Search NASA⌕ Search

SEARCH · Search NASA

Results for “FINANCIAL MODEL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

High-Performance Buildings – Value, Messaging, Financial and Policy Mechanisms

At the request of the Pacific Northwest National Laboratory, an in-depth analysis of the rapidly evolving state of real estate investments, high-performance building technology, and interest in efficiency was conducted by HaydenTanner, LLC, for the U.S. Department of Energy (DOE) Building Technologies Program. The analysis objectives were • to evaluate the link between high-performance buildings and their market value • to identify core messaging to motivate owners, investors, financiers, and others in the real estate sector to appropriately value and deploy high-performance strategies and technologies across new and existing buildings • to summarize financial mechanisms that facilitate increased investment in these buildings. To meet these objectives, work consisted of a literature review of relevant writings, examination of existing and emergent financial and policy mechanisms, interviews with industry stakeholders, and an evaluation of the value implications through financial modeling. This report documents the analysis methodology and findings, conclusion and recommendations. Its intent is to support and inform the DOE Building Technologies Program on policy and program planning for the financing of high-performance new buildings and building retrofit projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transferring PACE Assessments Upon Home Sale

A significant barrier to investing in renewable energy and comprehensive energy efficiency improvements to homes across the country is the initial capital cost. Property Assessed Clean Energy (PACE) financing is one of several new financial models broadening access to clean energy by addressing this upfront cost issue. Recently, the White House cited PACE programs as an important element of its 'Recovery through Retrofit' plan. The residential PACE model involves the creation of a special clean energy financing district that homeowners elect to opt into. Once opted in, the local government (usually at the city or county level) finances the upfront investment of the renewable energy installation and/or energy efficiency improvements. A special lien is attached to the property and the assessment is paid back as a line item on the property tax bill. As of April 2010, 17 states have passed legislation to allow their local governments to create PACE programs, two already have the authority to set up PACE programs, and over 10 additional states are actively developing enabling legislation. This policy brief analyzes one of the advantages of PACE, which is the transferability of the special assessment from one homeowner to the next when the home is sold. This analysis focuses on the potential for the outstanding lien to impact the sales negotiation process, rather than the legal nature of the lien transfer itself. The goal of this paper is to consider what implications a PACE lien may have on the home sales negotiation process so that it can be addressed upfront rather than risk a future backlash to PACE programs. If PACE programs do expand at a rapid rate, the chances are high that there will be other cases where prospective buyers uses PACE liens to negotiate lower home prices or require repayment of the lien as a condition of sale. As a result, PACE programs should highlight this issue as a potential risk factor for the sake of full disclosure. A good example of this is in Boulder County where the following statement is included in the ClimateSmart PACE program materials: 'Please Note: There is no legal requirement that the loan be paid off when you refinance or sell your home. However, this may be an item subject to negotiation with a future buyer and may also be a matter of negotiation with the mortgage lender.' Such candid disclosure for what might be a low risk event can be debated. However, a selling point of PACE programs is the transferability of the lien to the new homeowner. To the degree this benefit is questioned, PACE programs may end up looking more like home equity loan financing, with the associated debt repaid at closing, rather than property-based financing that remains with the improved home. While it is possible that upfront disclosure might negatively impact participation rates in PACE programs, it also will protect the integrity of a PACE program in later years if such situations come to pass. Ideally, this will become less of an issue over time as more homebuyers understand the positive economic and societal benefits of owning a home with clean energy features.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

North Dakota Refining Capacity Study

According to a 2008 report issued by the United States Geological Survey, North Dakota and Montana have an estimated 3.0 to 4.3 billion barrels of undiscovered, technically recoverable oil in an area known as the Bakken Formation. With the size and remoteness of the discovery, the question became 'can a business case be made for increasing refining capacity in North Dakota?' And, if so what is the impact to existing players in the region. To answer the question, a study committee comprised of leaders in the region's petroleum industry were brought together to define the scope of the study, hire a consulting firm and oversee the study. The study committee met frequently to provide input on the findings and modify the course of the study, as needed. The study concluded that the Petroleum Area Defense District II (PADD II) has an oversupply of gasoline. With that in mind, a niche market, naphtha, was identified. Naphtha is used as a diluent used for pipelining the bitumen (heavy crude) from Canada to crude markets. The study predicted there will continue to be an increase in the demand for naphtha through 2030. The study estimated the optimal configuration for the refinery at 34,000 barrels per day (BPD) producing 15,000 BPD of naphtha and a 52 percent refinery charge for jet and diesel yield. The financial modeling assumed the sponsor of a refinery would invest its own capital to pay for construction costs. With this assumption, the internal rate of return is 9.2 percent which is not sufficient to attract traditional investment given the risk factor of the project. With that in mind, those interested in pursuing this niche market will need to identify incentives to improve the rate of return.

