Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Bioenergy Technologies Office 2019 R&D State of Technology

The U.S. Department of Energy’s Bioenergy Technologies Office funds research and development on technologies necessary for the deployment and production of cost-competitive bioenergy, primarily biofuels. Results of experimental efforts are periodically compiled and compared with benchmark technology designs to assess overall progress. This report provides a status of those R&D efforts at the end of 2019. This report first describes the approach for assessing progress followed by specific technology pathway configurations within which progress is charted. Each pathway configuration is described separately and the state of technology progress is presented for the combined pathway as well as for pathway components. Detailed component descriptions reference technology barriers and challenges that are detailed in the appendix.

09 BIOMASS FUELS↗

Bioenergy Technologies Office: R&D State of Technology 2020

The U.S. Department of Energy’s Bioenergy Technologies Office (BETO) funds research and development (R&D) on technologies necessary for the deployment and production of cost competitive bioenergy, primarily biofuels. Results of experimental efforts are periodically compiled and compared with benchmark technology designs to assess overall progress. This report provides a status of those R&D efforts at the end of 2020. This report first describes the approach for assessing progress, followed by specific technology pathway configurations within which progress is charted. Each pathway configuration is described separately and the state of technology progress is presented for the combined pathway, as well as for pathway components. Detailed component descriptions reference technology barriers and challenges that are detailed in the appendix.

09 BIOMASS FUELS↗

Neutrino Interactions observed with Large Area Picosecond Photodetectors in ANNIE

The Accelerator Neutrino Neutron Interaction Experiment (ANNIE) is a 26-ton water-based neutrino detector located at Fermilab, approximately 110 m downstream of the Booster Neutrino Beam (BNB). ANNIE utilizes both photomultiplier tubes (PMTs) and advanced photodetectors, specifically Large Area Picosecond Photodetectors (LAPPDs), to detect Cherenkov light emitted by leptons produced in neutrino interactions within ANNIE. LAPPDs are a novel technology designed to detect photons with picosecond-level temporal resolution and sub-millimetre spatial precision. Multiple LAPPDs have been deployed in the ANNIE detector. This is the first use of this technology in a running particle physics experiment and has yielded the first detection of light from neutrino interactions in water with LAPPDs. In this poster, I will showcase the operational performance and functionality of LAPPDs in the ANNIE experiment. Neutrino beam data from the BNB is used to evaluate the timing precision, hit reconstruction performance, and beam response of deployed LAPPDs, demonstrating how this novel picosecond-resolution technology performs in a running neutrino water Cherenkov detector. This work highlights the successful integration of LAPPDs in ANNIE and provides quantitative benchmarks that inform their application in future neutrino experiments requiring high-resolution photon detection.

Aman, Mohammad Adil [Florida State U.] (ORCID:0009↗

Irradiation Experiments and Thermal Analysis for Reactor System Design and Analysis at INL

Idaho National Laboratory (INL) is the nation's lead nuclear laboratory working to enhance reactor systems' safety, security, economics, and efficiency. Research and development (R&D) programs at INL support the current fleet of nuclear reactors for safer operation and newer reactors technology design, development, demonstration, and deployment. A major focus of INL's mission is the reactor system design and analysis supported by the irradiation experiments and thermal analysis of advanced and current-generation nuclear fuels and materials. The irradiation experiments and thermal analysis provide a deeper understanding of basic radiation damage processes that can determine the basis for performance improvements and verification of modeling assumptions. These experiments and analyses include experiment management: design, fabrication, characterization, irradiation, and post-irradiation examination. This research involves thermal, neutronic, and material investigation using the INL's Advanced Test Reactor (ATR) and Transient Reactor Test (TREAT) facilities. The results from these experiments and analysis are required to develop the regulatory basis for deploying new or modified fuels and materials. This seminar talk will also provide a general overview of the INL's research facilities, ongoing research programs, core capabilities, and opportunities for students and faculties.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A Concept for a Low Pressure Noble Gas Fill Intervention in the IFE Fusion Test Facility (FTF) Target Chamber

