Search NASA⌕ Search

SEARCH · Search NASA

Results for “DIRECTIONAL DRILLING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

EGS Reservoir Modeling for Developing Geothermal District Heating at Cornell University: Preprint

Cornell University is pursuing development of an enhanced geothermal system (EGS) for providing heating to its main campus in Upstate New York. A ~10,000 ft (~3 km) deep vertical observation well ("CUBO") was drilled in 2022 to characterize the subsurface using wellbore logging, borehole imaging, fluid sampling, mini-frac tests, coring and drill cutting analysis. Down-hole temperatures measured at 3 km depth are about 80 degrees C, sufficiently high for direct-use heating. The well drilled through generally low porosity and low permeability Paleozoic sedimentary formations and into metamorphic basement rock, encountered at about 9,400 ft depth. Leveraging subsurface data obtained through CUBO, we investigated technical feasibility and design requirements of a doublet well system with horizontal laterals connected to a fracture network created through hydraulic fracturing. The EGS reservoir is sized to provide a nominal heat output in the range 5 to 10 MWth of continuous heating over a 15 year-lifetime with limited thermal drawdown. We applied the Gringarten Multiple parallel fracture model, the Cornell Discrete Fracture Simulator FOXFEM and the commercial simulator ResFrac to estimate required heat transfer area and design a potential hydraulic stimulation treatment. Reservoir simulations indicate that, depending on fluid flow rate and injection temperature, 2 to 3 km2 of effective fracture heat transfer area is required to supply the target heat output of 5 to 10 MWth over 15 years.

district heating↗

EGS Reservoir Modeling for Developing Geothermal District Heating at Cornell University

Cornell University is pursuing development of an enhanced geothermal system (EGS) for providing heating to its main campus in Upstate New York. A ~10,000 ft (~3 km) deep vertical observation well ('CUBO') was drilled in 2022 to characterize the subsurface using wellbore logging, borehole imaging, fluid sampling, mini-frac tests, coring and drill cutting analysis. Down-hole temperatures measured at 3 km depth are about 80 degrees C, sufficiently high for direct-use heating. The well drilled through generally low porosity and low permeability Paleozoic sedimentary formations and into metamorphic basement rock, encountered at about 9,400 ft depth. Leveraging subsurface data obtained through CUBO, we investigated technical feasibility and design requirements of a doublet well system with horizontal laterals connected to a fracture network created through hydraulic fracturing. The EGS reservoir is sized to provide a nominal heat output in the range 5 to 10 MWth of continuous heating over a 15 year-lifetime with limited thermal drawdown. We applied the Gringarten Multiple parallel fracture model, the Cornell Discrete Fracture Simulator FOXFEM and the commercial simulator ResFrac to estimate required heat transfer area and design a potential hydraulic stimulation treatment. Reservoir simulations indicate that, depending on fluid flow rate and injection temperature, 2 to 3 km2 of effective fracture heat transfer area is required to supply the target heat output of 5 to 10 MWth over 15 years.

district heating↗

Groundwater Monitoring and Control Before Decommissioning of the Research Reactor VVR-S from Magurele-Bucharest