02 PETROLEUM↗

Community Crowd-Funded Solar Finance

The award supported the demonstration and development of the Village Power Platform, which enables community organizations to more readily develop, finance and operate solar installations on local community organizations. The platform enables partial or complete local ownership of the solar installation. The award specifically supported key features including financial modeling tools, community communications tools, crowdfunding mechanisms, a mobile app, and other critical features.

14 SOLAR ENERGY↗

Facilitating Deployment of Community Solar PV systems on Rooftops and Vacant Land in Northeast IL - Final Report

The Cook County Community Solar project set out to unlock the potential of community solar in the Chicago region with lessons that could be applied nationally. One of the first steps was to prove out the potential market. This was done through an opportunity assessment which showed there is over 9,000 megawatts worth of site capacity available for community solar projects in Cook County – nearly enough to offset all of Cook County’s residential electricity use. The assessment also showed that almost 75% of Cook County households are not able to invest directly in solar photovoltaic systems due to a variety of issues from physical barriers such as shading, or condition of the roof, to financial barriers such as lack of roof ownership, or the up-front costs of installation. Because of these barriers, community solar is an essential part of making the benefits of renewable energy available to all of the residents of Cook County. In addition to the opportunity assessment the project team also worked with the over 200 individuals who participated in the stakeholder advisory group to develop a number of other products including: 1) an Economic & Policy Barriers Resolutions and Work Plan document which laid out best practices to address the policy barriers that existed at the time (May of 2016) 2) Value Proposition Report I and Report II which summarize the value of community solar to potential developers and subscribers, 3) The Community Solar Business Case Tool, which provides a flexible financial model that projects the costs and befits to the system developer and subscriber for a project, 4) Bill Crediting Analysis and the 5) Final Report. The Final Report contains 15 case studies which prove that community solar projects are economically feasible in Cook County with a variety of sites, solar designs, ownership and subscriber models.

14 SOLAR ENERGY↗

Commercial Property Assessed Clean Energy (CPACE) for Tax-Exempt and Public Entities (“CivicPACE”)

This report summarizes the work of the CivicPACE team to open the market for property assessed clean energy financing for the nonprofit, tax exempt sector. Property Assessed Clean Energy (PACE) finances property improvements that are paid back through a line item on the property owner’s tax bill. Most states restrict such improvements to renewable energy and energy efficiency, although they may include water conservation and disaster related improvements such as hurricane or earthquake preparedness. When such projects are developed for commercial properties, it is referred to as commercial PACE or CPACE. When CPACE applies to tax exempt or nonprofit organizations, we refer to it as CivicPACE. CivicPACE also represents the name of this program. The purpose of the CivicPACE project was to help nonprofit tax-exempt organizations such as affordable housing, faith-based institutions, and schools gain greater access to financing for solar energy deployment through PACE. As such, the lessons learned and best practices from the CivicPACE team work is intended for state and municipal program designers, PACE administrators, solar installers, and nonprofit organizations. CPACE is experiencing rapid growth. Cumulative CPACE financing grew from 8.2 million in 2010 to 111 million in 2014 to 588 million in 2017. Renewable energy, mostly solar, represents about a quarter of the financing; the nonprofit sector represents about 10% of total financing. The Project Team was formed in early 2015 when solar financing options were limited for nonprofits (NPOs). Traditional bank financing was difficult for nonprofit organizations to secure since they are often viewed as a credit risk. Despite the growth of CPACE, few tax-exempt organizations were using the financing mechanism at the start of 2015. Nonetheless, CPACE financing appeared to have tremendous potential for solar development for tax-exempt organizations such as schools, churches, and multifamily affordable housing, because it addresses many of the traditional nonprofit financing roadblocks, such as credit risk. Given the benefits and the rapid growth of CPACE, the opportunity to expand CPACE financing for solar development on tax-exempt buildings was timely. The Project team was comprised of The Solar Foundation (TSF), Urban Ingenuity (UI), and Clean Energy Solutions, Inc. (CESI). The Solar Foundation was the Principal Investigator and overall team lead. The Solar Foundation is an independent 501(c)(3) nonprofit organization whose mission is to accelerate adoption of the world’s most abundant energy source. PACE financing specialist Urban Ingenuity was the lead for the team for the pilot projects. Clean Energy Solutions (CESI) was the lead on the market analysis, financial modeling, and HUD regulatory issues for PACE financed solar development on affordable housing. The CivicPACE team focused on four key activities to help open the market for CPACE financing of solar development for nonprofit entities: research, pilot projects, technical assistance, and information dissemination.

