Search NASA⌕ Search

SEARCH · Search NASA

Results for “ELECTRIC CONNECTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Connector pin and method

An electrical connector and method includes a connector and a conforming element proximate to or in contact with the mating end of the connector so as to prevent distortion of a matable end. The matable end of the connector may be of a female or male type and may be of a post, tube, blade, pin, or other configuration. An element made of conforming material, for example, an elastomer, epoxy or rubber type material, is configured and positioned in contact with the matable end of the connector, providing support during assembly to prevent distortion of the matable end. The conforming element may be rectangular, wedge, cylindrical, conical, annular, or of another configuration as required to provide support to the connector pin. The conforming element may be fastened with an adhesive to the matable end to further prevent distortion.

Davis, Donald R.↗

SEE Design Guide and Requirements for Electrical Deadfacing

The purpose of this design guide is to present information for understanding and mitigating the potential hazards associated with de-mating and mating powered electrical connectors on space flight vehicles. The process of staging is a necessary function in the launching of space vehicles and in the deployment of satellites, and now in manned assembly of systems in space. During this electrical interconnection process, various environments may be encountered that warrant the restriction of the voltage and current present across the pins of an electrical connector prior to separation, mating, or in a static open non-mated configuration. This process is called deadfacing. These potentially hazardous environments encompass the obvious explosive fuel vapors and human shock hazard, to multiple Electro-Magnetic Interference (EMI) phenomena related to the rapid rate of change in current as well as exposure to Radio Frequency (RF) fields.

Berki, Joe M.↗

Automated Ground Umbilical Systems (AGUS) Project

All space vehicles require ground umbilical systems for servicing. Servicing requirements can include, but are not limited to, electrical power and control, propellant loading and venting, pneumatic system supply, hazard gas detection and purging as well as systems checkout capabilities. Of the various types of umbilicals, all require several common subsystems. These typically include an alignment system, mating and locking system, fluid connectors, electrical connectors and control !checkout systems. These systems have been designed to various levels of detail based on the needs for manual and/or automation requirements. The Automated Ground Umbilical Systems (AGUS) project is a multi-phase initiative to develop design performance requirements and concepts for launch system umbilicals. The automation aspect minimizes operational time and labor in ground umbilical processing while maintaining reliability. This current phase of the project reviews the design, development, testing and operations of ground umbilicals built for the Saturn, Shuttle, X-33 and Atlas V programs. Based on the design and operations lessons learned from these systems, umbilicals can be optimized for specific applications. The product of this study is a document containing details of existing systems and requirements for future automated umbilical systems with emphasis on design-for-operations (DFO).

Gosselin, Armand M.↗

A Compact, Modular Superconducting Bolometer Array Package

We have designed a detector package to house a superconducting bolometer array, SQUID multiplexers, bias and integration circuitry, optical filtering, electrical connectors, and thermal/mechanical interfaces. This package has been used successfully in the GISMO 2mm camera, a 128-pixel camera operating at a base temperature of 270mK. Operation at lower temperatures is allowed by providing direct heat sinking to the SQUIDS and bias resistors, which generate the bulk of the dissipation in the package. Standard electrical connectors provide reliable contact while enabling quick installation and removal of the package. Careful design has gone into the compensation for differing thermal expansions, the need for heat sinking of the bolometer array, and the placement of magnetic shielding in critical areas. In this presentation, we detail the design and performance of this detector package and describe its scalability to 1280- pixel arrays in the near future.

Benford, Dominic J.↗

A Compact, Modular Package for Superconducting Bolometer Arrays

As bolometer arrays grow to ever-larger formats, packaging becomes a more critical engineering issue. We have designed a detector package to house a superconducting bolometer array, SQUID multiplexers, bias and filtering circuitry, and electrical connectors. The package includes an optical filter, magnetic shielding, and has well-defined thermal and mechanical interfaces. An early version of this package has been used successfully in the GISMO 2mm camera, a 128-pixel camera operating at a base temperature of 270mK. A more advanced package permits operation at lower temperatures by providing direct heat sinking to the SQUIDS and bias resistors, which generate the bulk of the dissipation in the package. Standard electrical connectors provide reliable contact while enabling quick installation and removal of the package. We describe how the design compensates for differing thermal expansions, allows heat sinking of the bolometer array, and features magnetic shielding in critical areas. We highlight the performance of this detector package and describe its scalability to 1280-pixel arrays in the near future.

