Search NASA⌕ Search

SEARCH · Search NASA

Results for “Eclipse mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

TESS Revisits WASP-12: Updated Orbital Decay Rate and Constraints on Atmospheric Variability

After observing WASP-12 in the second year of the primary mission, the Transiting Exoplanet Survey Satellite (TESS) revisited the system in late 2021 during its extended mission. In this paper, we incorporate the new TESS photometry into a reanalysis of the transits, secondary eclipses, and phase curve. We also present a new Ks-band occultation observation of WASP-12b obtained with the Palomar/Wide-field Infrared Camera instrument. The latest TESS photometry spans three consecutive months, quadrupling the total length of the TESS WASP-12 light curve and extending the overall time baseline by almost two years. Based on the full set of available transit and occultation timings, we find that the orbital period is shrinking at a rate of −29.81 ± 0.94 ms yr−1. The additional data also increase the measurement precision of the transit depth, orbital parameters, and phase-curve amplitudes. We obtain a secondary eclipse depth of 466 ± 35 ppm, a 2σ upper limit on the nightside brightness of 70 ppm, and a marginal 6°.2 ± 2°.8 eastward offset between the dayside hotspot and the substellar point. The voluminous TESS data set allows us to assess the level of atmospheric variability on timescales of days, months, and years. We do not detect any statistically significant modulations in the secondary eclipse depth or day–night brightness contrast. Likewise, our measured Ks-band occultation depth of 2810 ± 390 ppm is consistent with most ∼2.2 μm observations in the literature.

Ian Wong↗

TESS in the Extended Mission: A Powerful Tool for Time-Domain Exoplanet Science

Since its launch in 2018, the Transiting Exoplanet Survey Satellite (TESS) has embarked on an ambitious mission to image almost the entire sky in search of nearby transiting exoplanet systems. Upon completion of its Primary Mission in July 2020, TESS transitioned to its first Extended Mission, during which it has returned to both the southern and northern ecliptic hemispheres and revisited most of the targets it observed during the first two years of operation. With future Extended Missions likely, the end-to-end time baseline provided by TESS will significantly exceed that of Kepler, enabling a plethora of scientific investigations into time-domain exoplanet science. TESS has already established itself as an extremely productive tool for studying visible-wavelength exoplanet phase curves. During the Primary Mission, we carried out a systematic phase-curve analysis of more than 30 transiting exoplanet systems. These datasets constrained the dayside hemisphere brightness temperatures, day-night brightness contrasts, and optical geometric albedos of a wide range of gas giant planets, revealing some tantalizing trends that warrant further study. In particular, we uncovered a tentative positive correlation between geometric albedo and equilibrium temperature for gas giants with 1500 < Teq < 3000 K. The new light curves from the Extended Mission have refined the measured astrophysical parameters of the previously studied systems and yielded statistically significant secondary eclipse and phase-curve detections for dozens of more systems. By comparing the phase-curve properties obtained from TESS observations separated by months or years, we have also probed for possible atmospheric variability, as well as transit-timing variations due to orbital decay or additional companions. In this presentation, I will provide an overview of the main results from our ongoing multiyear study of TESS light curves and discuss potentially fruitful avenues for further research as TESS continues its all-sky survey into the future.

Ian Wong↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Planetary Candidates from K2 Campaign 16

Given that Campaign 16 of the K2 mission is one of just two K2 campaigns observed so far in "forward-facing" mode, which enables immediate follow-up observations from the ground, we present a catalog of interesting targets identified through photometry alone. Our catalog includes 30 high-quality planet candidates (showing no signs of being non-planetary in nature), 48 more ambiguous events that may be either planets or false positives, 164 eclipsing binaries, and 231 other regularly periodic variable sources. We have released light curves for all targets in C16 and have also released system parameters and transit vetting plots for all interesting candidates identified in this paper. Of particular interest is a candidate planet orbiting the bright F dwarf HD 73344 (V = 6.9, K = 5.6) with an orbital period of 15 days. If confirmed, this object would correspond to a 2.56 +/- 0.18 R⊕ planet and would likely be a favorable target for radial velocity characterization. This paper is intended as a rapid release of planet candidates, eclipsing binaries, and other interesting periodic variables to maximize the scientific yield of this campaign, and as a test run for the upcoming TESS mission, whose frequent data releases call for similarly rapid candidate identification and efficient follow up.

bright F dwarf↗

Arcus Mission Design: Stable Lunar-Resonant High Earth Orbit for X-Ray Astronomy

The Arcus mission, proposed for NASA's 2016 Astrophysics Medium Explorer (MIDEX) announcement of opportunity, will use X-ray spectroscopy to detect previously unaccounted quantities of normal matter in the Universe. The Arcus mission design uses 4:1 lunar resonance to provide a stable orbit for visibility of widely-dispersed targets, in a low background radiation environment, above the Van Allen belts for the minimum two-year science mission. Additional ad-vantages of 4:1 resonance are long term stability without maintenance maneu-vers, eclipses under 4.5 hours, perigee radius approximately 12 Re for data download, and streamlined operational cadence with approximately 1 week orbit period.

