Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Search for bottom-type vectorlike quark pair production in dileptonic and fully hadronic final states in proton-proton collisions at s = 13 TeV

A search is described for the production of a pair of bottom-type vectorlike quarks ( B VLQs) with mass greater than 1000 GeV. Each B VLQ decays into a b quark and a Higgs boson, a b quark and a Z boson, or a t quark and a W boson. This analysis considers both fully hadronic final states and those containing a charged lepton pair from a Z boson decay. The products of the H → b b boson decay and of the hadronic Z or W boson decays can be resolved as two distinct jets or merged into a single jet, so the final states are classified by the number of reconstructed jets. The analysis uses data corresponding to an integrated luminosity of 138 fb - 1 collected in proton-proton collisions at s = 13 TeV with the CMS detector at the LHC from 2016 to 2018. No excess over the expected background is observed. Lower limits are set on the B VLQ mass at the 95% confidence level. These depend on the B VLQ branching fractions and are 1570 and 1540 GeV for 100% B → b H and 100% B → b Z , respectively. In most cases, the mass limits obtained exceed previous limits by at least 100 GeV.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Measurement of charged-current muon neutrino-argon interactions without pions in the final state using the MicroBooNE detector

We report a new measurement of flux-integrated differential cross sections for charged-current (CC) muon neutrino interactions with argon nuclei that produce no final-state pions (𝜈 𝜇 ⁢CC⁢0⁢𝜋). These interactions are of particular importance as a topologically defined signal dominated by quasielasticlike interactions. This measurement was performed with the MicroBooNE liquid argon time projection chamber detector located at the Fermilab Booster Neutrino Beam and uses an exposure of 1.3 ×10 21 protons on target collected between 2015 and 2020. The results are presented in terms of single- and double-differential cross sections as a function of the final-state muon momentum and angle. The data are compared with widely used neutrino event generators. We find good agreement with the single-differential measurements, while only a subset of generators are also able to adequately describe the data in double-differential distributions. This work facilitates comparison with Cherenkov detector measurements, including those located at the Booster Neutrino Be

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

ETROC2 as the Final Version for CMS MTD Endcap Timing Layer (ETL) Upgrade

The ETROC2 is the first full-size full-functionality prototype design fully compatible with the final chip specifications for CMS ETL. The ETROC2 chips have been extensively tested and the results have been presented at IEEE NSS MIC RTSD 2024. We will present here new results including the bump bonding yield improvement study, the time walk correction (TWC) generality study with single pixel TWC applied to all pixels, the final SEU testing results using both heavy ion and proton beam, more beam test studies including different sensors and irradiated sensors, and readiness for the ETROC2 production for CMS ETL upgrade.

Liu, Tie Hui [Fermilab] (ORCID:0009000765225605)

Search for ${\text {Z}{}{}} {\text {Z}{}{}} $ and ${\text {Z}{}{}} {\text {H}{}{}} $ production in the ${\text {b}{}{}} {\bar{{\text {b}{}{}}}{}{}} {\text {b}{}{}} {\bar{{\text {b}{}{}}}{}{}} $ final state using proton-proton collisions at $\sqrt{s}=13\,\text {Te}\hspace{-.08em}\text {V} $

A search for ${\text {Z}{}{}} {\text {Z}{}{}} $ and ${\text {Z}{}{}} {\text {H}{}{}} $ production in the ${\text {b}{}{}} {\bar{{\text {b}{}{}}}{}{}} {\text {b}{}{}} {\bar{{\text {b}{}{}}}{}{}} $ final state is presented, where H is the standard model (SM) Higgs boson. The search uses an event sample of proton-proton collisions corresponding to an integrated luminosity of 133$\,\text {fb}^{-1}$ collected at a center-of-mass energy of 13$\,\text {Te}\hspace{-.08em}\text {V}$ with the CMS detector at the CERN LHC. The analysis introduces several novel techniques for deriving and validating a multi-dimensional background model based on control samples in data. A multiclass multivariate classifier customized for the ${\text {b}{}{}} {\bar{{\text {b}{}{}}}{}{}} {\text {b}{}{}} {\bar{{\text {b}{}{}}}{}{}} $ final state is developed to derive the background model and extract the signal. The data are found to be consistent, within uncertainties, with the SM predictions. The observed (expected) upper limits at 95% confidence level are found to be 3.8 (3.8) and 5.0 (2.9) times the SM prediction for the ${\text {Z}{}{}} {\text {Z}{}{}} $ and ${\text {Z}{}{}} {\text {H}{}{}} $ production cross sections, respectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Dispersion Suppression for Wedge-Based Final Cooling at a 10 TeV Muon Collider

