Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELAY LOCK”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

86 records · Page 5

Unsymmetrical QPSK demodulator

The present invention is a demodulator for demodulating an unsymmetrical QPSK signal (1), i.e., one in which the amplitudes of the I and Q channels are different, and the I and Q channels have been modulated by signals having differnt bit rates. Analog versions of the I and Q modulating baseband signals are first extracted from the carrier. Each baseband signal is then subjected to a bit-rate-matched low pass filter (23, 13). The channel having the higher bit rate is subjected to a delay (32) to time-align the two baseband signals. The time-aligned filtered signals are then amplified by amplifiers (22, 12) having unequal gains that are preselected to substantially equalize the amplifier (22, 12) outputs. The amplified time-aligned filtered signals are then subjected to a phase error (E) generating means (15, 25, 16, 26, 34). The phase error (E) is passed through a loop integrator (38) and a VCO (30) and back to the baseband signal extracting means to complete a phase lock loop. Frequency searching means (40), frequency lock detect means (42, 44), and AGC control ( 46, 8) are optionally present.

Guyer, Edward↗

Advanced Strategic and Tactical Relay Request Management for the Mars Relay Operations Service

This software provides a new set of capabilities for the Mars Relay Operations Service (MaROS) in support of Strategic and Tactical relay, including a highly interactive relay request Web user interface, mission control over relay planning time periods, and mission management of allowed strategic vs. tactical request parameters. Together, these new capabilities expand the scope of the system to include all elements critical for Tactical relay operations. Planning of replay activities spans a time period that is split into two distinct phases. The first phase is called Strategic, which begins at the time that relay opportunities are identified, and concludes at the point that the orbiter generates the flight sequences for on board execution. Any relay request changes from this point on are called Tactical. Tactical requests, otherwise called Orbit - er Relay State Changes (ORSC), are highly restricted in terms of what types of changes can be made, and the types of parameters that can be changed may differ from one orbiter to the next. For example, one orbiter may be able to delay the start of a relay request, while another may not. The legacy approach to ORSC management involves exchanges of e-mail with "requests for change" and "acknowledgement of approval," with no other tracking of changes outside of e-mail folders. MaROS Phases 1 and 2 provided the infrastructure for strategic relay for all supported missions. This new version, 3.0, introduces several capabilities that fully expand the scope of the system to include tactical relay. One new feature allows orbiter users to manage and "lock" Planning Periods, which allows the orbiter team to formalize the changeover from Strategic to Tactical operations. Another major feature allows users to interactively submit tactical request changes via a Web user interface. A third new feature allows orbiter missions to specify allowed tactical updates, which are automatically incorporated into the tactical change process. This software update is significant in that it provides the only centralized service for tactical request management available for relay missions.

Allard, Daniel A.↗

Relative Bioavailability of Scopolamine Dosage Forms and Interaction with Dextroamphetamine

The NASA Reduced Gravity Office (RGO) uses scopolamine (SCOP) and in combination with dextoamphetamine (DEX) to manage motion sickness symptoms during parabolic flights. The medications are dispensed as custom dosage forms as gelatin capsules. Anecdotal evidence of efficacy suggests that these formulations are unreliable and less efficacious for the treatment of motion sickness. We estimated bioavailability of four different oral formulations used by NASA for the treatment of motion sickness. Twelve healthy, non-smoking subjects between 21and 48 years of age received four treatments on separate days in a randomized fashion; the treatments were 0.8 mg SCOP alone as tablet, 0.8 mg SCOP alone in gel cap, 0.8 mg SCOP and 10 mg DEX as tablets, and 0.8 mg SCOP and 10 mg DEX in gel cap. After each treatment, blood, saliva, and urine samples were collected at scheduled time intervals for 24 h after dosing. Bioavailability and pharmacokinetic parameters were calculated and compared using ANOVA. After administration of SCOP tablets alone, maximum concentration (C(sub max)) and time for maximum concentration (t(sub max)) were 0.26 plus or minus 0.04 ng/mL and 0.71 plus or minus 0.02 h, respectively; volume of distribution, and clearance were 47.6 plus or minus 4.72 L/kg and 23.0 plus or minus 4.58 L/h/kg, respectively. SCOP t(sub max) after administration as gelcaps was significantly longer than that with tablets (1.04 h, p less than 0.05), but no significant differences in other pharmacokinetic parameters of SCOP were observed between the two dosage forms. When coadministered with DEX, the area underneath the concentration versus time curve (AUC) of SCOP was significantly reduced to 0.61 plus or minus 0.09 and 0.64 plus or minus 0.11 ng (raised dot) h/mL after administration as a tablet or gelcap formulation, respectively; SCOP C(sub max) was lower after coadministration with DEX, this difference, however, was not statistically significant. Delayed absorption with gelcaps coupled with reduced bioavailability with DEX coadministration may have resulted in the observed treatment failure with some of these formulations. This could result from failure to reach minimum effective concentrations after treatment with gelcap formulations before parabolic flights. A new nomogram for dosing is proposed for treatment with SCOP gelcaps or SCOP-DEX combination.

