Search NASA⌕ Search

SEARCH · Search NASA

Results for “DRILL PIPES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Microwave/Sonic Apparatus Measures Flow and Density in Pipe

An apparatus for measuring the rate of flow and the mass density of a liquid or slurry includes a special section of pipe instrumented with microwave and sonic sensors, and a computer that processes digitized readings taken by the sensors. The apparatus was conceived specifically for monitoring a flow of oil-well-drilling mud, but the basic principles of its design and operation are also applicable to monitoring flows of other liquids and slurries.

Arndt, G. D.↗

Directional Drilling Technology for HLW Disposal - Outline of System and its Application - 16078

During high-level waste (HLW) disposal site selection, borehole measurement and logging to investigate the hydro-geological and geo-mechanical conditions of the host rocks is a very important way to examine the potential of the disposal candidates. In Japan, attention is being given to Neogene soft sedimentary rock as the host rock for HLW disposal. In particular, the soft sedimentary rock in coastal areas is thought to be one of the best candidates, because there is little driving force from underground water. Directional drilling is supposed to be efficient under limited topographic and geological conditions, and the Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project on directional drilling and logging/measurement technologies since 2000. Basic directional drilling system was developed and the system was applied to the Neogene normal sedimentary rock at the Hokushin area of the Horonobe town in Hokkaido. The borehole was drilled to the 700 m long and the applicability of the system was confirmed until 2004. A basic directional drilling system was developed, and the system was applied to the Neogene normal sedimentary rock in the Hokushin area, in the town of Horonobe in Hokkaido. A 700-m borehole was drilled, and the applicability of the system was confirmed in 2004. After conducting a seismic reflection survey for the Omagari fault distribution at the Kami-Horonobe area in the town of Horonobe, a drilling site was selected, and a borehole trace was planned to perpendicularly intersect the fault zone in 2005. Considering the planned trace, a 1000-m-long borehole was drilled to a depth of 450 m. From 750 m to the bottom (1000 m), the borehole was horizontal. The total core recovery was 99.8%, even though it was drilled in the fault zone. The geological, hydrological, geo-mechanical, geophysical, and geochemical data were collected using borehole logging/measurement/survey and core logging/measurement/analysis, and the Omagari fault was characterized. After conducting all the work in the borehole, a steel pipe was inserted into the borehole to case the wall. Open hole sections for monitoring were constructed considering the hydro-geological conditions throughout the hole. Then, the monitoring system was inserted and set up to obtain the initial conditions of the groundwater pressure and chemistry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulating Fracture Sealing by Granular LCM Particles in Geothermal Drilling

Lost circulation occurs when the returned fluid is less than what is pumped into the well due to loss of fluid to pores or fractures. A lost-circulation event is a common occurrence in a geothermal well. Typical geothermal reservoirs are often under-pressured and have larger fracture apertures. A severe lost-circulation event is costly and may lead to stuck pipe, well instability, and well abandonment. One typical treatment is adding lost-circulation materials (LCMs) to seal fractures. Conventional LCMs fail to properly seal fractures because their mechanical limit is exceeded at elevated temperatures. In this paper, parametric studies in numerical simulations are conducted to better understand different thermal effects on the sealing mechanisms of LCMs. The computational fluid dynamics (CFDs) and the discrete element method (DEM) are coupled to accurately capture the true physics of sealing by granular materials. Due to computational limits, the traditional Eulerian–Eulerian approach treats solid particles as a group of continuum matter. With the advance of modern computational power, particle bridging is achievable with DEM to track individual particles by modeling their interactive forces between each other. Particle–fluid interactions can be modeled by coupling CFD algorithms. Fracture sealing capability is investigated by studying the effect of four individual properties including fluid viscosity, particle size, friction coefficient, and Young’s modulus. It is found that thermally degraded properties lead to inefficient fracture sealing.