Achieving a luminosity of $\gtrsim 10^{34} cm^{-2} s^{-1}$ in a $10 \text{ } TeV$ Muon Collider, given the short lifetime of a muon, requires reducing the 6D emittance of the muon beam through a process known as ionization cooling. In the final stage of this cooling process, the transverse emittance must be reduced to $22 \text{ } μm$, typically by allowing longitudinal emittance growth up to downstream acceptance limits. While the current International Muon Collider Collaboration designs involve $40 \text{ } T$ solenoids to reach the transverse emittance target, such high-field solenoids come with several challenges, including mechanical stress management, quench protection, and potential limitations in relying on High Temperature Superconductor technology. Designed as an alternative to using such solenoids while simultaneously reaching target transverse emittance, the previously proposed wedge-based, reverse emittance-exchange cooling scheme requires excellent dispersion suppression. In this study, we design and simulate a dispersion suppressor channel for the wedge-based final cooling design that reduces dispersion in the target direction to a target value of $D_x \sim 0.001 \text{ } m$.

Karaaslan, I. [Chicago U.] (ORCID:0000000337849879

Measuring Muon Antineutrino Charged-Current Interactions Without Mesons in the Final State, in the NOvA Near Detector

NOvA is a long-baseline neutrino experiment based at Fermilab in the US, with the primary aim of measuring neutrino and antineutrino oscillations. This will enhance our understanding of electroweak interactions by measuring the neutrino mixing angles, CP-violating phase and neutrino mass ordering. To measure these oscillations, we first need to have a deep understanding of how neutrinos and antineutrinos interact with matter. Antineutrino interaction cross sections are, at present, particularly poorly constrained, and processes such as meson exchange currents are not well understood in the antineutrino sector. This analysis will develop a cross-section measurement of muon antineutrino interactions without mesons (e.g. pions or kaons) in the final state, in the NOvA near detector. A high-statistics, high-purity sample is obtained through a cut-based selection process implementing machine learning techniques. The sample is dominated by quasi-elastic and meson exchange current interactions which are sensitive to nuclear effects such as Final-State Interactions. The cross section will be extracted as a function of the incoming neutrino energy and the kinematics of the outgoing particles.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Dynamic and Responsive Distributed Energy Resource Education Solutions for Building, Fire, and Safety Department Officials (Final Technical Report)

From April 2021 through March 2024, the Interstate Renewable Energy Council (IREC) led a collaborative project to develop a free online clearinghouse of educational resources about solar photovoltaics (PV), energy storage systems (ESS), electric vehicle supply equipment (EVSE), and grid-interactive efficient building (GEB) technologies. Two websites—the Clean Energy Clearinghouse and CleanEnergyTraining.org—housed over 70 educational resources. Over the course of the three-year project, 154,272 unique visitors accessed the learning materials. Learner feedback was overwhelmingly positive. Even through the end of the project, there was sustained demand for education and communication. A primary innovation of the project was to drive multiple complementary audiences to the same place. Building owners, designers, installation contractors and developers, authorities having jurisdiction (AHJs), and fire service personnel all benefit from a shared understanding of clean energy technologies, including safety and code-related requirements. When considering the impact on the target audience, the project team worked with partners and advisors to inform resource creation and delivery in such a way as to address key motivational factors of the target audience and compel each user to seek additional information on the topic and return to the Clean Energy Clearinghouse website as their central location for more information. Resources were intentionally developed to be concise—five to 15 minutes—and accessible, meaning not overly technical. Providing basic information demystified the technologies and invited the professional to explore additional learning opportunities. Awardee and partner collaboration was key to project success. IREC facilitated collaboration among the other Topic 2 awardees, Southface and New Buildings Institute (NBI). The three awardees shared relevant information gained through discovery and validation questionnaires that informed product development and reduced duplication of effort by coordinating the development of complementary, and not competing, educational resources. Inspired by this collaboration, IREC brought on additional partners even in the final year of the project. Five regional energy efficiency organizations were part of the project, which expanded the connection between efficiency and distributed energy resources. We also included resources on the Clearinghouse that were developed through other federally funded projects, such as the Buildings Energy Efficiency Frontiers & Innovation Technologies (BENEFIT) program. The website was developed with the learner in mind, and not solely the funding source. Feedback from stakeholders throughout the project, and especially in its final year, indicated the need for continued education and facilitated communication among stakeholders to further the safe and widespread adoption of clean energy.

