Search NASA⌕ Search

SEARCH · Search NASA

Results for “ELECTRIC INSPECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

A Screening Method Using Pulsed-Power Combined with Infrared Imaging to Detect Pattern Defects in Bulk Metal Foil or Thin Film Resistors

Bulk metal foil and thin film resistors occasionally contain localized defects within the etched resistor pattern. Common defects of this type include in-line constrictions referred to as notches, unremoved resistor material bridges between adjacent pattern lines, and embedded non-conductive particles in the resistor material. Such defects are prone to fracture due to thermomechanical fatigue during powered operation, especially power cycling, resulting in positive resistance change and open circuit failure modes. Common screening methods of optical microscopy, short time overload power tests (e.g., 6.25x rated power for 5 seconds) and burn-in (e.g., 1.5x rated power for 100 hours) are useful, but they are not always effective at removing devices with such defects. An improved method has been developed to screen for localized resistor pattern defects. The method involves the application of brief, high power electrical pulses at a low duty cycle while inspecting the resistor with a high resolution, high speed infrared camera. The following test conditions were found to be suitable for this purpose: 6.25x rated power, 1 to 5 pulses, 50 ms pulse width and 10% duty cycle. During the power pulsing, localized constrictions in the resistor pattern are identifiable as hot spots via the infrared camera. Reject criteria can be established based on observations of hot spots. To assess its effectiveness, a total of two hundred eighty (280) surface mount foil resistors (40 each from 7 different lots) were screened using this infrared technique. The screening identified twenty-nine (29) resistors with significant hot spots in the resistor pattern. All 280 resistors were then subjected to an industry standard 10,000 hour life test at 1x rated power at 70°C with power cycled for 90 minutes on and 30 minutes off. During life testing, three resistors exhibited positive resistance change failure mode. All three failures were due to thermomechanical fatigue failure of localized bridge defects at the locations identified via infrared screening. The results of this evaluation illustrate the benefits of the pulsed-power infrared detection screening technique to identify reliability suspect foil or thin film resistors that may escape common screening methods.

screening↗

Tribal Renewable Energy: Bishop Paiute Tribe, Residential Solar Program Phase II (Final Report)

The project consisted of the design, installation, inspection, and interconnection of 35 grid-tied, solar electric systems, totaled 123 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation, which provide at least 65-79% savings in displaced electricity. Tribal job trainees were hired for each installation, gaining valuable job experience. Additionally, each homeowner was educated on energy efficiency and renewable energy. The overall project goal was to deploy clean energy systems in order to achieve the Bishop Paiute Tribe’s long-term goals of energy self-sufficiency, environmental protection, and better lives for our Tribal members and community. The energy displaced was 82.4 percent of total electricity used (exceeding estimated 65-79%)or over 170,000 kWh/year generating approximately $1.29 million worth of power for low-income families over their lifespans, while eliminating an estimated 2,640 tons of greenhouse gas emissions. This reduction makes a significant difference on the reservation giving more families money to spend on other essential items, while reducing their carbon footprint in this beautiful mountain community. Also, implementing these 35 systems provided a approximately 132 hours of paid solar installation work for tribal members. Training and good paying jobs are scarce on the reservation and solar is the fastest growing industry in CA and this training offered our members a real chance to learn and then get paid. The program is very significant to the family who qualified, as most families fall below the federal poverty guidelines, and many are living paycheck to paycheck. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase II— affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental, and social self-sufficiency and sovereignty amongst the most needy on the Reservation

14 SOLAR ENERGY↗

Observations of solar-cell metallization corrosion

The Engineering Sciences Area of the Jet Propulsion Laboratory (JPL) Flat-Plate Solar Array Project is performing long term environmental tests on photovoltaic modules at Wyle Laboratories in Huntsville, Alabama. Some modules have been exposed to 85 C/85% RH and 40 C/93% RH for up to 280 days. Other modules undergoing temperature-only exposures ( 3% RH) at 85 C and 100 C have been tested for more than 180 days. At least two modules of each design type are exposed to each environment - one with, and the other without a 100-mA forward bias. Degradation is both visually observed and electrically monitored. Visual observations of changes in appearance are recorded at each inspection time. Significant visual observations relating to metallization corrosion (and/or metallization-induced corrosion) include discoloration (yellowing and browning) of grid lines, migration of grid line material into the encapsulation (blossoming), the appearance of rainbow-like diffraction patterns on the grid lines, and brown spots on collectors and grid lines. All of these observations were recorded for electrically biased modules in the 280-day tests with humidity.

Mon, G. R.↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Study of Contact Resistances in Integrated Circuits

Techniques explored in search for rapid, reliable test. Resistances of aluminum/silicon contacts and methods to measure subjects of NASA report. Study with three tasks undertaken to evaluate nature and reliability of large numbers of semiconductor contacts of type now being fabricated in integrated circuits: Develop yield analysis for series strings of contacts using wafer-level electrical measurements, and identify different types of faults by visual inspection; develop wafer-level tests to evaluate reliability of contact strings; and develop mathematical model for current flow in contacts and examine contact region for evidence of micro-alloying.

