Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEVELOPING COUNTRIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Can Radiation Therapy Quality Assurance Improve Nasopharyngeal Cancer Outcomes in Low- and Middle-Income Countries: Reporting the First Phase of a Prospective International Atomic Energy Agency Study

Most new nasopharyngeal cancer cases occur in low-income and middle-income countries, and these patients experience poorer overall survival than that of new nasopharyngeal cancer cases in high-income countries. The goal of this research project is to determine whether the introduction of a radiation therapy quality assurance program can ultimately improve outcomes for nasopharyngeal cancer patients in lower-income and middle-income countries. This study reports the results of the first phase of the International Atomic Energy Agency Coordinated Research Project (325-E3-TM-47712).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Epidemiologic and economic considerations regarding persistently infected cattle during vaccinate-to-live strategies for control of foot-and-mouth disease in FMD-free regions

Development of a foot-and-mouth disease (FMD) carrier state following FMD virus (FMDV) infection is a well-established phenomenon in cattle. However, the proportion of cattle likely to become carriers and the duration of the carrier state at a herd or population-level are incompletely understood. The objective of this study was to examine the epidemiologic and economic impacts of vaccination-to-live strategy in a disease-free region or country. We developed and simulated scenarios of FMD spread and control in the US livestock population, which included depopulation for a limited period, followed by a vaccinate-to-live strategy with strong biosecurity and movement restrictions. Six scenarios of FMD spread and control were simulated in the InterSpread Plus (ISP) modeling tool. Data on the number of infected and depopulated cattle (by operation types) from ISP model runs were used to estimate the monthly number of infected but not depopulated (potential carrier) cattle after the infection. Using available literature data on the FMD carrier state, we estimated the monthly proportion of carrier cattle (from infected but not depopulated cattle) over time following infection. Among the simulated scenarios, the median (25th, 75th percentile) number of infected cattle ranged from 43,217 (42,819, 55,274) head to 148,907 (75,819, 205,350) head, and the epidemic duration ranged from 20 (11, 30) to 76 (38, 136) days. In general, larger outbreaks occurred when depopulation was carried out through longer periods, and the onset of the vaccination was late (p > 0.05). The estimated proportion of surviving cattle, which were infected and not depopulated and had the potential to become persistently infected ranged from 14 to 35% of total infected cattle. Production losses in beef and dairy sectors were higher when outbreaks started in multiple states simultaneously, but production losses were small compared to trade losses and consumer avoidance losses. These results can be used to inform the consideration of a vaccinate-to-live strategy for FMD outbreaks and the development of appropriate post-outbreak management strategies. Furthermore, this output will enable a more detailed examination of the epidemiologic and economic implications of allowing convalescent cattle to survive and remain in production chains after FMD outbreaks in FMD-free regions.

60 APPLIED LIFE SCIENCES↗

Scaling Up Energy Efficiency Investment in Emerging Markets - Private Sector Perspectives

Since 2000, electricity demand has flattened and decoupled from Gross Domestic Product (GDP) growth in the Organization for Economic Cooperation and Development (OECD) countries. This trend is anticipated to continue for the next several decades and is largely attributed to the implementation of energy efficiency measures. However, non-OECD countries (emerging markets) have experienced, and are projected to continue experiencing, increasing electricity demands. If the world is to meet the requirements of the Paris Agreement, annual investments in clean energy and energy efficiency need to increase by a factor of six by 2050, compared to 2015. Information presented in this paper is based on qualitative and quantitative data collection and analysis methods to provide an empirical understanding of barriers to private sector clean energy investment including microgrid development, energy efficiency, smart grid development, and utility-scale wind and solar in emerging markets. Through literature review, a survey, and a series of webinar dialogues, USAID and the U.S. Department of Energy National Renewable Energy Laboratory (NREL) solicited input from private sector actors, including developers, project financiers, manufacturers and technical assistance service providers, on the challenges they face to market entry in emerging markets, and their suggestions for improving market competitiveness.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

International assessment of priority environmental issues for land-based and offshore wind energy development

Non-technical summary A substantial increase in wind energy deployment worldwide is required to help achieve international targets for decreasing global carbon emissions and limiting the impacts of climate change. In response to global concerns regarding the environmental effects of wind energy, the International Energy Agency Wind Technical Collaborative Program initiated Task 34 – Working Together to Resolve Environmental Effects of Wind Energy or WREN. As part of WREN, this study performed an international assessment with the global wind energy and environmental community to determine priority environmental issues over the next 5‒10 years and help support collaborative interactions among researchers, developers, regulators, and stakeholders. Technical summary A systematic assessment was performed using feedback from the international community to identify priority environmental issues for land-based and offshore wind energy development. Given the global nature of wind energy development, feedback was of interest from all countries where such development is underway or planned to help meet United Nations Intergovernmental Panel on Climate Change targets. The assessment prioritized environmental issues over the next 5–10 years associated with wind energy development and received a total of 294 responses from 28 countries. For land-based wind, the highest-ranked issues included turbine collision risk for volant species (birds and bats), cumulative effects on species and ecosystems, and indirect effects such as avoidance and displacement. For offshore wind, the highest-ranked issues included cumulative effects, turbine collision risk, underwater noise (e.g. marine mammals and fish), and displacement. Emerging considerations for these priorities include potential application to future technologies (e.g. larger turbines and floating turbines), new stressors and species in frontier regions, and cumulative effects for multiple projects at a regional scale. For both land-based and offshore wind, effectiveness of minimization measures (e.g. detection and deterrence technologies) and costs for monitoring, minimization, and mitigation were identified as overarching challenges. Social media summary Turbine collisions and cumulative effects among the international environmental priorities for wind energy development.

