Search NASA⌕ Search

SEARCH · Search NASA

Results for “Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Electrification Analysis: Container Ports' Cargo Handling Equipment

This one-page highlight details the key takeaways from a project that utilized NREL's Fleet Research, Energy Data, and Insights (FleetREDI) data analysis pipeline, the Electrification Analysis of Container Ports' Cargo Handling Equipment project. This project created a scalable solution to model energy demand per shipping container moved (kWh/TEU) for an all-electric cargo handling equipment fleet located at a maritime port. The model allows stakeholders to understand energy demand at each electric vehicle (EV) equipment level and is easily scalable to container demand and EV adoption rate projections.

ADVANCED PROPULSION SYSTEMS↗

SPC-71260 Rev 0 MARVEL Heat Extraction Subsystem Secondary Coolant Equipment (SCE) Design/Build

A. The Microreactor Applications Research Validation and Evaluation (MARVEL) reactor will offer experimental capabilities that are not currently available at DOE’s national laboratories. Idaho National Laboratory (INL), operated for the U.S. Department of Energy (DOE) by Battelle Energy Alliance, LLC (BEA) (Contractor hereafter) is procuring services for the design, analysis, fabrication, testing and delivery of a Secondary Coolant Equipment system (SCE). This specification contains the requirements for design, analysis, fabrication, testing and delivery of the SCE as described herein. The MARVEL reactor is a microreactor which uses eutectic sodium-potassium alloy (NaK) as a primary coolant. The primary coolant is circulated through four primary loops by natural convection of the coolant. In each loop is a closed well which will accommodate an intermediate heat exchanger (IHX) for extracting heat from the loop. These wells will be referred to in this specification as the “IHX wells.” It is intended for the IHX containment to also be filled with NaK. The MARVEL design team has determined that a Heat Extraction System (HES) using pumped NaK will be used to extract heat from the IHXs and deliver it to a downstream system for power generation or alternate process heat users. This Heat Extraction System will enable MARVEL operations including the ability to test, demonstrate, and address issues related to installation, startup, and operations. In addition, it will allow down-stream utilization of process heat for various uses. The objective of this specification is to develop the final design for the HES Secondary Coolant Equipment system (SCE) that will be used as the core of the HES. This system provides control of the NaK circulation between the MARVEL reactor and the subsequent process heat utilization systems. It does not include design of the Intermediate Heat Exchangers and piping inside the T-REXc pit in which the reactor is located. B. The MARVEL microreactor will be installed in the Transient Reactor Test Facility (TREAT) building in the Transient Reactor Test (TREAT) Micro-Reactor Experiment Cell (T-REXc) C. An INL Subcontractor has developed a conceptual design for this system per SPC-71145, referred to in that specification as the Process Heat Extraction System. SPC-71260 is based on the pumped NaK loop concept developed under SPC-71145. D. The SCE system design and (as option scope) fabrication shall be provided by the awardee of the subcontract (Subcontractor hereafter) pertaining to this Specification. Prior to shipment, the SCE will be fabricated, assembled, and tested at the Subcontractor’s facility. After successful completion of acceptance testing, the SCE and associated equipment will be shipped to the Materials and Fuels Complex (MFC) at the INL (Contractor’s Facility hereafter) to be installed by others in TREAT/T-REXc.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Benefits and challenges in deployment of low global warming potential R290 refrigerant for room air conditioning equipment in California

High global warming potential gases (“high GWP”) are the fastest growing sector of greenhouse gas emissions in the world and in California and are primarily used as refrigerant gases in refrigeration and cooling equipment. Hydrofluorocarbons (HFCs) refrigerants are the dominant type of high GWP gases with GWP values thousands of times larger than CO 2 on a 100-year timescale. Refrigerant-grade propane (“R290”) has a very low GWP (GWP = 3.3) with good thermodynamic properties and good cooling equipment performance but the flammability of any leaked refrigerant makes equipment design, handling, and maintenance critical factors to manage. This paper focuses on the potential climate benefits and costs of transitioning to R290 refrigerant in small room air conditioning (AC) units, specifically window AC, packaged terminal AC/heat pumps (PTAC/PTHP), and mini-split heat pumps. Overall climate impact for a transition to all three types of air conditioning units in the 2022–2051 timeframe is found to be from 15 to 64 million metric tons of greenhouse gas (GHG) savings in California with a cost of saved CO 2 eq that ranges from $14.50 per ton of CO 2 eq saved to -$50.30 per ton of CO 2 eq saved (net savings) depending on whether the baseline refrigerant is R32 or R410A and depending on the relative energy efficiency for R290 units compared to baseline units.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Study on Intelligent Compaction-Equipment Logistics Scheduling and Propagation Characteristics of Vibration Wave in Nonlinear Systems with Multistability Based on Field Test

The equipment scheduling and propagation characteristics of vibration wave from vibratory roller ⟶ filling material nonlinear systems with multistability are the core problems of subgrade intelligent construction technology, and the logistics scheduling of the equipment is directly related to the construction efficiency. Aiming at the shortages, one typical subgrade located at the Gu’an station of Beijing-Xiong’an city railway is selected to research and finish the field tests; some findings are shown as follows: first, some valuable suggestions about the logistics scheduling of intelligent equipment are proposed, which can break the barriers between the organizations and improve construction efficiency; second, when the vibration wave propagates from the vibratory roller ⟶ surface of filling material ⟶ different buried depths of filling material, the peak acceleration of vibration wave gradually decreases and is hyperbolic distribution approximately. At the same time, the sensitive of attenuation is shown as follows: Z R 2 >0.9), and the concrete functional relationship among different amplitudes of harmonics can be summarized as y = Ae −BX ; fourth, the vibration energy is mainly concentrated near 10–30 Hz in the vibratory roller, but when the vibration wave propagates from vibratory roller⟶filling material, the vibration energy gradually decreases with the increase in depth, and the marginal spectrum gradually changes from one peak to two peaks, that is, 30–50 Hz and 50–100 Hz; fifth, the vibration energy in the vibrational wheel is distributed averagely in the compaction process, and the effective compaction time is two seconds, which will be helpful for revealing the propagation characteristics of vibration wave, optimizing the compaction quality control models and providing some support for the development of intelligent compaction theory of railway subgrade.

Han, Yixuan↗

Assessment of Low-Level Pu Isotope Ratio Measurements Using Multicollector Inductively Coupled Plasma Mass Spectrometry (MC-ICP-MS/MS) Equipped with a Pre-Mass Filter

We present an initial investigation into the performance of a multicollector inductively coupled plasmamass spectrometer equipped with a pre-mass filter (Neoma MC-ICP-MS/MS) for making plutonium (Pu) isotope ratio measurements on solutions containing low level (i.e., pg mL –1 ) Pu concentrations. This assessment was achieved by comparison of the 240 Pu/ 239 Pu, 241 Pu/ 239 Pu, and 242 Pu/ 239 Pu ratios attained over a one month period on the MC-ICP-MS/MS with the long-term (∼1 year) performance observed on the predecessor MC-ICP-MS (Neptune Plus) instrument each equipped with an equipped with an APEXΩ desolvating nebulizer for repeated measurements of certified reference materials from New Brunswick Program Office (NBL PO) CRM 136a and CRM 137. The MC-ICP-MS/MS performance of repeated measurement of CRM 136a (n = 20) resulted in mean values of 240 Pu/ 239 Pu = 0.1448 ± 0.0006, 241 Pu/ 239 Pu = 0.00371 ± 0.00006, and 242 Pu/ 239 Pu = 0.00682 ± 0.00006 (k = 2). The CRM 137 (n = 20), analyzed during the same analytical sessions, produced mean values for 240 Pu/ 239 Pu = 0.2414 ± 0.0006, 241 Pu/ 239 Pu = 0.00464 ± 0.00007, and 242 Pu/ 239 Pu = 0.0157 ± 0.0001 (k = 2). These results closely align with the certificate values for CRM 136a and CRM 137 and are within the k = 2 envelopes defined by the long-term performance of the traditional MC-ICP-MS approach (Neptune Plus). Examination of the performance of the various Pu isotope ratios as a function of total Pu content revealed accurate results (<3% relative difference, or RD) above ∼50 fg total Pu. The results presented here demonstrate the capability of the MC-ICP-MS/MS making accurate and precise low level Pu isotopic measurements. While the intent of this work was not to investigate the functionality of the collision cell, the pre-mass filter was employed. Future studies are warranted to investigate the entire capability of the MC-ICP-MS/MS collision cell and pre-cell mass filter optimization for performing low level Pu isotope measurements, even in mixed matrix samples.

CRM↗

Specifying Calibration of Energy-Measuring Equipment

A report on calibrating energy-measuring equipment to maximize energy efficiency of lighting and other systems. The report describes best practices for accrediting calibration laboratories and for calibrating measuring equipment, compares and contrasts service providers accredited for energy-measuring equipment calibration, presents a tailorable specification template for requesting such calibration, and offers recommendations to a range of stakeholders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE

As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation and optimization for the decontamination/sterilization of personal protective equipment using a novel ozone chamber (CRADA Final Report)

Personal protective equipment slows the spread of the SARS-Cov-2 virus and protects first responders and the general population. However, there is a significant and well-publicized shortage of personal protective equipment for healthcare workers. Treatment with ozone may be a compelling, affordable, and scalable method to rapidly decontaminate personal protective equipment but more work is needed to verify these claims. Together with colleagues at the University of Nevada Reno and FATHHOME we helped design the experiments that evaluated the virucidal efficacy of FATHHOME’s device on N95 face masks and face shields. The results of our study were published in the journal Pathogens.

60 APPLIED LIFE SCIENCES↗

International review of market trends, technologies and policies for commercial refrigeration equipment and implications for China

This report reviews the latest global and China-specific market trends as well as latest technology and policy trends related to commercial refrigeration equipment, with emphasis on refrigerated display cabinets. Section 2 reviews the global and China market trends for commercial refrigeration equipment. Section 3 presents the latest technology options for improving energy performance and compares global Best Available Technologies (BAT) to regional and China-specific baselines, and discusses low-GWP refrigerant options for commercial refrigeration equipment. Section 4 reviews global energy efficiency standards and labeling programs, and compares international efficiency standard requirements with China’s proposed and existing standard requirements. Section 5 ends with a review of key findings and conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Systematic Approach for Estimating High-Altitude Electromagnetic Pulse Coupling onto Power Generation Facility Equipment

A systematic approach is presented to evaluate the effects of high-altitude electromagnetic pulse (HEMP) signals on the equipment located inside a power generation facility. The approach uses a combination of practical measurement and simulation efforts to characterize the radio wave propagation behavior and the device immunity profile. Of particular interest in this work was estimating the vulnerability level of equipment that is connected to long cables. As an example application, a detailed study was conducted for one common class of facility equipment, and its frequency- and time-domain HEMP coupling properties were investigated as a function of terminal loading condition and cable attachment configuration. Overall, the proposed method can be generalized and applied to other electronic components and systems found in the facility environment.

42 ENGINEERING↗

Equipment List Comparing Balance of Plant Containing a Heat Pump against a Reference Electricity Generating Plant

Approximately two-thirds of U.S. energy consumption in the industrial and transportation sectors relies on fossil fuels. These sectors require high-quality heat, i.e., thermal energy at very high temperatures, for molecular transformation processes. The Integrated Energy Systems (IES) program aims to assess the economic potential of utilizing nuclear-grade heat from Advanced Reactors (ARs) to meet the high-quality heat demands. By having industrial processes (IPs) supplied with nuclear-generated heat, manufacturers could benefit from more stable and potentially lower energy costs, reducing reliance on volatile fossil fuel markets. The main outcome of the FY24 research was the thermodynamic assessment and gap analysis of steam generation for IP applications. The study completed in June 2024 demonstrated that the required steam temperatures could be achieved by integrating a heat pump into an AR power plant. After identifying the thermal demands of target IPs, multiple balance of plant configurations for the Xe-100 reactor by X-energy, incorporating a heat pump, were analyzed. Their technical feasibilities were assessed, including the design of suitable axial compressors for these applications. Comparative performance analysis showed that thermal efficiency alone is insufficient to evaluate system suitability. To address this, a new indicator (heat factor) was introduced in the report released in September 2024 to quantify the low-quality thermal power needed to produce one unit of high-quality heat for the IP. Results showed that integrating heat pumps into Rankine cycles enables higher steam temperatures, though at the expense of increased thermal energy input. This report builds upon and completes the foundational work previously undertaken. It focuses on the design of two Balance of Plant (BOP) configurations, both based on Rankine energy conversion cycles: “Case 1”, which involves electricity generation only, and “Case 2”, which combines electricity and high-temperature heat generation for industrial use. For each configuration, a comprehensive equipment list was developed, detailing all major components such as turbines, compressors, heat exchangers, pumps, and control systems. These lists will serve as the basis for future comparative cost analyses, with the goal of assessing the number and type of components required to integrate a heat pump into the Rankine cycle and to establish a heat transport system capable of delivering thermal energy from the nuclear plant to an industrial facility. Using the constitutive equations presented in the June 2024 milestone, the operating conditions of all BOP components for both “Case 1” and “Case 2” were evaluated. These parameters—such as temperature, pressure, mass flow rate, and steam quality—served as the basis for calculating the associated thermal and mechanical power flows. The net power required from the heat pump to raise the steam temperature to the target level was also determined. The thermodynamic performance of the configuration was then assessed using the heat factor metric. The key outcome of this analysis is a comparative table that presents the equipment that was used in the “Case 1” and “Case 2” configurations. This study offers a preliminary comparison of the two designs, providing insight into the impact of integrating a heat pump in terms of component requirements and thermal efficiency. This equipment list, together with the evaluated operating conditions, also serves as a foundation for the economic analyses scheduled for the current fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Proceedings of the Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure

The Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure was sponsored by the Jet Propulsion Laboratory, Pasadena, California. It has been three and one-half years since the convening of the first workshop on voltage breakdown. In this interval, gains are evidenced in the progress and sophistication in solving voltage breakdown problems affecting electronic equip­ment operating at high altitudes or other low air pressure environments. Although space applications predominate the area of concern, other projects such as the SST are becoming increasingly involved with voltage breakdown. High-voltage breakdown in spacecraft continues; however, the incidences of occurrence appear to have decreased in spite of an increase in the number of missions flown. This, it is felt, is due to many project managers now requiring all equipment with voltage in excess of 270-V peak to be designed to operate in the critical pressure region without damage, even though its normal functional environment is sea level pressure and the hard vacuum of space. In addition, designers are becoming more aware of the principle of good high-voltage design by selecting void-free components, proper spacing of conductors, isolating high-­voltage circuitry from lower voltage areas, etc. The consensus seems to be that the slight increase in cost to achieve a provable corona-free design is more than offset by the increase in confidence that the equipment will survive accidental loss of vacuum during high-vacuum tests, inadvertent turn on while passing through the critical air-pressure region of earth after launch or outgassing in flight pressurizing the enclosure into the critical pressure region.

E. R. Bunker, Jr.↗

Mariner Mars 1971 science operational support equipment

The Mariner Mars 1971 science operational support equipment (SOSE) was developed to support the checkout of the proof test model and flight spacecraft. The test objectives of the SOSE and how these objectives were implemented are discussed. Attention is focused on the computer portion of the SOSE, since incorporation of a computer in ground checkout equipment represents a major departure from the support equipment concepts previously used. A functional description of the major hardware elements contained in the SOSE is also included, along with the operational performance of the SOSE during spacecraft testing.

Source record↗

Apollo experience report: Crew provisions and equipment subsystem

A description of the construction and use of crew provisions and equipment subsystem items for the Apollo Program is presented. The subsystem is composed principally of survival equipment, bioinstrumentation devices, medical components and accessories, water- and waste-management equipment, personal-hygiene articles, docking aids, flight garments (excluding the pressure garment assembly), and various other crew-related accessories. Particular attention is given to items and assemblies that presented design, development, or performance problems: the crew optical alinement sight system, the metering water dispenser, and the waste-management system. Changes made in design and materials to improve the fire safety of the hardware are discussed.

Mcallister, F.↗

Maintainability design criteria for packaging of spacecraft replaceable electronic equipment.

Maintainability must be designed into long-duration spacecraft and equipment to provide the required high probability of mission success with the least cost and weight. The ability to perform repairs quickly and easily in a space environment can be achieved by imposing specific maintainability design criteria on spacecraft equipment design and installation. A study was funded to investigate and define design criteria for electronic equipment that would permit rapid removal and replacement in a space environment. The results of the study are discussed together with subsequent simulated zero-g demonstration tests of a mockup with new concepts for packaging.

Kappler, J. R.↗

The history and development of NASA survival equipment.

A research and development program on survival equipment was begun in early 1960 with the Mercury Program. The Mercury survival kit is discussed together with Gemini survival equipment, and Apollo I survival equipment. A study program is conducted to assess potential survival problems that may be associated with future space flights landing in polar waters. Survival kit requirements for applications on the Skylab program are also considered. Other investigations are concerned with the design of a global survival kit in connection with Space Shuttle missions.

Radnofsky, M. I.↗

Life sciences payload definition and integration study, task C and D. Volume 4: Preliminary equipment item specification catalog

A specification catalog to define the equipment to be used for conducting life sciences experiments in a space laboratory is presented. The specification sheets list the purpose of the equipment item, and any specific technical requirements which can be identified. The status of similar hardware for ground use is stated with comments regarding modifications required to achieve spaceflight qualified hardware. Pertinent sketches, commercial catalog sheets, or drawings of the applicable equipment are included.

Source record↗