIAD heatshield and one with two HIADs. The study presents the development and production cost of each vehicle and the total cost to build five flight units and fifteen flight units. Five flight units is representative of a single mission, or a "Flags and Footprints" style campaign, whereas fifteen flight units is representative of multiple missions going to multiple sites on Mars. All costs presented in this work are normalized to the average of the first unit production cost of the lander concepts. There is a large amount of uncertainty both in the design of the vehicles and the cost of the vehicles and it is impossible to claim with certainty which vehicle will cost the least. However, it is likely that the total cost to produce five flight units will be in the following ranking from least costly to most costly, Single HIAD, Capsule, Dual HIAD, Cobra, ADEPT. The ranking for fifteen units is similar but with the positions of the Dual HIAD and Cobra reversed. This study only considers the cost of the entry vehicle and does not take into account the effect of the entry vehicle’s mass on the cost of the in-space propulsion stage or launch vehicle.

Paul D Friz↗

Heat Exchanger Performance Impacts on Optimum Cost Conditions in Thermoelectric Energy Recovery Designs

Cost is just as important as power density or efficiency for the adoption of waste heat recovery thermoelectric generators (TEG). Prior work [1] has shown that the system design that minimizes cost (e.g., the $/W value) can be close to the designs that maximize the system’s efficiency or power density, however, it is important to understand the relationship between those designs to optimize TEG performance-cost compromises. Expanding on recent work [1, 2, 3] the impact of heat exchanger conditions on the optimum TEG fill factors and cost scaling of a waste heat recovery thermoelectric generator with a detailed treatment of the hot side exhaust heat exchanger has been investigated further. The effect of the heat lost to the environment and updated relationships between the hot-side and cold-side conductances [4] that maximize power output are considered. The optimum fill factor to minimize TEG energy recovery system costs is strongly dependent on the heat leakage fraction, σ, the mass flow rate of the exhaust, the hot-side heat exchanger effectiveness, heat exchanger UAh, and heat flux. These relationships are explored and characterized for typical exhaust gas-flow conditions to show the inherent design complexities. The heat exchanger costs often dominate the TEG cost equation and it is critical to fully understand the tradeoff between heat exchanger performance, optimum TEG fill factors, and cost to establish potentially optimum design points within the cost-performance design space. This work will explore the design tradeoffs and relationships within the cost-efficiency-power density design space for a typical thermoelectric energy recovery system application. The interplay between optimum TEG fill factors and heat exchanger design can impact system footprint, volume, and mass in weight-sensitive applications. Less-effective, low-cost heat exchangers may outperform higher cost alternatives from a market adoption perspective. This shift of emphasis acknowledging the interdependence of optimum TEG fill factors and heat exchanger performance has significant implications on thermoelectric waste heat recovery systems designs and their operation. In addition, preferred TEG design regimes exist that accommodate reasonable compromises in TE performance and cost. This effort highlights how the optimum fill factor–heat exchanger performance relations couple to these optimum TEG performance-cost domains based on TEG-system-level analyses and provides a focus for future system research and development efforts.

Energy recovery↗

Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