Boyd, Jason L.↗

Performance evaluation of a six-axis generalized force-reflecting teleoperator

Work in real-time distributed computation and control has culminated in a prototype force-reflecting telemanipulation system having a dissimilar master (cable-driven, force-reflecting hand controller) and a slave (PUMA 560 robot with custom controller), an extremely high sampling rate (1000 Hz), and a low loop computation delay (5 msec). In a series of experiments with this system and five trained test operators covering over 100 hours of teleoperation, performance was measured in a series of generic and application-driven tasks with and without force feedback, and with control shared between teleoperation and local sensor referenced control. Measurements defining task performance included 100-Hz recording of six-axis force/torque information from the slave manipulator wrist, task completion time, and visual observation of predefined task errors. The task consisted of high precision peg-in-hole insertion, electrical connectors, velcro attach-de-attach, and a twist-lock multi-pin connector. Each task was repeated three times under several operating conditions: normal bilateral telemanipulation, forward position control without force feedback, and shared control. In shared control, orientation was locally servo controlled to comply with applied torques, while translation was under operator control. All performance measures improved as capability was added along a spectrum of capabilities ranging from pure position control through force-reflecting teleoperation and shared control. Performance was optimal for the bare-handed operator.

Hannaford, B.↗

The stability to two-dimensional wakes and shear layers at high Mach numbers

This study is concerned with the stability properties of laminar free-shear-layer flows, and in particular symmetric two-dimensional wakes, for the supersonic through the hypersonic regimes. Emphasis is given to the use of proper wake profiles that satisfy the equations of motion at high Reynolds numbers. In particular the inviscid stability of a developing two-dimensional wake is studied as it accelerates at the trailing edge of a splitter plate. The nonparallelism of the flow is a leading-order effect in the calculation of the basic state, which is obtained numerically. Neutral stability characteristics are computed and the hypersonic stability is obtained by increasing the Mach number. It is found that the stability characteristics are altered significantly as the wake develops. Multiple modes (secondary modes) are found in the near wake that are closely related to the corresponding Blasius ones, but as the wake develops mode multiplicity is delayed to higher and higher Mach numbers. At a distance of about one plate length from the trailing edge, there is only one mode in a Mach number range of 0-20. The dominant mode emerging at all wake stations, and for high enough Mach numbers, is the so-called vorticity mode that is centered around the generalized inflection point layer. The structure of the dominant mode is also obtained analytically for all streamwise wake locations and it is shown how the far-wake limit is approached. Asymptotic results for the hypersonic mixing layer given by a tanh and a Lock distribution are also given.