Arcus↗

Solar Array Performance Modeling for NASA’s Artemis Missions

NASA’s Artemis exploration campaign includes multiple elements that utilize photovoltaic power generation. Artemis mission profiles feature a variety of events that can limit solar array generation and stress electrical power system (EPS) performance, including eclipses, propulsive or navigational maneuvers which constrain the positioning of the solar arrays, and spiral trajectories with significant radiation degradation. These features make predicting the performance of the power system particularly important and requires accurate modeling of power generation by the solar arrays under a variety of conditions. One of the tools used to predict spacecraft EPS performance is the System Power Analysis for Capability Evaluation (SPACE) model developed at NASA Glenn Research Center. SPACE is used by NASA to model EPS performance for the Orion crew transport vehicle and the Power and Propulsion Element (PPE) of the Gateway space station. This presentation will provide an overview of how SPACE calculates solar array performance, including degradation factors considered and environmental conditions that drive the solar array designs. Additionally, Orion array performance predictions generated by SPACE will be compared to flight data collected during the Artemis I mission.

Photovoltaic↗

Coronal and chromospheric physics

Achievements and completed results are discussed for investigations covering solar activity during the solar maximum mission and the solar maximum year; other studies of solar activity and variability; infrared and submillimeter photometry; solar-related atomic physics; coronal and transition region studies; prominence research; chromospheric research in quiet and active regions; solar dynamics; eclipse studies; and polarimetry and magnetic field measurements. Contributions were also made in defining the photometric filterograph instrument for the solar optical telescope, designing the combined filter spectrograph, and in expressing the scientific aims and implementation of the solar corona diagnostic mission.

Jefferies, J. T.↗

Real-Time Visualization of Spacecraft Telemetry for the GLAST and LRO Missions

GlastCam and LROCam are closely-related tools developed at NASA Goddard Space Flight Center for real-time visualization of spacecraft telemetry, developed for the Gamma-Ray Large Area Space Telescope (GLAST) and Lunar Reconnaissance Orbiter (LRO) missions, respectively. Derived from a common simulation tool, they use related but different architectures to ingest real-time spacecraft telemetry and ground predicted ephemerides, and to compute and display features of special interest to each mission in its operational environment. We describe the architectures of GlastCam and LROCam, the customizations required to fit into the mission operations environment, and the features that were found to be especially useful in early operations for their respective missions. Both tools have a primary window depicting a three-dimensional Cam view of the spacecraft that may be freely manipulated by the user. The scene is augmented with fields of view, pointing constraints, and other features which enhance situational awareness. Each tool also has another "Map" window showing the spacecraft's groundtrack projected onto a map of the Earth or Moon, along with useful features such as the Sun, eclipse regions, and TDRS satellite locations. Additional windows support specialized checkout tasks. One such window shows the star tracker fields of view, with tracking window locations and the mission star catalog. This view was instrumental for GLAST in quickly resolving a star tracker mounting polarity issue; visualization made the 180-deg mismatch immediately obvious. Full access to GlastCam's source code also made possible a rapid coarse star tracker mounting calibration with some on the fly code adjustments; adding a fine grid to measure alignment offsets, and introducing a calibration quaternion which could be adjusted within GlastCam without perturbing the flight parameters. This calibration, from concept to completion, took less than half an hour. Both GlastCam and LROCam were developed in the C language, with non-proprietary support libraries, for ease of customization and portability. This no-blackboxes aspect enables engineers to adapt quickly to unforeseen circumstances in the intense operations environment. GlastCam and LROCam were installed on multiple workstations in the operations support rooms, allowing independent use by multiple subsystems, systems engineers and managers, with negligible draw on telemetry system resources.

