Search NASA⌕ Search

SEARCH · Search NASA

Results for “Discovery Mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

MESUR Pathfinder Science Investigations

The MESUR (Mars Environmental Survey) Pathfinder mission is the first Discovery mission planned for launch in 1996. MESUR Pathfinder is designed as an engineering demonstration of the entry, descent and landing approach to be employed by the follow-on MESUR Network mission, which will land of order 10 small stations on the surface of Mars to investigate interior, atmospheric and surface properties. Pathfinder is a small Mars lander, equipped with a microrover to deploy instruments and explore the local landing site. Instruments selected for Pathfinder include a surface imager on a 1 m pop-up mast (stereo with spectral filters), an atmospheric structure instrument/surface meteorology package, and an alpha proton x-ray spectrometer. The microrover will carry the alpha proton x-ray spectrometer to a number of different rocks and surface materials and provide close-up imaging...

Golombek, M.↗

EPOXI Trajectory and Maneuver Analyses

The EPOXI mission is a NASA Discovery Mission of Opportunity combining two separate investigations: Extrasolar Planet Observation and Characterization (EPOCh) and Deep Impact eXtended Investigation (DIXI). Both investigations reused the DI instruments and spacecraft that successfully flew by the comet Tempel-1 (4 July 2005). For EPOCh, the goal was to find exoplanets with the high resolution imager, while for DIXI it was to fly by the comet Hartley 2 (4 Nov 2010). This paper documents the navigation experience of the earlier ma-neuver analyses critical for the EPOXI mission including statistical ?V analyses and other useful analyses in designing maneuvers. It also recounts the trajectory design leading up to the final reference trajectory to Hartley 2.

trajectory design↗

The NASA Discovery 5, Genesis Mission

Genesis is the NASA Discovery 5 mission to solar wind return samples to the Earth for analyses in terrestrial laboratories. This will significantly increase our knowledge of the chemical and isotopic composition of the solar system.

sample return Genesis NASA Discovery 5 solar wind↗

STS-121: Discovery End of Mission Crew Briefing

The crew of the STS-121 Discovery mission is shown during this end of mission briefing. The crewmembers consist of: Stephanie Wilson, mission specialist; Steve Lindsey, commander; Lisa Nowak, mission specialist; Piers Sellers, mission specialist; Mike Fossum, mission specialist; and Mark Kelly, pilot. The briefing opens with Commander Lindsey describing the two major objectives of this mission, which are to accomplish the rest of the return to flight objectives started by STS-114, and to increase the ISS crew to three. He expresses that these objectives were fulfilled. A question and answer period from the news media follows. Lisa Nowak talks about robotics and her experiences during her first flight. Stephanie Wilson also discusses robotics and gives her thoughts about spaceflight. Steve Lindsey discusses the flying qualities of STS-121, spacecraft landing, and weather conditions while in space. Mark Kelly was responsible for the undocking of the Shuttle from the International Space Station, and he elaborates on this process. Spacewalkers Piers Sellers and Mike Fossum discuss testing of the Orbiter Boom Sensor System (OBSS). This system will be used as a platform to make repairs to the Space Shuttle.

Source record↗

Application of Solar Electric Propulsion to a Comet Surface Sample Return Mission

Current NSTAR (planned for the Discovery Mission: Dawn) and NASA's Evolutionary Xenon Thruster based propulsion systems were compared for a comet surface sample return mission to Tempe1 1. Mission and systems analyses were conducted over a range of array power for each propulsion system with an array of 12 kW EOL at 1 AU chosen for a baseline. Engine configurations investigated for NSTAR included 4 operational engines with 1 spare and 5 operational engines with 1 spare. The NEXT configuration investigated included 2 operational engines plus 1 spare, with performance estimated for high thrust and high Isp throttling modes. Figures of merit for this comparison include Solar Electric Propulsion dry mass, average engine throughput, and net non-propulsion payload returned to Earth flyby.

Cupples, Mike↗

STS-102 Crew Activity Report/Flight Day 8 Highlights

On this eighth day of the STS-102 mission, Discovery Pilot James Kelly and Mission Specialist Andrew Thomas are seen in the Leonardo Module. The Expedition 2 crew (James Voss, Susan Helms, and Yuriy Usachev) work to set up the robotic workstations for the robotic arm. STS-102 Commander Jim Weatherbee, Pilot Kelly, and the Expedition 1 crew (William M. Shepherd, Yuri P. Gidzenko, and Sergei K. Krikalev) answer questions about the mission in an in-flight interview.