Papageorgiou, Demetrios T.↗

NASA Tech Briefs, May 2008

Topics covered inclde: Deployable Wireless Camera Penetrators; Hand-Held Units for Short-Range Wireless Biotelemetry; Wearable Wireless Telemetry System for Implantable BioMEMS Sensors; Electronic Escape Trails for Firefighters; Architecture for a High-to-Medium-Voltage Power Converter; 24-Way Radial Power Combiner/Divider for 31 to 36 GHz; Three-Stage InP Submillimeter-Wave MMIC Amplifier; Fast Electromechanical Switches Based on Carbon Nanotubes; Solid-State High-Temperature Power Cells; Fast Offset Laser Phase-Locking System; Fabricating High-Resolution X-Ray Collimators; Embossed Teflon AF Laminate Membrane Microfluidic Diaphragm Valves; Flipperons for Improved Aerodynamic Performance; System Estimates Radius of Curvature of a Segmented Mirror; Refractory Ceramic Foams for Novel Applications; Self-Deploying Trusses Containing Shape-Memory Polymers; Fuel-Cell Electrolytes Based on Organosilica Hybrid Proton Conductors; Molecules for Fluorescence Detection of Specific Chemicals; Cell-Detection Technique for Automated Patch Clamping; Redesigned Human Metabolic Simulator; Compact, Highly Stable Ion Atomic Clock; LiGa(OTf)(sub 4) as an Electrolyte Salt for Li-Ion Cells; Compact Dielectric-Rod White-Light Delay Lines; Single-Mode WGM Resonators Fabricated by Diamond Turning; Mitigating Photon Jitter in Optical PPM Communication; MACOS Version 3.31; Fiber-Optic Determination of N2, O2, and Fuel Vapor in the Ullage of Liquid-Fuel Tanks; Spiking Neurons for Analysis of Patterns; Symmetric Phase-Only Filtering in Particle-Image Velocimetry; Efficient Coupler for a Bessel Beam Dispersive Element; and Attitude and Translation Control of a Solar Sail Vehicle.

Source record↗

Tracking performance and cycle slipping in the all-digital symbol synchronizer loop of the block 5 receiver

Computer simulated noise performance of the symbol synchronizer loop (SSL) in the Block 5 receiver is compared with the theoretical noise performance. Good agreement is seen at the higher loop SNR's (SNR(sub L)'s), with gradual degradation as the SNR(sub L) is decreased. For the different cases simulated, cycle slipping is observed (within the simulation time of 10(exp 4) seconds) at SNR(sub L)'s below different thresholds, ranging from 6 to 8.5 dB, comparable to that of a classical phase-locked loop. An important point, however, is that to achieve the desired loop SNR above the seemingly low threshold to avoid cycle slipping, a large data-to-loop-noise power ratio, P(sub D)/(N(sub 0)B(sub L)), is necessary (at least 13 dB larger than the desired SNR(sub L) in the optimum case and larger otherwise). This is due to the large squaring loss (greater than or equal to 13 dB) inherent in the SSL. For the special case of symbol rates approximately equaling the loop update rate, a more accurate equivalent model accounting for an extra loop update period delay (characteristic of the SSL phase detector design) is derived. This model results in a more accurate estimation of the noise-equivalent bandwidth of the loop.

Aung, M.↗

Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Performance Verification Report, METSAT Phase Locked Oscillator Assembly, P/N 1348360-1, S/N's F07 and F08

Two Flight Model AMSU-A Phase Locked Oscillators (PIN 1348360-1, S/N F07 and F08) have been tested per AES Test Procedure AE-26758 Rev. B, which include full functional testing, vibration testing, thermal testing, and AM/FM Noise testing. Both assemblies satisfactorily passed all performance requirements of the AE-26633 Product Specification. During the thermal cycling of both units, spurs developed 1 MHz from the carrier when the units were cold, and TARs were written to document the anomaly. The symptoms observed in both cases were consistent with inadequate tuning. The units were successfully re-tuned. In the case of F08, re-tuning required a design change which allowed a greater range of possible values for tuning resisters. Both units completed thermal cycling without further delay. The results of the required tests are presented in the following section as test data. As indicated on the test data sheets, all measured data passed all requirements.

Pines, D.↗

Improvements to pulsed phase locked loop strain monitor

A pulse phase locked loop system according to the present invention is described. A frequency generator such as a voltage controlled oscillator (VCO) generates an output signal and a reference signal having a frequency equal to that of the output signal. A transmitting gate gates the output frequency signal and this gated signal drives a transmitting transducer which transmits an acoustic wave through a material. A sample/hold samples a signal indicative of the transmitted wave which is received by a receiving transducer. Divide-by-n counters control these gating and sampling functions in response to the reference signal of the frequency generator. Specifically, the output signal is gated at a rate of F/h, wherein F is the frequency of the output signal and h is an integer; and the received signal is sampled at a delay of F/n wherein n is an integer.

