Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hourly Load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Coordinated Optimal Control of Constrained DERs

In this paper, a coordinated optimal control is designed to simultaneously satisfy multiple power system objectives at the distribution network level. With high penetration of renewables, traditional generation and control may not be enough to compensate for intermittent changes in net load. Dynamic coordination of battery storage devices and demand response at aggregated distributed energy resource (DER) sites becomes necessary to maintain power system operation, however, each dynamic power component operates at different time scales. Frequency stabilization can be achieved by designing optimal controls for traditional generation, storage devices and demand response. The proposed optimal controls naturally render frequency separation of these load balancing mechanisms. Given a 24-hour net load forecast, optimal tracking control inputs are designed subject to constraints of selected system elements to ensure optimal performance of the power system. Simulation results are presented and discussed.

Harvey, Roland↗

Computer simulation of the effect of dDAVP with saline loading on fluid balance after 24-hour head-down tilt

Fluid loading (FL) before Shuttle reentry is a countermeasure currently in use by NASA to improve the orthostatic tolerance of astronauts during reentry and postflight. The fluid load consists of water and salt tablets equivalent to 32 oz (946 ml) of isotonic saline. However, the effectiveness of this countermeasure has been observed to decrease with the duration of spaceflight. The countermeasure's effectiveness may be improved by enhancing fluid retention using analogs of vasopressin such as lypressin (LVP) and desmopressin (dDAVP). In a computer simulation study reported previously, we attempted to assess the improvement in fluid retention obtained by the use of LVP administered before FL. The present study is concerned with the use of dDAVP. In a recent 24-hour, 6 degree head-down tilt (HDT) study involving seven men, dDAVP was found to improve orthostatic tolerance as assessed by both lower body negative pressure (LBNP) and stand tests. The treatment restored Luft's cumulative stress index (cumulative product of magnitude and duration of LBNP) to nearly pre-bedrest level. The heart rate was lower and stroke volume was marginally higher at the same LBNP levels with administration of dDAVP compared to placebo. Lower heart rates were also observed with dDAVP during stand test, despite the lower level of cardiovascular stress. These improvements were seen with only a small but significant increase in plasma volume of approximately 3 percent. This paper presents a computer simulation analysis of some of the results of this HDT study.

NASA Discipline Cardiopulmonary↗

Current Developments in Retail Rate Design: Implications for Solar and Other Distributed Energy Resources

Retail electricity pricing is evolving in the context of broader shifts in how electricity customers pay for grid services and how they are compensated for customer-sited generation. This evolution has been prompted by a broad set of factors, chief among them being: widespread adoption of advanced metering infrastructure (AMI), increased customer investment in solar and other distributed energy resources (DERs), concerns about utilities’ fixed cost recovery and revenue sufficiency in an era of flat or declining load growth, and significant changes to utilities’ hourly net load profiles and operational needs as greater amounts of variable renewable energy (VRE) resources connect to the grid. This report discusses five current retail rate design trends among residential and commercial customer classes that have emerged, at least in part, in response to those drivers, and uses case studies to illustrate key motivations, variations in rate design, and aspects of implementation experience.