The research reactor type VVR-S (tank type, water is cooler, moderator and reflector, thermal power- 2 MW, thermal energy- 9. 52 GW d) was put into service in July 1957 and, in December 1997 was shout down. In 2002, Romanian Government decided to put the research reactor in the permanent shut-down in order to start the decommissioning. This nuclear facility was used in nuclear research and radioisotope production for 40 years, without events, incidents or accidents. Within the same site, in the immediate vicinity of the research reactor, there are many other nuclear facilities: Radioactive Waste Treatment Plant, Tandem Van der Graaf heavy ions accelerator, Cyclotron, Industrial Irradiator, Radioisotope Production Center. The objectives of this work were dedicated on the water underground analyses described in the following context: - presentation of the approaches in planning the number of drillings, vertical soil profiles (characteristics, analyses, direction of the flow of underground water, uncertainties in measurements); - presentation of the instrumentation used in analyses of water, soil and vegetation samples - analyses and final conclusions on results of the measurements; - comparison of the results of measurements on underground water from drillings with the measurements results on samples from the town and the system of drinking water - supplied from the second level of underground water. According to the analysis, in general, no values higher than the Minimum Detectable Activity were detected in water samples (MDA) for Pb{sup 212}, Bi{sup 214}, Pb{sup 214}, Ac{sup 228}, but situated under values foreseen in drinking water. Distribution of Uranium As results of the Uranium determination, values higher than 0,004 mg/l (4 ppb) were detected, values that represent the average contents in the underground water. The higher values, 2-3 times higher than background, were detected in the water from the drillings F15, F12, F5, F13, drillings located between RWTP (Radioactive Waste Treatment Plant) - the 300 m{sup 3} tanks and the Spent Filters Storage (SFS). At south of this area, on the leaking direction of the underground water layer, in the drillings F1, F2, F3, F18 and at east, in F6, F7, the natural Uranium values are within the background for the underground-water. Distribution of Radon For the Radon determination with RAD 7 equipment, water samples were taken from the same piezo-metrical drilling, 2 or 4 times during of six months period, and then, the average contents were calculated, which varied between 0,35 - 2,1 Bq/l. The values higher than 1,1 -1,2 Bq/l were detected in the water taken from the drillings located in the northern part (F10, F11) and in the eastern part (F6, F8) of the Institute fences (around of the radioactive waste storage facilities). The concentrations of 0,3 - 0,5 Bq/l are in the underground-water layer 'intercepted' by the piezo-metrical drillings (F1, F2, F3) located near the Nuclear Reactor. Concentration of heavy metals: 0.04-0.08 mg/l Pb in F5, F14, F7, F8 exceeding MCA-Maximum Admissible Concentration (0.01 mg/l) for Pb, and for Zn in F5, F7, F8, F14 are 0.2-0.5 mg/l situated under MCA , and 0.18 mg/l in F18, in accordance with tendency of decreasing of concentration of contaminants. After 50 years of deploying nuclear activities on the site the underground water quality is in very good condition. Taking into consideration the direction of the underground water flow, it results that, only in the area of underground pipe, around of the research reactor and radioactive waste treatment plant, the quality of water is influenced, and remediation actions are not necessary. Based on measurements executed in F18, the water quality is the same with any other part of the region. During the decommissioning of the Research Reactor, the samples from 18 drillings will be analysed monthly, and the contents of the heavy metals, Pb and Zn, will be monitored carefully, together with all the factors: air, soil, vegetation, subsoil, water surface and underground water. A great attention will be paid to the dismantlement of the underground structures, the 30 m{sup 3} tank, that collects all the liquid radioactive waste from the reactor, the pipes that connects this tank to the other two 300 m{sup 3} tanks, from RWTP, the ventilation ducts between the Spent Filters Storage and reactor's stack, in order to prevent contamination of surface and underground water. Engineering Absorbent Barriers will be used both for hydrophilic substances and for hydrophobic substances, tents will be used for preventing the spread of possible contaminants from the pipes and tanks, owing to the precipitation or wind, and the tanks and pipes will be drained to eliminate the spills. Since we are dealing with a multinuclear facility site, the on site and off site Monitoring Program of Institute will be properly upgraded, taking into account the values of the derived emission limit approved by Regulatory Body, before, during and after the completion of the works with impact on underground water. In another work will be presented radiological map of land associated of decommissioning project (on surface, at 0.15 m and 0.30 m in depth of soil) and estimation of migration rate in soil up to ground water level. Applying these measures, taking account of the radiological status at the beginning of the project, will mean savings and a good protection of the environment in completing the decommissioning project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Innovative Exploration Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico

Surface exploration methods like geological mapping, mineralogical analysis, hydrogeochemistry, magnetotelluric as well as seismic, have been used to analyze the study area and identify a location for a production size exploration well. After that location has been identified in a blind resource scenario, a 5,657 feet deep deviated production size exploration well has been drilled. The surface casing is 13 3/8 inch with open hole starting at 4,136 feet. The well has been designed to be deepened up to 8,000 feet if needed. The first 4,180 feet have been sufficiently analyzed and were considered only of direct use interest prior to drilling. That has been confirmed. The remaining depth couldn't be logged by the time the report has been submitted because the well had an obstruction at 4,180 feet. Currently the power production potential for the drilling location cannot be determined without additional work-over of the well. The seismic conducted prior to drilling was a 100% success, providing a clear image of the subsurface and allowing for geosteering to be fact based and on target. Once the obstruction has been removed, work can continue to determine the power generation potential at that location.

15 GEOTHERMAL ENERGY↗

Conceptual Waste Packaging Options for Deep Borehole Disposal

This report presents four concepts for packaging of radioactive waste for disposal in deep boreholes. Two of these are reference-size packages (11 inch outer diameter) and two are smaller (5 inch) for disposal of Cs/Sr capsules. All four have an assumed length of approximately 18.5 feet, which allows the internal length of the waste volume to be 16.4 feet. However, package length and volume can be scaled by changing the length of the middle, tubular section. The materials proposed for use are low-alloy steels, commonly used in the oil-and-gas industry. Threaded connections between packages, and internal threads used to seal the waste cavity, are common oilfield types. Two types of fill ports are proposed: flask-type and internal-flush. All four package design concepts would withstand hydrostatic pressure of 9,600 psi, with factor safety 2.0. The combined loading condition includes axial tension and compression from the weight of a string or stack of packages in the disposal borehole, either during lower and emplacement of a string, or after stacking of multiple packages emplaced singly. Combined loading also includes bending that may occur during emplacement, particularly for a string of packages threaded together. Flask-type packages would be fabricated and heat-treated, if necessary, before loading waste. The fill port would be narrower than the waste cavity inner diameter, so the flask type is suitable for directly loading bulk granular waste, or loading slim waste canisters (e.g., containing Cs/Sr capsules) that fit through the port. The fill port would be sealed with a tapered, threaded plug, with a welded cover plate (welded after loading). Threaded connections between packages and between packages and a drill string, would be standard drill pipe threads. The internal flush packaging concepts would use semi-flush oilfield tubing, which is internally flush but has a slight external upset at the joints. This type of tubing can be obtained with premium, low-profile threaded connections at each end. The internal-flush design would be suitable for loading waste that arrives from the originating site in weld-sealed, cylindrical canisters. Internal, tapered plugs with sealing filet welds would seal the tubing at each end. The taper would be precisely machined onto both the tubing and the plug, producing a metal-metal sealing surface that is compressed as the package is subjected to hydrostatic pressure. The lower plug would be welded in place before loading, while the upper plug would be placed and welded after loading. Conceptual Waste Packaging Options for Deep Borehole Disposal July 30, 2015 iv Threaded connections between packages would allow emplacement singly or in strings screwed together at the disposal site. For emplacement on a drill string the drill pipe would be connected directly into the top package of a string (using an adapter sub to mate with premium semi-flush tubing threads). Alternatively, for wireline emplacement the same package designs could be emplaced singly using a sub with wireline latch, on the upper end. Threaded connections on the bottom of the lowermost package would allow attachment of a crush box, instrumentation, etc.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microhole Wireless Steering While Drilling System

A background to Coiled Tubing Bottom Hole Assemblies (CT-BHA) is given, and the development of a bi-directional communications and power module (BCPM)component is described. The successful operation of this component in both the laboratory and field environment is described. The primary conclusion of this development is that the BCPM component operates as anticipated within the CT-BHA, and significantly extends the possibility of drilling with coiled tubing in the microhole environment.