14 SOLAR ENERGY↗

Innovative Gasification to Produce Fischer-Tropsch Jet and Diesel Fuel

The primary objective of this project and the U.S. DOE’s integrated biorefinery (“IBR”) program was to demonstrate conversion of biomass and waste-derived feedstocks into military spec liquid fuels. Frontline’s proposed integrated process was to incorporate several novel technologies and innovative applications of existing technologies that would serve both to increase plant efficiency and also to lower the cost of the produced biofuels. The project was intended to demonstrate Frontline Bioenergy’s technologies for gasification and synthesis gas clean-up configuration to produce a syngas stream suitable for a proven Fischer-Tropsch (“F-T”) unit that would produce F-T intermediate products. These F-T intermediate products were to be upgraded to military spec diesel and jet fuel, including F76, JP5, and JP8. Specifically, these technologies consisted of: 1. Frontline’s PMFreeGas® ultra low particulate matter (PM) hot gas filtration technology 2. Application of Frontline’s TarFreeGas® ultra low-tar gasification technology 3. Frontline’s novel approach to syngas conditioning The proposed gasifier system was to operate at 10 tpd capacity while the F-T plant was capable of approximately one barrel per day. Although the gasifier output would have been roughly ten times the F-T plant’s required input, the 10 tpd capacity was chosen to enable scaling to commercial capacity. Project partners included i) SGC Energia, owner of the F-T technology and owner of the proposed demonstration site in Pasadena, Texas; ii) Stanley Consultants, a reputable engineering company that provided detailed electrical engineering services; and iii) Delphi Engineering & Construction LLC, a consulting company that provided project management advisory services. The integrated plant was never constructed due to lack of cost share funds. However, the commercialization plan and associated financial model suggested such a plant could be economically viable when the price of oil exceeds $70 per barrel. The price of feedstock plays a significant role in the profitability of the plant for a given value of oil. An integrated biorefinery capable of producing liquid transportation fuels and other chemical feedstocks would benefit the public by providing a sustainable pathway to convert domestically available feedstocks into fuels that might otherwise be imported from countries or regions of the world that are typically hostile to the United States.

09 BIOMASS FUELS↗

Disaggregating Future Retail Electricity Rate Growth [Slides]

Recent Berkeley Lab research found that modest retail rate increases over the past 10 years were mostly driven by large increases in capital expenditures (CapEx) that were offset in part by substantial wholesale price reductions. Decision-makers are increasingly concerned about the potential future rate impacts of a number of policies and industry trends that support rapid decarbonization, electrification, and grid modernization. Using historical FERC Form 1 data and the existing literature on policies and industry trends that are likely to affect utility-incurred costs and retail sales, Berkeley Lab researchers developed ranges of forecasted growth rates for cost-related rate drivers (i.e., fuel and purchased power; transmission, distribution, generation, and other categories of both non-fuel operations & maintenance and CapEx) and non-cost related rate drivers (i.e., retail sales, peak demand, and customers). These were then used as inputs to a pro-forma utility financial model (FINDER) that estimated the growth in retail electric rates between 2020 and 2030 for a prototypical vertically-integrated investor-owned utility in the United States. The analysis produced the following results: 1. Assuming average growth rates in all rate drivers, future retail rate growth is driven by sizable increases in all CapEx costs, where fuel and purchased power costs are replaced by generation CapEx as the largest rate component between 2020 and 2030. 2. Growth in sales/peak demand/customers, generation CapEx costs, and fuel and purchased power (FPP) costs, in isolation, produce the most uncertainty in rate growth. Specifically, a 1% increase in the compound annual growth rate (CAGR) of retail sales, coincident peak demand (CP), and customers (Sales-CP-Cust) results in a 0.88-0.93% decrease in the CAGR of rates, in isolation. However, a 1% increase in the CAGR of generation CapEx budgets results in a 0.07-0.14% increase in the CAGR of rates, while a 1% increase in the CAGR of FPP costs causes a 0.10-0.14% increase in the CAGR of rates, all else being equal. 3. Taking into account the correlation and variability of the growth in all rate drivers jointly, generation CapEx is expected to be both the largest and most uncertain rate component by 2030 (20-25% share of the retail rate). Transmission and distribution CapEx, along with fuel and purchased power costs are each expected to comprise between 12% and 17% of retail rates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Availability and Performance Loss Factors for U.S. PV Fleet Systems