17 WIND ENERGY↗

Infrastructure inequality is a characteristic of urbanization

Urbanization can challenge sustainable development if it produces unequal outcomes. Infrastructure is an important urbanization dimension, providing services to support diverse urban activities. However, it can lock in unequal outcomes due to its durable nature. This paper studies inequalities in infrastructure distributions to derive insights into the structure and characteristics of unequal outcomes associated with urbanization. We analyzed infrastructure inequalities in two emerging economies in the Global South: India and South Africa. We developed and applied an inequality measure to understand the structure of inequality in infrastructure provisioning (based on census data) and infrastructure availability (based on satellite nighttime lights [NTLs] data). Consistent with differences in economic inequality, results show greater inequalities in South Africa than in India and greater urban inequalities than rural inequalities. Nevertheless, inequalities in urban infrastructure provisioning and infrastructure availability increase from finer to coarser spatial scales. NTL-based inequality measurements additionally show that inequalities are more concentrated at coarse spatial scales in India than in South Africa. Finally, results show that urban inequalities in infrastructure provisioning covary with urbanization levels conceptualized as a multidimensional phenomenon, including demographic, economic, and infrastructural dimensions. Similarly, inequalities in urban infrastructure availability increase monotonically with infrastructure development levels and urban population size. Together, these findings underscore infrastructure inequalities as a feature of urbanization and suggest that understanding urban inequalities requires applying an inequality lens to urbanization.

54 ENVIRONMENTAL SCIENCES↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY↗

Recommendations for Establishing Local Rural Electrification Programs Using Photovoltaic Systems [Recomendaciones Para la Implantacidn de Programas Locales de Electrificacidn Rural con Sistemas Fotovoltaicos]

Photovoltaic (PV) technology is becoming one the best options for supplying electricity to rural communities far from electrical networks and which have a small and disperse demand for electricity. As the cost of the technology goes down and its development advances, opportunities for applying it continue to grow. As a result, in the near future we will probably see an increase in massive application programs of this technology in rural Mexico. This document presents some of the most relevant problems needing immediate solution to increase the possibility of success in establishing photovoltaic programs for rural electrification in Mexico. These problems are influenced by economic, technological, engineering, infrastructural, social and political issues. The paper presents the requirements for an industrial center based on PV technology, the accessibility of replacement parts and maintenance service, development of financial solutions, training of the users and introducing norms and technical regulations. The document summarizes the issue of rural electrification in Mexico, emphasizing the low population density in these areas. A brief description is given of photovoltaics showing different configurations that can be utilized for supplying electricity to the rural areas. The issues involved and recommendations for introducing PV systems to the rural area are described.

14 SOLAR ENERGY↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

Accomplishments and challenges of metrics for sustainable energy, population, and economics as illustrated through three countries

The global Sustainable Development Goals require meeting multiple objectives on energy, population, economics, and ecosystems. Development and economic growth as defined by current metrics requires energy inputs, yet energy growth can also increase negative impacts on natural systems. To achieve sustainable development goals, policymakers and technologists will need energy system solutions that consider not only cost and efficiency but also population, quality of life, natural ecosystems, and culture that accommodates different starting points and transition timelines of various countries. To explore possible approaches, this perspectives paper summarizes energy in the context of economic growth and population, illustrating concepts through the diverse status and direction of three countries--Japan, the United States, and Bangladesh--as potential views into a post-growth sustainable future. Four fundamental questions on long-term energy development are identified, related to optimal energy use per capita, sustainable global energy demand, managing an energy transition with stable population, and the need for generalizable approaches across countries.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technology Development and Field Monitoring in nZEB - US Country report IEA HPT Annex 49 Task 3