14 SOLAR ENERGY

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY

High Yield Xray Imager Final Design Review

The High Yield Xray Imager (HYXI) is a new NIF target diagnostic system currently under development. The goal of HYXI is to provide high-fidelity, high temporal resolution x-ray imaging capability on high yield NIF implosions at 10MJ and above. The HYXI instrument design concept is based on the combination of two technologies that have been successfully utilized at the NIF on previous instruments, electron pulse-dilation and hybrid-CMOS sensor imaging. The combination of these two techniques will give HYXI sufficient data quality to ascertain differences in hot spot formation dynamics between high and low yield implosions. This information will highlight the critical hot spot conditions needed for ignition and burn. The HYXI design leverages the successful operation of the PDIXI x-ray imager at the NIF on multi MJ yield shots. A new radiation tolerant CMOS imaging array (HYPERION) is being developed to eliminate the significant background noise which limits the data quality of PDIXI. We successfully placed the contract with Advanced hCMOS Systems (AHS) to develop the HYPERION sensor, which fulfils our criteria to place long lead time item procurements by end of FY24. The HYXI Final Design Review was completed at the end of Q4 FY24 (Sep 24 th and Sep 30 th ). The HYXI project is a multi-year effort with a phased approach to be bring up system functionality over time in parallel with the development and fabrication effort of the HYPERION CMOS imaging array. In Phase 1, time-integrated x-ray images on NIF DT experiments will be collected starting in Q3 FY25. In Phase 2 of the project, time-resolved imaging with HYXI utilizing a spare microchannel plate detector back-end will begin in Q3 FY26. Phase 3 concludes the project with the installation of the HYPERION sensor array and the final performance qualification of the HYXI instrument which is scheduled for Q3 FY27 as discussed in the PDR and MRT report on this project in FY23.

42 ENGINEERING

Illinois Basin Carbon Ore, Rare Earth, and Critical Minerals (IB-CORE-CM) Initiative (Final Report (Redacted)(Public))

Final Report; Illinois Basin - Carbon Ore, Rare Earth and Critical Mineral (IB-CORE-CM) project team has conducted a comprehensive basin-wide assessment of CORE-CM presence in coal, coal-based, and waste stream resources, as well as a thorough examination of mining practices, separation technologies, and the local infrastructure necessary for producing and providing the needed CORE-CM resources for U.S. industry. This final report details the research, methods, and results of the project.

01 COAL, LIGNITE, AND PEAT

Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improved greenhouse gas inventories. The GTI Energy (“GTI”) project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This final report summarizes and integrates the project tasks' results and outputs.

03 NATURAL GAS

Supporting Information for the Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improvedgreenhouse gas inventories. The GTI Energy (“GTI”)project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This document provides additional information supporting the findings in the final report.