Benford, D.↗

Design, Manufacture, and Experimental Serviceability Validation of ITER Blanket Components

In 2014, the Russian Federation and the ITER International Organization signed two Procurement Arrangements (PAs) for ITER blanket components: 1.6.P1ARF.01 “Blanket First Wall” of February 14, 2014, and 1.6.P3.RF.01 “Blanket Module Connections” of December 19, 2014. The first PA stipulates development, manufacture, testing, and delivery to the ITER site of 179 Enhanced Heat Flux (EHF) First Wall (FW) Panels intended for withstanding the heat flux from the plasma up to 4.7MW/m{sup 2}. Two Russian institutions, NIIEFA (Efremov Institute) and NIKIET, are responsible for the implementation of this PA. NIIEFA manufactures plasma-facing components (PFCs) of the EHF FW panels and performs the final assembly and testing of the panels, and NIKIET manufactures FW beam structures, load-bearing structures of PFCs, and all elements of the panel attachment system. As for the second PA, NIKIET is the sole official supplier of flexible blanket supports, electrical insulation key pads (EIKPs), and blanket module/vacuum vessel electrical connectors. Joint activities of NIKIET and NIIEFA for implementing PA 1.6.P1ARF.01 are briefly described, and information on implementation of PA 1.6.P3.RF.01 is given. Results of the engineering design and research efforts in the scope of the above PAs in 2015–2016 are reported, and results of developing the technology for manufacturing ITER blanket components are presented.

42 ENGINEERING↗

Improved shielding termination adapter for electrical cable connectors

Termination adapter replaces braid ring and ensures permanent attachment and grounding of sheath wires. The inner ferrule of the termination is slipped inside the exposed ends of the sheath wires and the outer ferrule is placed over the wires and crimped in place to secure the wires for grounding.

Vanasse, M. A.↗

Electrical-splicing connector

Connection can be made without removing insulation, and connector case insulates splice. Device can be made in various sizes and saves time, especially when working on prototype boards with several interconnecting test leads.

Stringer, E. J.↗

Dust-Tolerant Intelligent Electrical Connection System

Faults in wiring systems are a serious concern for the aerospace and aeronautic (commercial, military, and civilian) industries. Circuit failures and vehicle accidents have occurred and have been attributed to faulty wiring created by open and/or short circuits. Often, such circuit failures occur due to vibration during vehicle launch or operation. Therefore, developing non-intrusive fault-tolerant techniques is necessary to detect circuit faults and automatically route signals through alternate recovery paths while the vehicle or lunar surface systems equipment is in operation. Electrical connector concepts combining dust mitigation strategies and cable diagnostic technologies have significant application for lunar and Martian surface systems, as well as for dusty terrestrial applications. The dust-tolerant intelligent electrical connection system has several novel concepts and unique features. It combines intelligent cable diagnostics (health monitoring) and automatic circuit routing capabilities into a dust-tolerant electrical umbilical. It retrofits a clamshell protective dust cover to an existing connector for reduced gravity operation, and features a universal connector housing with three styles of dust protection: inverted cap, rotating cap, and clamshell. It uses a self-healing membrane as a dust barrier for electrical connectors where required, while also combining lotus leaf technology for applications where a dust-resistant coating providing low surface tension is needed to mitigate Van der Waals forces, thereby disallowing dust particle adhesion to connector surfaces. It also permits using a ruggedized iris mechanism with an embedded electrodynamic dust shield as a dust barrier for electrical connectors where required.