Stoneking, Eric T.↗

Heavy-Lift for a New Paradigm in Space Operations

NASA is developing an unprecedented heavy-lift capability to enable human exploration beyond low Earth orbit (LEO). This capability could also significantly enhance numerous other missions of scientific, national security, and commercial importance. That capability is currently configured as the Ares V cargo launch vehicle. This capability will eclipse the capability the United States lost with the retirement of the Saturn V. It is capable of launching roughly 53 percent more payload mass to trans lunar injection (TLI) and 30 percent more payload mass to LEO than its Apollo Program predecessor. Ares V is a major element of NASA's Constellation Program, which also includes the Ares I crew launch vehicle (CLV), Orion crew exploration vehicle (CEV), and a lunar lander for crew and cargo. As currently configured, Ares V will be capable of launching 413,800 pounds (187.7 mT) to LEO, 138,500 pounds (63 mT) direct to the Moon or 156,700 pounds (71.1 mT) in its dual-launch architecture role with Ares I. Its 33-foot (10 m) shroud provides unprecedented payload volume. Assessment of astronomy and planetary science payload requirements since spring 2008 has indicated that a Saturn V-class heavy-lift vehicle has the potential to support a range of payloads and missions. This vehicle configuration enables some missions previously considered difficult or impossible and enhances many others. Collaborative design/architecture inputs, exchanges, and analyses have already begun between scientists and payload developers. This early dialogue between NASA engineers and payload designers allows both communities to shape their designs and operational concepts to be mutually supportive to the extent possible with the least financial impact. This paper provides an overview of the capabilities of a heavy-lift vehicle to launch payloads with increased mass and/or volume and reduce technical and cost risk in both design and operations.

Morris, Bruce↗

Earth Observing System (EOS) Terra Spacecraft 120 Volt Power Subsystem: Requirements, Development and Implementation

Built by the Lockheed-Martin Corporation, the Earth Observing System (EOS) TERRA spacecraft represents the first orbiting application of a 120 Vdc high voltage spacecraft electrical power system implemented by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC). The EOS TERRA spacecraft's launch provided a major contribution to the NASA Mission to Planet Earth program while incorporating many state of the art electrical power system technologies to achieve its mission goals. The EOS TERRA spacecraft was designed around five state-of-the-art scientific instrument packages designed to monitor key parameters associated with the earth's climate. The development focus of the TERRA electrical power system (EPS) resulted from a need for high power distribution to the EOS TERRA spacecraft subsystems and instruments and minimizing mass and parasitic losses. Also important as a design goal of the EPS was maintaining tight regulation on voltage and achieving low conducted bus noise characteristics. This paper outlines the major requirements for the EPS as well as the resulting hardware implementation approach adopted to meet the demands of the EOS TERRA low earth orbit mission. The selected orbit, based on scientific needs, to achieve the EOS TERRA mission goals is a sun-synchronous circular 98.2degree inclination Low Earth Orbit (LEO) with a near circular average altitude of 705 kilometers. The nominal spacecraft orbit is approximately 99 minutes with an average eclipse period of about 34 minutes. The scientific goal of the selected orbit is to maintain a repeated 10:30 a.m. +/- 15 minute descending equatorial crossing which provides a fairly clear view of the earth's surface and relatively low cloud interference for the instrument observation measurements. The major EOS TERRA EPS design requirements are single fault tolerant, average orbit power delivery of 2, 530 watts with a defined minimum lifetime of five years (EOL). To meet these mission requirements, while minimizing mass and parasitic power losses, the EOS TERRA project relies on 36, 096 high efficiency Gallium Arsenide (GaAs) on Germanium solar cells adhered to a deployable flexible solar array designed to provide over 5,000 watts of power at EOL. To meet the eclipse power demands of the spacecraft, EOS TERRA selected an application of two 54-cell series connected Individual Pressure Vessel (IPV) Nickel-Hydrogen (NiH2) 50 Ampere-Hour batteries. All of the spacecraft observatory electrical power is controlled via the TERRA Power Distribution Unit (PDU) which is designed to provide main bus regulation of 120 Vdc +/- -4% at all load interfaces through the implementation of majority voter control of both the spacecraft's solar array sequential shunt unit (SSU) and the two battery bi-directional charge and discharge regulators. This paper will review the major electrical power system requirement drivers for the EOS TERRA mission as well as some of the challenges encountered during the development, testing, and implementation of the power system. In addition, spacecraft test and early on orbit performance results will also be covered.

