At least 91 records · Page 5

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Secure Communications Concept and API Concept for Integrating XENDEE Positronix with TESLA PowerPack System at Site 300 (Final Deliverable)

The CleanStart DERMS project focuses on the management of Distributed Energy Resources (DER) for enhanced distribution grid resilience. The demonstration site has changed from Riverside Public Utility to the LLNS Site 300 DERS demonstration site. This project has so far focused only on device level controllers and local area controllers. These controllers potentially lack the ability to perform supervisory control and grid interactive control functions, essential for grid-level optimal DER management. This project seeks to close that gap in development of secure communication concept and appropriate Application Programming Interfaces (API) to enable integration with DERs, device level and local area controllers, such as Distributed Energy Resources Management System (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of an Energy Services Interface for the EGoT

The Energy Services Interface (ESI) is a set of rules that ensure private, secure, and trustworthy information exchange between Grid Service Providers (GSPs) and utility customers. Large-scale adoption of Distributed Energy Resources (DERs) will be necessary for GSPs to dispatch effective grid services, and to stimulate technological innovations in DER and DERMS (DER Management Systems) technologies, as well as novel grid service programs. The ESI promotes these objectives by advancing a set of rules and interoperability requirements that define bi-directional, service-oriented, logical interfaces between GSPs and customers’ DERs, with expectations for privacy, security, and trust. The ESI rules and interoperability requirements establish boundaries between customers and GSPs that delineate the functions and responsibilities that must be implemented by the developers of Energy Grid of Things (EGoT) ecosystem products. These rules impose constraints on the implementation of a DERMS. The ESI interoperability requirements are based on the Interoperability Maturity Model (IMM), developed by the Grid Modernization Laboratory Consortium. By emphasizing private, secure, and trustworthy information exchange, and by mandating a service-oriented and interoperable architecture, the ESI promotes the development of an EGoT ecosystem that motivates customer participation and technological innovation. Interoperability will encourage innovation by reducing barriers to entry and increasing confidence of stakeholders. Customers will be willing to participate in DER service programs that establish trust and emphasize customer choice. Large-scale customer participation ensures GSPs have ample DER resources to provide grid services that have significant impact on grid reliability and reduce electricity cost for consumers. This in turn signals economic opportunities that encourage innovation, resulting in the development of a robust EGoT ecosystem.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Evaluation of Distributed Energy Resources Management System via Advanced Hardware-in-the-Loop Simulation: Preprint

This paper presents an advanced hardware-in-the-loop (HIL) platform to evaluate the performance of voltage regulation coordinated across advanced distribution management systems (ADMS), distributed energy management system (DERMS), and DERs. The HIL platform provides realistic laboratory testing, including accurate modeling of the real-world distribution system from a utility partner, real controller (ADMS and DERMs) and power (DERs) hardware, and standard communications protocols. The test results show proper functionalities of the integrated platform and performance of the peak load management of coordinated control systems. Based on the laboratory testing, the utility can set up the same grid automation system to manage DERs to achieve system-level control and operation objectives (e.g., peak load management), thus derisking potential issues (e.g., instability) for field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Distributed Trust Model Simulator for Energy Grid of Things Distributed Energy Resource Management System

The evolution of networks into more distributed, self-reliant nodes has mitigated single-point failures that plagued traditional centralized networks. Applied to power grids, distributed systems can increase the integrity and availability of grid services while also offering a power management solution. However, while distributed networks provide scalability, security, and sustainability compared to centralized networks, their distributed nature makes them harder for anomaly detection and prevention. Incorporating a Distributed Trust Model (DTM) System into an Energy Grid of Things Distributed Energy Resource Management System (EGOT DERMS) allows grid participants to be characterized and their communication to be analyzed for possible attacks. A Trust Model simulator is needed to evaluate and improve the DTM System.Trustworthiness is calculated using a Trust Model. While many trust models exist, most only consider 2-3 matrices to evaluate trust. The TM proposed in this thesis uses a Metric Vector of Trust (MVoT) monitoring 17 parameters when assessing trust. Moreover, unlike standard trust models, the proposed trust model establishes a method to test the trust between various actors within the network and probe the trust model itself. Using a Trust Model Simulator, MVoT calaculations, initial values, and parameters are fine-tuned to achieve high-confidence message classifications and minimize false positives. The DTM System and Trust Mode Simulation Suite allow for distributed trust evaluation with a real-time classification of EGOT DERMS actors, providing additional security for distributed systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Master Services Agreement - Flexible Feeder/Distribution System Support: Cooperative Research and Development (Final Report)