15 GEOTHERMAL ENERGY↗

A Rapid Sequential Separation Method for Determination of Actinides and TENORM in Fracking Wastes - 20223

With recent advances in unconventional drilling technology in the US and around the world, the risks of environmental contamination and exposure due to technologically enhanced naturally occurring radioactive materials (TENORM) from fracking wastes have also surfaced. Although the Permian Basin (southeastern New Mexico, western Texas) has long been a modest producer of oil, the advent of fracking technology a decade ago turned it into hot property for producers. A 2018 assessment of undiscovered, technically recoverable continuous oil and gas resources by the U.S. Geological Survey estimates an average 46.3 billion barrels of oil and 281 trillion cubic feet of gas. This is likely to increase the use of unconventional drilling and TENORM generation. TENORM concentrations in oil and gas exploration and production waste can be several hundred to several thousand times higher than background TENORM concentrations. Both the thorium and uranium decay chains contribute to airborne radionuclides arising from the radon gas escaping the ground and subsequently decaying as airborne particulates. Additionally, radon decay products {sup 210}Pb and {sup 210}Po can build up in scale on the internal surfaces of oil and gas handling pipes and in sludge in refineries, becoming potential inhalation and ingestion hazards for workers. Furthermore, southeastern NM is also home to world's only licensed and operating transuranic nuclear waste repository, the DoE's Waste Isolation Pilot Plant (WIPP). Plutonium isotopes ({sup 239+240}Pu) and {sup 241}Am, are expected to account for more than 99% of the total radioactivity scheduled for disposal in the WIPP repository. Thus, an improved understanding of the environmental fate and transport of TENORM, liberated by unconventional drilling, is essential to assess how best to protect individuals and the environment. In this context, accurate measurement of TENORM and actinides in environmental and biological samples is essential. In this presentation, a new sequential method for the separation and pre-concentration of actinides (Pu, Am, Np) and TENORM (Po, U and Th) derived from oil and gas exploration is proposed. The TEVA method involves a rapid co-precipitation step to remove matrix interferences from the samples, followed by plutonium oxidation state adjustment to Pu (IV) and an incubation period of ∼ 1 hour at 50-60 deg. C to allow the resultant Po (II) to oxidize into Po(IV). The polonium, neptunium, thorium and plutonium are then separated on a TEVA column, while americium and uranium are separated on a TRU column. After separation, the alpha counting source was prepared by micro-precipitation with copper sulfide (CuS) for polonium and neodymium fluoride (NdF{sub 3}) for actinides. The efficiency and reliability of the procedures were tested by analyzing filter, drinking water and frack sand samples. The method is simple, robust and can be performed quickly with excellent removal of interferences, high chemical recovery and very good alpha peak resolution. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Techno-economic feasibility of geothermal energy production using inactive oil and gas wells for district heating and cooling systems in Tuttle, Oklahoma

Oil and gas wells have been drilled in the United States and often encounter hot co-produced water possibly suitable for geothermal direct-use applications. Here this study evaluated geothermal resources, heating and cooling demand, and techno-economic potential of four oil and gas wells repurposed for geothermal energy production to serve two public schools and 250 nearby houses in Tuttle, Oklahoma, USA. Subsurface geology in the study area primarily consists of Permian to Mississippian sandstone and limestone formations approximately from 2 km to 3.5 km depth. With a geothermal gradient of 25.3 °C/km, the temperature of geothermal energy production was estimated as 68.2 °C at 2.1 km. The potential of calcite scaling within boreholes and pipes was minimal. Using the characterized reservoir properties, techno-economic analyses were conducted for evaluating levelized costs of geothermal energy production for direct-use heating and cooling and district heating systems with five different production scenarios. Heating and cooling demand in two schools and 250 houses and additional 0.3 MW and 0.6 MW base heating loads for potential geothermal direct-use applications in the study area were also incorporated in the modeling. Results indicated that the levelized cost of heating of geothermal district heating systems utilizing existing wells were significantly lower than those of conventional geothermal energy systems that include well drillings. The geothermal energy production with doublet and quartet configurations was generally sufficient to supply total annual heating demand in the district, while a peaking boiler was used to supply peak loads. Doublet configurations showed higher production temperature with a lower thermal drawdown than the quartet configurations. The doublet system at 2.1 km production depth with 9.3 kg/s flow rate represented the optimal levelized cost of $71/MWh and 91.2% utilization factor. These results imply that the Tuttle geothermal district heating system is techno-economically feasible and comparable to geothermal district heating systems in the United States and the regional natural gas rate for residentials by recycling inactive oil and gas wells with no drillings.