14 SOLAR ENERGY↗

Modern Sorters for Soil Segregation on Large Scale Remediation Projects

In the mid-1940's, Dr. C. Lapointe developed a Geiger tube based uranium ore scanner and picker to replace hand-cobbing. In the 1990's, a modern version of the Lapointe Picker for soil sorting was developed around the need to clean the Johnston Atoll of plutonium. It worked well with sand, but these systems are ineffective with soil, especially with wet conditions. Additionally, several other constraints limited throughput. Slow moving belts and thin layers of material on the belt coupled with the use of multiple small detectors and small sorting gates make these systems ineffective for high throughput. Soil sorting of clay-bearing soils and building debris requires a new look at both the material handling equipment, and the radiation detection methodology. A new class of Super-Sorters has attained throughput of one hundred times that of the old designs. Higher throughput means shorter schedules which reduce costs substantially. The planning, cost, implementation, and other site considerations for these new Super-Sorters are discussed. Modern soil segregation was developed by Ed Bramlitt of the Defense Nuclear Agency for clean up at Johnston Atoll. The process eventually became the Segmented Gate System (SGS). This system uses an array of small sodium iodide (NaI) detectors, each viewing a small volume (segment), that control a gate. The volume in the gate is approximately one kg. This system works well when the material to be processed is sand; however, when the material is wet and sticky (soils with clays) the system has difficulty moving the material through the gates. Super-Sorters are a new class of machine designed to take advantage of high throughput aggregate processing conveyors, large acquisition volumes, and large NaI detectors using gamma spectroscopy. By using commercially available material handling equipment, the system can attain processing rates of up to 400 metric tons/hr with spectrum acquisition approximately every 0.5 sec, so the acquisition volume is 50 kilograms or less. Smaller sorting volumes can be obtained with lower throughput or by re-sorting the diverted material. This equipment can also handle large objects. The use of spectroscopy systems allows several regions of- interest to be set. Super-Sorters can bring waste processing charges down to less than $30/ metric ton on smaller jobs and can save hundreds of dollars per metric ton in disposal charges. The largest effect on the overall project cost occurs during planning and implementation. The overall goal is reduction of the length of the project, which dictates the most efficient soil processing. With all sorting systems the parameters that need to be accounted for are matrix type, soil feed rate, soil pre-processing, site conditions, and regulatory issues. The soil matrix and its ability to flow are extremely crucial to operations. It is also important to consider that as conditions change (i.e., moisture), the flowability of the soil matrix will change. Many soil parameters have to be considered: cohesive strength, internal and wall friction, permeability, and bulk density as a function of consolidating pressure. Clay bearing soils have very low permeability and high cohesive strength which makes them difficult to process, especially when wet. Soil feed speed is dependent on the equipment present and the ability to move the soil in the Super-Sorter processing area. When a Super-Sorter is running at 400 metric tons per hour it is difficult to feed the system. As an example, front-end loaders with large buckets would move approximately 5-10 metric tons of material, and 400 metric tons per hour would require 50-100 bucket-loads per hour to attain. Because the flowability of the soil matrix is important, poor material is often pre-processed before it is added to the feed hopper of the 'survey' conveyor. This pre-processing can consist of a 'grizzly' to remove large objects from the soil matrix, followed screening plant to prepare the soil so that it feeds well. Hydrated lime can be added to improve material properties. Site conditions (site area, typical weather conditions, etc.) also play a large part in project planning. Downtime lengthens project schedule and costs. The system must be configured to handle weather conditions or other variables that affect throughput. The largest single factor that plays into the project design is the regulatory environment. Before a sorter can be utilized, an averaging mass must be established by the regulator(s). There currently are no standards or guidelines in this area. The differences between acquisition mass and averaging mass are very important. The acquisition mass is defined based on the acquisition time and the geometry of the detectors. The averaging mass can then be as small as the acquisition mass or as large as several hundred tons (the averaging mass is simply the sum of a number of acquisitions). It is important to define volumetric limits and any required point-source limits. Super-Sorters handle both of these types of limits simultaneously. The minimum detectable activity for Super- Sorters is a function of speed. The chart below illustrates the detection confidence level for a 0.1 {mu}Ci point source of Ra-226 vs alarm point for three different sorter process rates. The minimal detection activity and diversion volume for a Super-Sorter is also a function of the acquisition mass. The curves were collected using a 0-15 kg acquisition mass. Diversion volumes ranged from 20-30 kg for a point source diversion. Soil Super-Sorters should be considered for every D and D project where it is desirable to reduce the waste stream. A volume reduction of 1:1000 can be gained for each pass through a modern sorter, resulting in significant savings in disposal costs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Manufacturing Thermal Energy Use in 2014

The first data set estimates thermal energy use (i.e., fuels combusted for process heating, boilers, and combined heat and power/cogeneration) by end use, temperature, county, and facility employment size class for all U.S. manufacturing industries in 2014. The estimation methodology builds off of prior estimates of industrial energy use (https://dx.doi.org/10.7799/1481899, https://dx.doi.org/10.7799/1461488). The second data set estimates hourly heat load (as a fraction of annual energy used for heat) using hourly observations of industrial boiler and combined heat and power/cogeneration heat load from EPA's Air Markets Program Data (https://ampd.epa.gov/ampd/), weekly operating hours in 2014 from Census Quarterly Survey of Plant Capacity Utilization (https://www.census.gov/programs-surveys/qpc/data.html), and annual production hours reported by assessments conducted by Industrial Assessment Centers (https://iac.university/).

14 SOLAR ENERGY↗

Manufacturing Thermal Energy Use in 2014

The first data set estimates thermal energy use (i.e., fuels combusted for process heating, boilers, and combined heat and power/cogeneration) by end use, temperature, county, and facility employment size class for all U.S. manufacturing industries in 2014. The estimation methodology builds off of prior estimates of industrial energy use (https://dx.doi.org/10.7799/1481899, https://dx.doi.org/10.7799/1461488). The second data set estimates hourly heat load (as a fraction of annual energy used for heat) using hourly observations of industrial boiler and combined heat and power/cogeneration heat load from EPA's Air Markets Program Data (https://ampd.epa.gov/ampd/), weekly operating hours in 2014 from Census Quarterly Survey of Plant Capacity Utilization (https://www.census.gov/programs-surveys/qpc/data.html), and annual production hours reported by assessments conducted by Industrial Assessment Centers (https://iac.university/).