An engineering evaluation has been initiated to investigate conceptual engineering methods for implementing a viable gas shield strategy in the Fusion Test Facility (FTF) target chamber. The employment of a low pressure noble gas in the target chamber to thermalize energetic helium ions prior to interaction with the wall could dramatically increase the useful life of the first wall in the FTF reactor1. For the purpose of providing flexibility, two target chamber configurations are addressed: a five meter radius sphere and a ten meter radius sphere. Experimental studies at Nike have indicated that a low pressure, ambient gas resident in the target chamber during laser pulsing does not appear to impair the ability of laser light from illuminating targets2. In addition, current investigations into delivering, maintaining, and processing low pressure gas appear to be viable with slight modification to current pumping and plasma exhaust processing technologies3,4. Employment of a gas fill solution for protecting the dry wall target chamber in the FTF may reduce, or possibly eliminate the need for other attenuating technologies designed for keeping He ions from implanting in first wall structures and components. The gas fill concept appears to provide an effective means of extending the life of the first wall while employing mostly commercial off the shelf (COTS) technologies. Although a gas fill configuration may provide a methodology for attenuating damage inflicted on chamber surfaces, issues associated with target injection need to be further analyzed to ensure that the gas fill concept is viable in the integrated FTF design5. In the proposed system, the ambient noble gas is heated via the energetic helium ions produced by target detonation. The gas is subsequently cooled by the chamber wall to approximately 800oC, removed from the chamber, and processed by the chamber gas processing system (CGPS). In an optimized scenario of the above stated concept, the chamber wall acts as the primary heat exchanger. During removal, gas is pumped through the laser ports by turbo molecular-drag pumps (TM-DP). For the purpose of reducing organic based lubricants and seals, a magnetically levitated TM-DP is being investigated with pump manufacturers. Currently, magnetically levitated turbo molecular pumps are commercially available. The pumps will be exposed to thermal loads and ionizing radiation (tritium, Ar-41, post detonation neutrons). Although the TM-DP's will be subjected to these various radiations, current designs for similar pumping devices have been hardened and have the ability of locating control electronics in remote radiation shielded enclosures4. The radiation hardened TM-DP's will be 5 required to operate with minimal maintenance for periods of up to 18 continuous months. As part of this initial investigation for developing a conceptual engineering strategy for a gas fill solution, commercial suppliers of low pressure gas pumping systems have been contacted and engaged in this evaluation. Current technology in the area of mechanical pumping systems indicates that the development of a robust pumping system to meet the requirements of the FTF gas fill concept is within the limits of COTS equipment3,4.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Geochemical Monitoring Considerations for the FutureGen 2.0 Project

Geochemical monitoring is an essential component of a suite of monitoring technologies designed to evaluate CO2 mass balance and detect possible loss of containment at the FutureGen 2.0 geologic sequestration site near Jacksonville, IL. This presentation gives an overview of the potential geochemical approaches and tracer technologies that were considered, and describes the evaluation process by which the most cost-effective and robust of these were selected for implementation

54 ENVIRONMENTAL SCIENCES↗

Wind Energy Workforce Development: Engineering, Science, & Technology

Broadly, this project involved the development and delivery of a new curriculum in wind energy engineering at the Pennsylvania State University; this includes enhancement of the Renewable Energy program at the Pennsylvania College of Technology. The new curricula at Penn State includes addition of wind energy-focused material in more than five existing courses in aerospace engineering, mechanical engineering, engineering science and mechanics and energy engineering, as well as three new online graduate courses. The online graduate courses represent a stand-alone Graduate Certificate in Wind Energy, and provide the core of a Wind Energy Option in an online intercollege professional Masters degree in Renewable Energy and Sustainability Systems. The Pennsylvania College of Technology erected a 10 kilowatt Xzeres wind turbine that is dedicated to educating the renewable energy workforce. The entire construction process was incorporated into the Renewable Energy A.A.S. degree program, the Building Science and Sustainable Design B.S. program, and other construction-related coursework throughout the School of Construction and Design Technologies. Follow-on outcomes include additional non-credit opportunities as well as secondary school career readiness events, community outreach activities, and public awareness postings.