Buehler, M. G.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

US HL-LHC Accelerator Upgrade Project: MQXFA11 shipping incident report

The truck transporting the MQXFA11 magnet from LBNL to BNL was involved in an accident on 7/20/22. It was rear ended by another truck. Drivers were not injured. The main hit took place on the right back corner. The truck with the MQXFA11 magnet was towed to a tow yard in Rockdale, IL (~50 min drive from Fermilab). Subsequently, it was moved on another truck and moved to Fermilab. Fermilab employees added 3 accelerometers on the crate before it was moved on the new truck and attended all loading/unloading operations at the tow yard and at FNAL. The magnet arrived at FNAL on July 28 th . Upon arrival a visual inspection was performed. Accelerometers were removed and shock data were analyzed. Electrical checkout and a metrology survey were carried out. Strain data were also collected from the fiber optics installed on two coils and compared with data obtained before shipment. This report presents a summary of results. More pictures and details can be found at: https://indico.fnal.gov/event/55698/

43 PARTICLE ACCELERATORS↗

MQXFA11 shipping incident report

The truck transporting the MQXFA11 magnet from LBNL to BNL was involved in an accident on 7/20/22. It was rear ended by another truck. The magnet arrived at FNAL on July 28th. Upon arrival a visual inspection was performed. Accelerometers were removed and shock data were analyzed. Electrical checkout and a metrology survey were carried out. Strain data were also collected from the fiber optics installed on two coils and compared with data obtained before shipment. This report presents a summary of results.

43 PARTICLE ACCELERATORS↗

Eddy-current testing

Eddy-current inspection is discussed as a method for locating subsurface flaws in electrically conductive materials. The physical principles and electrical circuitry are described along with the test equipment.

Pasley, R. L.↗

MB C220 Centering System Capacitor Fire

A detailed analysis of the MB C220 Centering System Capacitor Fire is presented. The topics include: 1) Description of Incident/Mishap; 2) System Block Diagram; 3) Fault Tree Analysis; 4) Inspection and Repair of Cabinet; 5) Discussions with GSFC Experts; 6) Electrical Measurements of Capacitors; 7) Other Research; 8) Discussions with Capacitor Manufacturers; 9) Findings/Root Cause; and 10) Recommendations. This paper is in viewgraph form.

Worth, Daniel B.↗

Space Shuttle Columbia Aging Wiring Failure Analysis

A Space Shuttle Columbia main engine controller 14 AWG wire short circuited during the launch of STS-93. Post-flight examination divulged that the wire had electrically arced against the head of a nearby bolt. More extensive inspection revealed additional damage to the subject wire, and to other wires as well from the mid-body of Columbia. The shorted wire was to have been constructed from nickel-plated copper conductors surrounded by the polyimide insulation Kapton, top-coated with an aromatic polyimide resin. The wires were analyzed via scanning electron microscope (SEM), energy dispersive X-Ray spectroscopy (EDX), and electron spectroscopy for chemical analysis (ESCA); differential scanning calorimetry (DSC) and thermal gravimetric analysis (TGA) were performed on the polyimide. Exemplar testing under laboratory conditions was performed to replicate the mechanical damage characteristics evident on the failed wires. The exemplar testing included a step test, where, as the name implies, a person stepped on a simulated wire bundle that rested upon a bolt head. Likewise, a shear test that forced a bolt head and a torque tip against a wire was performed to attempt to damage the insulation and conductor. Additionally, a vibration test was performed to determine if a wire bundle would abrade when vibrated against the head of a bolt. Also, an abrasion test was undertaken to determine if the polyimide of the wire could be damaged by rubbing against convolex helical tubing. Finally, an impact test was performed to ascertain if the use of the tubing would protect the wire from the strike of a foreign object.

McDaniels, Steven J.↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Temperature Dependence of Electrical Resistance of Woven Melt-Infiltrated SiCf/SiC Ceramic Matrix Composites

Recent studies have successfully shown the use of electrical resistance (ER)measurements to monitor room temperature damage accumulation in SiC fiber reinforced SiC matrix composites (SiCf/SiC) Ceramic Matrix Composites (CMCs). In order to determine the feasibility of resistance monitoring at elevated temperatures, the present work investigates the temperature dependent electrical response of various MI (Melt Infiltrated)-CVI (Chemical Vapor Infiltrated) SiC/SiC composites containing Hi-Nicalon Type S, Tyranno ZMI and SA reinforcing fibers. Test were conducted using a commercially available isothermal testing apparatus as well as a novel, laser-based heating approach developed to more accurately simulate thermomechanical testing of CMCs. Secondly, a post-test inspection technique is demonstrated to show the effect of high-temperature exposure on electrical properties. Analysis was performed to determine the respective contribution of the fiber and matrix to the overall composite conductivity at elevated temperatures. It was concluded that because the silicon-rich matrix material dominates the electrical response at high temperature, ER monitoring would continue to be a feasible method for monitoring stress dependent matrix cracking of melt-infiltrated SiC/SiC composites under high temperature mechanical testing conditions. Finally, the effect of thermal gradients generated during localized heating of tensile coupons on overall electrical response of the composite is determined.

Ceramic Matrix Composites↗

NASA Ames Research Center Unitary Plan Wind Tunnel Fall 2018 Outage - Motor 1 Activity: Stator Shift

The Unitary Plan Wind Tunnel consists of the 11 x 11- Foot Transonic Wind Tunnel and the 9 x 7 foot Supersonic Wind Tunnel. The four 65,000hp electric motors that drive the wind tunnel compressors require periodic maintenance. In order to inspect the motors without the removal of drive shaft components, the stator must be shifted away from the motor. This process is referred to as "Stator Shift". Video is mp4 formatted with runtime of 2 mins 54 secs.

Wind Tunnel↗