02 PETROLEUM↗

Contaminant point source localization error estimates as functions of data quantity and model quality

We develop empirically-grounded error envelopes for localization of a point contamination release event in the saturated zone of a previously uncharacterized heterogeneous aquifer into which a number of plume-intercepting wells have been drilled. We assume that flow direction in the aquifer is known exactly and velocity is known to within a factor of two of our best guess from well observations prior to source identification. Other aquifer and source parameters must be estimated by interpretation of well breakthrough data via the advection-dispersion equation. We employ high performance computing to generate numerous random realizations of aquifer parameters and well locations, simulate well breakthrough data, and then employ unsupervised machine optimization techniques to estimate the most likely spatial (or space-time) location of the source. Tabulating the accuracy of these estimates from the multiple realizations, we relate the size of 90% and 95% confidence envelopes to the data quantity (number of wells) and model quality (fidelity of ADE interpretation model to actual concentrations in a heterogeneous aquifer with channelized flow). We find that for purely spatial localization of the contaminant source, increased data quantities can make up for reduced model quality. For space-time localization, we find similar qualitative behavior, but significantly degraded spatial localization reliability and less improvement from extra data collection. Since the space-time source localization problem is much more challenging, we also tried a multiple-initial-guess optimization strategy. Furthermore, this greatly enhanced performance, but gains from additional data collection remained limited.

54 ENVIRONMENTAL SCIENCES↗

Recovery Act: High-Temperature Circuit Boards for use in Geothermal Well Monitoring Applications

The U.S. Department of Energy is leading the development of alternative energy sources that will ensure the long-term energy independence of our nation. One of the key renewable resources currently being advanced is geothermal energy. To tap into the large potential offered by generating power from the heat of the earth, and for geothermal energy to be more widely used, it will be necessary to drill deeper wells to reach the hot, dry rock located up to 10 km beneath the earth’s surface. In this instance, water will be introduced into the well to create a geothermal reservoir. A geothermal well produced in this manner is referred to as an enhanced geothermal system (EGS). EGS reservoirs are typically at depths of 3 to 10 km, and the temperatures at these depths have become a limiting factor in the application of existing downhole technologies. These high temperatures are especially problematic for electronic systems such as downhole data-logging tools, which are used to map and characterize the fractures and high-permeability regions in underground formations. Information provided by these tools is assessed so that underground formations capable of providing geothermal energy can be identified, and the subsequent drilling operations can be accurately directed to those locations. The mapping of geothermal resources involves the design and fabrication of sensor packages, including the electronic control modules, to quantify downhole conditions (300°C temperature, high pressure, seismic activity, etc.). Because of the extreme depths at which these measurements are performed, it is most desirable to perform the sensor signal processing downhole and then transmit the information to the surface. This approach necessitates the use of high-temperature electronics that can operate in the downhole environment. Downhole signal processing in EGS wells will require the development and demonstration of circuit boards that can withstand the elevated temperatures found at these depths. At present, the highest-temperature commercially available circuit boards are based on polyimide materials, and those have maximum use temperatures of 200 to 250°C. In addition to thermal stability, downhole electronics must also be fabricated into high-aspect-ratio packages. For example, the multilayer assemblies produced at SNL were approximately 2.5 cm wide and 50 cm long. Because of this very high form factor, glass-fiber-reinforced polymers are much more desirable than multilayer ceramic modules (MCM). MCMs have many advantages for some applications, but are susceptible to damage induced by the mechanical and vibrational loads commonly experienced by data-logging tools. Thus, as EGS technology continues to advance, there is a strong need for multilayer electronics that can provide the necessary thermal performance while also being compatible with high-form-factor circuit designs. This project involved the design and development of high-temperature circuit materials, as well as the fabrication and testing of circuit components. The material development included the evaluation of various polymer/fiberglass composites, whereas the circuit components were tested using conventional microelectronic evaluation techniques. This effort targeted development of a new class of high-temperature multilayer circuit boards for use in downhole data-logging applications where temperatures are on the order of 300°C. This is consistent with DOE’s multiyear plan for advancing technologies for use in enhanced geothermal systems. Organic and inorganic polymer systems, both with glass reinforcements, were considered to provide the following performance at elevated temperatures: • Mechanical strength and durability • High dielectric strength and electrical resistivity • Thermal stability • Strong adhesion to copper to ensure the reliability of the multilayer assemblies • Processing characteristics that are consistent with state-of-the-art multilayer circuit board manufacturing practices