17 WIND ENERGY↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dispersion Suppression for Wedge-Based Final Cooling at a 10 TeV Muon Collider

Achieving a luminosity of $\gtrsim 10^{34} cm^{-2} s^{-1}$ in a $10 \text{ } TeV$ Muon Collider, given the short lifetime of a muon, requires reducing the 6D emittance of the muon beam through a process known as ionization cooling. In the final stage of this cooling process, the transverse emittance must be reduced to $22 \text{ } μm$, typically by allowing longitudinal emittance growth up to downstream acceptance limits. While the current International Muon Collider Collaboration designs involve $40 \text{ } T$ solenoids to reach the transverse emittance target, such high-field solenoids come with several challenges, including mechanical stress management, quench protection, and potential limitations in relying on High Temperature Superconductor technology. Designed as an alternative to using such solenoids while simultaneously reaching target transverse emittance, the previously proposed wedge-based, reverse emittance-exchange cooling scheme requires excellent dispersion suppression. In this study, we design and simulate a dispersion suppressor channel for the wedge-based final cooling design that reduces dispersion in the target direction to a target value of $D_x \sim 0.001 \text{ } m$.

Karaaslan, I. [Chicago U.] (ORCID:0000000337849879↗

Seismic Array Analysis Using Fiber-Optic Distributed Acoustic Sensing on Small Local and Regional Earthquakes

We examined the feasibility of using fiber-optic Distributed Acoustic Sensing (DAS) as an alternative to a traditional seismic array. Seismic arrays are used routinely globally to measure waveform propagation parameters and signal features including back-azimuth (BAZ) and apparent horizontal velocity through the process of beamforming or frequency-wavenumber (f-k) array analysis with the assumption that the signals travel across the array as a plane-wave. These measurements are useful for identifying signal detections as teleseismic, regional, or local distance seismic phases based on their velocities traveling across the array (e.g., Rost and Thomas, 2001). Signal enhancement is the main benefit of array processesing through the stacking of multiple channels as a phased array. This enhancement increases as the square root of the number of channels relative to a single seismic station (e.g., Rost and Thomas, 2001), which is a factor of 3 from a typical nine-channel array. DAS provides the potential of stacking waveforms from 100’s to 1000’s of channels. However, DAS is a novel technology designed for geophysical exploration and therefore has some limitations which we will explore. We started with the dataset from the PoroTomo project because of its unique experimental layout of colocated geophone array and DAS deployment so the two recording technologies can be compared side-by-side.

58 GEOSCIENCES↗

COMMERCIALIZATION DEMONSTRATION OF MID-SIZED SUPERCONDUCTING MAGNETIC ENERGY STORAGE TECHNOLOGY FOR ELECTRIC UTILITYAPPLICATIONS

As an outgrowth of the Technology Reinvestment Program of the 1990’s, an Agreement was formed between BWXT and the DOE to promote the commercialization of Superconducting Magnetic Energy Storage (SMES) technology. Business and marketing studies showed that the performance of electric transmission lines could be improved with this SMES technology by stabilizing the line thereby allowing the reserved stability margin to be used. One main benefit sought was to double the capacity and the amount of energy flow on an existing transmission line by enabling the use of the reserved stability margin, thereby doubling revenue. Also, electrical disturbances, power swings, oscillations, cascading disturbances and brown/black-outs could be mitigated and rendered innocuous; thereby improving power quality and reliability. Additionally, construction of new transmission lines needed for increased capacity could be delayed or perhaps avoided (with significant savings) by enabling the use of the reserved stability margin of the existing lines. Two crucial technical aspects were required; first, a large, powerful, dynamic, economic and reliable superconducting magnet, capable of oscillating power flow was needed; and second, an electrical power interface and control to a transmission line for testing, demonstrating and verifying the benefits and features of the SMES system was needed. A project was formed with the goals of commercializing the technology by demonstrating SMES technology for utility applications and to establish a domestic capability for manufacturing large superconducting magnets for both commercial and defense applications. The magnet had very low AC losses to support the dynamic and oscillating nature of the stabilizing power flow. Moreover, to economically interface to the transmission line, the magnet had the largest operating voltage ever made. The manufacturing of that design was achieved by establishing a factory with newly designed and acquired equipment, tooling, methods and skilled personnel. The final magnet system measured 14 feet in diameter, 10 feet in height, and weighed about 35 tons. The superconducting magnet and design technology was successfully implemented and demonstrated. The project was not successfully concluded however; as the critical planned final demonstration was not achieved. The utilities could not understand or clarify their future business needs and the regulatory requirements, because of the deregulation policies and practices of the country. Much uncertainty existed which prevented utilities from defining business plans, including asset allocation and cost recovery. Despite the technical successes and achievements, the commercial development could not be implemented and achieved. Thus, the demonstration of this enhancement to the utility’s transmission system and to the reliability of the nation’s electrical grid was not achieved. The factory was ultimately discontinued and the technology, equipment and product were placed in storage.