Froggatt, Mark E.↗

Pulsed phase locked loop strain monitor

A pulse phase locked loop system according to the present invention is described. A frequency generator such as a voltage controlled oscillator (VCO) generates an output signal and a reference signal having a frequency equal to that of the output signal. A transmitting gate gates the output frequency signal and this gated signal drives a transmitting transducer which transmits an acoustic wave through a material. A sample/hold samples a signal indicative of the transmitted wave which is received by a receiving transducer. Divide-by-n counters control these gating and sampling functions in response to the reference signal of the frequency generator. Specifically, the output signal is gated at a rate of F/h, wherein F is the frequency of the output signal and h is an integer; and the received signal is sampled at a delay of F/n wherein n is an integer.

Froggatt, Mark E.↗

Miniature EPSPs and sensory encoding in the primary afferents of the vestibular lagena of the toadfish, Opsanus tau

The synaptic activity transmitted from vestibular hair cells of the lagena to primary afferent neurons was recorded in vitro using sharp, intracellular microelectrodes. At rest, the activity was composed of miniature excitatory postsynaptic potentials (mEPSPs) at frequencies from 5 to 20/s and action potentials (APs) at frequencies betwen 0 and 10/s. mEPSPs recorded from a single fiber displayed a large variability. For mEPSPs not triggering APs, amplitudes exhibited an average coefficient of variance (CV) of 0.323 and rise times an average CV of 0.516. APs were only triggered by mEPSPs with larger amplitudes (estimated 4-6 mV) and/or steeper maximum rate of rise (10.9 mV/ms, +/- 3.7 SD, n=4 experiments) compared to (3.50 mV/ms, +/-0.07 SD, n=6 experiments) for nontriggering mEPSPs. The smallest mEPSPs showed a fast rise time (0.99 ms between 10% and 90% of peak amplitude) and limited variability across fibers (CV:0.18) confirming that they were not attenuated signals, but rather represented single-transmitter discharges (TDs). The mEPSP amplitude and rise-time relationship suggests that many mEPSPs represented several, rather than a single pulse of secretion of TDs. According to the estimated overall TD frequency, the coincidence of TDs contributing to the same mEPSP were not statistically independent, indicating a positive interaction between TDs that is reminiscent of the way subminiature signals group to form miniature signals at the neuromuscular junction. Depending on the duration and intensity of efferent stimulation, a complete block of AP initiation occurred either immediately or after a delay of a few seconds. Efferent stimulation did not significantly change AP threshold level, but abruptly decreased mEPSP frequency to a near-complete block that followed the block of APs. Maximum mEPSP rate of rise decreased during, and recovered progressively after, efferent stimulation. After termination of efferent stimulation, mEPSP amplitude did not recover instantly and for a few seconds the amplitude distribution of synaptic events showed fewer large-amplitude events than during the control period. This confirms that mEPSP amplitude and rate of rise properties, which are critical for triggering afferent APs, are modified by efferent activity. The depression of afferent AP firing during efferent stimulation corresponded to a decrease in mEPSP frequency and, to a lesser extent, a decrease in mEPSP amplitude and rate of rise, suggesting, a decrease in the level of interaction among TDs contibuting to a mEPSP.