Keys, Denney J.↗

Water Phase Change Heat Exchanger System Level Analysis for Low Lunar Orbit

In low Lunar orbit (LLO) the thermal environment is cyclic - extremely cold in the eclipse and as warm as room temperature near the subsolar point. Phase change material heat exchangers (PCHXs) are the best option for long term missions in these environments. The Orion spacecraft will use a n-pentadecane wax PCHX for its envisioned mission to LLO. Using water as a PCM material is attractive because its higher heat of fusion and greater density result in a lighter, more compact PCHX. To assess the use of a water PCHX for a human spacecraft in a circular LLO, a system level analysis was performed for the Orion spacecraft. Three cases were evaluated: 1) A one-to-one replacement of the wax PCHX on the internal thermal control loop with a water PCHX (including the appropriate control modifications), 2) reducing the radiator return setpoint temperature below Orion's value to enhance PCHX freezing, and 3) placing the water PCM on the external loop. The model showed that the water PCHX could not be used as a drop-in replacement for the wax PCHX. It did not freeze fully during the eclipse owing to its low freezing point. To obtain equivalent performance, 40% more radiator area than the Orion baseline was required. The study shows that, although water PCHXs are attractive at a component level, system level effects mean that they are not the best choice for LLO.

Navarro, Moses↗

A New Eclipse Algorithm for use in Spacecraft Trajectory Optimization

This paper presents a new eclipse algorithm, which determines if a spacecraft is in sunlight or shadow, that is simple to define, fast to compute, smooth and continuous in all regions external to the eclipsing body, and suitable for use in a spacecraft trajectory optimization problem. Details of the design evolution are presented, including the specifics of the algorithm's implementation in the trajectory design of NASA's Artemis I mission to a lunar DRO. Some alternate uses and discussion of future work is also presented.

Orion↗

Laser beamed power: Satellite demonstration applications

It is possible to use a ground-based laser to beam light to the solar arrays of orbiting satellites, to a level sufficient to provide all or some of the operating power required. Near-term applications of this technology for providing supplemental power to existing satellites are discussed. Two missions with significant commercial pay-off are supplementing solar power for radiation-degraded arrays and providing satellite power during eclipse for satellites with failed batteries.

Landis, Geoffrey A.↗

Artemis I Trajectory Design and Optimization

This paper presents the overall trajectory design and optimization process for NASA’s Artemis I mission to send an uncrewed Orion vehicle to a lunar Distant Retrograde Orbit (DRO). The on-orbit trajectory begins at the Space Launch System (SLS) core separation and ends at the Orion service module Earth Entry Interface (EI) point. The details of the trajectory optimization process are presented, including design of nominal and extended mission options, launch windows, and abort options. Novel design techniques are also discussed to account for contingencies, such as using auxiliary thrusters to protect against main engine failure and applying trajectory shaping to mitigate or reduce eclipse durations.

Artemis I↗

Multimission observations of 4U 1538 - 52

Archival data from the eclipsing binary X-ray pulsar 4U 1538 - 52 have been analyzed. These data were obtained from four different X-ray missions and span a baseline of 12 yr. Scanning observations were made using the Uhuru satellite during May 9-15, 1972 and using HEAO A1 during August 26-31, 1977 and February 22-28, 1978. Pointed observations were made using the Einstein Observatory during March 2, 1979 and Exosat during March 17, August 7-8 and 10-11, 1984. These data are used to improve the orbital period determination, to set a limit to the change in orbital period, and to improve the knowledge of the pulse period as a function of time. Exosat pulse profiles are presented and pulse-phase spectroscopy is performed. The pulsation observations of 4U 1538 - 52 are modeled geometrically, and parameters for magnetic beaming of the accretion column are derived.

Cominsky, L. R.↗

Trajectory Design for the Transiting Exoplanet Survey Satellite (TESS)

The Transiting Exoplanet Survey Satellite (TESS) is a National Aeronautics and Space Administration (NASA) mission launching in 2017. TESS will travel in a highly eccentric orbit around Earth, with initial perigee radius near 17 Earth radii (Re) and apogee radius near 59 Re. The orbit period is near 2:1 resonance with the Moon, with apogee nearly 90 degrees out-of-phase with the Moon, in a configuration that has been shown to be operationally stable. TESS will execute phasing loops followed by a lunar flyby, with a final maneuver to achieve 2:1 resonance with the Moon. The goals of a resonant orbit with long-term stability, short eclipses and limited oscillations of perigee present significant challenges to the trajectory design. To rapidly assess launch opportunities, we adapted the SWM76 launch window tool to assess the TESS mission constraints. To understand the long-term dynamics of such a resonant orbit in the Earth-Moon system we employed Dynamical Systems Theory in the Circular Restricted 3-Body Problem (CR3BP). For precise trajectory analysis we use a high-fidelity model and multiple shooting in the General Mission Analysis Tool (GMAT) to optimize the maneuver delta-V and meet mission constraints. Finally we describe how the techniques we have developed can be applied to missions with similar requirements.