15 GEOTHERMAL ENERGY↗

Facies Analysis of the Prairie Du Chien Group in the Illinois Basin and Analogous Rocks in Missouri and Kentucky

Funded in 2023 by the U.S. Department of Energy’s Phase II Carbon Storage Assurance Facility Enterprise (CarbonSAFE) initiative, a Heidelberg Materials cement plant in Mitchell, Indiana, is currently being evaluated as a potential Carbon Capture and Storage (CCS) subsurface injection site. The Heidelberg CCS project targets the middle to upper Prairie du Chien Group (Early Ordovician) in southwestern Indiana. Assessment of reservoir feasibility requires collection of field data, seismic surveys, well-log correlation, geologic modeling, characterization well drilling, well testing, and reservoir simulation. However, the proposed Heidelberg CCS site is in a data-limited region, lacking both outcrop analogs and deep wells penetrating the target interval, which makes geologic modelling difficult prior to drilling a characterization well. To directly address this problem, the present study was undertaken to understand the sedimentologic composition and stratigraphic architecture of the Prairie du Chien Group from analogous outcrops and cores in the Illinois Basin and adjacent regions.

Ali, Shah Bilawal [Univ. of Illinois at Urbana-Cha↗

DEPLOYING TECHNOLOGY ADVANCEMENTS FOR CHARACTERIZING THE VADOSE ZONE IN SINGLE-SHELL TANK WASTE MANAGEMENT AREAS

As much as one million gallons of waste is believed to have leaked from tanks, pipelines or other equipment in the single-shell tank farm waste management areas (WMAs) within the 200 East and West areas of the U.S. Department of Energy's Hanford Site near Richland, Washington. Although some contamination has reached groundwater, most contamination still resides in the vadose zone. The magnitude ofthis problem requires new approaches for soil characterization if we are to understand the nature and extent of the contamination and take action to protect the enviromnent. Because of the complexity and expense of drilling traditional boreholes in contaminated soil, direct push characterization using a hydraulic hammer has been extensively employed. Direct push probe holes <3-inch diameter have been pushed to a maximum depth of 240 feet below ground surface in 200 East area. Previously gross gamma and moisture logging of these narrow probe holes was perfonned to identify the location of cesium-137 ({sup 137}Cs) (which has limited mobility in Hanford soil) and moisture peaks. Recently a bismuth germinate detector has been deployed for detecting and quantifying the spectrum of cobalt-60 ({sup 60}Co) (a more mobile contaminant), which provides additional information. The direct push system is configured to allow the collection ofmultiple soil core samples throughout the depth ofthe probe hole. The direct push unit has been used to place individual electrodes at a variety of depths as the probe hole is being decommissioned. These deep electrodes enable the use of soil resistivity measurement methods between surface and deep electrodes as-well-as between sets of deep electrodes. Initial testing of surface-to-deep electrode resistivity measurements in WMA C demonstrated significant improvement in defining the three dimensional extent of a contamination plume. A multiple-electrode string is presently being developed to further enhance the resolution of resistivity data. The combined use of direct push logging/sampling and soil resistivity measurement allows more extensive characterization of the large tank farm WMAs with less cost and time commitment than required by traditional methods. An additional tool is in the laboratory testing stage to support these investigations. A beta detection tool is being evaluated to determine if it might be deployed with the direct push unit to identify technetium-99 ({sup 99}Tc) contamination. {sup 99}Tc is a mobile, long-lived contaminant that is the major risk driver from tank waste contamination. A screening tool to locate {sup 99}Tc contamination is anticipated to further increase the cost-effectiveness ofvadose zone characterization efforts.