PGE will engage NREL on a broad range of projects related to the integration of distributed energy resources (DERs) into the utility's operations. This portfolio of work could include projects focused on DER adoption models, advanced distribution management system (ADMS) and distributed energy management system (DERMS) design, DER dispatch strategy development, and DER valuation framework development. Additional topics could include long-term energy planning, renewable energy, energy efficiency and demand-side management. As well as technology evaluations and design guidance for building retrofits and new construction projects, energy and energy infrastructure planning, policies, and markets (and their analysis), energy storage, energy security and resilience (including energy system-related cybersecurity), transportation and mobility, technology integration analysis. Additionally, other assistance as requested by PGE consistent with NREL’s expertise.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Security Constrained Economic Optimization of Photovoltaic and Other Distributed Assets

The rapid growth of distributed energy resources (DERs), especially photovoltaic (PV) systems, has introduced new complexities in maintaining grid reliability, stability, and cost-effective operation. This project addresses these challenges by developing and demonstrating a scalable GridOS Distributed Energy Resource Management System (DERMS) that enables secure, real-time optimization and control of DERs at the distribution feeder level.

14 SOLAR ENERGY↗

ADMS and DER Coordinated Capability Demonstrations to Assist Utilities to Increase Resilience and Reliability

The proliferation of distributed energy resources (DERs) presents opportunities and challenges to distribution grid operators. The National Renewable Energy Laboratory (NREL) and Survalent are collaborating to demonstrate advanced distribution management system (ADMS) and DER coordinated capability to assist utilities to increase resilience and reliability. ADMS and Distributed Energy Resource Management System (DERMS) Coordination for Peak Load Management (PLM). Fault Location, Isolation, and Service Restoration (FLISR) in the Presence of DERs. Grid-Edge Intelligent Distribution Automation System for Self-Healing Distribution Grids. These laboratory demonstrations use NREL's ADMS Test Bed.

ADMS↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions

There are fewer conventional, dispatchable generation resources and more variable renewable energy (VRE) and distributed energy resources (DERs). There is more uncertainty from bulk-level VRE and net demand from distribution systems with high DER levels. FAST-DERMS aims to develop and demonstrate a scalable solution for managing uncertainties in supply and demand at the grid edge. We propose that distribution system operators (DSOs) provide firm net load forecasts to the bulk system operator's energy management system (EMS).

distributed energy resources↗

Securing Digital Energy Infrastructure: BESS Procurement Guidance & Sample Contract Terms

Presentation for Procurement webinar providing technical guidance for entities, procuring Battery Energy Storage Systems (BESS), Inverter Based Resources (IBR), Distributed Energy Resource Management Systems (DERMS) and other energy digital systems and services on how to incorporate cybersecurity requirements into the procurement process to enhance both supply chain security as well as entity-specific supply chain risk management (SCRM) programs.

99 GENERAL AND MISCELLANEOUS↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Online Model-Free Chance-Constrained Distribution System Voltage Control Using DERs

This paper proposes an online data-driven distributed energy resource management system (DERMS) optimization method using chance-constrained formulation to address distribution system voltage regulation. This is achieved via the local sensitivity factor (LSF)-enabled reformulation of the DER control into a linear programming (LP) problem, which is easy and computationally efficient to solve. The LSF is estimated using online measurements and does not need the assumption of node load information. The latter is usually required for existing optimization-based methods but is difficult to obtain in practice. To mitigate measurement uncertainties, a scenario-based chance-constrained formulation is constructed. Compared with other control methods, the results carried out in a realistic distribution system show that the proposed method can effectively eliminate voltage violation issues.

chance-constrained optimization↗

Area-Preserving Mapping of 3D Carotid Ultrasound Images Using Density-Equalizing Reference Map