In the PV Fleet Performance Data Initiative, we partner with photovoltaic (PV) fleet owners to collect time-series PV production data and publish aggregated, anonymized results. This report is an update of our previous publications, specifically a FY 2021 performance index publication and a FY 2022 fleet degradation analysis. In this analysis, we have increased our data participants and system totals by around 10% to 8.5 GW and 24,000 separate inverter data channels. Four major analysis topics are considered in this report: Performance Index (PI) trends, PV system availability, soiling losses, and PV system degradation. Performance Index and inverter availability are assessed on a larger set of data from our FY 2021 report: 1,128 systems compared with 200 systems from before. The increased number of systems is due to an improved data quality methodology, as well as introducing new systems to the analysis. Overall results are similar to previously published values - overall inverter availability is low in the first six months of system performance before reaching steady-state by the end of the first year. Excluding this six-month startup period, system-level aggregated data shows a median (P50) system availability of 0.99 and a lower 10th percentile (P90) value of 0.95 (Figure ES-1). A dependence on system size is also demonstrated, with worse inverter availability results for larger PV systems. Causes of this effect are under investigation, but may be impacted by inverter size, which also show lower availability for larger inverter sizes. This report also investigates PI, correcting for degradation, soiling, snow, and availability. Following these corrections, the median system PI over its entire lifetime is 0.95. PI values reported here are approximately 3% lower than what we presented in our previous FY 2021 report. Soiling loss is assessed in a comprehensive way for the first time in this report. Results are presented using the COmbined Degradation and Soiling (CODS) method, as implemented in RdTools (v3.0.0a4). Soiling values are presented for 255 systems, which indicated irradiance-weighted soiling loss greater than 1%. The values have been published in an updated NREL soiling map at nrel.gov/pv/soiling.html. Finally, we investigated system degradation using three different data analysis techniques: conventional RdTools (year-on-year (YOY)), CODS, and Performance Loss Rate (PLR) analysis. Overall degradation results are consistent with our previous publications. Rerunning conventional RdTools on our updated fleet shows that some data partners have systematically fallen below the median system degradation rate (change over time) of -0.75 %/year. A comparison with PLR analysis, which looks at change in annual PI over time, shows that median system degradation is consistent with -0.5% to -0.75% per year change. However, at the P90 value, system degradation is substantially faster. These two results are consistent and indicate that resulting degradation statistics depend to a great degree on the population of PV systems making up the analysis cohort and whether soiling impacts the systems. The use of CODS for degradation analysis provides a different method for degradation assessment, which explicitly excludes the impact of recoverable soiling on degradation analysis. Excluding soiling effects yields an annual system degradation around -0.5% per year on average. This indicates that a portion of system performance loss may be attributed to periodic soiling that is not fully recovered. This report provides PV system owners/operators with background and methods to analyze PV system performance, give guidance for expected cohort performance, and performance loss values for use in pro-forma financial models, which guide new-build system design and bankability reports.

14 SOLAR ENERGY↗

Regulators’ Financial Toolbox: Leveraging Software as a Service, Cloud Computing, and Artificial Intelligence in Electric Utilities

The rapid evolution of Software as a Service (SaaS), cloud computing, and artificial intelligence (AI) is transforming the electric utility industry, reshaping operations, customer engagement, and financial models. This webinar introduced how utilities can deploy advanced software solutions and AI-driven analytics to improve grid efficiency, optimize asset management, and accurately forecast demand.

Bartlett, Phillip↗

Hualapai Tribal Utility Development Project

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Photovoltaics (PV) as an Eligible Measure in Residential PACE Programs: Benefits and Challenges (Fact Sheet)

Property Assessed Clean Energy (PACE) financing is one of several new financial models broadening access to clean energy by addressing the barrier of initial capital cost. The majority of the PACE programs in the market today include PV as an eligible measure. PV appeals to homeowners as a way to reduce utility bills, self-generate sustainable power, increase energy independence and demonstrate acommitment to the environment. If substantial state incentives for PV exist, PV projects can be economic under PACE, especially when partnered with good net metering policies. At the same time, PV is expensive relative to other eligible measures with a return on investment horizon that might exceed program targets. This fact sheet reviews the benefits and potential challenges of including PV inPACE programs.