25 ENERGY STORAGE↗

Gasification Combined Heat and Power from Coal Fines

The goal of this final project report is to comprehensively summarize the work for public domain conducted on project DE-FE 0031520. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UKy-CAER) (Recipient) has completed a Front End Engineering Design (FEED) study 5 MWe polygeneration unit using the Coal Fields Regional Industrial Park in Hazard, Kentucky (KY) as a model location and using coal recovered from the adjacent Pads Branch Impoundment as feed. The scope of work is a thorough study that can be used as a template for the application of the proposed technology throughout Eastern KY and other coal communities nationwide. The Technology Design Basis was developed based on three elements: basic site characteristics; fuel feedstock; and environmental health and safety requirements. The Basic Engineering Design Elements include the preliminary process design (the process area descriptions; the Block Flow Diagram (BFD), Process Flow Diagrams (PFDs) and Piping and Instrumentation Diagrams (P&IDs), process simulation outputs and Heat and Mass Balance (H&MB) stream tables, the major process equipment and instrumentation lists which includes specifications and materials of construction); the cost estimate (capital cost estimate, operational cost estimate, and comparison with state-of-the-art commercial scale similar technologies, options to lower cost, construction cost and schedule estimate); and other supporting elements (guidelines for execution and management of the project), logistical summary, and balance of plant summary, the Environmental Health and Safety (EH&S) assessment; and a Social and Economic Impact (S&EI) assessment. All project milestones, deliverables and success criteria were met. The proposed 5 MWe polygeneration facility being fed from impoundment recovered coal has been shown to be technically feasible. Annual revenues are estimated at $\$ $2.4M from electricity, steam and hydrocarbon production; annual operating expenses are $\$ $5.2M ($\$ $2.9 M in operating expenses, and $\$ $2.4M in indirect expenses). The gasifier facility, as configured during the FEED, will lose money when operating under commercial operating conditions and terms. However, eight options improving the economics can be considered during the detailed design phase to make the facility profitable by taking advantage of the positive differential of revenue to variable operating costs, and reducing the influence of fixed operating costs. Coupled with the findings from the S&EI assessment estimating a total economic impact of $\$ $374M for the proposed polygeneration facility at >$\$ $1.5B, if three additional such projects are implemented, clearly positive economics are demonstrated. No EH&S issues are identified that would prohibit proceeding with the project, although permitting efforts are estimated to take 3-5 years.

01 COAL, LIGNITE, AND PEAT↗

Optimization Using Metamodeling in the Context of Integrated Computational Materials Engineering (ICME)

