Search NASA⌕ Search

SEARCH · Search NASA

Results for “EARTH-MOON TRAJECTORY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Optimal Low Energy Earth-Moon Transfers

The optimality of a low-energy Earth-Moon transfer is examined for the first time using primer vector theory. An optimal control problem is formed with the following free variables: the location, time, and magnitude of the transfer insertion burn, and the transfer time. A constraint is placed on the initial state of the spacecraft to bind it to a given initial orbit around a first body, and on the final state of the spacecraft to limit its Keplerian energy with respect to a second body. Optimal transfers in the system are shown to meet certain conditions placed on the primer vector and its time derivative. A two point boundary value problem containing these necessary conditions is created for use in targeting optimal transfers. The two point boundary value problem is then applied to the ballistic lunar capture problem, and an optimal trajectory is shown. Additionally, the ballistic lunar capture trajectory is examined to determine whether one or more additional impulses may improve on the cost of the transfer.

Griesemer, Paul Ricord↗

High Level Architecture Distributed Space System Simulation for Simulation Interoperability Standards Organization Simulation Smackdown

Modeling and Simulation plays a very important role in mission design. It not only reduces design cost, but also prepares astronauts for their mission tasks. The SISO Smackdown is a simulation event that facilitates modeling and simulation in academia. The scenario of this year s Smackdown was to simulate a lunar base supply mission. The mission objective was to transfer Earth supply cargo to a lunar base supply depot and retrieve He-3 to take back to Earth. Federates for this scenario include the environment federate, Earth-Moon transfer vehicle, lunar shuttle, lunar rover, supply depot, mobile ISRU plant, exploratory hopper, and communication satellite. These federates were built by teams from all around the world, including teams from MIT, JSC, University of Alabama in Huntsville, University of Bordeaux from France, and University of Genoa from Italy. This paper focuses on the lunar shuttle federate, which was programmed by the USRP intern team from NASA JSC. The shuttle was responsible for provide transportation between lunar orbit and the lunar surface. The lunar shuttle federate was built using the NASA standard simulation package called Trick, and it was extended with HLA functions using TrickHLA. HLA functions of the lunar shuttle federate include sending and receiving interaction, publishing and subscribing attributes, and packing and unpacking fixed record data. The dynamics model of the lunar shuttle was modeled with three degrees of freedom, and the state propagation was obeying the law of two body dynamics. The descending trajectory of the lunar shuttle was designed by first defining a unique descending orbit in 2D space, and then defining a unique orbit in 3D space with the assumption of a non-rotating moon. Finally this assumption was taken away to define the initial position of the lunar shuttle so that it will start descending a second after it joins the execution. VPN software from SonicWall was used to connect federates with RTI during testing and the Smackdown event. HLA software from Pitch Technology and MAK Technology were used to edit and extend FOM and provide HLA services for federation execution. The SISO Smackdown event for 2011 was held in Boston, Massachusetts. The federation execution lasted for one hour, and the event was very successful in catching the attention of university students and faculties.

Li, Zuqun↗

Solar Electric Propulsion Technologies Being Designed for Orbit Transfer Vehicle Applications

There is increasing interest in employing Solar Electric Propulsion (SEP) for new missions requiring transfer from low Earth orbit to the Earth-Moon Lagrange point, L1. Mission architecture plans place the Gateway Habitat at L1 in the 2011 to 2016 timeframe. The Gateway Habitat is envisioned to be used for Lunar exploration, space telescopes, and planetary mission staging. In these scenarios, an SEP stage, or "tug," is used to transport payloads to L1--such as the habitat module, lunar excursion and return vehicles, and chemical propellant for return crew trips. SEP tugs are attractive because they are able to efficiently transport large (less than 10,000 kg) payloads while minimizing propellant requirements. To meet the needs of these missions, a preliminary conceptual design for a general-purpose SEP tug was developed that incorporates several of the advanced space power and in-space propulsion technologies (such as high-power gridded ion and Hall thrusters, high-performance thin-film photovoltaics, lithium-ion batteries, and advanced high-voltage power processing) being developed at the NASA Glenn Research Center. A spreadsheet-based vehicle system model was developed for component sizing and is currently being used for mission planning. This model incorporates a low-thrust orbit transfer algorithm to make preliminary determinations of transfer times and propellant requirements. Results from this combined tug mass estimation and orbit transfer model will be used in a higher fidelity trajectory model to refine the analysis.