14 SOLAR ENERGY↗

Hourly Electricity Demand Projections for Eight Combined Climate and Socioeconomic Scenarios

This dataset contains 40 years (1980-2019) of simulated historical hourly electricity demand (i.e., loads) and 80 years (2020-2099) of projected hourly loads for 54 Balancing Authorities (BAs) and 48 states plus the District of Columbia. Details about the scenarios and variables included in this dataset are in the readme.pdf file. The two primary models that created the dataset are a version of the Global Change Analysis Model with detailed sectoral resolution over the United States (GCAM-USA) and the Total ELectricity Loads (TELL) model. Links to the model source code and workflow for deriving the dataset are provided in an accompanying meta-repository: https://github.com/IMMM-SFA/burleyson-etal_2023_applied_energy. Projections are for four future climate scenarios that represent combinations of Representative Concentration Pathways (RCPs) 4.5 and 8.5 combined with two levels of climate model sensitivities: rcp45cooler, rcp45hotter, rcp85cooler, and rcp85hotter. The four climate scenarios are crossed with Shared Socioeconomic Pathways (SSPs) 3 and 5 to yield eight different future load projections: rcp45cooler_ssp3, rcp45cooler_ssp5, rcp45hotter_ssp3, rcp45hotter_ssp5, rcp85cooler_ssp3, rcp85cooler_ssp5, rcp85hotter_ssp3, and rcp85hotter_ssp5. The climate scenarios are from the IM3 Thermodynamic Global Warming (TGW) dataset which is linked below in the related metadata. The related metadata also contains links to a repository containing the raw GCAM-USA output files.

Climate Change↗

Hourly Electricity Demand Projections for Eight Combined Climate and Socioeconomic Scenarios

This dataset contains 40 years (1980-2019) of simulated historical hourly electricity demand (i.e., loads) and 80 years (2020-2099) of projected hourly loads for 54 Balancing Authorities (BAs) and 48 states plus the District of Columbia. Details about the scenarios and variables included in this dataset are in the readme.pdf file. The two primary models that created the dataset are a version of the Global Change Analysis Model with detailed sectoral resolution over the United States (GCAM-USA) and the Total ELectricity Loads (TELL) model. Links to the model source code and workflow for deriving the dataset are provided in an accompanying meta-repository: https://github.com/IMMM-SFA/burleyson-etal_2024_applied_energy. Projections are for four future climate scenarios that represent combinations of Representative Concentration Pathways (RCPs) 4.5 and 8.5 combined with two levels of climate model sensitivities: rcp45cooler, rcp45hotter, rcp85cooler, and rcp85hotter. The four climate scenarios are crossed with Shared Socioeconomic Pathways (SSPs) 3 and 5 to yield eight different future load projections: rcp45cooler_ssp3, rcp45cooler_ssp5, rcp45hotter_ssp3, rcp45hotter_ssp5, rcp85cooler_ssp3, rcp85cooler_ssp5, rcp85hotter_ssp3, and rcp85hotter_ssp5. The climate scenarios are from the IM3 Thermodynamic Global Warming (TGW) dataset which is linked below in the related metadata. The related metadata also contains links to a repository containing the raw GCAM-USA output files.

Climate Change↗

Modeled Electricity Demand Profiles for Electric Airport Ground Support Equipment in the United States

Electric airport ground support equipment (eGSE) hourly annual (8760) load datasets for the top 50 U.S. airports (by enplanements), as described in Liu et al. (2025). Please cite as: Liu, Bo, Kevin Robby, Jayaraj Rane, Adway Das, Kara Podkaminer, and Brennan Borlaug. 2025. Hourly Load Profile Dataset for Electric Airport Ground Support Equipment in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-92139. https://www.nlr.gov/docs/fy25osti/92139.pdf

24 POWER TRANSMISSION AND DISTRIBUTION↗

SolarPlus Optimizer: Integrated Control of Solar, Batteries, and Flexible Loads for Small Commercial Buildings