15 GEOTHERMAL ENERGY↗

Nuclear Test Scenarios for Discussion of On-Site Inspection Technologies

The purpose of the ISS OSI Invited Meeting being held in Vienna March 24-27, 2009 is to obtain a better understanding of the phenomenology of underground nuclear explosions for On-Site Inspection (OSI) purposes. In order to focus the technology discussions, we have developed two very general scenarios, or models, of underground nuclear test configurations and phenomena that will help us explore the application of OSI methodologies and techniques. The scenarios describe testing environments, operations, logistics, equipment, and facilities that might be used in conducting an underground nuclear test. One scenario involves emplacement of a nuclear device into a vertical borehole in an area with relatively flat terrain; the other involves emplacement within a tunnel (horizontally) in an area with mountainous terrain. Vertical borehole geometry The example for this scenario is an intermediate yield nuclear explosion carried out in a flat desert area. The ground was cleared and smoothed over a 200 X 200 m fenced area for operational support activities, access to the borehole, and in order to place a few structures to house diagnostics equipment and control functions. Power lines were provided for local electrical power. The vertical emplacement borehole was 2 m in diameter and bored to a depth of 350 m. The emplacement hole was lined with steel pipe in order to keep the hole open and to avoid cave-ins during emplacement of the nuclear device. Emplacement was above the local water table, and the top of the saturation zone is about 30 m below the bottom of the emplacement hole. The detonation point was at a depth of 340 m. All of the rock material removed while drilling the borehole was removed to another place. Diagnostics and control for the test were relatively simple: about 2 dozen high capacity coaxial cables feed from the down hole instruments to the surface and then about 100 m laterally to a diagnostics trailer. Two strong steel cables were used to emplace the device and diagnostic instruments and to support the down hole cables. The borehole was stemmed after the device was emplaced. The stemming material was relatively simple: the hole was backfilled with sand or gravel about 20-30 m above the nuclear experiment package, a grouted plug about 3 m thick is added, and the hole backfilled with a mixture of sand and gravel to the surface. After the test, the testing party removed all structures and power lines and covered the top of the borehole with a small building. Geologic environment before the test--The geology for the test consists of flat-lying alluvium and tuff, with 50 m of poorly consolidated alluvium near the surface and moderately welded tuff from 50 m depth to 50 m below the bottom of the hole. The upper tuff is underlain by a densely welded tuff unit, with basement Paleozoic sedimentary rock beginning at a depth of about 1000 m. The tuff is intact with a few fractures. There are no known faults located within 500 m of the borehole. Alteration of the underground environment--The blast created a spherical or near spherical cavity with a lens of vitrified material at the bottom. There are several zones surrounding the detonation point with decreasing levels of rock damage. The zones are: (1) the crushed zone (several tens of meters)where the rock has lost all prior integrity; (2) the fractured zone (out to a couple of hundred meters) characterized by radial and concentric fissures; and (3) the zone of irreversible strain (out to a couple of thousand meters) with local media deformation. A collapse chimney formed one hour after the detonation, in which overlying material fell into the explosion cavity. This chimney zone reached up to within 50 m of the surface and a small apical void formed (10 m high and 80 m in diameter) at the top of the rubble chimney. The rubble chimney is dry and density is about 20% less than the surrounding intact rock. Alteration at the surface--No surface depression formed, but there is significant 'fluffing' of the surface soil from the effects of the initial shock wave. A few radial and concentric fractures formed from the shock effects within a radius of 200 m of the borehole. Radionuclide environment--No particulates or aerosol radiological material reached the surface. However, the stemming is not completely impervious to gas release and a small amount of gas and vapor was released along the emplacement pipe immediately after the explosion and before the rubble chimney formed. Most of the gas venting stopped as soon as cavity collapse occurred. After the rubble chimney formed and the pressure in the explosion cavity reached equilibrium, gases began to migrate up through the rubble chimney aided by barometric pumping. There is also an unknown fault located 300 m from the explosion cavity that provided another gas migration pathway between the damage zone of the cavity and the surface.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Ultrasonic/Sonic Impacting Penetrators