Monte Carlo↗

Implementation of Active Thermal Control (ATC) for the Soil Moisture Active and Passive (SMAP) Radiometer

NASA's Earth Observing Soil Moisture Active and Passive (SMAP) Mission is scheduled to launch in November 2014 into a 685 kilometer near-polar, sun-synchronous orbit. SMAP will provide comprehensive global mapping measurements of soil moisture and freeze/thaw state in order to enhance understanding of the processes that link the water, energy, and carbon cycles. The primary objectives of SMAP are to improve worldwide weather and flood forecasting, enhance climate prediction, and refine drought and agriculture monitoring during its three year mission. The SMAP instrument architecture incorporates an L-band radar and an L-band radiometer which share a common feed horn and parabolic mesh reflector. The instrument rotates about the nadir axis at approximately 15 revolutions per minute, thereby providing a conically scanning wide swath antenna beam that is capable of achieving global coverage within three days. In order to make the necessary precise surface emission measurements from space, the electronics and hardware associated with the radiometer must meet tight short-term (instantaneous and orbital) and long-term (monthly and mission) thermal stabilities. Maintaining these tight thermal stabilities is quite challenging because the sensitive electronics are located on a fast spinning platform that can either be in full sunlight or total eclipse, thus exposing them to a highly transient environment. A passive design approach was first adopted early in the design cycle as a low-cost solution. With careful thermal design efforts to cocoon and protect all sensitive components, all stability requirements were met passively. Active thermal control (ATC) was later added after the instrument Preliminary Design Review (PDR) to mitigate the threat of undetected gain glitches, not for thermal-stability reasons. Gain glitches are common problems with radiometers during missions, and one simple way to avoid gain glitches is to use the in-flight set point programmability that ATC affords to operate the radiometer component away from the problematic temperature zone. A simple ThermXL model (10 nodes) was developed to exercise quick trade studies among various proposed control algorithms: Modified P control vs. PI control. The ThermXL results were then compared with the detailed Thermal Desktop (TD) model for corroboration. Once done, the simple ThermXL model was used to evaluate parameter effects such as temperature digitization, heater size and gain margin, time step, and voltage variation of power supply on the ATC performance. A Modified P control algorithm was implemented into the instrument flight electronics based on the ThermXL results. The thermal short-term stability margin decreased by 10 percent with ATC and a wide temperature error band (plus or minus 0.1 degrees Centigrade) compared to the original passive thermal design. However, a tighter temperature error band (plus or minus 0.1 degrees Centigrade) increased the thermal short-term stability margin by a factor of three over the passive thermal design. The current ATC design provides robust thermal control, tighter stability, and greater in-flight flexibility even though its implementation was prompted by non-thermal performance concerns.

Mikhaylov, Rebecca↗

Solar Magnetism eXplorer (Solme X)

The magnetic field plays a pivotal role in many fields of Astrophysics. This is especially true for the physics of the solar atmosphere. Measuring the magnetic field in the upper solar atmosphere is crucial to understand the nature of the underlying physical processes that drive the violent dynamics of the solar corona-that can also affect life on Earth. SolmeX, a fully equipped solar space observatory for remote-sensing observations, will provide the first comprehensive measurements of the strength and direction of the magnetic field in the upper solar atmosphere. The mission consists of two spacecraft, one carrying the instruments, and another one in formation flight at a distance of about 200 m carrying the occulter to provide an artificial total solar eclipse. This will ensure high-quality coronagraphic observations above the solar limb. SolmeX integrates two spectro-polarimetric coronagraphs for off-limb observations, one in the EUV and one in the IR, and three instruments for observations on the disk. The latter comprises one imaging polarimeter in the EUV for coronal studies, a spectro-polarimeter in the EUV to investigate the low corona, and an imaging spectro-polarimeter in the UV for chromospheric studies. SOHO and other existing missions have investigated the emission of the upper atmosphere in detail (not considering polarization), and as this will be the case also for missions planned for the near future. Therefore it is timely that SolmeX provides the final piece of the observational quest by measuring the magnetic field in the upper atmosphere through polarimetric observations

Magnetic Fields↗