Building-level microgrids may be a key strategy to unlock the combined potential of flexible loads, renewable generation, and energy storage. However, few software options exist for integrated control of building loads and other distributed energy resources at this scale. The commercial software solutions on the market can force customers to adopt one particular ecosystem of products, thus limiting consumer choice. The SolarPlus Optimizer (SPO) is an open-source building-level microgrid control platform that uses Model Predictive Control to optimize both building loads and behind-the-meter energy storage to reduce energy bills and increase demand flexibility. This paper evaluates the capabilities of SPO in a small commercial building in Northern California under multiple electricity tariffs and demand response scenarios. Comparing SPO operation with an emulated battery and baseline operation employing a commercial optimization service, SPO reduced electricity bills by an estimated 7.3% in summer, 3.2% in spring, and 3.7% in winter. In a “load shape” scenario meant to counter the “duck curve”, SPO achieved 71% fewer violations from the load signal than the baseline control method. During a three hour long load shed event, SPO reduced cooling and refrigeration load by 38%. This research shows significant potential to provide load flexibility for building-level microgrids for this type of control systems. Finally, the paper discusses the future direction of research on open-source control systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

tell: a Python package to model future total electricity loads in the United States

The purpose of the Total ELectricity Load (tell) model is to generate 21st century profiles of hourly electricity load (demand) across the Conterminous United States (CONUS). tell loads reflect the impact of climate and socioeconomic change at a spatial and temporal resolution adequate for input to an electricity grid operations model. tell uses machine learning to develop profiles that are driven by projections of climate/meteorology and population. tell also harmonizes its results with United States (U.S.) state-level, annual projections from a national- to global-scale energy-economy model. This model accounts for a wide range of other factors affecting electricity demand, including technology change in the building sector, energy prices, and demand elasticities, which stems from model coupling with the U.S. version of the Global Change Analysis Model (GCAM-USA). tell was developed as part of the Integrated Multisector Multiscale Modeling (IM3) project. IM3 explores the vulnerability and resilience of interacting energy, water, land, and urban systems in response to compound stressors, such as climate trends, extreme events, population, urbanization, energy system transitions, and technology change

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Evaluation of Electricity Net Load Profiles and the Baseload Generation Concept

This paper investigates the amount of baseload generation that would be displaced due to renewable resources being implemented to meet state renewable portfolio standards (RPS) in the following regions: the Midwest Independent System Operator (MISO), the PJM regional transmission organization (RTO), the Electric Reliability Council of Texas (ERCOT), and the California ISO (CAISO). Modeling of these regions was done in Promod, a security constrained economic dispatch (SCED) model, for the years 2016-2030, to compare scenarios with and without the two primary intermittent renewable resources (solar and wind) attributable to the RPS regulations implemented in each state. In addition, a new statistical approach was developed for evaluating the variability in net load shapes caused by these two intermittent resources. The load variability index (LVI) was developed to apply to the hourly net load profiles for each day as a means of comparing variability in net loads.

14 SOLAR ENERGY↗

Community Geothermal: Soil Conductivity, Borehole Design, Energy Models, and Load Data for a Residential System Development - Hinesburg, VT

This dataset contains materials from the Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES) project, which evaluated the techno-economic feasibility of a community geothermal system for a residential development in Hinesburg, VT. The dataset includes detailed soil conductivity test reports, energy models, borehole design reports, hourly energy loads for heating, cooling, and hot water, and design layouts. EnergyPlus was used to model building energy loads, and Modelica software was applied for geothermal loop sizing based on these loads and soil conductivity results. Python scripts for network design further refined the models. Key files include PDF reports on borehole design (with projections for 1-year, 15-year, and 30-year systems), soil conductivity test results, EnergyPlus modeling outputs, and 2D/3D design drawings in PDF, DWG, and DXF formats. Python notebooks for network design and OnePipe model files are also provided, with Modelica required for viewing certain files. Outputs and modeling data are in various formats including CSV, JPG, HTML, and IDF, with units and data clearly labeled to support understanding of system design and performance for the proposed geothermal solution.