03 NATURAL GAS

CalWave's xWave Design for PacWave (Final Technical Report)

CalWave Inc. (CalWave) is developing a wave energy converter (WEC) technology that can generate electricity from ocean waves. CalWave’s design offers a unique approach to wave energy conversion that operates fully submerged and can actively adjust the wave excitation. This capability gives the architecture enhanced survivability in ocean storms without adding significant costs. Prior to this project, CalWave had completed a demonstration of a fully functional WEC system in an open ocean demonstration at nominal 1:5 scale under FOA 1663. The goal of this project was the detailed design, following relevant standards and industry best-practices, of a variant of the xWave WEC technology that can safely and efficiently operate at the DOE’s PacWave South test site for a targeted deployment of up two years. The WEC design and associated review processes proceeded in two distinct project phases: a ‘Preliminary’ and a ‘Final’ design phase. The first phase of the project consisted of the systematic design of the WEC’s key features with regards to appropriate IEC standards. The work resulted in a preliminary design of the xWave hull including structural and Power Take-Off (PTO) load estimates, as well as performance estimates for all ocean conditions the WEC would operate in at PacWave South. Following the first open-water demonstration of CalWave’s small-scale “x1” device under FOA 1663, lessons learned were fed directly into a comprehensive review of the xWave design in the second design phase of this FOA project. CalWave’s work was supported by Sandia National Lab (SNL) and the National Renewable Energy Lab (NREL) on the holistic WEC design, and detailed feedback from specialized partners on hull design, mooring and anchoring specification, and electrical grid interconnection. Optimization of the WEC system was performed using a novel numerical optimization tool developed by Sandia and optimization trends were confirmed via an experimental model scale tank test campaign. Performance estimates for PacWave and a detailed xWave design including integration of all relevant system components were concluded. The mooring design was also concluded in the Final design phase using the most up to date sea floor characterization (CPT) data.

16 TIDAL AND WAVE POWER

Advancing Development of Emissions Detection (Final Report)

This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.

42 ENGINEERING

Effect of Anoxic Iron Corrosion on WIPP Brine Geochemistry FY23 Final Report (U)

A 280-day study was completed to evaluate the effect of zero-valent iron (Fe 0 ) on the Waste Isolation Pilot Plant (WIPP) brine geochemistry under anticipated reducing conditions. Hydrogen (H 2 ) gas is expected to be present in the repository after closure due to the anoxic corrosion of a vast quantity of iron contained in the waste forms disposed at WIPP; therefore, a background argon atmosphere containing H 2 was chosen for this study. WIPP groundwater brine pH and E h will impact the mobility and fate of plutonium within the repository. Modeling and laboratory results for Castile WIPP brine indicate that equilibrium fa values relative to the standard hydrogen electrode (SHE) are 40 mV more reducing (i.e., more negative) than those for Salado WIPP brine (-480 mV vs. -440 mV, respectively) because of the higher pH of the Castile brine (pH 9 .3 for Castile vs. pH 8.8 for Salado). The E h and pH data were corrected for the effects of high ionic strength. The experimental results for both brines are consistent with thermodynamic predictions using OLI Systems' Mixed Solvent Electrolyte chemical equilibrium model. The measured and corrected pH and E h data from this study are provided in Table ES-I and Table ES-2, respectively. The experimental study, with four test conditions in triplicate, was performed in a dual glovebox with a nominally 3 vol.% H 2 in argon atmosphere (target H 2 range: 3 ± I vol.%). Simulants containing MgO only ( experimental control) and MgO+Fe 0 (WIPP base case) were prepared for both the Salado and Castile brines. MgO was included in all simulants to account for the use of bulk magnesium oxide in the WIPP repository. Fe 0 was included in some simulants to incorporate the effects of the anoxic corrosion of iron and in-situ hydrogen generation in the study. The brine compositions were developed by Sandia National Laboratory (SNL; Xiong, 2008) and have been used in previous WIPP evaluations. The test method (agitation, etc.) is partially based on ASTM D3987-12. Twelve rounds of periodic measurements of pH and E h were performed over the course of the study. Chemical analysis results for liquids and solids (ICP-MS, ICP-ES, IC Anion, TIC, SEM-EDX) are consistent with the pH, E h , and thermodynamic modeling results. This study included the following conditions that deviate from anticipated post-closure conditions following brine intrusion, but were selected to facilitate bench-scale testing to validate modeling of pH and E h for the post-closure WIP P repository: an anoxic glove box atmosphere containing ≤ 4 vol. % H 2 vs. substantially higher H 2 gas concentrations assumed in the WIPP Performance Assessment (PA); a significantly higher liquid-to-solid test ratio compared to the much lower phase ratio anticipated in the WIP P repository; agitation of the simulant bottles to maximize mass transfer; and finally the use of Fe 0 reagents having a much greater surface area than expected in the WIP P repository. Non-representative conditions were chosen for various reasons such as: to provide bounding conservative results, to provide a margin of safety for testing, or to facilitate simulant sub-sampling and analysis. In a parallel effort, aqueous electrolyte thermodynamic models were developed for the synthetic Salado and Castile brines to inform the experimental design, facilitate laboratory data interpretation, and allow extension of evaluations beyond the parameters tested. Thermodynamic modeling simulations including the MgO and Fe 0 additives that are directly relevant to the experimental measurements (e.g., pH calibration curve, ORP corrections) are included in this report. The measured fa of the simulants was close to the OLI model predictions for both brines and was largely controlled by the background H 2 partial pressure in the vapor phase as well as H 2 generated in situ in the aqueous phase by the Fe 0 corrosion. The H 2 gas-phase concentration tested and thermodynamically evaluated was much lower than is assumed in the WIPP PA; however, H 2 (g) concentrations significantly below this level are still predicted to result in very reducing conditions. In conclusion: • The experimental results are consistent with thermodynamic model predictions for fa, pH, and the effects of high ionic strength. • Evidence to date suggests that the H2 concentration in the glovebox atmosphere ultimately determined the final E h values of the simulants and resulted in highly reducing conditions. As a result, little difference was observed between the control simulants containing only MgO and the WIPP base-case simulants that contained MgO and Fe 0 . • This test methodology is recommended for future studies evaluating WIPP repository conditions. The methodology includes: (1) background H 2 in argon with agitation ( or could alternatively include in-situ-generated H 2 in sealed bottles); (2) carefully measured and corrected ORP data ( with much effort focused on allowing the probes to fully stabilize); and (3) ionic-strength-corrected pH data. Other best practices, such as simulant sparging/handling, ORP probe replacement, etc., should also be considered. • The coupling of experimental studies and thermodynamic modeling is also highly recommended because these methods inform and direct one another leading to greater confidence in and understanding of the results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Research in Neutrino Physics (Final Technical Report)

