Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resource Management Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Beyond DERMS: Platform Development, Flexibility, Prediction, and Value Measurements

This report describes the results from the “Beyond DERMS” project that aims to build, deploy, and demonstrate - at megawatt scale with thousands of devices - a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. The results demonstrate how emerging ‘internet of energy’ technologies can be leveraged to simultaneously solve the grid problems of today and prepare for the challenges of tomorrow in a way that goes beyond the capabilities of existing distributed energy resource management systems (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Configurable DERMS Test System in GridAPPS-D

Distributed Energy Resources and their increased penetration within the power grid are a suitable method to provide essential reliability services. In order to do so, they must operate in aggregate. Aggregation of a wide variety of systems with varying standards and protocols is a complex task, which could benefit from rules and standards to support interoperability. To this end, the Portland State University Power Lab has developed the Energy Grid of Things project, which includes a Distributed Energy Resource Management System to provide aggregation and demonstrate the usage of an Energy Services Interface: a set of rules governing the interface between resource owners and aggregator businesses. This thesis presents a Modeling Environment that provides a simulation and test platform reflecting the complex needs of an aggregator. A grid simulator is required that is able to reflect the effects of thousands of Distributed Energy Resources operating in tandem; furthermore, these effects must be communicated to external actors such as the Grid Operator, which provides grid service requests to the aggregator and requires feedback. The Modeling Environment provides all of this functionality by leveraging the GridAPPS-D platform to develop an interoperable class-based system that provides configurable simulations with modular input and output APIs. The Modeling Environment uses abstractions to allow any feasible type of input to be reflected within the model as a Distributed Energy Resource, and serves as a proof-of-concept for the development of aggregation simulation and testing within GridAPPS-D.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DERMS Online: A New Voltage Sensitivity-Enabled Feedback Optimization Framework: Preprint

This paper proposes a distributed energy resource management system (DERMS) solution by developing a new voltage sensitivity enabled feedback optimization framework. The key idea is to adopt a measurement feedback scheme to reformulate the original nonlinear optimization into a linear programming (LP) problem via perturb and observe-based voltage sensitivity analysis. The proposed solution eliminates the dependence on load knowledge and can be implemented online thanks to an efficient open-source solver for LP problems. The proposed DERMS online platform is generalizable to deal with various types of distributed energy resources (DERs), including distributed photovoltaics (PVs), energy storage, electric vehicles, demand response, etc. Comparison results with other control methods on a realistic distribution feeder in Southern California highlight the feasibility as well as benefits for the proposed framework.

distributed energy resources management↗

Requirements for Robust DERMS Control and Cyber Attack Scenarios

A Distribution Management System (DMS) is responsible for monitoring and maintaining the health of a distribution grid. Common DMS applications include fault location isolation and service restoration, on-line power flow (OLPF), volt/VAR optimization (VVO), and switch order management. These systems were developed primarily in the area of top-down, unidirectional power flow, with large centralized generating plants moving electricity through the transmission grid and into the distribution grid from and thence to consumers. The recent and ongoing addition of distributed energy resources (DER) to the grid, including rooftop and community solar and wind, means that power is now flowing into the distribution grid from the edge, which complicates the functioning of the DMS. To ameliorate this problem, DMS use distributed energy resource management systems (DERMS) to control DER such as solar inverters. DERMS comprise software management tools that allow management and near real-time control of an array of DER. DERMS control devices and grid services including smart inverters, capacitor banks, on-load tap changes, voltage regulators, and customer loads.

14 SOLAR ENERGY↗

DERMS Online: A New Voltage Sensitivity-Enabled Feedback Optimization Framework

This paper proposes a distributed energy resource management system (DERMS) solution by developing a new voltage sensitivity-enabled feedback optimization framework. The key idea is to adopt a measurement feedback scheme to reformulate the original nonlinear optimization into a linear programming (LP) problem via perturb-and-observe-based voltage sensitivity analysis. The proposed solution eliminates the dependence on load knowledge and can be implemented online thanks to an efficient open-source solver for LP problems. Comparison results with other control methods on a real distribution feeder in Southern California highlight the feasibility as well as benefits for the proposed framework.

distributed energy resource management↗

Self-Assembling Microgrids for Resilient Distribution Systems of the Future: Implementation in a Commercial DERMS Platform

Microgrids have long provided resilience to critical facilities such as hospitals and military installations, and they are now increasingly being looked at as a building block for future grids to support the energy resilience needs of the grid of the future. State-of-the-art technologies, such as blackstart algorithms using renewable distributed energy resources (DERs) to effectively and seamlessly form microgrids, have been produced by national labs over the years. Their adoption by the utility industry would be critical to reap the most benefits toward energy and climate resilience, and the pathway is via commercialization of these self-assembling microgrid algorithms by integrating them in a commercial product platform. This project brings a national labs team (LLNL, LANL) together with a vendor (Smarter Grid Solutions) to perform proof-of-concept integration of the algorithms into the vendor’s commercial Distributed Energy Resources Management System (DERMS). The project provides a strong pathway to commercialization of the algorithms thereby promoting adoption of resilient microgrid technology by utilities to offer resilience benefits to all customers and especially to disadvantaged and underserved communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interaction and Impact Studies for Distributed Energy Resource, Transactive Energy, and Electric Grid, using High Performance Computing ?based Modeling and Simulation

The electric utility industry is undergoing significant transformations in its operation model, including a greater emphasis on automation, monitoring technologies, and distributed energy resource management systems (DERMS). With these changes and new technologies, while driving greater efficiencies and reliability, these new models may introduce new vectors of cyber attack. The appropriate cybersecurity controls to address and mitigate these newly introduced attack vectors and potential vulnerabilities are still widely unknown and performance of the control is difficult to vet. This proposal argues that modeling and simulation (M&S) is a necessary tool to address and better understand these problems introduced by emerging technologies for the grid. M&S will provide electric utilities a platform to model its transmission and distribution systems and run various simulations against the model to better understand the operational impact and performance of cybersecurity controls.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.

Leader, Jared↗

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Performance Evaluation of Data-Enhanced Hierarchical Control for Grid Operations

This paper presents a hardware-in-the-loop (HIL) simulation to evaluate the performance of voltage regulation of Data-Enhanced Hierarchical Control (DEHC). This DEHC uses an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results demonstrate functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues such as instability for field deployment.

41 EE - Solar Energy Technologies Office (EE-4S)↗

EVSE DERMS Controls [SWR-26-010]

An MQTT (Message Queuing Telemetry Transport) and OCPP (Open Charge Point Protocol) based remote smart charging controller framework for AC Electric Vehicle Supply Equipments (EVSEs). The code in this repo allows for the National Laboratory of the Rockies (NLR) controls to interface with the real Distributed Energy Resource Management System (DERMS) and EVSEs in NLR's ESIF Optimization and Control Laboratory (OCL). Different charge management algorithms can be tested to determine which power allocation method is most effective with the overall goal of demonstrating clear and well documented test results as well as providing functional control algorithms which could be utilized to provide effective smart charge management (SCM) at EV charging stations. Different power allocation methods are programmed in lab_demo_controller.py and include allocation based on first come first served, equal sharing, state of charge (SOC), priority factors, and behind the meter control methods.

Panossian, Nadia [National Laboratory of the Rocki↗

Utility-Scale Operational Consequences for Solar Grid Services

This report delves into the critical aspects of grid services provided by solar inverter-based resources (IBRs), with an emphasis on the evolving landscape of microgrids, virtual power plants (VPPs), aggregators, and distributed energy resource management systems (DERMS). As the energy sector undergoes a transformative shift towards more decentralized and resilient grid architectures, understanding the multifaceted risks associated with these technologies becomes paramount. The report categorizes these risks into organizational, technical, and procedural domains, providing a thorough risk assessment framework that stakeholders can utilize to anticipate and mitigate potential issues. In addressing the increasing complexity of grid interconnections, the report highlights the importance of Cyber-Informed Engineering (CIE). By embedding engineering controls and cybersecurity measures into the early stages of system design, this approach aims to fortify grid infrastructure against emerging cyber threats. The analysis includes an exploration of best practices and strategies for integrating CIE principles to enhance grid security and resilience. To provide practical insights, the report conducts a detailed consequence analysis of various grid services and cyber mitigations that can be applied through the interconnection process. This analysis evaluates the potential impacts of different failure modes and vulnerabilities, offering a clear understanding of the consequences that could arise from disruptions within the energy grid. The findings are further enriched by a series of case studies that illustrate real-world scenarios and lessons learned from past incidents. Through this comprehensive examination of grid services and their criticality, the report aims to prepare industry professionals with the knowledge and tools necessary to navigate the complexities of modern energy systems. By providing a comprehensive approach that includes risk assessment, cybersecurity, and consequence analysis, solar stakeholders can more effectively guarantee the reliability, efficiency, and security of the energy grid.

14 SOLAR ENERGY↗

Distributed Resource Energy Analysis and Management System (DREAMS) Development for Real-time Grid Operations

This project supports development of the next generation, integrated energy management infrastructure (EMS) able to incorporate advance visualization of behind-the-meter distributed resource information and probabilistic renewable energy generation forecasts to inform real-time operational decisions. The project involves end-users and active feedback from an Utility Advisory Team (UAT) to help inform how information can be used to enhance operational functions (e.g. unit commitment, load forecasting, Automatic Generation Control (AGC) reserve monitoring, ramp alerts) within two major EMS platforms. Objectives include: Engaging utility operations personnel to develop user input on displays, set expectations, test and review; Developing ease of use and timeliness metrics for measuring enhancements; Developing prototype integrated capabilities within two operational EMS environments; Demonstrating an integrated decision analysis platform with real-time wind and solar forecasting information and timely distributed resource information; Seamlessly integrating new 4-dimensional information into operations without increasing workload and complexities; Developing sufficient analytics to inform and confidently transform and adopt new operating practices and procedures; Disseminating project lessons learned through industry sponsored workshops and conferences;Building on collaborative utility-vendor partnership and industry capabilities

14 SOLAR ENERGY↗

Developing a Distributed Trust Model for Distributed Energy Resources

Electric power system operators can manage distribution system reliability by coordinating end customer usage of distributed energy resources. The end customers in this regard are Service Provisioning Customers, who provide their energy resources to a Grid Service Provider, which in turn dispatches large aggregations of distributed energy resources to provide reliable service to the power system.The security of this system relies upon information protection mechanisms, as described in IEEE 2030.5. However, in addition to preventive security measures, a monitoring function is required to ensure trustworthiness. Trust models are a method to detect and respond to both expected and unexpected behavior. Different trust models are required for various types and characteristics of each situation. This paper will describe the topics that must be considered when developing a trust model as it applies to distributed energy resources. The major contribution of this paper is the creation and application of a Distributed Trust Model applied to distributed energy resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Voltage Optimization

Voltage optimization refers to a volt-var optimization technique which was originally designed to minimize energy consumption and improve end-use efficiency on the distribution system. This reduces source voltage at a substation, which lowers generation demand, reduces system losses, and improves system stability. This has been the conventional implementation of voltage optimization: focusing on regulation of voltages throughout the distribution system via coordinated adjustments of load tap changers, line-voltage regulators, switched shunt compensation, and the targeted placement of new shunt compensation. These methods have received increased focus following a growth in distributed-energy resources (DERs) interconnecting at the distribution level, given their developing capability to participate in voltage regulation. This is paired with the intermittency challenges they pose, load imbalances, and voltage fluctuations. Voltage optimization has long been an area of extensive research within the distribution system, with various strategies and philosophies demonstrating a range of effects. The conventional focus on the distribution system owes to the typical operation of transmission systems, which assumes firm local resources and flows strictly from generation resources to loads. The strategies employed in distribution have also been optimized for this typically radial configuration and operation of the distribution system.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Hawaiian Electric Company (HECO) Grid Optimization with Solar (Cooperative Research and Development Final Report)

The purpose of this project is to provide a software platform that gives utility companies the capability to seamlessly dispatch legacy devices (at both the distribution and subtransmission levels) and distributed energy resources (DERs) to achieve system-wide performance and reliability targets–such as minimizing loss, reducing voltage violation, and corresponding imbalance–for extreme solar futures with well over 100% (capacity) penetrations.

14 SOLAR ENERGY↗

Defining a Use Case for the ADMS Test Bed: Fault Location, Isolation, and Service Restoration with Distributed Energy Resources

Advanced distribution management systems (ADMS) integrate multiple enterprise-level functions into a single platform and offer advanced applications such as fault location, isolation, and service restoration (FLISR), to utilities to meet their operational needs for a modernized grid. These applications need to operate reliably even as distributed energy resource (DER) penetration increases on distribution systems. The ADMS test bed at the National Renewable Energy Laboratory offers utilities and vendors the opportunity to evaluate the performance of such advanced applications on distribution feeders of the future and to understand their potential benefits for a specific utility. This is done through defining use cases that address specific questions. This paper presents the definition of a use case on the performance of a commercially-available FLISR application on a feeder of an electric cooperative with DERs. After experiments are completed, results from this use case will be disseminated to the electric utility and research community to improve understanding of the challenges and benefits that DERs present to ADMS applications and the operation of a modernized grid.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