15 GEOTHERMAL ENERGY↗

An Analysis of Representative Heating Load Lines for Residential HSPF Ratings

This report describes an analysis to investigate representative heating loads for single-family detached homes using current EnergyPlus simulations (DOE 2014a). Hourly delivered load results are used to determine binned load lines using US Department of Energy (DOE) residential prototype building models (DOE 2014b) developed by Pacific Northwest National Laboratory (PNNL). The selected residential single-family prototype buildings are based on the 2006 International Energy Conservation Code (IECC 2006) in the DOE climate regions. The resulting load lines are compared with the American National Standards Institute (ANSI)/Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Standard 210/240 (AHRI 2008) minimum and maximum design heating requirement (DHR) load lines of the heating seasonal performance factor (HSPF) ratings procedure for each region. The results indicate that a heating load line closer to the maximum DHR load line, and with a lower zero load ambient temperature, is more representative of heating loads predicted for EnergyPlus prototype residential buildings than the minimum DHR load line presently used to determine HSPF ratings. An alternative heating load line equation was developed and compared to binned load lines obtained from the EnergyPlus simulation results. The effect on HSPF of the alternative heating load line was evaluated for single-speed and two-capacity heat pumps, and an average HSPF reduction of 16% was found. The alternative heating load line relationship is tied to the rated cooling capacity of the heat pump based on EnergyPlus autosizing, which is more representative of the house load characteristics than the rated heating capacity. The alternative heating load line equation was found to be independent of climate for the six DOE climate regions investigated, provided an adjustable zero load ambient temperature is used. For Region IV, the default DOE climate region used for HSPF ratings, the higher load line results in an ~28% increase in delivered heating load and an ~52% increase in the estimated heating operating cost over that given in the AHRI directory (AHRI 2014).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Parameterizing the Variability and Uncertainty of Wind and Solar in CEMs

We present current and improved methods for estimating the capacity value and curtailment impacts from variable generation (VG) in capacity expansion models (CEMs). The ideal calculation of these variability metrics is through an explicit co-optimized investment-dispatch model using multiple years of VG and load data. Because of data and computational limitations, existing CEMs typically approximate these metrics using a subset of all hours from a single year and/or using statistical methods, which often do not capture the tail-event impacts or the broader set of interactions between VG, storage, and conventional generators. In our proposed new methods, we use hourly generation and load values across all hours of the year to characterize the (1) contribution of VG to system capacity during high load hours, (2) the curtailment level of VG, and (3) the reduction in VG curtailment due to storage and shutdown of select thermal generators. Using CEM model outputs from a preceding model solve period, we apply these methods to exogenously calculate capacity value and curtailment metrics for the subsequent model solve period. Preliminary results suggest that these hourly methods offer improved capacity value and curtailment representations of VG in the CEM from existing approximation methods without additional computational burdens.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Assessment for the Electric Load Shifting Potential of Integrating Thermal Energy Storage with Heat Pumps in Residential Buildings in Texas of United States

The widespread adoption of electric-driven heat pumps for heating and cooling is expected to significantly increase electric demand. Cooling electric demand will result in an increase in peak hours electric loads, placing additional strain on the grid during peak hours. This challenge, combined with the current rapidly increasing demand from data centers, exacerbates the electric demand duck curve problem. Integrating thermal energy storage (TES) with heat pump can shift electric use for heating and cooling from peak to off-peak hours of the electric grid, which can help flatten the daily electric demand profile of a building. This paper presents a novel design that integrates heat pump with TES (HP-TES), which uses phase change materials (PCM). Heat pump charges TES by melting or freezing PCM during off-peak hours when there is no thermal demand from the building. TES is then discharged (i.e., by freezing or melting PCM) during peak hours to provide a more favorable heat source or heat sink for the heat pump to meet the thermal demand of the building with lower electricity use than conventional air-source heat pumps. Computer simulations were developed to predict the performance of HP-TES applied to a typical single-family house in the US. The building-level simulation results were scaled up to preliminarily assess the aggregated impacts of deploying HP-TES across all single-family houses in Texas of the United States, including reduction of peak demand of the electric grid.

Anees, Fady [ORNL]↗

Tension experiments on diaphragm metals

Strips of german silver, steel, copper, duralumin, nickel and brass were tested in tension in an apparatus in which the change in deflection with time was measured by means of an interferometer. This change in deflection with time caused by the application and removal of a load is defined as "drift" and "recovery," respectively. It was measured in the time interval from approximately 5 seconds to 5 hours after loading. The data are given in a series of graphs in which the drift and recovery are plotted against time. The proportional drift and recovery in five hours are given for a number of the tests, and in addition are shown graphically for nickel and steel.

Henrickson, H B↗

Development of a metamodelling framework for building energy models with application to fifth-generation district heating and cooling networks

Fully defined physics-based building energy models can accurately represent building systems; however, generating models based on high-level parameters is time consuming and simulation time of complex models can be slow. This article discusses the development of a Metamodelling Framework to create metamodels from a building energy modelling dataset. The framework generates metamodels using either linear regression, random forests, or support vector regressions. A fifth-generation district heating and cooling system analysis use case was used to motivate the development of the framework. The use case required quick and accurate representations of annual building loads reported hourly. Typical annual building modelling approaches can result in a runtime of 10 min. The metamodels runtime was reduced to less than 10 s to load and run an annual simulation with user-defined covariates. The results of the metamodel performance and an abbreviated topology analysis based on the motivating use case will be presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