14 SOLAR ENERGY↗

US long distance fiber optic networks: Technology, evolution and advanced concepts. Volume 1: Executive summary

Over the past two decades, fiber optics has emerged as a highly practical and cost-efficient communications technology. Its competitiveness vis-a-vis other transmission media, especially satellite, has become a critical question. This report studies the likely evolution and application of fiber optic networks in the United States to the end of the century. The outlook for the technology of fiber systems is assessed and forecast, scenarios of the evolution of fiber optic network development are constructed, and costs to provide service are determined and examined parametrically as a function of network size and traffic carried. Volume 1 consists of the Executive Summary. Volume 2 focuses on fiber optic technology and long distance fiber optic networks. Volume 3 develops a traffic and financial model of a nationwide long distance transmission network. Among the study's most important conclusions are: revenue requirements per circuit for LATA-to-LATA fiber optic links are less than one cent per call minute; multiplex equipment, which is likely to be required in any competing system, is the largest contributor to circuit costs; the potential capacity of fiber optic cable is very large and as yet undefined; and fiber optic transmission combined with other network optimization schemes can lead to even lower costs than those identified in this study.

Source record↗

US long distance fiber optic networks: Technology, evolution and advanced concepts. Volume 2: Fiber optic technology and long distance networks

The study projects until 2000 the evolution of long distance fiber optic networks in the U.S. Volume 1 is the Executive Summary. Volume 2 focuses on fiber optic components and systems that are directly related to the operation of long-haul networks. Optimistic, pessimistic and most likely scenarios of technology development are presented. The activities of national and regional companies implementing fiber long haul networks are also highlighted, along with an analysis of the market and regulatory forces affecting network evolution. Volume 3 presents advanced fiber optic network concept definitions. Inter-LATA traffic is quantified and forms the basis for the construction of 11-, 15-, 17-, and 23-node networks. Using the technology projections from Volume 2, a financial model identifies cost drivers and determines circuit mile costs between any two LATAs. A comparison of fiber optics with alternative transmission concludes the report.

Source record↗

US long distance fiber optic networks: Technology, evolution and advanced concepts. Volume 3: Advanced networks and economics

This study projects until 2000 the evolution of long distance fiber optic networks in the U.S. Volume 1 is the executive Summary. Volume 2 focuses on fiber optic components and systems that are directly related to the operation of long-haul networks. Optimistic, pessimistic and most likely scenarios of technology development are presented. The activities of national and regional companies implementing fiber long haul networks are also highlighted, along with an analysis of the market and regulatory forces affecting network evolution. Volume 3 presents advanced fiber optic network concept definitions. Inter-LATA traffic is quantified and forms the basis for the construction of 11-, 15-, 17-, and 23-node networks. Using the technology projections from Volume 2, a financial model identifies cost drivers and determines circuit mile costs between any two LATAs. A comparison of fiber optics with alternative transmission concludes the report.

Source record↗

Communications satellite systems operations with the space station, volume 2

A financial model was developed which described quantitatively the economics of the space segment of communication satellite systems. The model describes the economics of the space system throughout the lifetime of the satellite. The expected state-of-the-art status of communications satellite systems and operations beginning service in 1995 were assessed and described. New or enhanced space-based activities and associated satellite system designs that have the potential to achieve future communications satellite operations in geostationary orbit with improved economic performance were postulated and defined. Three scenarios using combinations of space-based activities were analyzed: a spin stabilized satellite, a three axis satellite, and assembly at the Space Station and GEO servicing. Functional and technical requirements placed on the Space Station by the scenarios were detailed. Requirements on the satellite were also listed.

Price, K.↗

Evaluation of private sector roles in space resource development

An integrated engineering and financial modeling approach has been developed and used to evaluate the potential for private sector investment in space resource development, and to assess possible roles of the public sector in fostering private interest. This paper presents the modeling approach and its results for a transportation service using propellant extracted from lunar regolith.

space↗

Bifacial PV System Performance: Separating Fact from Fiction

The performance of bifacial PV systems depends greatly on the installed conditions. Previous simulations and results have shown very high bifacial gain improvement, but this may not be the case for all conditions, particularly for large-scale systems with self-shading, lower-cost PV modules (PERC) which might have lower bifaciality coefficient, and field deployments over natural ground cover. But not to worry! Financial models indicate that even with these lower performance conditions, and with bifacial gain of 4%-9%, bifacial modules can still provide improved LCOE.

14 SOLAR ENERGY↗