Source record↗

Modeling and Simulation for Mission Operations Work System Design

Work System analysis and design is complex and non-deterministic. In this paper we describe Brahms, a multiagent modeling and simulation environment for designing complex interactions in human-machine systems. Brahms was originally conceived as a business process design tool that simulates work practices, including social systems of work. We describe our modeling and simulation method for mission operations work systems design, based on a research case study in which we used Brahms to design mission operations for a proposed discovery mission to the Moon. We then describe the results of an actual method application project-the Brahms Mars Exploration Rover. Space mission operations are similar to operations of traditional organizations; we show that the application of Brahms for space mission operations design is relevant and transferable to other types of business processes in organizations.

Sierhuis, Maarten↗

Missed Thrust Requirements for Psyche Mission

The Psyche Mission, part of NASA’s Discovery Mission Program, will explore the metal asteroid (16) Psyche which orbits the sun at ~3 AU. The spacecraft uses solar electric propulsion (SEP) as its primary propulsion system during the ~3.5 year trajectory to (16) Psyche and 21 month orbital operations period around the asteroid. As the first NASA mission to use Hall thrusters for deep space exploration, unique challenges have been identified and resolved in how we plan to accommodate unplanned coast (missed thrust time) during the trajectory and orbital operations and still meet the mission objectives. This paper describes the projects missed thrust requirements in detail, along with the accompanying rationale and analysis plan for the Psyche mission.

Snyder, John Steven↗

STS-60 Mission Update

The activities of the STS-60 Discovery mission are reviewed, including details on the Wake Shield deployment, problems with the horizon sensor on the Shield, and the success of the thin film crystal growth experiment.

Source record↗

Sample Return from the Stardust Mission

On January 2,2004, the STARDUST spacecraft made a close flyby (236 km) of the nucleus of a comet - Comet Wild 2. During the flyby the spacecraft collected samples of dust from the coma of the comet. These samples were successfully returned to Earth on January 15,2006. After a six month preliminary examination to establish the nature of the returned samples, they will be made available to the general scientific community for study. STARDUST is one of the missions carried out under NASA's Discovery Mission Program. During my talk I will present a brief overview of the scientific goals of the STARDUST mission and describe the mission's design and flight. I will also discuss the reentry and recovery of the Stardust Sample Return Capsule (SRC) in Utah, with an emphasis on those aspects of the recovery important for minimizing the degree of contamination (particularly organic contamination) of the samples. Finally, I will discuss some of the results coming out of the preliminary examination of the returned samples, with an emphasis on the nature of organic materials found in the samples.

Source record↗

GN and C Subsystem Concept for Safe Precision Landing of the Proposed Lunar MARE Robotic Science Mission

The Lunar MARE (Moon Age and Regolith Explorer) Discovery Mission concept targets delivery of a science payload to the lunar surface for sample collection and dating. The mission science is within a 100-meter radius region of smooth lunar maria terrain near Aristarchus crater. The location has several small, sharp craters and rocks that present landing hazards to the spacecraft. For successful delivery of the science payload to the surface, the vehicle Guidance, Navigation and Control (GN&C) subsystem requires safe and precise landing capability, so design infuses the NASA Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) and a gimbaled, throttleable LOX/LCH4 main engine. The ALHAT system implemented for Lunar MARE is a specialization of prototype technologies in work within NASA for the past two decades, including a passive optical Terrain Relative Navigation (TRN) sensor, a Navigation Doppler Lidar (NDL) velocity and range sensor, and a Lidar-based Hazard Detection (HD) sensor. The landing descent profile is from a retrograde orbit over lighted terrain with landing near lunar dawn. The GN&C subsystem with ALHAT capabilities will deliver the science payload to the lunar surface within a 20-meter landing ellipse of the target location and at a site having greater than 99% safety probability, which minimizes risk to safe landing and delivery of the MARE science payload to the intended terrain region.