The goal of the experimental neutrino efforts at Louisiana State University is to measure the properties of neutrinos and to improve our understanding of neutrino interactions. In pursuit of this goal, the group will continue its Intensity Frontier work on the DUNE experiment at Fermilab and the T2K experiment at J-PARC, Japan. The current work is focused on understanding how neutrinos change flavor and on the possibility for asymmetry between neutrinos and anti-neutrinos. The effort on T2K includes physics measurements using the collected T2K data and preparation for the second phase T2K-II data with an increased beam power and the newly upgraded ND280 detector, featuring a novel 3D fine grained scintillation tracker with 4π acceptance and 3D readout. T2K is in a position to improve our understanding of neutrino nucleus interactions which continue to be one of the largest systematic uncertainties for neutrino oscillation measurements. On DUNE, the effort is on analyzing the data collected by the ProtoDUNE-SP prototype at CERN and on the design, installation, and commissioning of ProtoDUNE-II and later the DUNE Far Detector cold electronics. The final DUNE Module-1 components will be fully characterized by ProtoDUNE-II and the collected data will be used to improve and tune simulation and reconstruction algorithms, and to measure hadron scattering cross section, used to improve the modeling of neutrino final state interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Deliverable 6.7-Final Technical Report: Development Summary and Evaluation of the Solar Uncertainty Integrator (SUNI) Software

The Data Quality and Uncertainty Integration Project was a three-year effort to address stakeholder needs for assessing solar radiation resource data quality based on existing tools for estimating radiometer measurement uncertainties and assessing post-measurement data quality. The annual research objectives for the project addressed a logical progression of effort needed to achieve the ultimate project goal of developing the Solar Uncertainty Integrator (SUNI) software. This final technical report summarizes the development process for achieving these key research objectives and addresses the outreach and code development efforts in the final year of the project to develop a new solar irradiance data uncertainty integration software package.

14 SOLAR ENERGY

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT