Search NASA⌕ Search

SEARCH · Search NASA

Results for “FERC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Floating Photovoltaics in Hydropower Reservoirs in the United States

This report presents a comprehensive analysis of the feasibility of floating photovoltaics (FPV) in federally regulated reservoirs within the continental United States (CONUS) and to present a methodology for capturing the true costs of deployment, potential environmental impacts, and regulatory pathways for open-loop hydropower reservoirs. It is intended for stakeholders who may not be solar industry experts but who are interested in exploring the potential for FPV in their reservoirs. While there are promising opportunities, particularly in enhancing dissolved oxygen (DO) levels and potentially improving compliance with existing hydropower licenses, the current capital costs of FPV are not yet competitive with traditional land-based solar installations at the utility-scale when comparing the LCOE results. A competitive financial outlook is achievable when applying a 30% Investment Tax Credit (ITC) and considering a 5% reduction from the baseline capital expenditures (CapEx) at the Tuckertown Reservoir in North Carolina case study. The study is structured around three key pillars of research: technical potential, environmental impacts and regulatory considerations, and technoeconomic analysis. This report provides a nationwide assessment of the opportunities for FPV in terms of capacity, measured in direct current megawatts (MWDC), in reservoirs managed by the U.S. Bureau of Reclamation (USBR), the U.S. Army Corps of Engineers (USACE), and the Federal Energy Regulatory Commission (FERC). Additionally, the report introduces a heuristic model for estimating the CapEx of utility-scale FPV projects (1–100 MW), offering a baseline cost estimate for stakeholders. Finally, the report applies these models to a case study of a hydropower reservoir in North Carolina to present site-specific results.

13 - HYDRO ENERGY↗

Lessons Learned for Transmission Cost Allocation in U.S. Regional Markets

Expanding electric transmission can facilitate generator interconnection and improve grid reliability. Assigning costs for new transmission infrastructure is highly contentious because these costs can have a direct impact on energy prices and ratepayer bills. In this report, we evaluate what factors influence successful transmission cost allocation agreements. Through a review of legal disputes, existing cost allocation practices, and regional case studies, we identify potential strategies to minimize cost allocation disputes for future projects. The report also highlights the processes by which regions can update their cost allocation methods. While we do not consider cost allocation methods currently under development for compliance with FERC Order 1920, the trends and lessons learned identified in this report can inform discussions on effective cost allocation methods to reduce barriers for transmission development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Electric Utility Distribution Costs: Scoping Study on Trends, Drivers, and Possible Response Strategies [Slides]

This scoping study synthesizes information that will help stakeholders understand the scope, scale, and drivers of recent increases in investor-owned utility (IOU) expenditures on local distribution power grids, while providing regulators and other decision-makers with potential strategies to keep electricity bills down. The study includes five distinct components. Drawing first on data from FERC Form 1, it summarizes key trends in past and recent IOU distribution costs. Next, through a review of a sample of distribution-system plans, it characterizes material drivers of planned distribution expenditures. Ultimately, regulators must approve cost recovery for IOU expenditures, including those for the distribution system. The study therefore also: examines trends in utility requests and regulatory approvals related to changes in retail rates and return on equity; identifies areas where utility shareholder and customer incentives may be misaligned; and develops a menu of options that state regulators might consider to optimize distribution system expenditures. Some of the key findings include: - IOU distribution spending at a national level has grown by 6%/yr since 2014 in real dollar terms, 4x faster than in the prior 20 years and consisting mostly of capital (not operating) expenditure. - On a per-kWh basis, increases in IOU distribution costs since 2014 represent over 30% of the overall national-average increase in retail electricity rates. - Regional spending growth has ranged from 2-8%/yr, with larger estimated rate impacts in CAISO, then NYISO & ISO-NE, and then the Southeast, MISO & PJM (see figure). - Some utilities are planning for significantly increased distribution system spending. Planned spending on managing the existing system (asset replacement, safety & reliability, and resilience are all important drivers) exceeds that for capacity expansion. - IOU rate increase requests ($18 billion in 2025) and public utility commission (PUC) approval levels (average of 64% of requested amounts from 2021-2025) have recently hit multi-decadal highs. - PUCs in New England and the Southeast have recently approved a greater fraction of rate requests (>75%, on average) than in ther regions, while PUCs in California and the Southeast have generally authorized higher equity returns than in other regions. - Regulators have many tools to tackle potential misalignments between utility and customer interests and, more specifically, to optimize and reduce distribution costs. Shorter-term options include those related to return on equity, capital structure, depreciation, trackers, construction work in progress, and securitization. Longer-term options include performance-based regulation and a wide variety of planning-related requirements. All options embed important tradeoffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cost of Mitigating the Environmental Impacts of Hydropower Projects

The "Cost of Mitigating the Environmental Impacts of Hydropower Projects Database" compiles data on environmental impacts mitigation costs for 182 hydropower projects based on documents obtained from the U.S. Federal Energy Regulatory Commission (FERC).

13 HYDRO ENERGY↗

Cost of Fish Exclusion Technologies for Hydropower

This dataset compiles data on the costs of environmental mitigations related to fish exclusion for 35 hydropower projects based on documents obtained from the U.S Federal Energy Regulatory Commission (FERC). Data for all measures and their associated project-specific information, including installed and hydraulic capacities, were manually extracted from environmental impact statements and/or environmental assessment (EIS/EA) documents. All data were consolidated in a comma-separated (.csv) file, referred to as the Cost of Fish Exclusion Technologies for Hydropower Database.

13 HYDRO ENERGY↗

Hydropower Fish Passage Webmap

The National Fish Passage Webmap application provides an environment that allows users to visualize information information on fish passage facility existence, type, and direction at hydropower developments across the conterminous United States. It was developed through collaborative partnerships with fish passage engineers and biologists at both the US Fish and Wildlife Service (USFWS) and the National Marine Fisheries Service (NMFS), and hydropower experts at the Low Impact Hydropower Institute (LIHI). Data on fish passage facilities at hydropower features were compiled from numerous sources including published and non-published datasets, published reports, email communications with federal and state resource managers and hydropower operators, and by extracting information from regulatory documents within the FERC eLibrary. The number of sources for a given feature varied, which occasionally resulted in conflicting information regarding the existence of fish passage facilities or in the type or sub-type of passage technologies. Such discrepancies were reviewed and resolved individually, based on the weight of evidence or, when available, on direct observations from information providers or aerial imagery.

13 HYDRO ENERGY↗

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗

Integrated Transmission and Distribution Co-Simulation Platform for Demonstration of Bulk Grid Services Using Distributed Energy Resources

In September 2020, the Federal Energy Regulatory Commission (FERC) released Order 2222, which opens wholesale markets to small-capacity distributed energy resources (DERs), recognizing their potential in improving operational efficiency by providing bulk grid services. Therefore, a co-simulation capability that can connect transmission and distribution (T&D) simulations and evaluate the impacts of DER provision of bulk grid services is needed. In this paper, we present a new integrated T&D co-simulation platform that incorporates T&D system simulators, DER aggregator/group strategies, and a co-simulation coordinator. Industry-standard communication protocols are employed to mimic real-world conditions. Secondary frequency regulation is selected as the representative bulk grid service, and we simulate the responses of DERs to the frequency regulation signals. The simulation results for a solar-rich distribution feeder in Colorado, USA, demonstrate how the T&D co-simulation setup is used to evaluate the contributions of DERs to minimize the bulk grid frequency deviation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spatiotemporal Downscaling Model for Solar Irradiance Forecast Using Nearest-Neighbor Random Forest and Gaussian Process

Accurate solar photovoltaic (PV) capacity estimation requires high-resolution, site-specific solar irradiance data to account for localized variability. However, global datasets, such as the National Solar Radiation Database (NSRDB), provide regional averages that fail to capture the fine-scale fluctuations critical for large-scale grid integration. This limitation is particularly relevant in the context of increasing distributed energy resources (DERs) penetration, such as rooftop PV. Additionally, it is critical to the implementation of the U.S. Federal Energy Regulatory Commission (FERC) Order 2222, which facilitates DER participation in U.S. bulk power markets. To address this challenge, this study evaluates Nearest-Neighbor Random Forest (NNRF) and Nearest-Neighbor Gaussian Process (NNGP) models for spatiotemporal downscaling of global solar irradiance data. By leveraging historical irradiance and meteorological data, these models incorporate spatial, temporal, and feature-based correlations to enhance local irradiance predictions. The NNRF model, a machine-learning approach, prioritizes computational efficiency and predictive accuracy, while the NNGP model offers a level of interpretability and prediction uncertainty by numerically quantifying correlations and dependencies in the data. Model validation was conducted using day-ahead predictions. The results showed that the average Goodness of Fit (GoF) of the NNRF model of 90.61% across all eight sites outperformed the GoF of the NNGP of 85.88%. Additionally, the computational speed of NNRF was 2.5 times faster than the NNGP. Finally, the NNGP displayed polynomial scaling while the NNRF scaled linearly with increasing number of nearest neighbors. Additional validation of the model on five sites in Puerto Rico further confirmed the superiority of the NNRF model over the NNGP model. These findings highlight the robustness and computational efficiency of NNRF for large-scale solar irradiance downscaling, making it a strong candidate for improving PV capacity estimation and real-time electricity market integration for DERs.

Asiedu, Shadrack (ORCID:0009000646004826)↗

A Deep Reinforcement Learning-based Reserve Optimization in Active Distribution Systems for Tertiary Frequency Regulation

Federal Energy Regulatory Commission (FERC)Orders 841 and 2222 have recommended that distributed energy resources (DERs) should participate in energy and reserve markets; therefore, a mechanism needs to be developed to facilitate DERs’ participation at the distribution level. Although the available reserve from a single distribution system may not be sufficient for tertiary frequency regulation, stacked and coordinated contributions from several distribution systems can enable them participate in tertiary frequency regulation at scale. This paper proposes a deep reinforcement learning (DRL)-based approach for optimization of requested aggregated reserves by system operators among the clusters of DERs. The co-optimization of cost of reserve, distribution network loss, and voltage regulation of the feeders are considered while optimizing the reserves among participating DERs. The proposed framework adopts deep deterministic policy gradient (DDPG), which is an algorithm based on an actor-critic method. The effectiveness of the proposed method for allocating reserves among DERs is demonstrated through case studies on a modified IEEE 34-node distribution system.

deep reinforcement learning, distributed energy re↗

Impact of Space Heating Options on Electricity Rates and Affordability

Electricity prices have increased in many regions of the U.S., with a national average of 18 cents/kWh projected for 2026, up from 16 cents/kWh in 2020. While the increases can be attributed to a number of factors, increasing electricity use in an efficient and strategic manner - with energy efficient building envelope upgrades and high performance HVAC systems - has the potential to increase revenue for utilities without significantly increasing electricity demand, and therefore could help moderate rate increases. This effect has been studied for electric vehicle charging[1] and dual-fuel heat pumps in Minnesota[2]. Leveraging a recently developed system cost methodology and FERC data on utility revenue, spending, and profits, this poster will present the direction and relative magnitude of rate impacts for efficient space heating upgrades in utility balancing areas across the contiguous U.S., using current prices and showing how the rate impacts would evolve under future grid scenarios.

15 GEOTHERMAL ENERGY↗

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Coordinated Modeling of Electric Grid and Natural Gas Network Operations

Presentation based upon full report of a Colorado case study and coordination framework, which is available at https://www.nrel.gov/docs/fy20osti/77096.pdf. JISEA analysts Brian Sergi, Omar Guerra, and Bri-Mathias Hodge will present on recent JISEA work on coordination between the natural gas and electricity sectors. Power and gas are becoming increasingly interdependent but weren't designed to function together. How does greater coordination impact system operations with different levels of solar and wind penetrations? This free JISEA presentation will take place in a Webinar on Tuesday, May 11, 2021 at 12 p.m.: Learn how greater coordination between the natural gas and electricity sectors impacts system operations with different levels of solar and wind penetrations. Presentation information includes: Historical and projected data for natural gas consumption and power generation in the United States as demonstrated by 2014 East Coast Polar Vortex, 2021 Texas Winter Storm Uri. Showing coupling points, FERC identified need for better coordination, different levels of coordination (decision making and optimization control), coordination framework. Case study on Colorado Front Range, ramping requirements and gas nominations, real-time dispatch (June and December scenarios), results of analysis of impacts of coordination on unserved load. Total real-time gas offtakes by node, impacts on unserved gas, effect on CO2 emissions. Discussions on clusions drawn from Colorado Case study expanded co-simulation via HELICS, objectives of the HELICS+ natural gas use case, modeling of hydrogen blending, techno economic assessment of blending, and blending impacts on energy content and pressure.

analysis↗

A Blockchain Based Co-Simulation Framework for Integrating DERs into Wholesale Electricity Markets

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain testing↗

A Blockchain Based Co-Simulation Framework for Integrating DERs to Wholesale Electricity Markets: Preprint

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain testing↗

Enabling Grid-Aware Market Participation of Aggregate Flexible Resources

Increasing integration of distributed energy resources (DERs) within distribution feeders provides unprecedented flexibility at the distribution-transmission interconnection. With the new FERC 2222 order, DER aggregations are allowed to participate in energy market. To enable market participation, these virtual power plants need to provide their generation cost curves. This paper proposes efficient optimization formulations and solution approaches for the characterization of hourly as well as multi-time-step generation cost curves for a distribution system with high penetration of DERs. Network and DER constraints are taken into account when deriving these cost curves, and they enable active distribution systems to bid into the electricity market. The problems of deriving linear and quadratic cost curves are formulated as robust optimization problems and tractable reformulation/solution algorithm are developed to facilitate efficient calculations. The proposed formulations and solution algorithm are validated on a realistic test feeder with high penetration of flexible resources.

aggregated distributed energy resources↗