The International Energy Agency (IEA) Heat Pumping Technologies (HPT) Annex 49, “Design and Integration of Heat Pumps for Nearly Zero Energy Buildings,” deals with the application of heat pumps (HPs) as a core component of the HVAC system for nearly or net-zero energy buildings. This report covers the Task 3 activities of the US team. Three institutions are involved on the US team and have worked on the following projects. 1) Oak Ridge National Laboratory (ORNL) summarized development activities since the conclusion of IEA HPT Annex 40 for several integrated HP (IHP) systems - electric ground-source IHP and air-source IHP versions and engine-driven AS-IHP version. 2) The University of Maryland partnered with ORNL and Blue Bear Management to develop a personal cooling device called RoCo that can provide personalized conditioned air to occupants in inadequately or unconditioned environments. With RoCo, building facility management can elevate the HVAC thermostat settings without compromising occupants’ thermal comfort. Researchers have found that a 4°F increase in thermostat settings can save 12–30% energy savings. Therefore, RoCo is a promising technology that can help reduce building energy consumption and facilitate achievement of net-zero energy building performance. 3) The National Institute of Standards and Technology (NIST) is working on a field study effort on the NIST Net-Zero Energy Residential Test Facility. Two air-source split-system HPs were installed in a residential, net-zero energy home that was constructed as a laboratory on the NIST campus in Gaithersburg, Maryland. The first HP was a two-stage, 7 kW (2 ton), 15.8 seasonal energy efficiency ratio (SEER), 9.05 heating seasonal performance factor (HSPF) conventionally ducted system; the second HP was a variable-speed, 10.6 kW (3 ton), 14 SEER, 8.35 HSPF, high-velocity ducted system. These two systems operated side by side, using separate supply ducts and a common return duct, on a weekly alternating schedule to condition the home that was operated with very consistent simulated thermal loads. The team wanted to determine whether the high-velocity system could provide comparable energy-use efficiency to the conventional system. The results of this study showed that it did meet the required loads and had slightly greater efficiency; the average cooling coefficient of performance (COP) was (0.40 ± 0.11) higher, and the average heating COP was statistically equal. A new firmware was provided at the end of the heating season that greatly improved the performance of the high-velocity system; its average heating COP went from (1.8 ± 0.9) to (2.5 ± 1.1) at a 95% confidence level. The new firmware heating COP averaged (1.05 ± 0.23) higher than the old firmware over the same outdoor temperatures. The defrost performance is very different for these two systems, yet they consumed equivalent energy per HDD. The conventional system uses a timed-initiate, temperature-terminate algorithm with auxiliary electric resistive heating, whereas the high-velocity system uses calculated evaporator parameters with a hot-gas bypass before a full reverse-cycle defrost with no supplementary resistive heat.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Licensing, Regulations and Developing Guidance for Nuclear Technology Deployment for Embarking countries in Africa

The African region is witnessing an increased number of countries at different stages of implementing or considering the introduction of peaceful nuclear power programs to meet the demand of their rapidly growing economies as well as clean energy needs. Grid size, cost, licensing, and regulations will be some of the challenges to deploying larger power reactors. A key element of the regulatory framework will be the inclusion of nuclear security information and assurance that security is integrated into the license review process.As each country continue to implement and consider different reactor designs from several vendors, the significance of customer knowledge of licensing, Regulations, and guidance document to facilitate the deployment and operational needs for nuclear technology cannot be over-emphasized. This special session will bring together a selected panel of key stakeholders and policymakers from embarking countries in Africa to participate in a panel discussion to share their experience in the licensing, regulations, and development of guidance for power plant deployment. The session will also consider and identify potential gaps that may affect the licensing and regulatory applications for the future nuclear infrastructure. As well, the panel will promote regional networking and communication to increase capacities in readiness for the potential deployment of additional technology, such as Small Modular Reactors.

Dahunsi, Stephen↗

Policy Framework to Improve Mobility Efficiency and Electrify Transportation in Tonga

The Kingdom of Tonga, like many small island developing states, is heavily dependent on imported fossil fuels to meet its current energy needs, especially for transportation. The Kingdom has requested a policy framework that benefits its land transportation sector by saving cost and time, increasing resilience, and reducing petroleum and greenhouse gas (GHG) emissions. This framework was developed by building on past work, namely the Tonga Energy Efficiency Master Plan 2020-2030 (TEEMP), the Tonga Energy Road Map 2021-2035 (TERMPLUS), and the Regional Electric Mobility Policy for Pacific Island Countries and Territories developed by the Pacific Centre for Renewable Energy and Energy Efficiency (PCREEE). The strengths, weaknesses, opportunities, and threats to Tonga's land transportation system were identified at stakeholder working group meetings in Tonga in June 2023. A set of appropriate policies that have been effective in relevant jurisdictions were then discussed and refined by the working group. The resulting 27 policies are defined according to intended outcomes, relationship to other proposed policies, applications in other relevant jurisdictions, hurdles to implementation, resilience impact, equity impact, and government revenue impact. Some of the policies are also accompanied by implementation recommendations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

European Union's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement - but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda - whose broad purpose is to raise collective ambition - and the Global Power System Transformation (G-PST) Consortium - whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

Chile's Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Chile↗

Australia's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Australia↗