Ultrasonic/sonic impacting penetrators (USIPs) are recent additions to the series of apparatuses based on ultrasonic/sonic drill corers (USDCs). A USIP enables a rod probe to penetrate packed soil or another substance of similar consistency, without need to apply a large axial force that could result in buckling of the probe or in damage to some buried objects. USIPs were conceived for use in probing and analyzing soil to depths of tens of centimeters in the vicinity of buried barrels containing toxic waste, without causing rupture of the barrels. USIPs could also be used for other purposes, including, for example, searching for pipes, barrels, or other hard objects buried in soil; and detecting land mines. USDCs and other apparatuses based on USDCs have been described in numerous previous NASA Tech Briefs articles. The ones reported previously were designed, variously, for boring into, and/or acquiring samples of, rock or other hard, brittle materials of geological interest. To recapitulate: A USDC can be characterized as a lightweight, low-power, piezoelectrically driven jackhammer in which ultrasonic and sonic vibrations are generated and coupled to a tool bit. As shown in the figure, a basic USDC includes a piezoelectric stack, a backing and a horn connected to the stack, a free mass (free in the sense that it can slide axially a short distance between the horn and the shoulder of tool bit), and a tool bit, i.e., probe for USIP. The piezoelectric stack is driven at the resonance frequency of the stack/horn/backing assembly to create ultrasonic vibrations that are mechanically amplified by the horn. To prevent fracture during operation, the piezoelectric stack is held in compression by a bolt. The bouncing of the free mass between the horn and the tool bit at sonic frequencies generates hammering actions to the bit that are more effective for drilling than is the microhammering action of ultrasonic vibrations in ordinary ultrasonic drills. The hammering actions are so effective that the axial force needed to make the tool bit advance into the material of interest is much smaller than in ordinary twist drilling, ultrasonic drilling, or ordinary steady pushing.

Bao, Xiaoqi↗

Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron-Activated Shield Wall

Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility (Figure 1) was used in the early to mid-1960s for testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles. The TCA facility, known as Corrective Action Unit 115, was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the Federal Facility Agreement and Consent Order. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously, provided technical decisions are made by an experienced decision maker within the site conceptual site model. Facility closure involved a seven-step decommissioning strategy. First, preliminary investigation activities were performed, including review of process knowledge documentation, targeted facility radiological and hazardous material surveys, concrete core drilling and analysis, shield wall radiological characterization, and discrete sampling, which proved to be very useful and cost-effective in subsequent decommissioning planning and execution and worker safety. Second, site setup and mobilization of equipment and personnel were completed. Third, early removal of hazardous materials, including asbestos, lead, cadmium, and oil, was performed ensuring worker safety during more invasive demolition activities. Process piping was to be verified void of contents. Electrical systems were de-energized and other systems were rendered free of residual energy. Fourth, areas of high radiological contamination were decontaminated using multiple methods. Contamination levels varied across the facility. Fixed beta/gamma contamination levels ranged up to 2 million disintegrations per minute (dpm)/100 centimeters squared (cm2) beta/gamma. Removable beta/gamma contamination levels seldom exceeded 1,000 dpm/100 cm2, but, in railroad trenches on the reactor pad containing soil on the concrete pad in front of the shield wall, the beta dose rates ranged up to 120 milli-roentgens per hour from radioactivity entrained in the soil. General area dose rates were less than 100 micro-roentgens per hour. Prior to demolition of the reactor shield wall, removable and fixed contaminated surfaces were decontaminated to the best extent possible, using traditional decontamination methods. Fifth, large sections of the remaining structures were demolished by mechanical and open-air controlled explosive demolition (CED). Mechanical demolition methods included the use of conventional demolition equipment for removal of three main buildings, an exhaust stack, and a mobile shed. The 5-foot (ft), 5-inch (in.) thick, neutron-activated reinforced concrete shield was demolished by CED, which had never been performed at the NTS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of a Welding Procedure for Making Critical Aluminum Welds on the LBNF Absorber Core Block

The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard 1514 Class I quality welds on the aluminum core blocks. This was not successful in all cases. An existing Gas Tungsten Arc Welding Procedure Specification was fine tuned to minimize, in most cases, and eliminate detect-able tungsten inclusions in the welds. All the weld coupons, however passed welding inspection as per the piping code: ASME B31.3 Normal Fluid Service. Tungsten electrode diameter, type, and manufacturer were varied. Some of the samples were pre-heated and others were not. It was observed that larger diameter electrodes, 5/32 in., with pre-heated joints resulted in welds with the least number of tungsten inclusions. It is hypothesized that thinner electrodes breakdown easily and get lodged into the weld pool during the welding process. This breakdown is further enhanced by the large temperature differential between the un-preheated sample and the hot electrode.

