Search NASA⌕ Search

SEARCH · Search NASA

Results for “HULL STEPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

74 records · Page 5

U.S. Coast Guard Boat Recovery Simulation at the NASA Ames Vertical Motion Simulator

The U.S. Coast Guard routinely uses the Over-The-Horizon (OTH-IV), a cutter deployed, rigid-hulled inflatable boat for rescue and law enforcement operations. The term "cutter" refers to a Coast Guard vessel 65 feet in length or greater with accommodations for crew to live aboard and the ability to deploy smaller boats including the OTH-IV. A deployment method employed by some cutter class vessels is a davit crane system and specialized hook mechanism to connect the smaller boat. The launch and recovery operation requires several crewmembers, where one is tasked with releasing and connecting the hook to the small boat. Manipulating the hook can pose a risk to the crewmember depending on sea conditions combined with fatigue level or task expertise. Equipment and crewmembers are tested extensively due to the inherent risk of the task, but the sea conditions cannot be controlled. To address the sea condition variable, the U.S. Coast Guard and NASA leveraged the Vertical Motion Simulator (VMS) as a platform to test new equipment or train crewmembers in varying sea conditions. With 6 degrees of freedom and a vertical displacement of +/- 22ft, the VMS is capable of simulating conditions up to sea-state 5. The proof of concept experiment took place in September 2018 and demonstrated that the VMS can accurately simulate varying sea-states, collect performance data, and design a reliable and safe system for participants. The U.S. Coast Guard provided boat displacement data from the Large Amplitude Motion Program (LAMP). The program generates multi-directional waves with a cosine squared spreading function which produced a time history response of displacement data (surge, sway, heave, roll, pitch, yaw) of the OTH-IV's center of gravity (C.G). The displacement data was differentiated into acceleration evaluated at the crewmember's position at the front (bow) of the boat. Those accelerations were transformed to the VMS coordinate system and used as command inputs to the motion system's washout filters. The VMS uses Interchangeable Cabs (ICab) to perform flight simulations on a variety of aircraft or spacecraft configurations. An ICab typically contains seats, restraints, pilot controls, instrument panel, and out-the-window projectors all enclosed in a familiar cockpit configuration. To replicate the launch and recovery of a small boat, all the conventional features of a flight simulator and canopy were removed to be replaced with a to-scale OTH-IV bow mockup. The bow section was constructed from aluminum, and a connection point known as the davit ring. Additionally, a hook replica was suspended by a cable from the ceiling as if it were hanging from a davit crane aboard a cutter vessel. The last step was providing an auxiliary control to close the distance between suspended hook and the davit ring on the bow mockup. Without control the boat would simulate the wave motion, but with no guarantee that the crewmember will be in reach of the hook. Since the wave motion was repeatable, an additional acceleration command sent to the washout filters to move the simulator in the surge, sway, and heave directions, independently. The commands were rate limited such that the additional movement was not detectable with respect to the wave motion. The results showed that for each wave profile, a unique set of acceleration commands provided opportunities for crewmembers to gain control of the hook and connect it to the davit ring.

Riccobono, Nicholas S.↗

Technology-enabled Airborne Spacing and Merging

Over the last several decades, advances in airborne and groundside technologies have allowed the Air Traffic Service Provider (ATSP) to give safer and more efficient service, reduce workload and frequency congestion, and help accommodate a critically escalating traffic volume. These new technologies have included advanced radar displays, and data and communication automation to name a few. In step with such advances, NASA Langley is developing a precision spacing concept designed to increase runway throughput by enabling the flight crews to manage their inter-arrival spacing from TRACON entry to the runway threshold. This concept is being developed as part of NASA s Distributed Air/Ground Traffic Management (DAG-TM) project under the Advanced Air Transportation Technologies Program. Precision spacing is enabled by Automatic Dependent Surveillance-Broadcast (ADS-B), which provides air-to-air data exchange including position and velocity reports; real-time wind information and other necessary data. On the flight deck, a research prototype system called Airborne Merging and Spacing for Terminal Arrivals (AMSTAR) processes this information and provides speed guidance to the flight crew to achieve the desired inter-arrival spacing. AMSTAR is designed to support current ATC operations, provide operationally acceptable system-wide increases in approach spacing performance and increase runway throughput through system stability, predictability and precision spacing. This paper describes problems and costs associated with an imprecise arrival flow. It also discusses methods by which Air Traffic Controllers achieve and maintain an optimum interarrival interval, and explores means by which AMSTAR can assist in this pursuit. AMSTAR is an extension of NASA s previous work on in-trail spacing that was successfully demonstrated in a flight evaluation at Chicago O Hare International Airport in September 2002. In addition to providing for precision inter-arrival spacing, AMSTAR provides speed guidance for aircraft on converging routes to safely and smoothly merge onto a common approach. Much consideration has been given to working with operational conditions such as imperfect ADS-B data, wind prediction errors, changing winds, differing aircraft types and wake vortex separation requirements. A series of Monte Carlo simulations are planned for the spring and summer of 2004 at NASA Langley to further study the system behavior and performance under more operationally extreme and varying conditions. This will coincide with a human-in-the-loop study to investigate the flight crew interface, workload and acceptability.

Hull, James↗