54 ENVIRONMENTAL SCIENCES↗

Laser-Mechanical Drilling for Geothermal Energy: Low-Contact Drilling Technology to Enable Economical EGS Wells

Broad Funding Opportunity Announcement Project: Foro Energy is developing a unique capability and hardware system to transmit high power lasers over long distances via fiber optic cables. This laser power is integrated with a mechanical drilling bit to enable rapid and sustained penetration of hard rock formations too costly to drill with mechanical drilling bits alone. The laser energy that is directed at the rock basically softens the rock, allowing the mechanical bit to more easily remove it. Foro Energy’s laser-assisted drill bits have the potential to be up to 10 times more economical than conventional hard-rock drilling technologies, making them an effective way to access the U.S. energy resources currently locked under hard rock formations.

ARPA-E↗

Pre-treating water with non-thermal plasma

The present invention consists of a method of pre-treatment of adulterated water for distillation, including adulterated water produced during hydraulic fracturing ("fracking") of shale rock during natural gas drilling. In particular, the invention is directed to a method of treating adulterated water, said adulterated water having an initial level of bicarbonate ion in a range of about 250 ppm to about 5000 ppm and an initial level of calcium ion in a range of about 500 ppm to about 50,000 ppm, said method comprising contacting the adulterated water with a non-thermal arc discharge plasma to produce plasma treated water having a level of bicarbonate ion of less than about 100 ppm. Optionally, the plasma treated water may be further distilled.

03 NATURAL GAS↗

Mock-Up activities for the extraction of samples from a salt-stone disposal unit - 15502

Mock-up testing with respect to the core-drilling of simulant salt-stone grout was conducted to support the future retrieval of field-emplaced salt-stone samples from salt-stone Disposal Unit (SDU) Cell 2A. The primary objectives of extracting samples from SDU Cell 2A are to enable measurement of field-emplaced samples with respect to properties that influence long-term performance, such as saturated hydraulic conductivity, and to compare the measured properties for field-emplaced and comparable samples prepared in the laboratory. Initial mock-up activities (Phases 1 and 2) were conducted in Fiscal Years (FY) 2013 and 2014 in order to demonstrate the viability of standard core-drilling techniques that are typically employed for sampling concrete structures. The primary requirement for the core-drilling technique was that it should minimize the potential of physical or chemical sample changes that would artificially degrade key grout properties. Mock-up activities were aimed at optimizing the techniques for core-drilling, and subsequent sample extraction, using a set-up that mimicked, to the extent practical, both the physical characteristics, and operational complexities, of core-drilling salt-stone grout from the roof of the SDU. Samples extracted from the grout monolith were subsequently characterized with respect to saturated hydraulic conductivity and compressive strength, and compared to data for cast samples prepared using the same simulant salt-stone material. The comparison of these properties for the two sample types was expected to highlight potential flaws (e.g., micro-cracking) introduced by the core-drilling process. While the data for saturated hydraulic conductivity were virtually identical (approximately 2 E-09 cm/sec), the compressive strength of the core-drilled samples (approximately 3.5 MPa (500 psi)) was on average half that measured for the cast samples. It was suspected that increased water saturation and surface scoring of the core-drilled samples might account for the disparate compressive Strength data. During Phases 1 and 2 it was determined that cores could be successfully drilled and extracted to a depth of approximately 0.9 meters (3 feet) below the grout surface. Phase 3 (FY 2105) has been initiated and is primarily directed at demonstrating the ability to core-drill through approximately 1.8 meters (6 feet) of overlying grout to retrieve the desired sample from the SDU. The original drill depth of 0.6 - 0.9 meters (2-3 feet) was based on an SDU fill height of 5.6 meters (18.5 feet) and sample location of approximately 4.9 meters (16 feet); recently the allowable fill height in the SDUs has been increased to 6.5 meters (21.25 feet); hence the increased depth of overlying grout above the samples to be retrieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Direct Push Technologies for Characterization of the 216-Z-9 Trench at DOE's Hanford Site