Sarver-Verhey, Timothy R.↗

Lunar Flight Study Series: Volume 6. A Study of Geometrical and Terminal Characteristics of Earth-Moon Transits Embedded in the Earth-Moon Plane

This report represents the results of a study of coplanar earth-moon transits. The study was initiated to provide information concerning coplanar geometrical characteristics of earth-moon trnasits. The geometrical aspects of transit behavior are related to variations injection conditions. The model of the earth-moon system used in this investigation is the Jacobian model of the restricted three body problem. All transits considered in this study are restricted to the moon-earth plane (MEP).

TRAJECTORY MEASURING SYSTEM↗

A halo-orbit lunar station.

A relay satellite following a halo trajectory will always maintain line-of-sight contact with the earth and the moon's far side. The Integrated Program Plan for lunar exploration in the 1980s and beyond calls for a fully reusable earth-moon transportation system. The principal elements of the system are a Translunar Shuttle, a Lunar-Orbit Space Station or Halo-Orbit Space Station, and a Lunar Space Tug. It is shown that a halo-orbit space station could offer important operational and performance advantages compared to a lunar-orbit station in a second-generation lunar program.

Farquhar, R. W.↗

Doubly-periodic orbits in the Sun-Earth-Moon system

A series of periodic orbits in the Earth-Moon circular restricted problem of three bodies was found which is ideally suited for exploring the Earth's geomagnetic tail. The mean apsidal motion of the basic highly elliptical Earth orbit was maintained at about one degree per day by a sequence of lunar swingbys, keeping the apogees in the anti-Sun direction. The orbits were periodic in reference frames rotating at both lunar and solar rates. Apogee distances were alternately raised and lowered by the lunar swingby maneuvers. Several categories of these Sun-synchronous double lunar swingby orbits were identified. The strength and flexibility of this trajectory concept was demonstrated with real world simulations.

Farohar, R.↗

Stochastic analysis of the control of the movement of the spacecraft in the vicinity of the colinear libration point by means of the forces of luminous pressure

This paper is dedicated to the possible investigation of the utilization of the solar radiation pressure for the spacecraft motion control in the vicinity of collinear libration point of planar restricted ring problem of three bodies. The control is realized by changing the solar sail area at its permanent orientation. In this problem the influence of the trajectory errors and the errors of the execution control is accounted. It is worked out, the estimation method of the solar sail sizes, which are necessary for spacecraft keeping in the vicinity of collinear libration point during the certain time with given probability. The main control parameters were calculated for some examples in case of libration points of the Sun-Earth and Earth-Moon systems.

Lukyanov, S. S.↗

User and technical documentation

The program LP1 calculates outbound and return trajectories between low earth orbit (LEO) and libration point no. 1 (L1). Libration points (LP) are defined as locations in space that orbit the Earth such that they are always stationary with respect to the Earth-Moon line. L1 is located behind the Moon such that the pull of the Earth and Moon together just cancel the centrifugal acceleration associated with the libration point's orbit. The input required from the user to define the flight is described. The contents of the six reports produced as outputs are presented. Also included are the instructions needed to execute the program.

Source record↗

Earth and Moon encounters by the Galileo Jupiter orbiter

The Galileo Venus-Earth-Earth-Gravity-Assist trajectory to Jupiter is discussed. It includes two encounters from deep space with the Earth and the Earth-Moon system. Fortuitous and unique opportunities therefore exist to observe and study the Earth and Earth's moon during both of these encounters. Given the Galileo science payload, a candidate set of Earth and Moon science objectives is presented. The conditions and constraints of the Earth and Moon encounters, which define the observing opportunity, and which bound the objectives, are reviewed.

Clarke, T. C.↗

Project ECHO: Electronic Communications from Halo Orbit

The design of a communications relay to provide constant access between the Earth and the far side of the Moon is presented. Placement of the relay in a halo orbit about the L2 Earth-Moon Lagrange point allows the satellite to maintain constant simultaneous communication between Earth and scientific payloads on the far side of the Moon. The requirements of NASA's Discovery-class missions adopted and modified for this design are: total project cost should not exceed $150 million excluding launch costs, launch must be provided by Delta-class vehicle, and the satellite should maintain an operational lifetime of 10 to 15 years. The spacecraft will follow a transfer trajectory to the L2 point, after launch by a Delta II 7925 vehicle in 1999. Low-level thrust is used for injection into a stationkeeping-free halo orbit once the spacecraft reaches the L2 point. The shape of this halo orbit is highly elliptical with the maximum excursion from the L2 point being 35000 km. A spun section and despun section connected through a bearing and power transfer assembly (BAPTA) compose the structure of the spacecraft. Communications equipment is placed on the despun section to provide for a stationary dual parabolic offset-feed array antenna system. The dual system is necessary to provide communications coverage during portions of maximum excursion on the halo orbit. Transmissions to the NASA Deep Space Network 34 m antenna include six channels (color video, two voice, scientific data from lunar payloads, satellite housekeeping and telemetry and uplinked commands) using the S- and X-bands. Four radioisotope thermoelectric generators (RTG's) provide a total of 1360 W to power onboard systems and any two of the four Hughes 13 cm ion thrusters at once. Output of the ion thrusters is approximately 17.8 mN each with xenon as the propellant. Presence of torques generated by solar pressure on the antenna dish require the addition of a 'skirt' extending from the spun section of the satellite for balance. Total mass of the satellite is approximately 900 kg at a cost of $130 million FY99.

Borrelli, Jason↗

Guidance, navigation, and control study for a solar electric propulsion spacecraft

A preliminary investigation of a lunar-comet rendezvous mission using a solar electric propulsion (SEP) spacecraft was performed in two phases.The first phase involved exploration of the moon and the second involved rendezvous with a comet. The initial phase began with a chemical propulsion translunar injection and chemical insertion into a lunar orbit, followed by a low thrust SEP transfer to a circular, polar, low-lunar orbit. After collecting scientific data at the moon, the SEP spacecraft performed a spiral lunar escape maneuver to begin the interplanetary leg of the mission. After escape from the Earth-moon system, the SEP spacecraft maneuvered in interplanetary space and performed a rendezvous with a comet.The immediate goal of this study was to demonstrate the feasibility of using a low-thrust SEP spacecraft for orbit transfer to both the moon and a comet. Another primary goal was to develop a computer optimization code which would be robust enough to obtain minimum-fuel rendezvous trajectories for a wide range of comets.

Kluever, Craig A.↗

Optimal lunar trajectories for a combined chemical-electric propulsion spacecraft

Spacecraft which utilize electric propulsion (EP) systems are capable of delivering a greater payload fraction compared to spacecraft using conventional chemical propulsion systems. Several researchers have investigated numerous applications of low-thrust EP including a manned Mars mission, scientific missions to the outer planets, and lunar missions. In contrast, the study of optimal combined high and low-thrust spacecraft trajectories has been limited. In response to the release of NASA's 1994 Announcement of Opportunity (AO) for Discovery class interplanetary exploration missions, a preliminary investigation of a lunar comet rendezvous mission using a solar electric propulsion (SEP) spacecraft was performed. The Discovery mission (eventually named Diana) was envisioned to be a two-phase scientific exploration mission: the first phase involved exploration of the moon and second phase involved rendezvous with a comet. The initial phase began with a chemical propulsion translunar injection and chemical insertion into a lunar orbit, followed by a low-thrust SEP transfer to a circular, polar, low-lunar orbit (LLO). After scientific data was collected at the moon, the SEP spacecraft performed a spiral lunar escape maneuver to begin the interplanetary leg of the mission. After escape from the Earth-moon system, the SEP spacecraft maneuvered in interplanetary space and performed a rendezvous with a short period comet. An initial study that demonstrated the feasibility of using EP for the lunar and comet orbit transfer was performed under the grant NAG3-1581. This final report is a continuation of the initial research efforts in support of the Discovery mission proposal that was submitted to NASA Headquarters in October 1994. Section 2 discusses the lunar orbit transfer phase of the Diana mission which involves both chemical and electric propulsion stages. Section 3 discusses the chemical lunar orbit insertion (LOI) burn optimization. Finally, section 4 presents the conclusions of this research effort.

Kluever, Craig A.↗

Aerothermodynamic Environment Definition for the Genesis Sample Return Capsule

NASA's Genesis sample return mission will be the first to return material from beyond the Earth-Moon system. NASA Langley Research Center supported this mission with aerothermodynamic analyses of the sample return capsule. This paper provides an overview of that effort. The capsule is attached through its forebody to the spacecraft bus. When the attachment is severed prior to Earth entry, forebody cavities remain. The presence of these cavities could dramatically increase the heating environment in their vicinity and downstream. A combination of computational fluid dynamics calculations and wind tunnel phosphor thermography tests were employed to address this issue. These results quantify the heating environment in and around the cavities, and were a factor in the decision to switch forebody heat shield materials. A transition map is developed which predicts that the flow aft of the penetrations will still be laminar at the peak heating point of the trajectory. As the vehicle continues along the trajectory to the peak dynamic pressure point, fully turbulent flow aft of the penetrations could occur. The integrated heat load calculations show that a heat shield sized to the stagnation point levels will be adequate for the predicted environment aft of the penetrations.

Cheatwood, F. McNeil↗

Servicing and Deployment of National Resources in Sun-Earth Libration Point Orbits

Spacecraft travel between the Sun-Earth system, the Earth-Moon system, and beyond has received extensive attention recently. The existence of a connection between unstable regions enables mission designers to envision scenarios of multiple spacecraft traveling cheaply from system to system, rendezvousing, servicing, and refueling along the way. This paper presents examples of transfers between the Sun-Earth and Earth-Moon systems using a true ephemeris and perturbation model. It shows the (Delta)V costs associated with these transfers, including the costs to reach the staging region from the Earth. It explores both impulsive and low thrust transfer trajectories. Additionally, analysis that looks specifically at the use of nuclear power in libration point orbits and the issues associated with them such as inadvertent Earth return is addressed. Statistical analysis of Earth returns and the design of biased orbits to prevent any possible return are discussed. Lastly, the idea of rendezvous between spacecraft in libration point orbits using impulsive maneuvers is addressed.

Folta, David C.↗

Unstable Resonant Orbits near Earth and Their Applications in Planetary Missions

This paper explores the uses of planar, simple-periodic symmetrical families of orbits in mission designs in the Earth-Moon system. This classification is defined as the planar periodic orbits that pierce the x-axis in the rotating frame exactly twice per orbit where each piercing is orthogonal to the x-axis. A continuation method has been used to explore several families of this class of orbit in the Earth-Moon restricted three-body system. The invariant manifolds of the unstable orbits in each of these families are then produced and several mission designs are discussed that take advantage of these manifolds. Focus is given to mission designs that implement resonant orbits that periodically fly by the moon.

invariant manifolds↗

NASA's Decadal Planning Team Mars Mission Analysis Summary

In June 1999 the NASA Administrator chartered an internal NASA task force, termed the Decadal Planning Team, to create new integrated vision and strategy for space exploration. The efforts of the Decadal Planning Team evolved into the Agency-wide team known as the NASA Exploration Team (NEXT). This team was also instructed to identify technology roadmaps to enable the science-driven exploration vision, established a cross-Enterprise, cross-Center systems engineering team with emphasis focused on revolutionary not evolutionary approaches. The strategy of the DPT and NEXT teams was to "Go Anywhere, Anytime" by conquering key exploration hurdles of space transportation, crew health and safety, human/robotic partnerships, affordable abundant power, and advanced space systems performance. Early emphasis was placed on revolutionary exploration concepts such as rail gun and electromagnetic launchers, propellant depots, retrograde trajectories, nano structures, and gas core nuclear rockets to name a few. Many of these revolutionary concepts turned out to be either not feasible for human exploration missions or well beyond expected technology readiness for near-term implementation. During the DPT and NEXT study cycles, several architectures were analyzed including missions to the Earth-Sun Libration Point (L2), the Earth-Moon Gateway and L1, the lunar surface, Mars (both short and long stays), one-year round trip Mars, and near-Earth asteroids. Common emphasis of these studies included utilization of the Earth-Moon Libration Point (L1) as a staging point for exploration activities, current (Shuttle) and near-term launch capabilities (EELV), advanced propulsion, and robust space power. Although there was much emphasis placed on utilization of existing launch capabilities, the team concluded that missions in near-Earth space are only marginally feasible and human missions to Mars were not feasible without a heavy lift launch capability. In addition, the team concluded that missions in Earth s neighborhood, such as to the Moon, can serve as stepping-stones toward further deep-space missions in terms of proving systems, technologies, and operational concepts. The material contained in this presentation was compiled to capture the work performed by the Mars Sub-Team of the DPT NEXT efforts in the late 1999-2001 timeframe.

Drake, Bret G.↗

Long Term Missions at the Sun-Earth Libration Point L1: ACE, SOHO, and WIND

Three heliophysics missions -- the Advanced Composition Explorer (ACE), Solar Heliospheric Observatory (SOHO), and the Global Geoscience WIND -- have been orbiting the Sun-Earth interior libration point L1 continuously since 1997, 1996, and 2004, respectively. ACE and WIND (both NASA missions) and SOHO (an ESA-NASA joint mission) are all operated from the NASA Goddard Space Flight Center (GSFC). While ACE and SOHO have been dedicated libration point orbiters since their launches, WIND has had also a remarkable 10-year career flying a deep-space, multiple lunar-flyby trajectory prior to 2004. That era featured 36 targeted lunar flybys with excursions to both L1 and L2 before its final insertion in L1 orbit. A figure depicts the orbits of the three spacecraft, showing projections of the orbits onto the orthographic planes of a solar rotating ecliptic frame of reference. The SOHO orbit is a quasi-periodic halo orbit, where the frequencies of the in-plane and out-of-plane motions are practically equal. Such an orbit is seen to repeat itself with a period of approximately 178 days. For ACE and WIND, the frequencies of the in-plane and out-of-plane motions are unequal, giving rise to the characteristic Lissajous motion. ACE's orbit is of moderately small amplitude, whereas WIND's orbit is a large-amplitude Lissajous of dimensions close to those of the SOHO halo orbit. As motion about the collinear points is inherently unstable, stationkeeping maneuvers are necessary to prevent orbital decay and eventual escape from the L1 region. Though the three spacecraft are dissimilar (SOHO is a 3-axis stabilized Sun pointer, WIND is a spin-stabilized ecliptic pole pointer, and ACE is also spin-stabilized with its spin axis maintained between 4 and 20 degrees of the Sun), the stationkeeping technique for the three is fundamentally the same. The technique consists of correcting the energy of the orbit via a delta-V directed parallel or anti-parallel to the Spacecraft-to-Sun line. SOHO achieves this using thrusters oriented in line with the solar direction. WIND achieves the delta-V via pulsing radial thrusters when aligned with the Sun. ACE uses axial thrusters to apply delta-V with a component that is 94% or more aligned with the ACE-Sun line. Sunward thrust adds energy to the orbit preventing decay back toward Earth. Thrust directed anti-Sunward takes energy out of the L1 orbit, thereby preventing escape from the Earth-Moon system into independent heliocentric orbit. Libration point orbit stationkeeping delta-V costs grow exponentially with time elapsed from the last maneuver performed. The doubling time constant is approximately 16 days. For the sake of fuel conservation, and for limiting the absolute magnitude of propulsion performance errors, stationkeeping maneuvers should be performed before the delta-V grows too large; for our purposes 'too large' is considered to be greater than 0.5 m/sec. In practice, the typical interval between burns for this trio is about three months, and the typical delta-V is much smaller than 0.5 m/sec. Typical annual stationkeeping costs have been around 1.0 m/sec for ACE and WIND, and much less than that for SOHO. All three spacecraft have ample fuel remaining; barring contingencies all three could, in principle, be maintained at L1 for decades to come. This paper will review the L1 orbits and the mission history of ACE, WIND, and SOHO, and describe the stationkeeping techniques and orbit maneuver experience. The Lissajous phase control that was practiced for ACE during the period from 1999 to 2001 will also be briefly discussed. The final section will consider the future of these ongoing missions.

Roberts, Craig E.↗

Targeting Low-Energy Transfers to Low Lunar Orbit

A targeting scheme is presented to build trajectories from a specified Earth parking orbit to a specified low lunar orbit via a low-energy transfer and up to two maneuvers. The total transfer delta V (velocity) is characterized as a function of the Earth parking orbit inclination and the departure date for transfers to each given low lunar orbit. The transfer delta V (velocity) cost is characterized for transfers constructed to low lunar polar orbits with any longitude of ascending node and for transfers that arrive at the Moon at any given time during a month.

mission designs↗