Predictive Design Technologies, LLC (PDT) proposed to employ Integrated Computational Materials Engineering (ICME) tools to help the manufacturing industry in the United States regain the competitive advantage in the global economy. ICME uses computational materials science tools within a holistic system in order to accelerate materials development, improve design optimization, and unify design and manufacturing. With the advent of accurate modeling and simulation along with significant increases in high performance computing (HPC) power, virtual design and manufacturing using ICME tools provide the means to reduce product development time and cost by alleviating costly trial-and-error physical design iterations while improving overall quality and manufacturing efficiency. To reduce the computational cost necessary for the large-scale HPC simulations and to make the methodology accessible for small and medium-sized manufacturers (SMMs), metamodels are employed. Metamodels are approximate models (functional relationships between input and output variables) that can reduce the simulation times by one to two orders of magnitude. In Phase I, PDT, partnered with Mississippi State University (MSU), demonstrated the feasibility of the proposed methodology by employing MSU?s internal state variable (ISV) plasticity-damage model with the help of metamodels to optimize the microstructure-process-property-cost for tube manufacturing processes used by Plymouth Tube Company (PTC), which involves complicated temperature and mechanical loading histories. PDT quantified the microstructure-property relationships for PTC?s SAE J525 electric resistance-welded cold drawn low carbon hydraulic 1010 steel tube manufacturing processes at seven different material states and calibrated the ISV plasticity material parameters to fit experimental tensile stress-strain curves. PDT successfully performed large scale finite element (FE) simulations in an HPC environment using the ISV plasticity model in Abaqus FE analyses of the tube forming, sizing, drawing, welding, and normalizing processes. The simulation results coupled with the manufacturing cost data were used to develop prototype metamodeling (quick response) codes which could be used to predict and optimize the microstructure-process-property-cost relationships. The developed ICME metamodeling toolkits are flexible enough to be applied to other manufacturing processes (e.g. forging, forming, casting, extrusion, rolling, stamping, and welding/joining) and metamodeling codes can run on laptop computers. Based on the work completed in Phase I, in Phase II, PDT proposes to continue to refine the ISV model by correlating and incorporating the uncertainties in the microstructure, mechanical testing, and modeling. Following the model refinement, FE analyses will be simulated and will provide even more realistic predictions as they include an appropriate window of uncertainty. Using the HPC output (FE analyses) as input, the quick-response metamodel codes will more accurately predict and optimize the microstructure-process-property-cost relationships. Furthermore, PDT propose to employ the ICME metamodeling toolkits to help develop a new tube product using entirely new high strength steel. The modeling of the high strength steel manufacturing process will replace the costly and time consuming trial-and-error methods that were used in the tubing industry previously. This simulation-based process prototyping will greatly benefit our industrial partners by opening up new market spaces due to new products with greater capabilities.

36 MATERIALS SCIENCE↗

Introduction

Technological innovation is an essential driver of human and economic development. It can improve the functioning of markets (Jensen, 2007), promote government accountability (Callen and Long, 2014), build human capital (Foster and Rosenzweig, 1996), and reduce the risks we face from global environmental change (Dar et al., 2013). Yet designing technologies that improve the lives of the poor is notoriously challenging. The path from ideation to scale-up is rarely linear, or even successful.

42 ENGINEERING↗

Rational Ligand Design for U(VI) and Pu(IV)

Nuclear power is an attractive alternative to hydrocarbon-based energy production at a time when moving away from carbon-producing processes is widely accepted as a significant developmental need. Hence, the radioactive actinide power sources for this industry are necessarily becoming more widespread, which is accompanied by the increased risk of exposure to both biological and environmental systems. This, in turn, requires the development of technology designed to remove such radioactive threats efficiently and selectively from contaminated material, whether that be contained nuclear waste streams or the human body. Raymond and coworkers (University of California, Berkeley) have for decades investigated the interaction of biologically-inspired, hard Lewis-base ligands with high-valent, early-actinide cations. It has been established that such ligands bind strongly to the hard Lewis-acidic early actinides, and many poly-bidentate ligands have been developed and shown to be effective chelators of actinide contaminants in vivo. Work reported herein explores the effect of ligand geometry on the linear U(IV) dioxo dication (uranyl, UO 2 2+ ). The goal is to utilize rational ligand design to develop ligands that exhibit shape selectivity towards linear dioxo cations and provides thermodynamically favorable binding interactions. The uranyl complexes with a series of tetradentate 3-hydroxy-pyridin-2-one (3,2-HOPO) ligands were studied in both the crystalline state as well as in solution. Despite significant geometric differences, the uranyl affinities of these ligands vary only slightly but are better than DTPA, the only FDA-approved chelation therapy for actinide contamination. The terepthalamide (TAM) moiety was combined into tris-beidentate ligands with 1,2- and 3,2-HOPO moieties were combined into hexadentate ligands whose structural preferences and solution thermodynamics were measured with the uranyl cation. In addition to achieving coordinative saturation, these ligands exhibited increased uranyl affinity compared to bis-Me-3,2-HOPO ligands. This result is due in part to their increased denticity, but is primarily the result of the presence of the TAM moiety. In an effort to explore the relatively unexplored coordination chemistry of Pu(IV) with bidentate moieties, a series of Pu(IV) complexes were also crystallized using bidentate hydroxypyridinone and hydroxypyrone ligands. The geometries of these complexes are compared to that of the analogous Ce(IV) complexes. While in some cases these showed the expected structural similarities, some ligand systems led to significant coordination changes. A series of crystal structure analyses with Ce(IV) indicated that these differences are most likely the result of crystallization condition differences and solvent inclusion effects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Design Support of an Above Cap-rock Early Detection Monitoring System using Simulated Leakage Scenarios at the FutureGen2.0 Site