Lewis, Mark↗

Impacts of PV Module Connector Failures on Cost and Performance of Utility Scale Photovoltaic Systems

The reliability, cost and performance of electrical connectors are a concern in all types of electrical systems, and demands on connectors used on photovoltaic (PV) systems include that connectors maintain electrical conductivity and physical strength, endure ultraviolet sunlight and high ambient temperature, and resist moisture and chemical intrusion over a very long (>25 year) performance period. Connector failures increase operation and maintenance (O&M) costs and reduce plant production, but connector failure can also cause safety and liability problems, which are of greater concern. This work results from a three-year collaboration between Sandia National Laboratories (SNL), the Electric Power Research Institute (EPRI), and the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) Solar Energy Technology Office (SETO) under Agreements #39035 and #38531 "Connector Reliability Across the US Solar Sector." a multi-pronged investigation of PV connector health across the US (see https://energy.sandia.gov/pvconnectors/). This report presents derivation of a Techno-Economic Analysis (TEA) that models failure modes and frequencies (how often failure occurs), estimates O&M costs and lost production associated with connector failures, and then calculates the effect that PV module connectors can have on Levelized Cost of Energy (LCOE). The model is informed with initial data from quantitative assessment of failure rates, root causes and mechanisms, in-situ diagnostics and data collection, lab-based forensics, and interviews with PV connector manufacturers and plant operators. SNL conducted site inspections at multiple utility-scale sites in different climates and subjected field samples of new, used, and degraded connectors to visual and electrical characterization. EPRI conducted metallurgical analysis of the pin and sleeve conductors to study failure-induced morphological and compositional changes. There is in general a shortage of statistically valid data, but data from PVROM database maintained by SNL was sufficient to ascertain failure rates and lost production as well as provide qualitative insight in its curated maintenance records. This report details the structure of the mathematical model but the sources of data to inform the model will continue to evolve. Analysis of a 100 MW PV plant is provided as an example of the use of the model, with results indicating that connectors are responsible for Annualized O&M Costs of $\$$71,933/year; Annualized Unit O&M Costs of $\$$0.72/kW/year; that a Reserve Account of $\$$187,220 should be available to fund repairs related to connectors; that connectors add $\$$1,494,004 to the Net Present Value of the O&M Costs (project life); and that O&M related to connectors adds about $\$$0.00088/kWh to the Levelized Cost of Energy. The impact of this model is to provide a tool to make the US solar sector more robust by quantifying and monetizing the reliability risks to utility-scale PV systems posed by poorly installed, mismatched and/or poorly designed and manufactured connectors. The TEA provides a model incorporating failure statistics, O&M cost data, and lost production into a single figure of merit, informing decisions and enabling practitioners to optimize cost and performance trade-offs. Stakeholders include connector manufacturers, system designers and equipment specifiers, standards bodies, installers and O&M providers, investors and insurance underwriters. This report supports continued growth of PV predicated on assurances that properly installed and maintained PV system connectors are safe and reliable. The project team is proposing future work including accelerated testing of connectors and expanding the approach taken here to other PV system components, such as TEA for rapid shut-down devices.

14 SOLAR ENERGY↗

Quick-release connector module

A multi-bay electrical connector is described, of the type that has a frame (12, FIG. 2 ) with cavities (14) that each holds a separate module 20, which enables quick withdrawal of a single module from the frame and its quick replacement. A lock arm (42) is slidable along a first side (50) of a first cavity, and has at least one lock lug (80). A first module has a barrier part (70) that lies inward of the lock lug, which prevents outward movement of the first module out of the frame cavity. The lock arm can be moved to an unlocked position wherein the barrier part on the module lies inward of a gap (84) in the lock arm to permit the module to be pulled out of the frame cavity and later inserted therein. A latch (54) is slidable on the frame in directions (A, B) perpendicular to the sliding movement of the lock arm, and has an abutment (112, FIG. 5 ) that abuts a shoulder (114) on the lock arm to keep the lock arm in its unlocked position until the latch is released.

Sedig, Albert R.↗

Levered connector extractor

An extractor for separating electrical connectors is disclosed which imparts a prying force to connector elements in a plane normal to the mounting surface. The extractor comprises a lever pivotally connected to a rotatable fork that is adapted to fit under the end of a connector shell. A pair of extractors are deployed at opposite ends of a connector to pry the connector out of its mating socket gently and securely without damage to wires or connecting pins, even under crowded conditions.

Takahashi, Ted H.↗