Non-NASA Center↗

Combined Global Navigation Satellite Systems in the Space Service Volume

Besides providing position, velocity, and timing (PVT) for terrestrial users, the Global Positioning System (GPS) is also being used to provide PVT information for earth orbiting satellites. In 2006, F. H. Bauer, et. al., defined the Space Service Volume in the paper GPS in the Space Service Volume , presented at ION s 19th international Technical Meeting of the Satellite Division, and looked at GPS coverage for orbiting satellites. With GLONASS already operational, and the first satellites of the Galileo and Beidou/COMPASS constellations already in orbit, it is time to look at the use of the new Global Navigation Satellite Systems (GNSS) coming into service to provide PVT information for earth orbiting satellites. This presentation extends GPS in the Space Service Volume by examining the coverage capability of combinations of the new constellations with GPS GPS was first explored as a system for refining the position, velocity, and timing of other spacecraft equipped with GPS receivers in the early eighties. Because of this, a new GPS utility developed beyond the original purpose of providing position, velocity, and timing services for land, maritime, and aerial applications. GPS signals are now received and processed by spacecraft both above and below the GPS constellation, including signals that spill over the limb of the earth. Support of GPS space applications is now part of the system plan for GPS, and support of the Space Service Volume by other GNSS providers has been proposed to the UN International Committee on GNSS (ICG). GPS has been demonstrated to provide decimeter level position accuracy in real-time for satellites in low Earth orbit (centimeter level in non-real-time applications). GPS has been proven useful for satellites in geosynchronous orbit, and also for satellites in highly elliptical orbits. Depending on how many satellites are in view, one can keep time locked to the GNSS standard, and through that to Universal Time as long as at least one satellite is in view (the longest duration with no satellites in view is important in determining the maximum clock drift from GNSS time). Instantaneous position requires four satellites in view, but because orbital motion is predictable, it is possible to build up knowledge of the orbital position gradually through time without a need for constant four satellite coverage. However, it is desirable to have four satellite coverage when performing satellite maneuvers, since there can be significant changes in velocity, leading to large changes in orbit parameter, causing substantial divergence in position over time. The Space Service Volume has been defined as the volume between three thousand km altitude and geosynchronous altitude, and can be divided into medium orbit services between three thousand km altitude and eight thousand km altitude, and high orbit services above eight thousand km. The Terrestrial Service Volume includes the Earth s surface, the atmosphere, and space below the altitude of three thousand km. The Terrestrial Service Volume is the volume within which the GNSS systems will have very similar performance to the Earth surface, and satellites need only use the signals specified to provide terrestrial performance. Above three thousand km the use of signals passing by the Earth s limb becomes important, so it is desirable to have additional information on signal strength, phase delay, and group delay covering wider beam angles than are needed for terrestrial service (and which can be obtained by monitoring GNSS signals from the Earth s surface). This presentation will look at each of the new GNSS constellations in combination with GPS (GLONASS with GPS, Galileo with GPS, Beidou/COMPASS with GPS), and also at the combination of all four GNSS systems. The presentation will largely follow the format of GPS in the Space Service Volume , presenting data on the availability of one, two, three, or four of the various combinations of GNSS constellation satelles at approximately two thousand grid points evenly spaced and fixed in longitude and latitude, the duration of the longest single-fold outages (intervals when no satellites are available), and the duration of the longest four-fold outages (intervals when fewer than four satellites are available) at several altitudes. Following the original paper, we will use the altitudes of three hundred km (typical LEO satellite, and within the Terrestrial Service Volume), at three thousand km (border between Terrestrial Service Volume and Space Service Volume), at eight thousand km (the border between medium and high orbit service within the Space Service Volume), at fifteen thousand km (just below the GNSS constellations), at twenty five thousand km (just above the GNSS constellations), at thirty six thousand, five hundred km (limit of Space Service Volume definition, geosynchronous altitude), and at seventy thousand km (to show the potential usefulness of GNSS beyond geosynchronous altitude).