Carotid atherosclerosis is a focal disease at the bifurcations of the carotid artery. To quantitatively monitor the local changes in the vessel-wall-plus-plaque thickness (VWT) and compare the VWT distributions for different patients or for the same patients at different ultrasound scanning sessions, a mapping technique is required to adjust for the geometric variability of different carotid artery models. In this work, we propose a novel method called density-equalizing reference map (DERM) for mapping 3D carotid surfaces to a standardized 2D carotid template, with an emphasis on preserving the local geometry of the carotid surface by minimizing the local area distortion. The initial map was generated by a previously described arc-length scaling (ALS) mapping method, which projects a 3D carotid surface onto a 2D non-convex L-shaped domain. A smooth and area-preserving flattened map was subsequently constructed by deforming the ALS map using the proposed algorithm that combines the density-equalizing map and the reference map techniques. This combination allows, for the first time, one-to-one mapping from a 3D surface to a standardized non-convex planar domain in an area-preserving manner. Evaluations using 20 carotid surface models show that the proposed method reduced the area distortion of the flattening maps by over 80% as compared to the ALS mapping method.

60 APPLIED LIFE SCIENCES↗

Online Model-Free DER Dispatch Via Adaptive Voltage Sensitivity Estimation and Chance Constrained Programming

This paper proposes an online data-driven distributed energy resource management system (DERMS) for distribution system optimal DER dispatch as well as voltage regulation. Here, the key innovation is to leverage the Local Sensitivity Factor (LSF) for transforming the DER control into a computationally efficient linear programming (LP) problem. By taking real-time measurements, the estimation of LSF eliminates the need for an accurate distribution system model as well as full nodal load information, which is difficult to achieve in practice. A robust recursive least squares method is also developed to ensure the robust estimation of LSF, which is initialized using reasonable values from model-derived LSFs. This allows the system to adapt to changing operational conditions effectively. A scenario-based, chance-constrained framework is further employed to ensure voltage remains within acceptable limits in the presence of measurement and estimation uncertainties. Test results on a real-world, 759-node distribution network located in western Colorado, U.S., validate the effectiveness and robustness of the proposed control approach and demonstrate its superior performance as compared to alternative methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-Driven Mean-Corrected Recursive Estimation-Based Optimal DER Dispatch for Distribution System Voltage Control

Recent advances in smart inverters offer opportunities to mitigate adverse grid impacts caused by high penetrations of distributed photovoltaics (PV) in distribution grids, such as voltage violations. Here, this paper proposes a novel measurement-driven optimal power flow (OPF)-based distributed energy resource management system (DERMS) voltage regulation via recursive sensitivity estimation informed coordinated control of distributed PV inverters. The proposed approach leverages available grid and controllable DER measurements, eliminating reliance on system model information while being adaptive and robust to volatile operating conditions. A mean-corrected recursive ridge regression (MCRRR) algorithm is proposed for sensitivity estimation, continuously refining the sensitivity model through a closed-form solution. It effectively manages varying grid operating conditions, such as changes in power injections and topology reconfiguration, to facilitate a time-varying update of the Load Sensitivity Factors (LSF). The proposed approach is formulated as a linear programming (LP) problem and is thus scalable to larger-scale distribution systems. Its effectiveness and efficiency are demonstrated on a realistic distribution feeder with high PV penetrations in Southern California, USA.

14 SOLAR ENERGY↗

Resilience in Infrastructure Systems [Slides]

Threats and Resilience of the US Energy Infrastructure are described, including a summary of the CleanStart Distributed Energy Resource Management System (DERMS) project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Recommendations for Distributed Energy Resource Patching

While computer systems, software applications, and operational technology (OT)/Industrial Control System (ICS) devices are regularly updated through automated and manual processes, there are several unique challenges associated with distributed energy resource (DER) patching. Millions of DER devices from dozens of vendors have been deployed in home, corporate, and utility network environments that may or may not be internet-connected. These devices make up a growing portion of the electric power critical infrastructure system and are expected to operate for decades. During that operational period, it is anticipated that critical and noncritical firmware patches will be regularly created to improve DER functional capabilities or repair security deficiencies in the equipment. The SunSpec/Sandia DER Cybersecurity Workgroup created a Patching Subgroup to investigate appropriate recommendations for the DER patching, holding fortnightly meetings for more than nine months. The group focused on DER equipment, but the observations and recommendations contained in this report also apply to DERMS tools and other OT equipment used in the end-to-end DER communication environment. The group found there were many standards and guides that discuss firmware lifecycles, patch and asset management, and code-signing implementations, but did not singularly cover the needs of the DER industry. This report collates best practices from these standards organizations and establishes a set of best practices that may be used as a basis for future national or international patching guides or standards.

97 MATHEMATICS AND COMPUTING↗