MARE (Moon Age and Regolith Explorer)↗

Applicability of STEM-RTG and High-Power SRG Power Systems to the Discovery and Scout Mission Capabilities Expansion (DSMCE) Study of ASRG-Based Missions

This study looks at the applicability of utilizing the Segmented Thermoelectric Modular Radioisotope Thermoelectric Generator (STEM-RTG) or a high-power radioisotope generator to replace the Advanced Stirling Radioisotope Generator (ASRG), which had been identified as the baseline power system for a number of planetary exploration mission studies. Nine different Discovery-Class missions were examined to determine the applicability of either the STEM-RTG or the high-power SRG power systems in replacing the ASRG. The nine missions covered exploration across the solar system and included orbiting spacecraft, landers and rovers. Based on the evaluation a ranking of the applicability of each alternate power system to the proposed missions was made.

Stirling Engines↗

STS-92 Mission Highlights Resource Tape

An overview of the STS-92 Discovery mission (crew: Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter Wisoff, Michael Lopez-Alegria, and William McArthur) is given through footage of each flight day. Scenes from flight days one through five show activities such as astronaut prelaunch procedures (breakfast, suit-up, and boarding Discovery), launch, rendezvous and dock with the International Space Station, an various on-orbit activities such as the installation of the Z1 truss and the spacewalks performed by Chiao and McArthur. Footage from flight days 6-14 can be seen on 'STS-92 Mission Highlights Resource Tape, Part 2 of 4' (internal ID 2001120373), 'STS-92 Mission Highlights Resource Tape, Part 3 of 4' (internal ID 2001120376), and 'STS-92 Mission Highlights Resource Tape, Part 4 of 4' (internal ID 2001120371).

Source record↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Development Efforts Expanded in Ion Propulsion: Ion Thrusters Developed With Higher Power Levels

The NASA Glenn Research Center was the major contributor of 2-kW-class ion thruster technology to the Deep Space 1 mission, which was successfully completed in early 2002. Recently, NASA s Office of Space Science awarded approximately $21 million to Glenn to develop higher power xenon ion propulsion systems for large flagship missions such as outer planet explorers and sample return missions. The project, referred to as NASA's Evolutionary Xenon Thruster (NEXT), is a logical follow-on to the ion propulsion system demonstrated on Deep Space 1. The propulsion system power level for NEXT is expected to be as high as 25 kW, incorporating multiple ion thrusters, each capable of being throttled over a 1- to 6-kW power range. To date, engineering model thrusters have been developed, and performance and plume diagnostics are now being documented. The project team-Glenn, the Jet Propulsion Laboratory, General Dynamics, Boeing Electron Dynamic Devices, the Applied Physics Laboratory, the University of Michigan, and Colorado State University-is in the process of developing hardware for a ground demonstration of the NEXT propulsion system, which comprises a xenon feed system, controllers, multiple thrusters, and power processors. The development program also will include life assessments by tests and analyses, single-string tests of ion thrusters and power systems, and finally, multistring thruster system tests in calendar year 2005. In addition, NASA's Office of Space Science selected Glenn to lead the development of a 25-kW xenon thruster to enable NASA to conduct future missions to the outer planets of Jupiter and beyond, under the High Power Electric Propulsion (HiPEP) program. The development of a 100-kW-class ion propulsion system and power conversion systems are critical components to enable future nuclear-electric propulsion systems. In fiscal year 2003, a team composed of Glenn, the Boeing Company, General Dynamics, the Applied Physics Laboratory, the Naval Research Laboratory, the University of Wisconsin, the University of Michigan, and Colorado State University will perform a 6-month study that will result in the design of a 25-kW ion thruster, a propellant feed system, and a power processing architecture. The following 2 years will involve hardware development, wear tests, single-string tests of the thruster-power circuits and the xenon feed system, and subsystem service life analyses. The 2-kW-class ion propulsion technology developed for the Deep Space 1 mission will be used for NASA's discovery mission Dawn, which involves maneuvering a spacecraft to survey the asteroids Ceres and Vesta. The 6-kW-class ion thruster subsystem technology under NEXT is scheduled to be flight ready by calendar year 2006. The less mature 25- kW ion thruster system under HiPEP is expected to be ready for a flight advanced development program in calendar year 2006.

Patterson, Michael J.↗