Because of the significant radiological and chemical hazards present at the 216-Z-9 Trench at the US Department of Energy Hanford Site, the only practical subsurface characterization methods are those that minimize or control airborne vapors and particles. This study evaluates and compares the performance of two Direct Push Technologies (Hydraulic Hammer Rig (HHR) and Cone Penetrometer Testing (CPT)) with traditional cable tool drilling in similar difficult geologic conditions. The performance was based on the depth of penetration, the ability to collect representative vadose zone soil samples, the penetration rate, and the relative cost. The HHR achieved deeper penetration depths and faster penetration rates than CPT techniques, while still maintaining the waste minimization benefits of direct push technologies. Although cable tool drilling achieved the deepest penetration, the safety and disposal concerns due to the soil cuttings that were generated made this drilling approach both slow and costly compared to the direct push techniques. (authors)

42 ENGINEERING↗

Exploration Drilling and Technology Demonstration At Fort Bliss

The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before the well was cased.

15 GEOTHERMAL ENERGY↗

Photonic Doppler Velocimetry Probe Designed with Stereo Imaging

The velocity distribution of an imploding curved surface is measured with a miniature fiber-optic probe. The probe uses fiber matrix arrays that are focused onto different regions of this curved surface. A pyramid reflector deflects the interrogation onto specific regions of this curved surface. The fiber arrays record velocity along several hundred lines of sight with sub-nanosecond resolution. Reflected light from each spot on the moving surface is Doppler shifted with a small portion of this light propagating backwards through the launching fiber. The reflected light is mixed with a reference laser in a technique called Photonic Doppler velocimetry, providing continuous time records. Within the probe, seven groups of miniature optical relay lenses are grouped into a close-packed array, allowing the interrogation of seven regions of interest. A six-faceted pyramid reflector with a conical hole drilled into its center is used to direct the light beams onto different regions. To minimize back reflections, the fiber matrix arrays are index matched onto the first relay lens made of fused silica. The optical lens design minimizes the laser beam diameters and also provides excellent imaging capabilities. Therefore, two of the fiber matrix arrays are replaced by coherent bundles for stereo imaging recorded by a high-speed framing camera. This requires additional cutouts of the pyramid reflector to allow imaging overlap. Six additional 1.5 mm diameter incoherent bundles are attached to the edges of the pyramid reflector and are used for illumination. Precision metrology on the direction cosines of the trajectories is measured to satisfy environmental requirements for vibration and temperature.

photonic doppler velocimetry, PDV, pyramid reflect↗

Utah FORGE: Well 16A(78)-32 Planned Trajectory

This submission includes an Excel spreadsheet containing the Utah FORGE deep well 16A(78)-32 planned trajectory including UTM coordinates, elevations, and depths from the well head to the toe. This proposed new injection well is expected to descend vertically to a depth of approximately 1810 m and then extend laterally at an angle to a MD of approximately 3290 m and a maximum vertical depth of approximately 2584 m. There is approximately 1500 m of basin fill at the well head, and less than that above the simulation region with the targeted reservoir region fully enclosed in granitoid basement. The last 60 m of the well will be open hole. Drilling is planned for October 2020. Please direct questions to the Utah FORGE team: utahforge@utah.edu and check the Utah FORGE website: https://utahforge.com after October for more information.

15 GEOTHERMAL ENERGY↗