43 PARTICLE ACCELERATORS↗

Optimization of a Welding Procedure for Making Critical Aluminum Welds on the LBNF Absorber Core Block

he LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard (NAS) 1514 Class I quality welds on the aluminum core blocks. This was not successful in all cases. An existing Gas Tungsten Arc Welding (GTAW) Welding Procedure Specification (WPS) was fine tuned to minimize, in most cases, and eliminate detectable tungsten inclusions in the welds. All the weld coupons however, passed welding inspection as per the piping code: ASME B31.3 Normal Fluid Service. Tungsten electrode diameter, type, and manufacturer were varied. Some of the samples were pre-heated and others were not. It was observed that larger diameter electrodes, 5/32 in., with pre-heated joints resulted in welds with the least number of tungsten inclusions. It is hypothesized that thinner electrodes breakdown easily and get lodged into the weld pool during the welding process. This breakdown is further enhanced by the large temperature differential between the un-preheated sample and the hot electrode.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description for WIPP Wells 25 and H-4b

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2009. The addendum adds work scope to the previously developed program plan (DOE/WIPP-08-3376, Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program). Over the years, a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Temperature Deformation Constitutive Law for Dissimilar Weld Residual Stress Modeling: Effect of Thermal Load on Strain Hardening

Weld residual stress is one of the primary driving forces for primary water stress corrosion cracking in dissimilar metal welds (DMWs). To mitigate tensile residual stress in DMWs, it is critical to understand residual stress distribution by modeling techniques. Recent studies have shown that weld residual stress prediction using today s DMW residual stress models strongly depends on the strain-hardening constitutive model chosen. The commonly used strain-hardening models (isotropic, kinematic, and mixed) are all time-independent and inadequate to account for the time-dependent (viscous) plastic deformation at the elevated temperatures experienced during welding. For materials with profound strain-hardening, such as stainless steels and nickel-based alloys that are widely used in nuclear reactor and piping systems, the equivalent plastic strain the determinate factor of the flow stress can be highly dependent on the recovery and recrystallization processes. These processes are in turn a strong function of temperature, time, and deformation rate. Recently, the authors proposed a new temperature- and time-dependent strain-hardening constitutive model: the dynamic strain-hardening constitutive model. The application of such a model has resulted in improved weld residual stress prediction compared to the residual stress measurement results from the contour and deep-hole drilling methods. In this study, the dynamic strain-hardening behavior of Type 304 stainless steel and Alloy 82 used in pressure vessel nozzle DMWs is experimentally determined. The kinetics of the recovery and recrystallization of flow stress are derived from experiments, resulting in a semi-empirical equation as a function of pre-strain, time, and temperature that can be used for weld residual stress modeling. The method used in this work also provides an approach to study the kinetics of recovery and recrystallization of other materials with significant strain-hardening.

Yu, Xinghua↗

Digital Autoradiography as a novel complementary technique for the investigation of radioactive contamination in nuclear facilities under dismantlement

The detection (location and quantification) of nuclear facilities to be dismantled possible contamination with low-range particles emitters ({sup 3}H, other low-energy β emitters, a emitters) remains a tedious and expensive task. Indeed, usual remote counters show a too low sensitivity to these non-penetrating radiations, while conventional wipe tests are irrelevant for fixed radioactivity evaluation. The only method to accurately measure activity levels consists in sampling and running advanced laboratory analyses (spectroscopy, liquid scintillation counting, pyrolysis...). Such measurements generally induce sample preparation, waste production (destructive analyses, solvents), nuclear material transportation, long durations, and significant labor mobilization. Therefore, the search for the limitation of their number and cost easily conflicts with the necessity to perform a dense screening for sampling (to maximize the representativeness of the samples), in installations of thousands of square meters (floors, wells, ceilings), plus furniture, pipes, and other wastes. To overcome this contradiction, Digital Autoradiography (D. A.) was re-routed from bio molecular research to radiological mapping of nuclear installations under dismantling and to waste and sample analysis. After in-situ exposure to the possibly-contaminated areas to investigate, commercial reusable radiosensitive phosphor screens (of a few 100 cm{sup 2}) were scanned in the proper laboratory device and sharp quantitative images of the radioactivity could be obtained. The implementation of geostatistical tools in the data processing software enabled the exhaustive characterization of concrete floors at a rate of 2 weeks / 100 m{sup 2}, at lowest costs. Various samples such as drilled cores, or tank and wood pieces, were also successfully evaluated with this method, for decisive results. Thanks to the accurate location of potential contamination spots, this approach ensures relevant and representative sampling for further laboratory analyses and should be inserted in the range of common tools used in dismantling. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pressure Spike in The LBNF Absorber Core s Gun Drilled Cooling Channel from an Accident Beam Pulse

he LBNF absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. The cooling water is supplied by the LBNF absorber radioactive water (RAW) cooling system which is designed as per ASME B31.3 normal fluid service. An uninhibited beam accident pulse striking the water channels was identified as a credible accident scenario. In this study, it is assumed that the beam pulse hits the absorber directly without interacting with any of the other upstream beamline components. The beam parameters used for the LBNF beam are 120 GeV, 2.4 MW with a 1.2 s cycle time. The accident pulse lasts for 10 µs. The maximum energy is deposited in the 3rd aluminum core block. For the sake of simplicity, it is assumed that the accident pulse strikes the 1 in. ID water channel directly. The analysis here simulates the pressure rise in the water during and after the beam pulse and its effects on the aluminum piping components that deliver water to the core blocks. The weld strengths as determined by the Load and Resistance Factor Design (LRDF) and the Allowable Strength Design (ASD) are compared to the forces generated in the weld owing to the pressure spike. A transient structural analysis was used to determine the equivalent membrane, peak, and bending stresses and they were compared to allowable limits.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pressure Spike in The LBNF Absorber Core s Gun Drilled Cooling Channel from an Accident Beam Pulse

The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. The cooling water is supplied by the LBNF Absorber Radioactive Water (RAW) cooling system which is designed as per ASME B31.3 Normal Fluid Service [1]. An uninhibited beam accident pulse striking the water channels was identified as a credible accident scenario. In this study, it is assumed that the beam pulse hits the Absorber directly without interacting with any of the other upstream beamline components. The beam parameters used for the LBNF beam are 120 GeV, 2.4 MW with a 1.2 s cycle time. The accident pulse lasts for 10 μs. The maximum energy is deposited in the 3rd aluminum core block. For the sake of simplicity, it is assumed that the accident pulse strikes the 1 in. ID water channel directly. The analysis here simulates the pressure rise in the water during and after the beam pulse and its effects on the aluminum piping components that deliver water to the core blocks. The weld strengths as determined by the Load and Resistance Factor Design (LRDF) and the Allowable Strength Design (ASD) are compared to the forces generated in the weld owing to the pressure spike. A transient structural analysis was used to determine the equivalent membrane, peak, and bending stresses and they were com-pared to allowable limits.

43 PARTICLE ACCELERATORS↗

A Hydrogen Ignition Mechanism for Explosions in Nuclear Facility Piping Systems

Hydrogen explosions may occur simultaneously with water hammer accidents in nuclear facilities, and a theoretical mechanism to relate water hammer to hydrogen deflagrations and explosions is presented herein. Hydrogen and oxygen generation due to the radiolysis of water is a recognized hazard in pipe systems used in the nuclear industry, where the accumulation of hydrogen and oxygen at high points in the pipe system is expected, and explosive conditions may occur. Pipe ruptures in nuclear reactor cooling systems were attributed to hydrogen explosions inside pipelines, i.e., Hamaoka, Nuclear Power Station in Japan, and Brunsbuettel in Germany. Prior to these accidents, an ignition source for hydrogen was not clearly demonstrated, but these accidents demonstrated that a mechanism was, in fact, available to initiate combustion and explosion. A new theory to identify an ignition source and explosion cause is presented here, and further research is recommended to fully understand this explosion mechanism.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