The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO 2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to evaluate CO 2 mass balance and detect any unforeseen loss in CO 2 containment. The monitoring program will include direct monitoring of the reservoir, and early-leak-detection monitoring directly above the primary confining zone. This preliminary modeling study described here focuses on hypothetical leakage scenarios into the first permeable unit above the primary confining zone (Ironton Sandstone) and is used to support assessment of early-leak detection capabilities. Future updates of the model will be used to assess potential impacts on the lowermost underground source of drinking water (Saint Peter Sandstone) for a range of theoretical leakage scenarios. This preliminary modeling evaluation considers both pressure response and geochemical signals in the overlying Ironton Sandstone. This model is independent of the FutureGen 2.0 reservoir model in that it does not simulate caprock discontinuities, faults, or failure scenarios. Instead this modeling effort is based on theoretical, volumetric-rate based leakage scenarios. The scenarios include leakage of 1% of the total injected CO 2 mass, but spread out over different time periods (20, 100, and 500 years) with each case yielding a different mass flux (i.e., smaller mass fluxes for longer duration leakage cases]. A brine leakage scenario using a volumetric leakage similar to the 20 year 1% CO 2 case was also considered. A framework for the comparison of the various cases was developed based on the exceedance of selected pressure and geochemical thresholds at different distances from the point of leakage and at different vertical positions within the Ironton Sandstone. These preliminary results, and results from an updated models that incorporate additional site-specific characterization data, support development/refinement of the monitoring system design.

54 ENVIRONMENTAL SCIENCES↗

Risk-based monitoring designs for detecting CO 2 leakage through abandoned wellbores: An application of NRAP’s WLAT and DREAM tools

We report that one suggested approach to managing the risk of geologic CO 2 storage projects is to perform risk-based subsurface monitoring targeting early leak detection. The challenge in risk-based monitoring is that leakage impacts are expected to be small in comparison with the footprint of the stored CO 2 plume and could be at depths ranging from the depth of storage (often ~1 km bgs) up to surficial aquifers. Addressing this challenge requires a multidisciplinary effort capable of characterizing potential subsurface leakage in terms of likelihood, location, magnitude, impacts to overlying aquifers, and uncertainty as well as innovative monitoring technology design and implementation. The National Risk Assessment Partnership (NRAP) was established to develop related risk assessment tools to provide guidance on such assessments. Here we demonstrate the application workflow of two of the NRAP computational tools, WLAT (Wellbore Leakage Analysis Tool) and DREAM (Designs for Risk Evaluation and Management), to a hypothetical CO 2 storage site based on a study area in the Midwestern United States. This workflow shows how CO 2 leakage may be estimated, evaluated, and monitored in terms of risk. Results provide guidance on monitoring configurations and technologies which minimize the time to leak detection, maximize the probability detection, and provide cost considerations.

54 ENVIRONMENTAL SCIENCES↗

Photovoltaic Deployment Scenarios toward Global Decarbonization: Role of Disruptive Technologies

To totally decarbonize global electrical systems using photovoltaics (PVs) in the 2050–2060 decade, the world would need to install 63.4 TW of PV. This article models and explores how a PV manufacturing ramp‐up trajectory toward this goal can be achieved while assuming that investors continue to make financially rational decisions avoiding stranded production assets and therefore protecting their return on investment. The model effectively exploits experience curve benefits in both the scaling of the manufacturing process and continued progress in product design technologies. The scale‐up challenge is amplified because trajectories that achieve this goal require an unprecedented ramp‐up of production capacity over just two decades, followed by relatively modest demand to maintain the installed base and support continued population growth. It is demonstrated that sustainable ramp‐up of manufacturing is indeed possible and shown that the deployment of the requisite manufacturing capacity can be accelerated and accomplished at lower total capital cost by the introduction of disruptive technologies that have lower capital intensity, embedded energy, or higher efficiency.

14 SOLAR ENERGY↗