Force, Dale A.↗

Using LDPC Code Constraints to Aid Recovery of Symbol Timing

A method of utilizing information available in the constraints imposed by a low-density parity-check (LDPC) code has been proposed as a means of aiding the recovery of symbol timing in the reception of a binary-phase-shift-keying (BPSK) signal representing such a code in the presence of noise, timing error, and/or Doppler shift between the transmitter and the receiver. This method and the receiver architecture in which it would be implemented belong to a class of timing-recovery methods and corresponding receiver architectures characterized as pilotless in that they do not require transmission and reception of pilot signals. Acquisition and tracking of a signal of the type described above have traditionally been performed upstream of, and independently of, decoding and have typically involved utilization of a phase-locked loop (PLL). However, the LDPC decoding process, which is iterative, provides information that can be fed back to the timing-recovery receiver circuits to improve performance significantly over that attainable in the absence of such feedback. Prior methods of coupling LDPC decoding with timing recovery had focused on the use of output code words produced as the iterations progress. In contrast, in the present method, one exploits the information available from the metrics computed for the constraint nodes of an LDPC code during the decoding process. In addition, the method involves the use of a waveform model that captures, better than do the waveform models of the prior methods, distortions introduced by receiver timing errors and transmitter/ receiver motions. An LDPC code is commonly represented by use of a bipartite graph containing two sets of nodes. In the graph corresponding to an (n,k) code, the n variable nodes correspond to the code word symbols and the n-k constraint nodes represent the constraints that the code places on the variable nodes in order for them to form a valid code word. The decoding procedure involves iterative computation of values associated with these nodes. A constraint node represents a parity-check equation using a set of variable nodes as inputs. A valid decoded code word is obtained if all parity-check equations are satisfied. After each iteration, the metrics associated with each constraint node can be evaluated to determine the status of the associated parity check. Heretofore, normally, these metrics would be utilized only within the LDPC decoding process to assess whether or not variable nodes had converged to a codeword. In the present method, it is recognized that these metrics can be used to determine accuracy of the timing estimates used in acquiring the sampled data that constitute the input to the LDPC decoder. In fact, the number of constraints that are satisfied exhibits a peak near the optimal timing estimate. Coarse timing estimation (or first-stage estimation as described below) is found via a parametric search for this peak. The present method calls for a two-stage receiver architecture illustrated in the figure. The first stage would correct large time delays and frequency offsets; the second stage would track random walks and correct residual time and frequency offsets. In the first stage, constraint-node feedback from the LDPC decoder would be employed in a search algorithm in which the searches would be performed in successively narrower windows to find the correct time delay and/or frequency offset. The second stage would include a conventional first-order PLL with a decision-aided timing-error detector that would utilize, as its decision aid, decoded symbols from the LDPC decoder. The method has been tested by means of computational simulations in cases involving various timing and frequency errors. The results of the simulations ined in the ideal case of perfect timing in the receiver.

Jones, Christopher↗

Simulation and Analysis of Opportunistic MSPA for Multiple Cubesat Deployments

We describe a software approach for simultaneous demodulation and decoding of multiple frequency- multiplexed spacecraft across multiple ground stations. The approach involves the use of a single ground antenna with wide enough aperture to receive multiple angularly adjacent spacecraft simultaneously. This technique uses a wide-band RF signal digitizer coupled with easily and cheaply duplicated software-receiver modules to independently process the frequency-channelized downlink signals from the spacecraft. This approach relaxes the need for realizable modems at each antenna, for example in the Deep-SpaceNetwork (DSN), and can also function as a delayed data retrieval method for cubesat missions with routine science data return. Thus, we hope that this solution can enable more efficient utilization of DSN assets. We concentrate on a simulation similar to the proposed Exploration Mission 1 (EM-1) mission from a geometric perspective. To that end, the simulated scenario involves ten secondary cubesats deployed and tracked for a span of four days (the modeled motion over the first four days of the mission does not include any Trajectory Correction Maneuvers (TCMs) that may be necessary as the cubesats approach the moon). Transmissions from the cubesats may be received through a combination of DSN ground sites based on visibility. The cubesats are assumed to utilize typical cubesat transmit powers and a waveform similar to that of the Iris radio. One cubesat is chosen as the “target” and is considered tracked by all ground-stations throughout the simulation (i.e., it is consistently at the center of the main lobe of each ground station antenna when the ground station is in view of the cubesat in terms of elevation angle). The simulation effort involves synthesizing a wideband signal that includes the ten cubesats across a large bandwidth due to each cubesat having its own center-frequency in X-band, near 8.4 GHz. Each signal is characterized by its own Doppler-frequency shift and free-space path-loss computed through the underlying geometry of the simulation as well as the cubesat transmit power. Finally, each cubesat signal experiences a unique antenna gain at each ground station due to the underlying antenna pattern and spacecraft-ground station geometry. We establish two interesting findings: First, the link-budget for the EM-1-like scenario is almost completely limited by the angle between the center of the antenna main beam and the cubesat, which means that the signal-to-noise ratio is wholly adequate for demodulation and decoding at the simulated bitrates unless the cubesat exits the main beam. Secondly, and fortunately due to the use of a software radio architecture, we show that it is possible to successfully receive signals from most cubesats for the entire 4-day simulation. Due to the signal-to-noise ratio being sufficient for demodulation even after the side-lobe’s 17dB reduction in SNR, the software radio can still demodulate such cubesats as long as the radio is capable of re-establishing carrier lock as the cubesats leave the main beam and enter the side-lobe. Considering that the target application utilizes offline processing, a loss of lock can be detected and lock can be re-established by iterating over the data. Extensive simulations demonstrate these results.

Abraham, Douglas S.↗